A problem solving report was generated to address a defect where the bending operation was missing for some floor ladder parts. A team investigated and found the root causes were a lack of awareness about the bending process, negligence, and failure to check during inspection. As a permanent corrective action, 100% checking of the bending operation will be implemented before dispatch to prevent future issues. The team was recognized for their work resolving the problem.
A problem solving report was generated to address a defect where the bending operation was missing for some floor ladder parts. A team investigated and found the root causes were a lack of awareness about the bending process, negligence, and failure to check during inspection. As a permanent corrective action, 100% checking of the bending operation will be implemented before dispatch to prevent future issues. The team was recognized for their work resolving the problem.
A problem solving report was generated to address a defect where the bending operation was missing for some floor ladder parts. A team investigated and found the root causes were a lack of awareness about the bending process, negligence, and failure to check during inspection. As a permanent corrective action, 100% checking of the bending operation will be implemented before dispatch to prevent future issues. The team was recognized for their work resolving the problem.
Date: 02.03.19. Part Name: FLOOR STL LADDER 3350I STD Qty- 8 Nos
Part No. : 75952854
Mfg. Date : 09.02.19 Customer : Prommada Hindustan Ltd. 1. Problem (Defect Description)- Split Part Bending Operation Missing
2. Team Members (Name/ Department)-
Mr.Ganesh,Ms.Amruta,Mr.Shubham,Mr.Amol,Mr.Sonwane
3. Short Term Action(s) / Corrections: Respn. Impl. Date
Mr.Amruta 10.02.19 Bending operation done for parts
4. Root Cause(s) % Contribution
Why?-not awarness about for bending process 100% Why?-negeliance for bending operation Why?-Bending operator not checked at the time of Inspection Why? Why? 5. Chosen Permanent Corrective Action(s) (Deployment to other Models/ Parts ) % Effect 1)100% checking for bending operation before dispatch 100%
6. Implementation Permanent Corrective Respn. Impl. Date
Action(s) Mr.Amruta 10.02.19 1)100% Visual Inspection will be done at PDI stage.