Project Ekol Lojistik A.ù.

Part Aksaray Depolama Tesisi


Description Cephe Karkası
National code IBC
Author SGM Proje Mühendislik

1. Contents
1. Contents 2
2. Structural model 3
3. Materials 3
4. Cross-sections 4
5. Member 1D 5
6. Load cases 6
7. Load groups 6
8. Combinations 6
9. Result classes 7
10. Plane geometry 7
11. Line forces on beam 8
12. Wind pressures 11
13. Calculation protocol 12
14. Displacement of nodes 12
15. Internal forces on member 12
16. Reactions 13
17. Check of steel 14
18. Bill of material 15

E kol Lojistik A.ù . 2


Project Ekol Lojistik A.ù.
Part Aksaray Depolama Tesisi
Description Cephe Karkası
National code IBC
Author SGM Proje Mühendislik

2. Structural model

3. Materials
Name S235JR
Type Steel
Thermal exp [m/mK] 0,00
Unit mass [kg/m3] 7850,0
E mod [MPa] 2,0000e+05
Poisson - nu 0,3
Independent G modulus 8
G mod [MPa] 7,6923e+04
Log. decrement (non-uniform damping only) 0,15
Therm. exp. (fire) [m/mK] 0,00
Specific heat [J/gK] 0,0000e+00
Thermal conductivity [W/mK] 0,0000e+00
Fu [MPa] 365,0
Fy [MPa] 235,0

Name S275JR
Type Steel
Thermal exp [m/mK] 0,00
Unit mass [kg/m3] 7850,0
E mod [MPa] 2,0000e+05
Poisson - nu 0,3
Independent G modulus 8
G mod [MPa] 7,6923e+04
Log. decrement (non-uniform damping only) 0,15
Therm. exp. (fire) [m/mK] 0,00
Specific heat [J/gK] 0,0000e+00
Thermal conductivity [W/mK] 0,0000e+00
Fu [MPa] 435,0

E kol Lojistik A.ù . 3


Project Ekol Lojistik A.ù.
Part Aksaray Depolama Tesisi
Description Cephe Karkası
National code IBC
Author SGM Proje Mühendislik

Fy [MPa] 275,0

4. Cross-sections
Name CS1
Type CFRHS150X150X4
Source description Rautaruukki Oyj / Structural Hollow Sections EN10219 / Ed.2007
Item material S235JR
Fabrication rolled
Use 2D FEM analysis 8
z

A [m2] 2,2950e-03
A y, z [m2] 1,1470e-03 1,1470e-03
I y, z [m4] 8,0782e-06 8,0782e-06
I w [m6], t [m4] 2,5312e-08 1,2648e-05
Wel y, z [m3] 1,0771e-04 1,0771e-04
Wpl y, z [m3] 1,2487e-04 1,2487e-04
d y, z [mm] 0 0
c YUCS, ZUCS [mm] 75 75
Į [deg] 0,00
A L, D [m2/m] 5,8600e-01 1,1473e+00
Mply +, - [Nm] 2,93e+04 2,93e+04
Mplz +, - [Nm] 2,93e+04 2,93e+04

Name CS2
Type CFRHS250X150X5
Source description Rautaruukki Oyj / Structural Hollow Sections EN10219 / Ed.2007
Item material S235JR
Fabrication rolled
Use 2D FEM analysis 8
z

A [m2] 3,8360e-03
A y, z [m2] 1,4379e-03 2,3965e-03
I y, z [m4] 3,3042e-05 1,5080e-05
I w [m6], t [m4] 1,1719e-07 3,2845e-05
Wel y, z [m3] 2,6433e-04 2,0106e-04
Wpl y, z [m3] 3,1976e-04 2,2548e-04
d y, z [mm] 0 0
c YUCS, ZUCS [mm] 75 125
Į [deg] 0,00
A L, D [m2/m] 7,8300e-01 1,5341e+00
Mply +, - [Nm] 7,51e+04 7,51e+04
Mplz +, - [Nm] 5,30e+04 5,30e+04

Name CS3
Type 2Uc
Detailed 813  170
Item material S235JR
Fabrication rolled
Use 2D FEM analysis 8

E kol Lojistik A.ù . 4


Project Ekol Lojistik A.ù.
Part Aksaray Depolama Tesisi
Description Cephe Karkası
National code IBC
Author SGM Proje Mühendislik

a' 170
z
a0

A [m2] 8,4635e-03
A y, z [m2] 3,9734e-03 4,5224e-03
I y, z [m4] 7,1996e-05 3,8162e-05
I w [m6], t [m4] 2,3830e-08 7,3619e-05
Wel y, z [m3] 5,9997e-04 4,4897e-04
Wpl y, z [m3] 7,1554e-04 5,3021e-04
d y, z [mm] 0 0
c YUCS, ZUCS [mm] 85 120
Į [deg] 0,00
A L, D [m2/m] 8,2000e-01 1,5365e+00
Mply +, - [Nm] 1,68e+05 1,68e+05
Mplz +, - [Nm] 1,25e+05 1,25e+05

Name CS4
Type CFRHS150X100X4
Source description Rautaruukki Oyj / Structural Hollow Sections EN10219 / Ed.2007
Item material S235JR
Fabrication rolled
Use 2D FEM analysis 8
z

A [m2] 1,8950e-03
A y, z [m2] 7,5761e-04 1,1364e-03
I y, z [m4] 5,9460e-06 3,1857e-06
I w [m6], t [m4] 9,3750e-09 6,6163e-06
Wel y, z [m3] 7,9280e-05 6,3710e-05
Wpl y, z [m3] 9,5670e-05 7,2500e-05
d y, z [mm] 0 0
c YUCS, ZUCS [mm] 50 75
Į [deg] 0,00
A L, D [m2/m] 4,8600e-01 9,4730e-01
Mply +, - [Nm] 2,25e+04 2,25e+04
Mplz +, - [Nm] 1,70e+04 1,70e+04

5. Member 1D
Name CrossSection Length Shape Beg. node End node Type FEM type Layer
[m]
B1 CS1 - CFRHS150X150X4 3,070 Line N20 N2 column (100) standard kolon
B2 CS2 - CFRHS250X150X5 19,875 Line N3 N7 column (100) standard kolon
B4 CS1 - CFRHS150X150X4 2,695 Line N7 N4 column (100) standard kolon
B5 CS3 - 2Uc 813  170) 10,850 Line N8 N10 beam (80) standard kiriú
B7 CS3 - 2Uc 813  170) 10,850 Line N11 N13 beam (80) standard kiriú
B9 CS3 - 2Uc 813  170) 10,850 Line N14 N16 beam (80) standard kiriú
B11 CS3 - 2Uc 813  170) 10,850 Line N17 N19 beam (80) standard kiriú
B12 CS1 - CFRHS150X150X4 4,500 Line N21 N20 column (100) standard kolon
B13 CS1 - CFRHS150X150X4 5,000 Line N22 N21 column (100) standard kolon
B14 CS1 - CFRHS150X150X4 5,000 Line N1 N23 column (100) standard kolon
B15 CS1 - CFRHS150X150X4 5,000 Line N23 N22 column (100) standard kolon
B16 CS1 - CFRHS150X150X4 3,070 Line N30 N25 column (100) standard kolon

E kol Lojistik A.ù . 5


Project Ekol Lojistik A.ù.
Part Aksaray Depolama Tesisi
Description Cephe Karkası
National code IBC
Author SGM Proje Mühendislik

Name CrossSection Length Shape Beg. node End node Type FEM type Layer
[m]
B17 CS1 - CFRHS150X150X4 4,500 Line N31 N30 column (100) standard kolon
B18 CS1 - CFRHS150X150X4 5,000 Line N32 N31 column (100) standard kolon
B19 CS1 - CFRHS150X150X4 5,000 Line N24 N33 column (100) standard kolon
B20 CS1 - CFRHS150X150X4 5,000 Line N33 N32 column (100) standard kolon
B21 CS4 - CFRHS150X100X4 5,925 Line N2 N4 beam (80) standard kiriú
B22 CS4 - CFRHS150X100X4 5,925 Line N4 N25 beam (80) standard kiriú
B23 CS4 - CFRHS150X100X4 5,925 Line N34 N35 beam (80) standard kiriú
B24 CS4 - CFRHS150X100X4 5,925 Line N35 N36 beam (80) standard kiriú

6. Load cases
Name Description Action type LoadGroup Load type Spec Direction Duration Master load case
D zati Permanent LG1 Self weight -Z
DR çatı kaplama Variable LG2 Static Standard Long None
S kar Variable LG3 Static Snow None
Wx rüzgar-x Variable LG4 Static Static wind None
Wy rüzgar-y Variable LG4 Static Static wind None
DS döúeme-kaplama Variable LG6 Static Standard Long None
LS döúeme hareketli Variable LG6 Static Standard Short None
LR asma tavan Variable LG2 Static Standard Long None

7. Load groups
Name Load Relation Type
LG1 Permanent
LG2 Variable Standard L - Live load
LG3 Variable Standard L - Live load
LG4 Variable Standard L - Live load
LG6 Variable Standard L - Live load
LG7 Variable Standard L - Live load

8. Combinations
Name Description Type Load cases Coeff.
[-]
CO0 G Linear - D - zati 1,00
ultimate DS - döúeme-kaplama 1,00
CO1 G+Q (wo/ snow) Linear - D - zati 1,00
ultimate DR - çatı kaplama 1,00
DS - döúeme-kaplama 1,00
LS - döúeme hareketli 1,00
LR - asma tavan 1,00
CO2 G+Q (w/ snow) Linear - D - zati 1,00
ultimate DR - çatı kaplama 1,00
S - kar 1,00
DS - döúeme-kaplama 1,00
LS - döúeme hareketli 1,00
LR - asma tavan 1,00
CO3 G+Q+0.5Wx Linear - D - zati 1,00
ultimate DR - çatı kaplama 1,00
S - kar 1,00
Wx - rüzgar-x 0,50
DS - döúeme-kaplama 1,00
LS - döúeme hareketli 1,00
LR - asma tavan 1,00
CO4 G+Q-0.5Wx Linear - D - zati 1,00
ultimate DR - çatı kaplama 1,00
S - kar 1,00
Wx - rüzgar-x -0,50
DS - döúeme-kaplama 1,00
LS - döúeme hareketli 1,00
LR - asma tavan 1,00
CO5 G+Q+0.5Wy Linear - D - zati 1,00
DR - çatı kaplama 1,00

E kol Lojistik A.ù . 6


Project Ekol Lojistik A.ù.
Part Aksaray Depolama Tesisi
Description Cephe Karkası
National code IBC
Author SGM Proje Mühendislik

Name Description Type Load cases Coeff.


[-]
CO5 G+Q+0.5Wy ultimate
Linear - S - kar 1,00
Wy - rüzgar-y 0,50
DS - döúeme-kaplama 1,00
LS - döúeme hareketli 1,00
LR - asma tavan 1,00
CO6 G+Q-0.5Wy Linear - D - zati 1,00
ultimate DR - çatı kaplama 1,00
S - kar 1,00
Wy - rüzgar-y -0,50
DS - döúeme-kaplama 1,00
LS - döúeme hareketli 1,00
LR - asma tavan 1,00
CO7 G+Q+0.5S+Wx Linear - D - zati 1,00
ultimate DR - çatı kaplama 1,00
S - kar 0,50
Wx - rüzgar-x 1,00
DS - döúeme-kaplama 1,00
LS - döúeme hareketli 1,00
LR - asma tavan 1,00
CO8 G+Q+0.5S-Wx Linear - D - zati 1,00
ultimate DR - çatı kaplama 1,00
S - kar 0,50
Wx - rüzgar-x -1,00
DS - döúeme-kaplama 1,00
LS - döúeme hareketli 1,00
LR - asma tavan 1,00
CO9 G+Q+0.5S+Wy Linear - D - zati 1,00
ultimate DR - çatı kaplama 1,00
S - kar 0,50
Wy - rüzgar-y 1,00
DS - döúeme-kaplama 1,00
LS - döúeme hareketli 1,00
LR - asma tavan 1,00
CO10 G+Q+0.5S-Wy Linear - D - zati 1,00
ultimate DR - çatı kaplama 1,00
S - kar 0,50
Wy - rüzgar-y -1,00
DS - döúeme-kaplama 1,00
LS - döúeme hareketli 1,00
LR - asma tavan 1,00

9. Result classes
Name List
All ULS CO0 - Linear - ultimate
CO1 - Linear - ultimate
CO2 - Linear - ultimate
CO3 - Linear - ultimate
CO4 - Linear - ultimate
CO5 - Linear - ultimate
CO6 - Linear - ultimate
CO7 - Linear - ultimate
CO8 - Linear - ultimate
CO9 - Linear - ultimate
CO10 - Linear - ultimate

10. Plane geometry


Name Dir System q Loaded beams : Load case
[kN/m2]
PG1 Z GCS -0,25 All DR - çatı kaplama

E kol Lojistik A.ù . 7


Project Ekol Lojistik A.ù.
Part Aksaray Depolama Tesisi
Description Cephe Karkası
National code IBC
Author SGM Proje Mühendislik

11. Line forces on beam


Name Member Type Dir P1 W1 x1 Coor Orig Ecc ey
[kN/m] [m] [m] [m]
Load case System Distribution P2 x2 Loc Ecc ez
[kN/m] [m] [m]
LF1 B14 Wind Y 2,37 5,925 0,000 Rela From start 0,000
Wy - rüzgar-y GCS Uniform 2,37 1,000 Length 0,000
LF2 B15 Wind Y 2,37 5,925 0,000 Rela From start 0,000
Wy - rüzgar-y GCS Uniform 3,79 1,000 Length 0,000
LF3 B13 Wind Y 3,79 5,925 0,000 Rela From start 0,000
Wy - rüzgar-y GCS Uniform 3,79 1,000 Length 0,000
LF4 B12 Wind Y 3,79 5,925 0,000 Rela From start 0,000
Wy - rüzgar-y GCS Uniform 5,21 1,000 Length 0,000
LF5 B1 Wind Y 5,21 5,925 0,000 Rela From start 0,000
Wy - rüzgar-y GCS Uniform 5,21 1,000 Length 0,000
LF6 B2 Wind Y 2,37 5,925 0,000 Rela From start 0,000
Wy - rüzgar-y GCS Uniform 5,21 1,000 Length 0,000
LF7 B4 Wind Y 5,21 5,925 0,000 Rela From start 0,000
Wy - rüzgar-y GCS Uniform 5,21 1,000 Length 0,000
LF8 B17 Wind Y 3,79 5,925 0,000 Rela From start 0,000
Wy - rüzgar-y GCS Uniform 5,21 1,000 Length 0,000
LF9 B16 Wind Y 5,21 5,925 0,000 Rela From start 0,000
Wy - rüzgar-y GCS Uniform 5,21 1,000 Length 0,000
LF10 B18 Wind Y 3,79 5,925 0,000 Rela From start 0,000
Wy - rüzgar-y GCS Uniform 3,79 1,000 Length 0,000
LF11 B20 Wind Y 2,37 5,925 0,000 Rela From start 0,000
Wy - rüzgar-y GCS Uniform 3,79 1,000 Length 0,000
LF12 B19 Wind Y 2,37 5,925 0,000 Rela From start 0,000
Wy - rüzgar-y GCS Uniform 2,37 1,000 Length 0,000
LF94 B5 Wind Y 2,00 5,000 0,000 Rela From start 0,000
Wy - rüzgar-y GCS Uniform 2,00 1,000 Length 0,000
LF95 B7 Wind Y 3,20 5,000 0,000 Rela From start 0,000
Wy - rüzgar-y GCS Uniform 3,20 1,000 Length 0,000
LF96 B9 Wind Y 3,20 5,000 0,000 Rela From start 0,000
Wy - rüzgar-y GCS Uniform 3,20 1,000 Length 0,000
LF97 B11 Wind Y 4,40 5,000 0,000 Rela From start 0,000
Wy - rüzgar-y GCS Uniform 4,40 1,000 Length 0,000
LF98 B1 Plane load Z -0,06 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,23 0,685 Length 0,000
LF99 B1 Plane load Z -0,23 0,685 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 1,620 Length 0,000
LF100 B1 Plane load Z 0,00 1,620 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,18 2,345 Length 0,000
LF101 B1 Plane load Z -0,18 2,345 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 3,070 Length 0,000
LF102 B2 Plane load Z -1,48 0,000 Abso From start 0,000
DR - çatı kaplama GCS Uniform 1,961 Length 0,000
LF103 B2 Plane load Z -1,48 1,961 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,03 2,937 Length 0,000
LF104 B2 Plane load Z -1,03 2,937 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 5,000 Length 0,000
LF105 B2 Plane load Z 0,00 5,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,25 7,500 Length 0,000
LF106 B2 Plane load Z -1,25 7,500 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 10,000 Length 0,000
LF107 B2 Plane load Z 0,00 10,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,25 12,500 Length 0,000
LF108 B2 Plane load Z -1,25 12,500 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 15,000 Length 0,000
LF109 B2 Plane load Z 0,00 15,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,12 17,250 Length 0,000
LF110 B2 Plane load Z -1,12 17,250 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 19,500 Length 0,000
LF111 B2 Plane load Z 0,00 19,500 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,19 19,875 Length 0,000
LF112 B4 Plane load Z -0,19 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,40 0,435 Length 0,000
LF113 B4 Plane load Z -0,40 0,435 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 1,245 Length 0,000

E kol Lojistik A.ù . 8


Project Ekol Lojistik A.ù.
Part Aksaray Depolama Tesisi
Description Cephe Karkası
National code IBC
Author SGM Proje Mühendislik

Name Member Type Dir P1 W1 x1 Coor Orig Ecc ey


[kN/m] [m] [m] [m]
Load case System Distribution P2 x2 Loc Ecc ez
[kN/m] [m] [m]
LF114 B4 Plane load Z 0,00 1,245 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,36 1,970 Length 0,000
LF115 B4 Plane load Z -0,36 1,970 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 2,695 Length 0,000
LF116 B5 Plane load Z -0,13 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,25 2,250 Length 0,000
LF117 B5 Plane load Z -1,25 2,250 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,34 2,619 Length 0,000
LF118 B5 Plane load Z -1,34 2,619 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,26 2,925 Length 0,000
LF119 B5 Plane load Z -1,26 2,925 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,03 3,362 Length 0,000
LF120 B5 Plane load Z -1,03 3,362 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 5,425 Length 0,000
LF121 B5 Plane load Z 0,00 5,425 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,03 7,488 Length 0,000
LF122 B5 Plane load Z -1,03 7,488 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,26 7,925 Length 0,000
LF123 B5 Plane load Z -1,26 7,925 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,34 8,231 Length 0,000
LF124 B5 Plane load Z -1,34 8,231 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,25 8,600 Length 0,000
LF125 B5 Plane load Z -1,25 8,600 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,13 10,850 Length 0,000
LF126 B7 Plane load Z -0,13 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,25 2,250 Length 0,000
LF127 B7 Plane load Z -1,25 2,250 Abso From start 0,000
DR - çatı kaplama GCS Uniform 2,925 Length 0,000
LF128 B7 Plane load Z -1,25 2,925 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 5,425 Length 0,000
LF129 B7 Plane load Z 0,00 5,425 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,25 7,925 Length 0,000
LF130 B7 Plane load Z -1,25 7,925 Abso From start 0,000
DR - çatı kaplama GCS Uniform 8,600 Length 0,000
LF131 B7 Plane load Z -1,25 8,600 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,13 10,850 Length 0,000
LF132 B9 Plane load Z -0,13 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,12 2,000 Length 0,000
LF133 B9 Plane load Z -1,12 2,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,19 2,250 Length 0,000
LF134 B9 Plane load Z -1,19 2,250 Abso From start 0,000
DR - çatı kaplama GCS Uniform 2,925 Length 0,000
LF135 B9 Plane load Z -1,19 2,925 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,12 3,175 Length 0,000
LF136 B9 Plane load Z -1,12 3,175 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 5,425 Length 0,000
LF137 B9 Plane load Z 0,00 5,425 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,12 7,675 Length 0,000
LF138 B9 Plane load Z -1,12 7,675 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,19 7,925 Length 0,000
LF139 B9 Plane load Z -1,19 7,925 Abso From start 0,000
DR - çatı kaplama GCS Uniform 8,600 Length 0,000
LF140 B9 Plane load Z -1,19 8,600 Abso From start 0,000
DR - çatı kaplama GCS Trapez -1,13 8,850 Length 0,000
LF141 B9 Plane load Z -1,13 8,850 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,13 10,850 Length 0,000
LF142 B11 Plane load Z -0,13 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,41 0,560 Length 0,000
LF143 B11 Plane load Z -0,41 0,560 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,77 2,000 Length 0,000
LF144 B11 Plane load Z -0,77 2,000 Abso From start 0,000
DR - çatı kaplama GCS Uniform 3,175 Length 0,000
LF145 B11 Plane load Z -0,77 3,175 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,40 4,615 Length 0,000
LF146 B11 Plane load Z -0,40 4,615 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 5,425 Length 0,000

E kol Lojistik A.ù . 9


Project Ekol Lojistik A.ù.
Part Aksaray Depolama Tesisi
Description Cephe Karkası
National code IBC
Author SGM Proje Mühendislik

Name Member Type Dir P1 W1 x1 Coor Orig Ecc ey


[kN/m] [m] [m] [m]
Load case System Distribution P2 x2 Loc Ecc ez
[kN/m] [m] [m]
LF147 B11 Plane load Z 0,00 5,425 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,41 6,235 Length 0,000
LF148 B11 Plane load Z -0,41 6,235 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,77 7,675 Length 0,000
LF149 B11 Plane load Z -0,77 7,675 Abso From start 0,000
DR - çatı kaplama GCS Uniform 8,850 Length 0,000
LF150 B11 Plane load Z -0,77 8,850 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,41 10,290 Length 0,000
LF151 B11 Plane load Z -0,41 10,290 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,13 10,850 Length 0,000
LF152 B12 Plane load Z -0,06 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,62 2,250 Length 0,000
LF153 B12 Plane load Z -0,62 2,250 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,06 4,500 Length 0,000
LF154 B13 Plane load Z -0,06 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,69 2,500 Length 0,000
LF155 B13 Plane load Z -0,69 2,500 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,06 5,000 Length 0,000
LF156 B14 Plane load Z -0,74 0,000 Abso From start 0,000
DR - çatı kaplama GCS Uniform 2,287 Length 0,000
LF157 B14 Plane load Z -0,74 2,287 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,69 2,500 Length 0,000
LF158 B14 Plane load Z -0,69 2,500 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,06 5,000 Length 0,000
LF159 B15 Plane load Z -0,06 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,69 2,500 Length 0,000
LF160 B15 Plane load Z -0,69 2,500 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,06 5,000 Length 0,000
LF161 B16 Plane load Z -0,06 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,23 0,685 Length 0,000
LF162 B16 Plane load Z -0,23 0,685 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 1,620 Length 0,000
LF163 B16 Plane load Z 0,00 1,620 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,18 2,345 Length 0,000
LF164 B16 Plane load Z -0,18 2,345 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 3,070 Length 0,000
LF165 B17 Plane load Z -0,06 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,62 2,250 Length 0,000
LF166 B17 Plane load Z -0,62 2,250 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,06 4,500 Length 0,000
LF167 B18 Plane load Z -0,06 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,69 2,500 Length 0,000
LF168 B18 Plane load Z -0,69 2,500 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,06 5,000 Length 0,000
LF169 B19 Plane load Z -0,74 0,000 Abso From start 0,000
DR - çatı kaplama GCS Uniform 2,288 Length 0,000
LF170 B19 Plane load Z -0,74 2,288 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,69 2,500 Length 0,000
LF171 B19 Plane load Z -0,69 2,500 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,06 5,000 Length 0,000
LF172 B20 Plane load Z -0,06 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,69 2,500 Length 0,000
LF173 B20 Plane load Z -0,69 2,500 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,06 5,000 Length 0,000
LF174 B21 Plane load Z 0,00 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,18 0,725 Length 0,000
LF175 B21 Plane load Z -0,18 0,725 Abso From start 0,000
DR - çatı kaplama GCS Uniform 5,200 Length 0,000
LF176 B21 Plane load Z -0,18 5,200 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 5,925 Length 0,000
LF177 B22 Plane load Z 0,00 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,18 0,725 Length 0,000
LF178 B22 Plane load Z -0,18 0,725 Abso From start 0,000
DR - çatı kaplama GCS Uniform 5,200 Length 0,000
LF179 B22 Plane load Z -0,18 5,200 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 5,925 Length 0,000

E kol Lojistik A.ù . 10


Project Ekol Lojistik A.ù.
Part Aksaray Depolama Tesisi
Description Cephe Karkası
National code IBC
Author SGM Proje Mühendislik

Name Member Type Dir P1 W1 x1 Coor Orig Ecc ey


[kN/m] [m] [m] [m]
Load case System Distribution P2 x2 Loc Ecc ez
[kN/m] [m] [m]
LF180 B23 Plane load Z 0,00 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,36 0,725 Length 0,000
LF181 B23 Plane load Z -0,36 0,725 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,38 0,810 Length 0,000
LF182 B23 Plane load Z -0,38 0,810 Abso From start 0,000
DR - çatı kaplama GCS Uniform 5,115 Length 0,000
LF183 B23 Plane load Z -0,38 5,115 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,36 5,200 Length 0,000
LF184 B23 Plane load Z -0,36 5,200 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 5,925 Length 0,000
LF185 B24 Plane load Z 0,00 0,000 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,36 0,725 Length 0,000
LF186 B24 Plane load Z -0,36 0,725 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,38 0,810 Length 0,000
LF187 B24 Plane load Z -0,38 0,810 Abso From start 0,000
DR - çatı kaplama GCS Uniform 5,115 Length 0,000
LF188 B24 Plane load Z -0,38 5,115 Abso From start 0,000
DR - çatı kaplama GCS Trapez -0,36 5,200 Length 0,000
LF189 B24 Plane load Z -0,36 5,200 Abso From start 0,000
DR - çatı kaplama GCS Trapez 0,00 5,925 Length 0,000

12. Wind pressures


Name Input Height / Pressure curve parameters
[m,kN/m2]
WindPressure user 0,000/0,50
8,000/0,50
8,000/0,80
20,000/0,80
20,000/1,10
100,000/1,10

E kol Lojistik A.ù . 11


Project Ekol Lojistik A.ù.
Part Aksaray Depolama Tesisi
Description Cephe Karkası
National code IBC
Author SGM Proje Mühendislik

13. Calculation protocol

14. Displacement of nodes


Linear calculation, Extreme : Node
Selection : All
Class : All ULS
Node Case Ux Uy Uz
[mm] [mm] [mm]
N1 CO0/1 0,0 0,0 0,0
N2 CO0/1 0,0 0,0 0,0
N2 CO10/2 0,0 -36,2 0,0
N2 CO9/3 0,0 36,2 0,0
N2 CO1/4 0,0 0,0 0,0
N3 CO0/1 0,0 0,0 0,0
N4 CO0/1 0,0 0,0 -0,3
N4 CO10/2 0,0 -61,3 -0,8
N4 CO9/3 0,0 61,3 -0,8
N4 CO1/4 0,0 0,0 -0,8
N7 CO0/1 0,0 0,0 -0,3
N7 CO10/2 0,0 -25,6 -0,8
N7 CO9/3 0,0 25,6 -0,8
N7 CO1/4 0,0 0,0 -0,8
N8 CO0/1 0,0 0,0 0,0
N10 CO0/1 0,0 0,0 0,0
N11 CO0/1 0,0 0,0 0,0
N13 CO0/1 0,0 0,0 0,0
N14 CO0/1 0,0 0,0 0,0
N16 CO0/1 0,0 0,0 0,0
N17 CO0/1 0,0 0,0 0,0
N19 CO0/1 0,0 0,0 0,0
N20 CO0/1 0,0 0,0 0,0
N21 CO0/1 0,0 0,0 0,0
N22 CO0/1 0,0 0,0 0,0
N23 CO0/1 0,0 0,0 0,0
N24 CO0/1 0,0 0,0 0,0
N25 CO0/1 0,0 0,0 0,0
N25 CO10/2 0,0 -36,2 0,0
N25 CO9/3 0,0 36,2 0,0
N25 CO1/4 0,0 0,0 0,0
N30 CO0/1 0,0 0,0 0,0
N31 CO0/1 0,0 0,0 0,0
N32 CO0/1 0,0 0,0 0,0
N33 CO0/1 0,0 0,0 0,0
N34 CO0/1 0,0 0,0 0,0
N34 CO10/2 0,0 -14,1 0,0
N34 CO9/3 0,0 14,1 0,0
N34 CO1/4 0,0 0,0 0,0
N35 CO0/1 0,0 0,0 -0,3
N35 CO10/2 0,0 -39,0 -0,8
N35 CO9/3 0,0 39,0 -0,8
N35 CO1/4 0,0 0,0 -0,8
N36 CO0/1 0,0 0,0 0,0
N36 CO10/2 0,0 -14,1 0,0
N36 CO9/3 0,0 14,1 0,0
N36 CO1/4 0,0 0,0 0,0

15. Internal forces on member


Linear calculation, Extreme : Global, System : Principal
Selection : All
Class : All ULS
Member Case dx N Vy Vz Mx My Mz
[m] [kN] [kN] [kN] [kNm] [kNm] [kNm]
B2 CO1/4 0,000 -51,06 0,00 0,00 0,00 0,00 0,00
B14 CO1/4 2,500 1,14 0,00 0,00 0,00 0,00 0,00
B9 CO1/4 10,850 0,00 -4,21 0,00 0,00 0,00 -4,87
B9 CO1/4 0,000 0,00 4,21 0,00 0,00 0,00 -4,87

E kol Lojistik A.ù . 12


Project Ekol Lojistik A.ù.
Part Aksaray Depolama Tesisi
Description Cephe Karkası
National code IBC
Author SGM Proje Mühendislik

Member Case dx N Vy Vz Mx My Mz
[m] [kN] [kN] [kN] [kNm] [kNm] [kNm]
B11 CO10/2 0,000 0,00 3,72 -37,23 -4,29 79,41 -4,35
B11 CO9/3 0,000 0,00 3,72 37,23 4,29 -79,41 -4,35
B23 CO1/4 2,962 0,00 0,00 0,00 0,00 0,00 2,29

16. Reactions
Linear calculation, Extreme : Node
Selection : All
Class : All ULS
Rotated supports
Support Case dx Rx Ry Rz Mx My Mz
[m] [kN] [kN] [kN] [kNm] [kNm] [kNm]
Sn1/N1 CO9/3 0,00 -2,23 1,15 0,00 0,00 0,00
Sn1/N1 CO10/2 0,00 2,23 1,15 0,00 0,00 0,00
Sn1/N1 CO0/1 0,00 0,00 0,22 0,00 0,00 0,00
Sn1/N1 CO1/4 0,00 0,00 1,15 0,00 0,00 0,00
Sn2/N3 CO0/1 0,00 0,00 21,07 0,00 0,00 0,00
Sn2/N3 CO9/3 0,00 -5,26 51,06 0,00 0,00 0,00
Sn2/N3 CO10/2 0,00 5,26 51,06 0,00 0,00 0,00
Sn2/N3 CO1/4 0,00 0,00 51,06 0,00 0,00 0,00
Sn8/N8 CO0/1 0,00 0,00 1,84 0,00 -1,80 0,00
Sn8/N8 CO9/3 0,00 -17,84 4,06 1,36 -4,34 -38,58
Sn8/N8 CO10/2 0,00 17,84 4,06 -1,36 -4,34 38,58
Sn8/N8 CO1/4 0,00 0,00 4,06 0,00 -4,34 0,00
Sn9/N11 CO10/2 0,00 26,14 4,17 -0,36 -4,67 55,20
Sn9/N11 CO0/1 0,00 0,00 1,90 0,00 -1,96 0,00
Sn9/N11 CO9/3 0,00 -26,14 4,17 0,36 -4,67 -55,20
Sn9/N11 CO1/4 0,00 0,00 4,17 0,00 -4,67 0,00
Sn10/N14 CO10/2 0,00 25,96 4,22 -0,01 -4,87 54,71
Sn10/N14 CO0/1 0,00 0,00 1,94 0,00 -2,06 0,00
Sn10/N14 CO9/3 0,00 -25,96 4,22 0,01 -4,87 -54,71
Sn10/N14 CO1/4 0,00 0,00 4,22 0,00 -4,87 0,00
Sn11/N17 CO10/2 0,00 37,23 3,74 -4,29 -4,35 79,41
Sn11/N17 CO0/1 0,00 0,00 1,96 0,00 -2,12 0,00
Sn11/N17 CO9/3 0,00 -37,23 3,74 4,29 -4,35 -79,41
Sn11/N17 CO1/4 0,00 0,00 3,74 0,00 -4,35 0,00
Sn12/N10 CO0/1 0,00 0,00 1,84 0,00 1,80 0,00
Sn12/N10 CO9/3 0,00 -17,84 4,06 1,36 4,34 38,58
Sn12/N10 CO10/2 0,00 17,84 4,06 -1,36 4,34 -38,58
Sn12/N10 CO1/4 0,00 0,00 4,06 0,00 4,34 0,00
Sn13/N13 CO10/2 0,00 26,14 4,17 -0,36 4,67 -55,20
Sn13/N13 CO0/1 0,00 0,00 1,90 0,00 1,96 0,00
Sn13/N13 CO9/3 0,00 -26,14 4,17 0,36 4,67 55,20
Sn13/N13 CO1/4 0,00 0,00 4,17 0,00 4,67 0,00
Sn14/N16 CO10/2 0,00 25,96 4,22 -0,01 4,87 -54,71
Sn14/N16 CO0/1 0,00 0,00 1,94 0,00 2,06 0,00
Sn14/N16 CO9/3 0,00 -25,96 4,22 0,01 4,87 54,71
Sn14/N16 CO1/4 0,00 0,00 4,22 0,00 4,87 0,00
Sn15/N19 CO10/2 0,00 37,23 3,74 -4,29 4,35 -79,41
Sn15/N19 CO0/1 0,00 0,00 1,96 0,00 2,12 0,00
Sn15/N19 CO9/3 0,00 -37,23 3,74 4,29 4,35 79,41
Sn15/N19 CO1/4 0,00 0,00 3,74 0,00 4,35 0,00
Sn16/N23 CO10/2 0,00 -5,95 1,12 0,02 0,00 0,00
Sn16/N23 CO9/3 0,00 5,95 1,12 -0,02 0,00 0,00
Sn16/N23 CO0/1 0,00 0,00 0,44 0,00 0,00 0,00
Sn16/N23 CO1/4 0,00 0,00 1,12 0,00 0,00 0,00
Sn17/N20 CO9/3 0,00 20,95 3,69 -22,88 0,00 0,00
Sn17/N20 CO0/1 0,00 0,00 1,61 0,00 0,00 0,00
Sn17/N20 CO10/2 0,00 -20,95 3,69 22,88 0,00 0,00
Sn17/N20 CO1/4 0,00 0,00 3,69 0,00 0,00 0,00
Sn18/N21 CO10/2 0,00 -9,01 1,04 -0,38 0,00 0,00
Sn18/N21 CO9/3 0,00 9,01 1,04 0,38 0,00 0,00
Sn18/N21 CO0/1 0,00 0,00 0,42 0,00 0,00 0,00
Sn18/N21 CO1/4 0,00 0,00 1,04 0,00 0,00 0,00
Sn19/N22 CO10/2 0,00 -9,48 1,12 0,00 0,00 0,00

E kol Lojistik A.ù . 13


Project Ekol Lojistik A.ù.
Part Aksaray Depolama Tesisi
Description Cephe Karkası
National code IBC
Author SGM Proje Mühendislik

Support Case dx Rx Ry Rz Mx My Mz
[m] [kN] [kN] [kN] [kNm] [kNm] [kNm]
Sn19/N22 CO9/3 0,00 9,48 1,12 0,00 0,00 0,00
Sn19/N22 CO0/1 0,00 0,00 0,44 0,00 0,00 0,00
Sn19/N22 CO1/4 0,00 0,00 1,12 0,00 0,00 0,00
Sn20/N24 CO9/3 0,00 -2,23 1,15 0,00 0,00 0,00
Sn20/N24 CO10/2 0,00 2,23 1,15 0,00 0,00 0,00
Sn20/N24 CO0/1 0,00 0,00 0,22 0,00 0,00 0,00
Sn20/N24 CO1/4 0,00 0,00 1,15 0,00 0,00 0,00
Sn25/N30 CO9/3 0,00 20,95 3,69 -22,88 0,00 0,00
Sn25/N30 CO0/1 0,00 0,00 1,61 0,00 0,00 0,00
Sn25/N30 CO10/2 0,00 -20,95 3,69 22,88 0,00 0,00
Sn25/N30 CO1/4 0,00 0,00 3,69 0,00 0,00 0,00
Sn26/N31 CO10/2 0,00 -9,01 1,04 -0,38 0,00 0,00
Sn26/N31 CO9/3 0,00 9,01 1,04 0,38 0,00 0,00
Sn26/N31 CO0/1 0,00 0,00 0,42 0,00 0,00 0,00
Sn26/N31 CO1/4 0,00 0,00 1,04 0,00 0,00 0,00
Sn27/N32 CO10/2 0,00 -9,48 1,12 0,00 0,00 0,00
Sn27/N32 CO9/3 0,00 9,48 1,12 0,00 0,00 0,00
Sn27/N32 CO0/1 0,00 0,00 0,44 0,00 0,00 0,00
Sn27/N32 CO1/4 0,00 0,00 1,12 0,00 0,00 0,00
Sn28/N33 CO10/2 0,00 -5,95 1,12 0,02 0,00 0,00
Sn28/N33 CO9/3 0,00 5,95 1,12 -0,02 0,00 0,00
Sn28/N33 CO0/1 0,00 0,00 0,44 0,00 0,00 0,00
Sn28/N33 CO1/4 0,00 0,00 1,12 0,00 0,00 0,00
Sb1/B14 CO9/3 2,500 0,00 -6,66 1,96 -0,60 0,00 0,00
Sb1/B14 CO10/2 2,500 0,00 6,66 1,96 0,60 0,00 0,00
Sb1/B14 CO0/1 2,500 0,00 0,00 0,44 0,00 0,00 0,00
Sb1/B14 CO1/4 2,500 0,00 0,00 1,96 0,00 0,00 0,00
Sb2/B15 CO9/3 2,500 0,00 -8,39 1,64 0,61 0,00 0,00
Sb2/B15 CO10/2 2,500 0,00 8,39 1,64 -0,61 0,00 0,00
Sb2/B15 CO0/1 2,500 0,00 0,00 0,44 0,00 0,00 0,00
Sb2/B15 CO1/4 2,500 0,00 0,00 1,64 0,00 0,00 0,00
Sb3/B13 CO9/3 2,500 0,00 -9,48 1,64 0,00 0,00 0,00
Sb3/B13 CO10/2 2,500 0,00 9,48 1,64 0,00 0,00 0,00
Sb3/B13 CO0/1 2,500 0,00 0,00 0,44 0,00 0,00 0,00
Sb3/B13 CO1/4 2,500 0,00 0,00 1,64 0,00 0,00 0,00
Sb4/B12 CO9/3 2,250 0,00 -8,57 1,38 0,02 0,00 0,00
Sb4/B12 CO10/2 2,250 0,00 8,57 1,38 -0,02 0,00 0,00
Sb4/B12 CO0/1 2,250 0,00 0,00 0,40 0,00 0,00 0,00
Sb4/B12 CO1/4 2,250 0,00 0,00 1,38 0,00 0,00 0,00
Sb5/B17 CO9/3 2,250 0,00 -8,57 1,38 0,02 0,00 0,00
Sb5/B17 CO10/2 2,250 0,00 8,57 1,38 -0,02 0,00 0,00
Sb5/B17 CO0/1 2,250 0,00 0,00 0,40 0,00 0,00 0,00
Sb5/B17 CO1/4 2,250 0,00 0,00 1,38 0,00 0,00 0,00
Sb6/B18 CO9/3 2,500 0,00 -9,48 1,64 0,00 0,00 0,00
Sb6/B18 CO10/2 2,500 0,00 9,48 1,64 0,00 0,00 0,00
Sb6/B18 CO0/1 2,500 0,00 0,00 0,44 0,00 0,00 0,00
Sb6/B18 CO1/4 2,500 0,00 0,00 1,64 0,00 0,00 0,00
Sb7/B19 CO9/3 2,500 0,00 -6,66 1,96 -0,60 0,00 0,00
Sb7/B19 CO10/2 2,500 0,00 6,66 1,96 0,60 0,00 0,00
Sb7/B19 CO0/1 2,500 0,00 0,00 0,44 0,00 0,00 0,00
Sb7/B19 CO1/4 2,500 0,00 0,00 1,96 0,00 0,00 0,00
Sb8/B20 CO9/3 2,500 0,00 -8,39 1,64 0,61 0,00 0,00
Sb8/B20 CO10/2 2,500 0,00 8,39 1,64 -0,61 0,00 0,00
Sb8/B20 CO0/1 2,500 0,00 0,00 0,44 0,00 0,00 0,00
Sb8/B20 CO1/4 2,500 0,00 0,00 1,64 0,00 0,00 0,00

17. Check of steel


Linear calculation, Extreme : Member
Selection : All
Class : All ULS
Case Member css mat dx un.check
[m] [-]
CO9/3 B1 CS1 - CFRHS150X150X4 S235JR 0,000 1,41
CO10/2 B2 CS2 - CFRHS250X150X5 S235JR 1,563 0,82

E kol Lojistik A.ù . 14


Project Ekol Lojistik A.ù.
Part Aksaray Depolama Tesisi
Description Cephe Karkası
National code IBC
Author SGM Proje Mühendislik

Case Member css mat dx un.check


[m] [-]
CO9/3 B4 CS1 - CFRHS150X150X4 S235JR 0,000 1,30
CO10/2 B5 CS3 - 2Uc S235JR 0,000 0,53
CO10/2 B7 CS3 - 2Uc S235JR 0,000 0,73
CO9/3 B9 CS3 - 2Uc S235JR 0,000 0,72
CO9/3 B11 CS3 - 2Uc S235JR 0,000 1,01
CO9/3 B12 CS1 - CFRHS150X150X4 S235JR 4,500 0,10
CO9/3 B13 CS1 - CFRHS150X150X4 S235JR 2,500 0,11
CO10/2 B14 CS1 - CFRHS150X150X4 S235JR 2,500 0,11
CO9/3 B15 CS1 - CFRHS150X150X4 S235JR 2,500 0,11
CO9/3 B16 CS1 - CFRHS150X150X4 S235JR 0,000 1,41
CO9/3 B17 CS1 - CFRHS150X150X4 S235JR 4,500 0,10
CO9/3 B18 CS1 - CFRHS150X150X4 S235JR 2,500 0,11
CO10/2 B19 CS1 - CFRHS150X150X4 S235JR 2,500 0,11
CO9/3 B20 CS1 - CFRHS150X150X4 S235JR 2,500 0,11
CO6/5 B21 CS4 - CFRHS150X100X4 S235JR 2,962 0,14
CO6/5 B22 CS4 - CFRHS150X100X4 S235JR 2,962 0,14
CO9/3 B23 CS4 - CFRHS150X100X4 S235JR 2,962 0,22
CO9/3 B24 CS4 - CFRHS150X100X4 S235JR 2,962 0,22

18. Bill of material


Name Mass Surface Volume
[kg] [m2] [m3]
Total results : 4695,1 90,700 5,9810e-01

CSS Material Unit mass Length Mass Surface Unit volume mass Volume
[kg/m] [m] [kg] [m2] [kg/m3] [m3]
CS1 - CFRHS150X150X4 S235JR 18,0 47,835 861,8 28,031 7850,0 1,0978e-01
CS2 - CFRHS250X150X5 S235JR 30,1 19,875 598,5 15,562 7850,0 7,6241e-02
CS3 - 2Uc 813  170) S235JR 66,4 43,400 2882,2 35,588 7850,0 3,6716e-01
CS4 - CFRHS150X100X4 S235JR 14,9 23,700 352,6 11,518 7850,0 4,4912e-02

E kol Lojistik A.ù . 15


ERROR: syntaxerror
OFFENDING COMMAND: --nostringval--

STACK:
/Title
()
/Subject
(D:20150307150156+02’00’)
/ModDate
()
/Keywords
(PDFCreator Version 0.9.5)
/Creator
(D:20150307150156+02’00’)
/CreationDate
(Tarkan ERTN )
/Author
-mark-

You might also like