Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Project PROPOSED HENANN PARK RESORT ( 232 ROOMS HENANN RESORT HOTEL)

Owner BORACAY REGENCY BEACH RESORT, INC.


Location MAIN ROAD, STATION II, BRGY BALABAG, ISLAND OF BORACAY, AKLAN
Subject SUMMARY SANITARY & PLUMBING WORKS MATERIAL REQUISITION (INITIAL REQUIREMENT)
Date May-18

Size in BALANCE MATERIALS NOT SERVED


Item Description
Inches updated (Apr 29, 2019))

SANITARY WORKS
A Sanitary Wasteline System/Ventilation/Storm Draim
Polyvinyl Chloride Pipes and Fittings S1000
PIPES
150mm 6" 35
WYE
ELBOW 45°
100mm 4 2
75mm 3 15
ELBOW 90°
100mm 4 3
TEE
CLEAN-OUT
P-TRAP 100mm 4
BUSHING REDUCER 10x8
Hot and Cold Waterline Distribution System
Polyphropylene Random Copolymer (PPR-C)
Pipes and Fittings PN-20
Pipes
63mm 130
25mm 6
20mm 30
Equal Elbow
20mm 15
Equal/Unequal Tee
63mm x 25mm 4
63mm x 20mm 6
25mm x 25mm 2
25mm x 20mm 6
Female Threaded Elbow
20mm 12
Male Threaded Elbow
Elbow Reducer
25mm x 20mm x 90' 6
Threaded Tee
Male Adaptor
63mm 48
Female Adaptor
Coupling Reducer
Coupling/Socket
End Cap
Union Patente
Gate Valve
Float Valve
Foot Valve
Check Valve
Stainless Nipple
C Consumables

NELTEX SOLVENT CEMENT 400CC 200


D FIXTURES
NOT
WATER HEATER HENANN SUMMAR
20 gals 12
30 gals 52
40 gals 1
WATER CLOSET 2
BATH TUB 51
MIXING VALVE FOR GUEST ROOMS 4
MIXING VALVE COMMON TOILET (GF-4F)
MIXING VALVE MANAGERS ROOM
MIXING VALVE FOR STAFF ROOMS 12
BALCONY, HALLWAY & LOUNGE FLR DRAIN 3"
T&B SHOWER & LAV. AREA CONCEALED FLR DRAIN 3"
AL-FRESCO DOME DRAIN 3"
OPEN DECK/ROOF GARDEN/AL FRESCO DECK FLR DRAIN 3"
ROOF DECK DOME DRAIN 4"

Requested By:

Engr. Al Gian P. Isip

You might also like