Pve.s1S.3- HAT Weer Us Suet TAIT Searicsih: -CIMFR)
(donfe aun attains srqgitrer Gfewz/Council of Scientific and Indust arch)
Tar dE WANK, ETay/Banen Road, Ohenbadaharkhend. £26018
‘WEANo.:CIMFR/PA/130618/NKM,DB(BC)/R&A-IL Reaiw/Dated : 31/05/2018
fSaTa/Advertisement
ahewangareditre wat wd fuer arqgiet steerer & acer ds oa a mame sare sient Reais 13/08/2018
sey feat marae Fae | athe ee a Ae gol reerch we aera we wraer A WET MITTEE FCT,
sar avatars Fata 10.30 at wa a Rear a amr Hl rea Rear Peat
‘A Walk in-interview Is scheduled to bo held on 13/06/2018 at Barwa Road Campus, of CSIR-Central institute
of Mining and Fuel Research, for engagement of the positions of Project Assistant Level & Lovell purely on
tomporary and contractual basis at 10.30 AM and onwards for time bound projects. Other detalls are given below:
1. qT ATA/Name of Position: Gtatsrar WETIH FAT. U(Project Assistant Level-!)
ug # HEaV/Number of Position : 02, ‘afeerm/Stipond : * 15000/- (wat dag Kae ATH)
Sftatarat #wav/Project No.- SSP-266/17-18, SSP-261/17-18
weet ewan | rae 65 ofterer aie rer afar dese ata
No. of Post | Essential Qualification with minimum 85% marks
o2 ‘wat 3ffraifRéy # PEcatem/Diploma in Mining Engineering
2. UG THT ATT/Name of Position: oftatsrar Her FAT: Il/(Project Assistant Level!)
ug #1 HeaT/Number of Position : 04, aferau/Stipend : * 25000/- (ort weer Fare Ta)
aftatatat #wa/Project No.- GAP/MSI/CIL/104/16-17 & MLP-10/16-17
uch wear | rarer 55 vite aie & are ara dere aaa
No. of Post | Essential Qualification with minimum 55% marks
ot ‘wee afraiPtét # oh. ur AEWIB.EIB.Tech in Mining Engineering
o amt mrewsrgwaes apterex a earetarerearatere(areAtANyM.So/M.Se(Tach) In Geology!
Applied Geology
02 ‘Taras ergata feat A ETB /M.Se In Chemistry/Environmental Science
sftatsat eteraftatsat HEMProject Title/Project No.Sclentific Investigation and advice for improvement In
ventilation of Mochla and Balarla Minos: SSP-266, Monitoring of strata movement by BHE : SSP-261,
Development of guideline for prevention & mitigation of explosion hazard by risk assessment and determination of
explosibility of Indian coal Incorporating risk based mine emergency evacuation and re-entry
protocoUGAP/MSICIL/104/18-17, Development of Nanomaterial from Biological matters from decontamination of
water, MLP-10/16-17, Treatment of acid mine water to make It sultable for agriculture use: MLP-09/2018-19.
‘mercer #1 FuTAPlace of Welk In-Interview: war as GALA, UamTe/Barwa Road Campus, Dhanbad
[ANCHE HT AATTime of Walk In-intorview : We: 10.30 wt &
‘MIETaee #1 FAM/Date of Walk In-Interview-Eaim/Dated: 19/06/2018-