Outline
► Global Company Profile:
Bechtel Group
► Project Scheduling
► Project Controlling
► Single unit
► Many related activities
► Difficult production planning and
inventory control
► General purpose equipment
► High labor skills
► Research Project
© 2014 Pearson Education 3-6
Management of Projects
1. Planning - goal setting, defining the
project, team organization
2. Scheduling - relate people, money,
and supplies to specific activities and
activities to each other
3. Controlling - monitor resources, costs,
quality, and budgets; revise plans and
shift resources to meet time and cost
demands
© 2014 Pearson Education 3-7
Project Management Activities
► Planning
► Objectives ► Scheduling
► Resources ► Project
activities
► Work break-
down structure ► Start & end
times
► Organization
► Network
► Controlling
► Monitor, compare, revise, action
© 2014 Pearson Education 3-8
Project Planning,
Scheduling, and Controlling
Figure 3.1
Figure 3.1
Figure 3.1
Figure 3.1
Budgets
Delayed activities report
Slack activities report
CPM/PERT
Gantt charts
Milestone charts
Figure
Cash 3.1schedules
flow
Human Quality
Resources Marketing Finance Design Production
Mgt
Figure 3.2
Project 1
Project 2
Project 3
Project 4
Level
1. Project
2. Major tasks in the project
3. Subtasks in the major tasks
4. Activities (or “work packages”)
to be completed
Compatible with
Level 4 1.1.2.1
Windows 7
(Work packages)
Compatible with
1.1.2.2
Windows Vista
Time
J F M A M J J A S
Design
Prototype
Test
Revise
Production
© 2014
© 2014
Pearson
Pearson
Education
Education 3 - 30
Project Control Reports
► Detailed cost breakdowns for each task
► Total program labor curves
► Cost distribution tables
► Functional cost and hour summaries
► Raw materials and expenditure forecasts
► Variance reports
► Time analysis reports
► Work status reports
C and D cannot
A C begin until both A C
(d) A and B are
completed
B D B D
B and C cannot
begin until A is
completed
A B D D cannot begin A B D
until both B and C
(f) are completed Dummy
A dummy activity activity
C
C
is again
introduced in AOA
Activity A
A
(Build Internal Components)
Start
Activity B
Start B (Modify Roof and Floor)
Activity
Figure 3.5
A C
Start
B D
F
A C
E
Start H
B D G
H
1 Dummy 6 7
Activity (Inspect/
Test)
D
3 5
(Pour Figure 3.8
Concrete/
Install Frame)
© 2014 Pearson Education 3 - 44
Determining the Project Schedule
Activity Name
or Symbol
A Earliest
Earliest ES EF
Start Finish
Latest LS LF Latest
Start 2 Finish
Activity Duration
© 2014 Pearson Education 3 - 48
Computing Slack Time
After computing the ES, EF, LS, and LF times for
all activities, compute the slack or free time for
each activity
Slack = LS – ES or Slack = LF – EF
0 2 2 4 10 13
2 2 3
Start E H
0 0 4 8 13 15
0 0 4 8 13 15
0 4 2
B D G
0 3 3 7 8 13
1 4 4 8 8 13
3 4 5
A Build internal
components
B Modify roof and floor
C Construct collection
stack
D Pour concrete and
install frame
E Build high-temperature
burner
F Install pollution control
system
G Install air pollution
device
H Inspect and test
A Build internal
components
B Modify roof and floor
C Construct collection
stack
D Pour concrete and
install frame
E Build high-temperature
burner
F Install pollution control
system
G Install air pollution
device
H Inspect and test
t = (a + 4m + b)/6
Variance of
Probability
1 in 100 of
oftimes:
Probability of
Probability
Activity
Time
Program 3.1
Program 3.2
© 2014 Pearson Education 3 - 62
Using Microsoft Project
Pollution Project
Percentage Completed on
Aug. 12
ACTIVITY COMPLETED
A 100
B 100
C 100
D 10
E 20
F 20
G 0
H 0 Program 3.3