Mesas

MRP
Enter
Enter the
the data
data in in the
the shaded
shaded area.
area. Press
Press CTRL-SHIFT-M
CTRL-SHIFT-M to to return
return to
to the
the
indented
indented bill
bill of
of materials/product
materials/product tree.
tree. Do
Do not
not change
change the the names
names in in the
the red
red
shaded
shaded box.
box. Return
Return toto the
the indented
indented Bill
Bill of
of Materials
Materials ifif you
you need
need toto do
do so.
so.
Indented Bill of Materials
Number per Indented
Item name Level parent BOM
mesas 0 1 mesas
cubierta 1 1 cubierta
ensamble 1 1 ensamble
Travesaños cortos 2 2 Travesaños cortos
Travesaños largos 2 2 Travesaños largos
Patas 2 4 Patas

Distinct items 6

mesas Lead time 1 Safety Stock 0


Semanas 0 Semanas 1 Semanas 2 Semanas 3 Semanas 4
Gross requirements 0 0 0 200
Scheduled receipts
On Hand Inventory 50 50 50 50 50
NET POQ Req 0 0 0 150
Planned receipts 0 0 0 150
Planned orders 0 0 150 150

cubierta Lead time 1 Safety Stock 0


Semanas 0 Semanas 1 Semanas 2 Semanas 3 Semanas 4
Gross requirements 0 0 150 150
Scheduled receipts
On Hand Inventory 50 50 50 50 0
NET POQ Req 0 0 100 150
Planned receipts 0 0 100 150
Planned orders 0 100 150 100

ensamble Lead time 1 Safety Stock 0


Semanas 0 Semanas 1 Semanas 2 Semanas 3 Semanas 4
Gross requirements 0 0 150 150
Scheduled receipts
On Hand Inventory 100 100 100 100 0
NET POQ Req 0 0 50 150
Planned receipts 0 0 50 150
Planned orders 0 50 150 100

Travesaños cortos Lead time 1 Safety Stock 0


Semanas 0 Semanas 1 Semanas 2 Semanas 3 Semanas 4
Gross requirements 0 100 300 200
Scheduled receipts
On Hand Inventory 50 50 50 0 0
NET POQ Req 0 50 300 200
Planned receipts 0 50 300 200
Planned orders 50 300 200 0

Travesaños largos Lead time 1 Safety Stock 0


Semanas 0 Semanas 1 Semanas 2 Semanas 3 Semanas 4
Gross requirements 0 100 300 200
Scheduled receipts
On Hand Inventory 0 0 0 0
NET POQ Req 0 100 300 200
Planned receipts 0 100 300 200
Planned orders 100 300 200 0

Patas Lead time 1 Safety Stock 0


Semanas 0 Semanas 1 Semanas 2 Semanas 3 Semanas 4
Gross requirements 0 200 600 400
Scheduled receipts
On Hand Inventory 250 250 250 50 0
NET POQ Req 0 0 550 400
Planned receipts 0 0 550 400
Planned orders 0 550 400 0
CTRL-SHIFT-M
CTRL-SHIFT-M to to return
return to
to the
the
not
not change
change the the names
names in in the
the red
red
Materials
Materials ifif you
you need
need toto do
do so.
so.

Minimum
Lot size 1 quantity 0
Semanas 5 Semanas 6
150 100

0 0
150 100
150 100
100 0

Minimum
Lot size 1 quantity 0
Semanas 5 Semanas 6
100 0

0 0
100 0
100 0
0 0

Minimum
Lot size 1 quantity 0
Semanas 5 Semanas 6
100 0

0 0
100 0
100 0
0 0

Minimum
Lot size 1 quantity 0
Semanas 5 Semanas 6
0 0

0 0
0 0
0 0
0 0

Minimum
Lot size 1 quantity 0
Semanas 5 Semanas 6
0 0

0 0
0 0
0 0
0 0

Minimum
Lot size 1 quantity 0
Semanas 5 Semanas 6
0 0

0 0
0 0
0 0
0 0