A. TUJUAN
B. DATA PRAKTIKUM
Jumlah 2400
Note:
BS = Back sight
FS = Fore Sight
HI = Height of Instrument
D = Distance
C. PENGOLAHAN DATA
Point A-B
Laboratorium Survey dan Pemetaan
Departemen Teknik Sipil – Fakultas Teknik
Universitas Indonesia
BS = 131,3 cm
FS = 119,2 cm
HI(O1) = 127 cm
D = 800 cm
ΔH (I-B) = BS - HI(O1)
= 131,3 – 127
= 4,3 cm
ΔH (I-F) = FS - HI(O1)
= 119,2 – 127
= -7,8 cm
RLA-B = BS – FS
= 131,3 – 119,2
= 12,1 cm
Point B-C
BS = 125,5 cm
FS = 126,3 cm
HI(O1) = 126 cm
D = 800 cm
ΔH (I-B) = BS - HI(O1)
= 125,5 – 126
= - 0,5 cm
ΔH (I-F) = FS - HI(O1)
= 126,3 – 126
= 0,3 cm
RLB-C = BS – FS
= 125,5 – 126,3
= - 0,8 cm
RLA-C = RLA-B + RLA-B
= 12,1 + (-0,8)
= 11,3 cm
Point C-D
Laboratorium Survey dan Pemetaan
Departemen Teknik Sipil – Fakultas Teknik
Universitas Indonesia
BS = 106,2 cm
FS = 133,5 cm
HI(O1) = 128 cm
D = 800 cm
ΔH (I-B) = BS - HI(O1)
= 106,2 – 128
= - 21,8 cm
ΔH (I-F) = FS - HI(O1)
= 133,5 – 128
= 5,5 cm
RLC-D = BS – FS
= 106,2 – 133,5
= - 27,3 cm
RLA-D = RLA-B + RLA-B + RLC-D
= 12,1 + (-0,8) + (-27,3)
= -16 cm
Laboratorium Survey dan Pemetaan
Departemen Teknik Sipil – Fakultas Teknik
Universitas Indonesia