Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 3

PROJECT:

LOCATION:
FOOTING MARK: F-3

FOOTING DESIGN (isolated)


f'c= 28 Mpa Wconc.= 24 KN/m3 Depth= 1500 mm
fy= 414 Mpa Wsoil= 16 KN/m 3
Thick= 650 mm
Q allow= 11041.66667 Psf d= 562.5 mm
530 Kpa Cover= 75 mm
Main Bar= 25 mm Q eff= 500.8 Kpa
Total DL= 2590.63 KN Temp Bar= 12 mm AREAmin= 5982248 mm2
Total LL= 405.28 KN

X-axis Y-axis Type


Column Dimension 600 mm 600 mm 30
X-axis Y-axis Area
Footing Dimension 2500 mm 2500 mm 6250000 mm2
SAFE!
Q ult.= 690.54 Kpa

COLUMN @ CENTER OF FOOTING


One-Way Shear Punching Shear
bo= 4650 mm
X-axis Y-axis Bc= 1
Vu1= 668.96 KN 668.96 KN Vu2= 3382.66 KN
SAFE! SAFE! SAFE!
Capacity Capacity
X-axis Y-axis oVc1= 3921.50 KN
oVc= 1054.17 KN 1054.17 KN oVc2= 5882.25 KN
oVc3= 5518.56 KN
Reinforcement
X-axis Y-axis
Mu= 779.01 KN-m 779.01 KN-m Type of Column
Rn= 1.09425 Mpa 1.09425 Mpa #
p= 0.00271 0.00271 Interior 40
pmin= 0.00338 Edge 30
0.00320 Corner 20
0.002
Spacing 240.00 mm 240.00 mm
Min 81.36 mm 81.36 mm

SUMMARY:

Dimensions: 2500 mm X 2500 mm


Thick: 650 mm
Reinforcement: HORIZONTAL SPACING= 240.00 mm O.C or Lower

G.E. ORIGENES CONSULTING ENGINEERS


VERTICAL SPACING= 240.00 mm O.C or Lower

G.E. ORIGENES CONSULTING ENGINEERS


G.E. ORIGENES CONSULTING ENGINEERS

You might also like