Calculation of Quantities for PSC Girder of 30.

165 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 30.165 m
Length of Superstructure between bearings = 29.225 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 10.20 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 19.47 m
Length of Flared Portion = 6.10 m
Length of End Portion = 4.16 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.2
0.18 A
0.042 B

1.73 C

0.825
Section of Girder at ends

Crossection Area of A = 0.216 sqm


Crossection Area of B = 0.043 sqm
Crossection Area of C = 1.424 sqm
Total Area = 1.683 sqm

3.1

0.825 0.3

Section of Girder in Flared portion


Total Area = 1.326 sqm

1.2
0.45 0.45
0.30
0.18 A
0.1 B

1.228 C

0.2 D
0.24 E
0.263 0.263

0.825
Section of Girder in intermediate portion

Crossection Area of A = 0.216 sqm


Crossection Area of B = 0.075 sqm
Crossection Area of C = 0.369 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.970 sqm

Quantitiy of Concrete in one Girder in End Portion = 7.000 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 18.881 cum
Quantitiy of Concrete in one Girder in Flared Portion = 8.091 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 4.127 cum
Quantitiy of Concrete in one End Cross Girder = 11.924 cum
50.022
Quantity of Concrete in deck slab in one carriageway = 79.636 cum
Total Quantity of Concrete in deck slab = = 80 cum
Quantitiy of Concrete in Girders in End Portion = 28.001 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 75.524 cum
Quantitiy of Concrete in Girders in Flared Portion = 32.364 cum
Total Quantity of Concrete in PSC Girders = = 136 cum
Quantitiy of Concrete in Intermediate Cross Girders = 12.380 cum
Quantitiy of Concrete in End Cross Girders = 23.848 cum
Total Quantity of Concrete in Cross Girders = = 36 cum

Concrete in Deck Slab = 79.64


Concrete in Girders = 140.00
Concrete in Cross Girders = 40.00
Total Quantity of HYSD Steel = 39
Total Quantity of pre-stressed Steel = 8
Calculation of Quantities for PSC Girder of 26.70 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 26.700 m
Length of Superstructure between bearings = 25.760 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 10.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 17.18 m
Length of Flared Portion = 5.36 m
Length of End Portion = 3.72 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.042 B

1.44 C

0.825
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.044 sqm
Crossection Area of C = 1.188 sqm
Total Area = 1.457 sqm

2.7

0.825 0.3

Section of Girder in Flared portion


Total Area = 1.176 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.942 C

0.2 D
0.24 E
0.263 0.263

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.283 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.896 sqm

Quantitiy of Concrete in one Girder in End Portion = 5.418 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 15.386 cum
Quantitiy of Concrete in one Girder in Flared Portion = 6.304 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 3.353 cum
Quantitiy of Concrete in one End Cross Girder = 10.221 cum
40.682
Quantity of Concrete in deck slab in one carriageway = 70.488 cum
Total Quantity of Concrete in deck slab = = 70 cum
Quantitiy of Concrete in Girders in End Portion = 21.673 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 61.544 cum
Quantitiy of Concrete in Girders in Flared Portion = 25.215 cum
Total Quantity of Concrete in PSC Girders = = 108 cum
Quantitiy of Concrete in Intermediate Cross Girders = 10.060 cum
Quantitiy of Concrete in End Cross Girders = 20.442 cum
Total Quantity of Concrete in Cross Girders = = 31 cum

Concrete in Deck Slab = 70.49


Concrete in Girders = 110.00
Concrete in Cross Girders = 35.00
Total Quantity of HYSD Steel = 32
Total Quantity of pre-stressed Steel = 7
Calculation of Quantities for PSC Girder of 30.0 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 30.000 m
Length of Superstructure between bearings = 29.060 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 10.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 19.38 m
Length of Flared Portion = 6.04 m
Length of End Portion = 4.14 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.042 B

1.72 C

0.825
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.044 sqm
Crossection Area of C = 1.415 sqm
Total Area = 1.684 sqm

3.0

0.825 0.3

Section of Girder in Flared portion


Total Area = 1.331 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

1.217 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.365 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.978 sqm

Quantitiy of Concrete in one Girder in End Portion = 6.971 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 18.958 cum
Quantitiy of Concrete in one Girder in Flared Portion = 8.039 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 4.097 cum
Quantitiy of Concrete in one End Cross Girder = 11.915 cum
49.979
Quantity of Concrete in deck slab in one carriageway = 79.200 cum
Total Quantity of Concrete in deck slab = = 79 cum
Quantitiy of Concrete in Girders in End Portion = 27.882 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 75.830 cum
Quantitiy of Concrete in Girders in Flared Portion = 32.156 cum
Total Quantity of Concrete in PSC Girders = = 136 cum
Quantitiy of Concrete in Intermediate Cross Girders = 12.290 cum
Quantitiy of Concrete in End Cross Girders = 23.829 cum
Total Quantity of Concrete in Cross Girders = = 36 cum

Concrete in Deck Slab = 79.20


Concrete in Girders = 140.00
Concrete in Cross Girders = 40.00
Total Quantity of HYSD Steel = 39
Total Quantity of pre-stressed Steel = 8
Calculation of Quantities for PSC Girder of 21.69 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 21.690 m
Length of Superstructure between bearings = 20.750 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 10.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 13.83 m
Length of Flared Portion = 4.32 m
Length of End Portion = 3.10 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.042 B

1.12 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.044 sqm
Crossection Area of C = 0.921 sqm
Total Area = 1.190 sqm

2.2

0.825 0.3

Section of Girder in Flared portion


Total Area = 0.994 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.619 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.186 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.799 sqm

Quantitiy of Concrete in one Girder in End Portion = 3.689 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 11.045 cum
Quantitiy of Concrete in one Girder in Flared Portion = 4.295 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 2.481 cum
Quantitiy of Concrete in one End Cross Girder = 8.233 cum
29.742
Quantity of Concrete in deck slab in one carriageway = 57.262 cum
Total Quantity of Concrete in deck slab = = 57 cum
Quantitiy of Concrete in Girders in End Portion = 14.754 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 44.179 cum
Quantitiy of Concrete in Girders in Flared Portion = 17.180 cum
Total Quantity of Concrete in PSC Girders = = 76 cum
Quantitiy of Concrete in Intermediate Cross Girders = 7.442 cum
Quantitiy of Concrete in End Cross Girders = 16.466 cum
Total Quantity of Concrete in Cross Girders = = 24 cum

Concrete in Deck Slab = 57.26


Concrete in Girders = 80.00
Concrete in Cross Girders = 25.00
Total Quantity of HYSD Steel = 24
Total Quantity of pre-stressed Steel = 5
Calculation of Quantities for PSC Girder of 22.188 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 22.188 m
Length of Superstructure between bearings = 21.248 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 10.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 14.168 m
Length of Flared Portion = 4.42 m
Length of End Portion = 3.16 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.042 B

1.15 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.044 sqm
Crossection Area of C = 0.948 sqm
Total Area = 1.216 sqm

2.2

0.825 0.3

Section of Girder in Flared portion


Total Area = 1.012 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.651 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.195 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.808 sqm

Quantitiy of Concrete in one Girder in End Portion = 3.844 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 11.451 cum
Quantitiy of Concrete in one Girder in Flared Portion = 4.474 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 2.567 cum
Quantitiy of Concrete in one End Cross Girder = 8.431 cum
30.767
Quantity of Concrete in deck slab in one carriageway = 58.576 cum
Total Quantity of Concrete in deck slab = = 59 cum
Quantitiy of Concrete in Girders in End Portion = 15.375 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 45.805 cum
Quantitiy of Concrete in Girders in Flared Portion = 17.898 cum
Total Quantity of Concrete in PSC Girders = = 79 cum
Quantitiy of Concrete in Intermediate Cross Girders = 7.702 cum
Quantitiy of Concrete in End Cross Girders = 16.861 cum
Total Quantity of Concrete in Cross Girders = = 25 cum

Concrete in Deck Slab = 58.58


Concrete in Girders = 80.00
Concrete in Cross Girders = 25.00
Total Quantity of HYSD Steel = 25
Total Quantity of pre-stressed Steel = 5
Calculation of Quantities for PSC Girder of 22.6 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 22.600 m
Length of Superstructure between bearings = 21.660 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 10.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 14.22 m
Length of Flared Portion = 4.44 m
Length of End Portion = 3.50 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

1.15 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 0.952 sqm
Total Area = 1.215 sqm

2.2

0.825 0.3

Section of Girder in Flared portion


Total Area = 1.013 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.660 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.198 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.811 sqm

Quantitiy of Concrete in one Girder in End Portion = 4.251 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 11.532 cum
Quantitiy of Concrete in one Girder in Flared Portion = 4.498 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 2.591 cum
Quantitiy of Concrete in one End Cross Girder = 8.431 cum
31.304
Quantity of Concrete in deck slab in one carriageway = 59.664 cum
Total Quantity of Concrete in deck slab = = 60 cum
Quantitiy of Concrete in Girders in End Portion = 17.005 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 46.130 cum
Quantitiy of Concrete in Girders in Flared Portion = 17.993 cum
Total Quantity of Concrete in PSC Girders = = 81 cum
Quantitiy of Concrete in Intermediate Cross Girders = 7.773 cum
Quantitiy of Concrete in End Cross Girders = 16.862 cum
Total Quantity of Concrete in Cross Girders = = 25 cum

Concrete in Deck Slab = 59.66


Concrete in Girders = 85.00
Concrete in Cross Girders = 25.00
Total Quantity of HYSD Steel = 25
Total Quantity of pre-stressed Steel = 5
Calculation of Quantities for PSC Girder of 20.0 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 20.000 m
Length of Superstructure between bearings = 19.060 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 10.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 12.62 m
Length of Flared Portion = 3.96 m
Length of End Portion = 2.99 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

1.01 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 0.835 sqm
Total Area = 1.099 sqm

2.0

0.825 0.3

Section of Girder in Flared portion


Total Area = 0.932 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.510 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.153 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.766 sqm

Quantitiy of Concrete in one Girder in End Portion = 3.280 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 9.662 cum
Quantitiy of Concrete in one Girder in Flared Portion = 3.692 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 2.186 cum
Quantitiy of Concrete in one End Cross Girder = 7.563 cum
26.383
Quantity of Concrete in deck slab in one carriageway = 52.800 cum
Total Quantity of Concrete in deck slab = = 53 cum
Quantitiy of Concrete in Girders in End Portion = 13.120 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 38.647 cum
Quantitiy of Concrete in Girders in Flared Portion = 14.769 cum
Total Quantity of Concrete in PSC Girders = = 67 cum
Quantitiy of Concrete in Intermediate Cross Girders = 6.558 cum
Quantitiy of Concrete in End Cross Girders = 15.125 cum
Total Quantity of Concrete in Cross Girders = = 22 cum

Concrete in Deck Slab = 52.80


Concrete in Girders = 70.00
Concrete in Cross Girders = 25.00
Total Quantity of HYSD Steel = 22
Total Quantity of pre-stressed Steel = 4
Calculation of Quantities for PSC Girder of 27.285 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 27.285 m
Length of Superstructure between bearings = 26.345 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 10.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 17.55 m
Length of Flared Portion = 5.50 m
Length of End Portion = 3.80 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

1.48 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 1.223 sqm
Total Area = 1.487 sqm

2.8

0.825 0.3

Section of Girder in Flared portion


Total Area = 1.197 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.980 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.294 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.907 sqm

Quantitiy of Concrete in one Girder in End Portion = 5.649 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 15.912 cum
Quantitiy of Concrete in one Girder in Flared Portion = 6.582 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 3.455 cum
Quantitiy of Concrete in one End Cross Girder = 10.453 cum
42.051
Quantity of Concrete in deck slab in one carriageway = 72.032 cum
Total Quantity of Concrete in deck slab = = 72 cum
Quantitiy of Concrete in Girders in End Portion = 22.596 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 63.646 cum
Quantitiy of Concrete in Girders in Flared Portion = 26.328 cum
Total Quantity of Concrete in PSC Girders = = 113 cum
Quantitiy of Concrete in Intermediate Cross Girders = 10.365 cum
Quantitiy of Concrete in End Cross Girders = 20.906 cum
Total Quantity of Concrete in Cross Girders = = 31 cum

Concrete in Deck Slab = 72.03


Concrete in Girders = 115.00
Concrete in Cross Girders = 35.00
Total Quantity of HYSD Steel = 33
Total Quantity of pre-stressed Steel = 7
Calculation of Quantities for PSC Girder of 19.141 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 19.141 m
Length of Superstructure between bearings = 18.201 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 10.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 12.12 m
Length of Flared Portion = 3.80 m
Length of End Portion = 2.78 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

0.96 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 0.790 sqm
Total Area = 1.053 sqm

1.9

0.825 0.3

Section of Girder in Flared portion


Total Area = 0.901 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.454 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.136 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.749 sqm

Quantitiy of Concrete in one Girder in End Portion = 2.928 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 9.082 cum
Quantitiy of Concrete in one Girder in Flared Portion = 3.425 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 2.036 cum
Quantitiy of Concrete in one End Cross Girder = 7.222 cum
24.692
Quantity of Concrete in deck slab in one carriageway = 50.532 cum
Total Quantity of Concrete in deck slab = = 51 cum
Quantitiy of Concrete in Girders in End Portion = 11.711 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 36.328 cum
Quantitiy of Concrete in Girders in Flared Portion = 13.698 cum
Total Quantity of Concrete in PSC Girders = = 62 cum
Quantitiy of Concrete in Intermediate Cross Girders = 6.109 cum
Quantitiy of Concrete in End Cross Girders = 14.443 cum
Total Quantity of Concrete in Cross Girders = = 21 cum

Concrete in Deck Slab = 50.53


Concrete in Girders = 65.00
Concrete in Cross Girders = 25.00
Total Quantity of HYSD Steel = 21
Total Quantity of pre-stressed Steel = 4
Calculation of Quantities for PSC Girder of 20.950 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 20.950 m
Length of Superstructure between bearings = 20.010 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 10.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 13.33 m
Length of Flared Portion = 4.16 m
Length of End Portion = 3.02 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

1.07 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 0.886 sqm
Total Area = 1.149 sqm

2.1

0.825 0.3

Section of Girder in Flared portion


Total Area = 0.967 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.571 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.171 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.784 sqm

Quantitiy of Concrete in one Girder in End Portion = 3.471 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 10.455 cum
Quantitiy of Concrete in one Girder in Flared Portion = 4.022 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 2.352 cum
Quantitiy of Concrete in one End Cross Girder = 7.939 cum
28.239
Quantity of Concrete in deck slab in one carriageway = 55.308 cum
Total Quantity of Concrete in deck slab = = 55 cum
Quantitiy of Concrete in Girders in End Portion = 13.885 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 41.818 cum
Quantitiy of Concrete in Girders in Flared Portion = 16.088 cum
Total Quantity of Concrete in PSC Girders = = 72 cum
Quantitiy of Concrete in Intermediate Cross Girders = 7.055 cum
Quantitiy of Concrete in End Cross Girders = 15.879 cum
Total Quantity of Concrete in Cross Girders = = 23 cum

Concrete in Deck Slab = 55.31


Concrete in Girders = 75.00
Concrete in Cross Girders = 25.00
Total Quantity of HYSD Steel = 23
Total Quantity of pre-stressed Steel = 5
Calculation of Quantities for PSC Girder of 24.624 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 24.624 m
Length of Superstructure between bearings = 23.684 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 10.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 15.77 m
Length of Flared Portion = 4.92 m
Length of End Portion = 3.50 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

1.31 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 1.082 sqm
Total Area = 1.345 sqm

2.5

0.825 0.3

Section of Girder in Flared portion


Total Area = 1.100 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.808 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.242 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.855 sqm

Quantitiy of Concrete in one Girder in End Portion = 4.705 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 13.486 cum
Quantitiy of Concrete in one Girder in Flared Portion = 5.413 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 2.992 cum
Quantitiy of Concrete in one End Cross Girder = 9.397 cum
35.993
Quantity of Concrete in deck slab in one carriageway = 65.007 cum
Total Quantity of Concrete in deck slab = = 65 cum
Quantitiy of Concrete in Girders in End Portion = 18.819 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 53.945 cum
Quantitiy of Concrete in Girders in Flared Portion = 21.652 cum
Total Quantity of Concrete in PSC Girders = = 94 cum
Quantitiy of Concrete in Intermediate Cross Girders = 8.975 cum
Quantitiy of Concrete in End Cross Girders = 18.794 cum
Total Quantity of Concrete in Cross Girders = = 28 cum

Concrete in Deck Slab = 65.01


Concrete in Girders = 95.00
Concrete in Cross Girders = 30.00
Total Quantity of HYSD Steel = 29
Total Quantity of pre-stressed Steel = 6
Calculation of Quantities for PSC Girder of 19.860 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 19.860 m
Length of Superstructure between bearings = 18.920 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 10.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 12.60 m
Length of Flared Portion = 3.80 m
Length of End Portion = 3.02 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

1.00 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 0.828 sqm
Total Area = 1.091 sqm

1.9

0.825 0.3

Section of Girder in Flared portion


Total Area = 0.927 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.501 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.150 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.763 sqm

Quantitiy of Concrete in one Girder in End Portion = 3.296 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 9.616 cum
Quantitiy of Concrete in one Girder in Flared Portion = 3.524 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 2.162 cum
Quantitiy of Concrete in one End Cross Girder = 7.507 cum
26.105
Quantity of Concrete in deck slab in one carriageway = 52.430 cum
Total Quantity of Concrete in deck slab = = 52 cum
Quantitiy of Concrete in Girders in End Portion = 13.184 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 38.465 cum
Quantitiy of Concrete in Girders in Flared Portion = 14.095 cum
Total Quantity of Concrete in PSC Girders = = 66 cum
Quantitiy of Concrete in Intermediate Cross Girders = 6.485 cum
Quantitiy of Concrete in End Cross Girders = 15.014 cum
Total Quantity of Concrete in Cross Girders = = 21 cum

Concrete in Deck Slab = 52.43 cum


Concrete in Girders = 70.00
Concrete in Cross Girders = 25.00
Total Quantity of HYSD Steel = 22
Total Quantity of pre-stressed Steel = 4
Calculation of Quantities for PSC Girder of 20.850 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 20.850 m
Length of Superstructure between bearings = 19.910 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 10.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 13.27 m
Length of Flared Portion = 4.16 m
Length of End Portion = 2.98 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

1.07 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 0.881 sqm
Total Area = 1.144 sqm

2.1

0.825 0.3

Section of Girder in Flared portion


Total Area = 0.963 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.565 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.169 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.782 sqm

Quantitiy of Concrete in one Girder in End Portion = 3.409 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 10.382 cum
Quantitiy of Concrete in one Girder in Flared Portion = 4.007 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 2.334 cum
Quantitiy of Concrete in one End Cross Girder = 7.900 cum
28.032
Quantity of Concrete in deck slab in one carriageway = 55.044 cum
Total Quantity of Concrete in deck slab = = 55 cum
Quantitiy of Concrete in Girders in End Portion = 13.638 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 41.527 cum
Quantitiy of Concrete in Girders in Flared Portion = 16.028 cum
Total Quantity of Concrete in PSC Girders = = 71 cum
Quantitiy of Concrete in Intermediate Cross Girders = 7.003 cum
Quantitiy of Concrete in End Cross Girders = 15.800 cum
Total Quantity of Concrete in Cross Girders = = 23 cum

Concrete in Deck Slab = 55.04


Concrete in Girders = 75.00
Concrete in Cross Girders = 25.00
Total Quantity of HYSD Steel = 22
Total Quantity of pre-stressed Steel = 4
Calculation of Quantities for PSC Girder of 20.950 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 9.25 m
Formation Width = 10.25 m
Length of Superstructure between expansion joints = 20.950 m
Length of Superstructure between bearings = 20.010 m
Number of Main Girders = 4
Spacing between c/c of main girders = 2.650 m
Length of cantilever portion on each side = 1.150 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 7.95 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 9.20 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 13.33 m
Length of Flared Portion = 4.16 m
Length of End Portion = 3.02 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

1.07 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 0.886 sqm
Total Area = 1.149 sqm

2.1

0.825 0.3

Section of Girder in Flared portion


Total Area = 0.967 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.571 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.171 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.784 sqm

Quantitiy of Concrete in one Girder in End Portion = 3.471 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 10.455 cum
Quantitiy of Concrete in one Girder in Flared Portion = 4.022 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 2.077 cum
Quantitiy of Concrete in one End Cross Girder = 7.126 cum
27.151
Quantity of Concrete in deck slab in one carriageway = 47.242 cum
Total Quantity of Concrete in deck slab = = 47 cum
Quantitiy of Concrete in Girders in End Portion = 13.885 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 41.818 cum
Quantitiy of Concrete in Girders in Flared Portion = 16.088 cum
Total Quantity of Concrete in PSC Girders = = 72 cum
Quantitiy of Concrete in Intermediate Cross Girders = 6.232 cum
Quantitiy of Concrete in End Cross Girders = 14.252 cum
Total Quantity of Concrete in Cross Girders = = 20 cum

Concrete in Deck Slab = 47.24


Concrete in Girders = 75.00
Concrete in Cross Girders = 25.00
Total Quantity of HYSD Steel = 22
Total Quantity of pre-stressed Steel = 5
Calculation of Quantities for PSC Girder of 24.11 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 8.00 m
Formation Width = 9.00 m
Length of Superstructure between expansion joints = 24.110 m
Length of Superstructure between bearings = 23.170 m
Number of Main Girders = 3
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 6.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 7.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 15.43 m
Length of Flared Portion = 4.84 m
Length of End Portion = 3.40 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

1.28 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 1.054 sqm
Total Area = 1.318 sqm

2.4

0.825 0.3

Section of Girder in Flared portion


Total Area = 1.082 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.775 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.232 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.845 sqm

Quantitiy of Concrete in one Girder in End Portion = 4.480 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 13.045 cum
Quantitiy of Concrete in one Girder in Flared Portion = 5.235 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 1.935 cum
Quantitiy of Concrete in one End Cross Girder = 6.503 cum
31.197
Quantity of Concrete in deck slab in one carriageway = 47.738 cum
Total Quantity of Concrete in deck slab = = 48 cum
Quantitiy of Concrete in Girders in End Portion = 13.440 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 39.136 cum
Quantitiy of Concrete in Girders in Flared Portion = 15.704 cum
Total Quantity of Concrete in PSC Girders = = 68 cum
Quantitiy of Concrete in Intermediate Cross Girders = 5.804 cum
Quantitiy of Concrete in End Cross Girders = 13.005 cum
Total Quantity of Concrete in Cross Girders = = 19 cum

Concrete in Deck Slab = 47.74


Concrete in Girders = 70.00
Concrete in Cross Girders = 20.00
Total Quantity of HYSD Steel = 21
Total Quantity of pre-stressed Steel = 4
Calculation of Quantities for PSC Girder of 23.51 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 8.00 m
Formation Width = 9.00 m
Length of Superstructure between expansion joints = 23.510 m
Length of Superstructure between bearings = 22.570 m
Number of Main Girders = 3
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 6.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 7.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 15.03 m
Length of Flared Portion = 4.70 m
Length of End Portion = 3.34 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

1.24 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 1.022 sqm
Total Area = 1.286 sqm

2.4

0.825 0.3

Section of Girder in Flared portion


Total Area = 1.060 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.736 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.221 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.834 sqm

Quantitiy of Concrete in one Girder in End Portion = 4.294 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 12.533 cum
Quantitiy of Concrete in one Girder in Flared Portion = 4.981 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 1.865 cum
Quantitiy of Concrete in one End Cross Girder = 6.334 cum
30.007
Quantity of Concrete in deck slab in one carriageway = 46.550 cum
Total Quantity of Concrete in deck slab = = 47 cum
Quantitiy of Concrete in Girders in End Portion = 12.882 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 37.598 cum
Quantitiy of Concrete in Girders in Flared Portion = 14.943 cum
Total Quantity of Concrete in PSC Girders = = 65 cum
Quantitiy of Concrete in Intermediate Cross Girders = 5.595 cum
Quantitiy of Concrete in End Cross Girders = 12.668 cum
Total Quantity of Concrete in Cross Girders = = 18 cum

Concrete in Deck Slab = 46.55


Concrete in Girders = 70.00
Concrete in Cross Girders = 20.00
Total Quantity of HYSD Steel = 20
Total Quantity of pre-stressed Steel = 4
Calculation of Quantities for PSC Girder of 22.231 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 8.00 m
Formation Width = 9.00 m
Length of Superstructure between expansion joints = 22.231 m
Length of Superstructure between bearings = 21.291 m
Number of Main Girders = 3
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 6.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 7.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 14.19 m
Length of Flared Portion = 4.42 m
Length of End Portion = 3.18 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

1.16 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 0.954 sqm
Total Area = 1.218 sqm

2.2

0.825 0.3

Section of Girder in Flared portion


Total Area = 1.013 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.654 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.196 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.809 sqm

Quantitiy of Concrete in one Girder in End Portion = 3.872 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 11.482 cum
Quantitiy of Concrete in one Girder in Flared Portion = 4.479 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 1.717 cum
Quantitiy of Concrete in one End Cross Girder = 5.975 cum
27.524
Quantity of Concrete in deck slab in one carriageway = 44.017 cum
Total Quantity of Concrete in deck slab = = 44 cum
Quantitiy of Concrete in Girders in End Portion = 11.616 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 34.445 cum
Quantitiy of Concrete in Girders in Flared Portion = 13.437 cum
Total Quantity of Concrete in PSC Girders = = 59 cum
Quantitiy of Concrete in Intermediate Cross Girders = 5.150 cum
Quantitiy of Concrete in End Cross Girders = 11.950 cum
Total Quantity of Concrete in Cross Girders = = 17 cum

Concrete in Deck Slab = 44.02


Concrete in Girders = 60.00
Concrete in Cross Girders = 20.00
Total Quantity of HYSD Steel = 19
Total Quantity of pre-stressed Steel = 4
Calculation of Quantities for PSC Girder of 27.209 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 8.00 m
Formation Width = 9.00 m
Length of Superstructure between expansion joints = 27.209 m
Length of Superstructure between bearings = 26.269 m
Number of Main Girders = 3
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 6.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 7.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 17.51 m
Length of Flared Portion = 5.46 m
Length of End Portion = 3.80 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

1.48 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 1.219 sqm
Total Area = 1.483 sqm

2.7

0.825 0.3

Section of Girder in Flared portion


Total Area = 1.194 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.975 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.292 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.905 sqm

Quantitiy of Concrete in one Girder in End Portion = 5.634 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 15.853 cum
Quantitiy of Concrete in one Girder in Flared Portion = 6.519 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 2.295 cum
Quantitiy of Concrete in one End Cross Girder = 7.372 cum
37.673
Quantity of Concrete in deck slab in one carriageway = 53.874 cum
Total Quantity of Concrete in deck slab = = 54 cum
Quantitiy of Concrete in Girders in End Portion = 16.901 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 47.560 cum
Quantitiy of Concrete in Girders in Flared Portion = 19.558 cum
Total Quantity of Concrete in PSC Girders = = 84 cum
Quantitiy of Concrete in Intermediate Cross Girders = 6.884 cum
Quantitiy of Concrete in End Cross Girders = 14.745 cum
Total Quantity of Concrete in Cross Girders = = 22 cum

Concrete in Deck Slab = 53.87


Concrete in Girders = 85.00
Concrete in Cross Girders = 25.00
Total Quantity of HYSD Steel = 25
Total Quantity of pre-stressed Steel = 5
Calculation of Quantities for PSC Girder of 22.210 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 8.00 m
Formation Width = 9.00 m
Length of Superstructure between expansion joints = 22.210 m
Length of Superstructure between bearings = 21.270 m
Number of Main Girders = 3
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 6.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 7.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 14.17 m
Length of Flared Portion = 4.44 m
Length of End Portion = 3.16 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

1.16 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 0.953 sqm
Total Area = 1.216 sqm

2.2

0.825 0.3

Section of Girder in Flared portion


Total Area = 1.013 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.652 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.196 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.809 sqm

Quantitiy of Concrete in one Girder in End Portion = 3.844 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 11.459 cum
Quantitiy of Concrete in one Girder in Flared Portion = 4.496 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 1.714 cum
Quantitiy of Concrete in one End Cross Girder = 5.969 cum
27.482
Quantity of Concrete in deck slab in one carriageway = 43.976 cum
Total Quantity of Concrete in deck slab = = 44 cum
Quantitiy of Concrete in Girders in End Portion = 11.532 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 34.377 cum
Quantitiy of Concrete in Girders in Flared Portion = 13.488 cum
Total Quantity of Concrete in PSC Girders = = 59 cum
Quantitiy of Concrete in Intermediate Cross Girders = 5.142 cum
Quantitiy of Concrete in End Cross Girders = 11.939 cum
Total Quantity of Concrete in Cross Girders = = 17 cum

Concrete in Deck Slab = 43.98


Concrete in Girders = 60.00
Concrete in Cross Girders = 20.00
Total Quantity of HYSD Steel = 19
Total Quantity of pre-stressed Steel = 4
Calculation of Quantities for PSC Girder of 19.591 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 8.00 m
Formation Width = 9.00 m
Length of Superstructure between expansion joints = 19.591 m
Length of Superstructure between bearings = 18.651 m
Number of Main Girders = 3
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 6.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 7.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 12.43 m
Length of Flared Portion = 3.88 m
Length of End Portion = 2.84 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

0.99 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 0.814 sqm
Total Area = 1.077 sqm

1.9

0.825 0.3

Section of Girder in Flared portion


Total Area = 0.918 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.483 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.145 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.758 sqm

Quantitiy of Concrete in one Girder in End Portion = 3.059 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 9.423 cum
Quantitiy of Concrete in one Girder in Flared Portion = 3.560 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 1.410 cum
Quantitiy of Concrete in one End Cross Girder = 5.234 cum
22.686
Quantity of Concrete in deck slab in one carriageway = 38.790 cum
Total Quantity of Concrete in deck slab = = 39 cum
Quantitiy of Concrete in Girders in End Portion = 9.177 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 28.268 cum
Quantitiy of Concrete in Girders in Flared Portion = 10.680 cum
Total Quantity of Concrete in PSC Girders = = 48 cum
Quantitiy of Concrete in Intermediate Cross Girders = 4.230 cum
Quantitiy of Concrete in End Cross Girders = 10.469 cum
Total Quantity of Concrete in Cross Girders = = 15 cum

Concrete in Deck Slab = 38.79


Concrete in Girders = 50.00
Concrete in Cross Girders = 15.00
Total Quantity of HYSD Steel = 16
Total Quantity of pre-stressed Steel = 3
Calculation of Quantities for PSC Girder of 19.591 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 8.00 m
Formation Width = 9.00 m
Length of Superstructure between expansion joints = 19.591 m
Length of Superstructure between bearings = 18.651 m
Number of Main Girders = 3
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 6.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 7.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 12.43 m
Length of Flared Portion = 3.88 m
Length of End Portion = 2.84 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

0.99 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 0.814 sqm
Total Area = 1.077 sqm

1.9

0.825 0.3

Section of Girder in Flared portion


Total Area = 0.918 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.483 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.145 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.758 sqm

Quantitiy of Concrete in one Girder in End Portion = 3.059 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 9.423 cum
Quantitiy of Concrete in one Girder in Flared Portion = 3.560 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 1.410 cum
Quantitiy of Concrete in one End Cross Girder = 5.234 cum
22.686
Quantity of Concrete in deck slab in one carriageway = 38.790 cum
Total Quantity of Concrete in deck slab = = 39 cum
Quantitiy of Concrete in Girders in End Portion = 9.177 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 28.268 cum
Quantitiy of Concrete in Girders in Flared Portion = 10.680 cum
Total Quantity of Concrete in PSC Girders = = 48 cum
Quantitiy of Concrete in Intermediate Cross Girders = 4.230 cum
Quantitiy of Concrete in End Cross Girders = 10.469 cum
Total Quantity of Concrete in Cross Girders = = 15 cum

Concrete in Deck Slab = 38.79


Concrete in Girders = 50.00
Concrete in Cross Girders = 15.00
Total Quantity of HYSD Steel = 16
Total Quantity of pre-stressed Steel = 3
Calculation of Quantities for PSC Girder of 19.350 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 8.00 m
Formation Width = 9.00 m
Length of Superstructure between expansion joints = 19.350 m
Length of Superstructure between bearings = 18.410 m
Number of Main Girders = 3
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 6.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 7.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 12.27 m
Length of Flared Portion = 3.84 m
Length of End Portion = 2.80 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

0.97 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 0.801 sqm
Total Area = 1.064 sqm

1.9

0.825 0.3

Section of Girder in Flared portion


Total Area = 0.909 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

0.468 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.140 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.753 sqm

Quantitiy of Concrete in one Girder in End Portion = 2.980 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 9.243 cum
Quantitiy of Concrete in one Girder in Flared Portion = 3.490 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 1.382 cum
Quantitiy of Concrete in one End Cross Girder = 5.167 cum
22.262
Quantity of Concrete in deck slab in one carriageway = 38.313 cum
Total Quantity of Concrete in deck slab = = 38 cum
Quantitiy of Concrete in Girders in End Portion = 8.940 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 27.730 cum
Quantitiy of Concrete in Girders in Flared Portion = 10.469 cum
Total Quantity of Concrete in PSC Girders = = 47 cum
Quantitiy of Concrete in Intermediate Cross Girders = 4.146 cum
Quantitiy of Concrete in End Cross Girders = 10.333 cum
Total Quantity of Concrete in Cross Girders = = 14 cum

Concrete in Deck Slab = 38.31


Concrete in Girders = 50.00
Concrete in Cross Girders = 15.00
Total Quantity of HYSD Steel = 15
Total Quantity of pre-stressed Steel = 3
Calculation of Quantities for PSC Girder of 33.485 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 33.485 m
Length of Superstructure between bearings = 32.337 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 10.25 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 21.56 m
Length of Flared Portion = 6.74 m
Length of End Portion = 4.54 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.25
0.18 A
0.037 B

1.94 C

0.83
Section of Girder at ends

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.038 sqm
Crossection Area of C = 1.600 sqm
Total Area = 1.863 sqm

3.4

0.825 0.3

Section of Girder in Flared portion


Total Area = 1.453 sqm

1.25
0.475 0.475
0.30
0.18 A
0.1 B

1.436 C

0.2 D
0.24 E
0.2625 0.2625

0.83
Section of Girder in intermediate portion

Crossection Area of A = 0.225 sqm


Crossection Area of B = 0.078 sqm
Crossection Area of C = 0.431 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 1.044 sqm

Quantitiy of Concrete in one Girder in End Portion = 8.458 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 22.500 cum
Quantitiy of Concrete in one Girder in Flared Portion = 9.795 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 4.687 cum
Quantitiy of Concrete in one End Cross Girder = 13.258 cum
58.698
Quantity of Concrete in deck slab in one carriageway = 88.400 cum
Total Quantity of Concrete in deck slab = = 88 cum
Quantitiy of Concrete in Girders in End Portion = 33.830 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 90.000 cum
Quantitiy of Concrete in Girders in Flared Portion = 39.181 cum
Total Quantity of Concrete in PSC Girders = = 163 cum
Quantitiy of Concrete in Intermediate Cross Girders = 14.060 cum
Quantitiy of Concrete in End Cross Girders = 26.516 cum
Total Quantity of Concrete in Cross Girders = = 41 cum

Concrete in Deck Slab = 88.40


Concrete in Girders = 165.00
Concrete in Cross Girders = 45.00
Total Quantity of HYSD Steel = 45
Total Quantity of pre-stressed Steel = 10
Calculation of Quantities for PSC Girder of 30.5 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 30.500 m
Length of Superstructure between bearings = 29.560 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
Length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 3
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.30 m
Number of End Cross Girders = 2
Length of end Cross Girders = 10.20 m
Thickness of end Cross Girders = 0.60 m
Length of Intermediate Portion = 19.36 m
Length of Flared Portion = 6.04 m
Length of End Portion = 4.66 m
Thickness of Deck Slab = 0.22 m
Thickness of Girder at mid portion = 0.30 m
Thickness of Girder at end portion = 0.83 m

1.2
0.18 A
0.042 B

1.75 C

0.825
Section of Girder at ends

Crossection Area of A = 0.216 sqm


Crossection Area of B = 0.043 sqm
Crossection Area of C = 1.443 sqm
Total Area = 1.701 sqm

3.0

0.825 0.3

Section of Girder in Flared portion


Total Area = 1.339 sqm

1.2
0.45 0.45
0.30
0.18 A
0.1 B

1.251 C

0.2 D
0.24 E
0.263 0.263

0.825
Section of Girder in intermediate portion

Crossection Area of A = 0.216 sqm


Crossection Area of B = 0.075 sqm
Crossection Area of C = 0.375 sqm
Crossection Area of D = 0.113 sqm
Crossection Area of E = 0.198 sqm
Total Area = 0.977 sqm

Quantitiy of Concrete in one Girder in End Portion = 7.927 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 18.909 cum
Quantitiy of Concrete in one Girder in Flared Portion = 8.087 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 4.187 cum
Quantitiy of Concrete in one End Cross Girder = 12.060 cum
51.171
Quantity of Concrete in deck slab in one carriageway = 80.520 cum
Total Quantity of Concrete in deck slab = = 81 cum
Quantitiy of Concrete in Girders in End Portion = 31.710 cum
Quantitiy of Concrete in Girders in Intermediate Portion = 75.636 cum
Quantitiy of Concrete in Girders in Flared Portion = 32.349 cum
Total Quantity of Concrete in PSC Girders = = 140 cum
Quantitiy of Concrete in Intermediate Cross Girders = 12.560 cum
Quantitiy of Concrete in End Cross Girders = 24.121 cum
Total Quantity of Concrete in Cross Girders = = 37 cum

Concrete in Deck Slab = 80.52


Concrete in Girders = 140.00
Concrete in Cross Girders = 40.00
Total Quantity of HYSD Steel = 39
Total Quantity of pre-stressed Steel = 8
Calculation of Quantities for RCC Precast Girder of 15.6 m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 15.60 m
Length of Superstructure between bearings = 14.66 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 1
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.33 m
Number of End Cross Girders = 2
Length of end Cross Girders = 9.63 m
Thickness of end Cross Girders = 0.50 m
Length of Intermediate Portion = 11.06 m
Length of Flared Portion = 1.80 m
Length of End Portion = 2.30 m
Thickness of Deck Slab = 0.25 m
Thickness of Girder at mid portion = 0.625 m
Thickness of Girder at end portion = 0.375 m

0
0 A
0 B

1.11 C

0.625
Section of Girder at ends

Crossection Area of A = 0 sqm


Crossection Area of B = 0.000 sqm
Crossection Area of C = 0.694 sqm
Total Area = 0.694 sqm

0.9

0.625 0.375

Section of Girder in Flared portion


Total Area = 0.636 sqm

0.625
0.125 0.125
0.375
0.25 A
0.15 B

0.31 C

0.15 D
0.25 E
0.125 0.125

0.625
Section of Girder in intermediate portion

Crossection Area of A = 0.156 sqm


Crossection Area of B = 0.075 sqm
Crossection Area of C = 0.116 sqm
Crossection Area of D = 0.075 sqm
Crossection Area of E = 0.156 sqm
Total Area = 0.579 sqm

Quantitiy of Concrete in one Girder in End Portion = 1.596 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 6.401 cum
Quantitiy of Concrete in one Girder in Flared Portion = 1.145 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 1.784 cum
Quantitiy of Concrete in one End Cross Girder = 5.342 cum
16.268
Quantity of Concrete in deck slab in one carriageway = 46.800 cum
Total Quantity of Concrete in deck slab = = 47 cum

Quantitiy of Concrete in Girders in End Portion = 6.383 cum


Quantitiy of Concrete in Girders in Intermediate Portion = 25.604 cum
Quantitiy of Concrete in Girders in Flared Portion = 4.581 cum
Total Quantity of Concrete in RCC Girders = = 37 cum

Quantitiy of Concrete in Intermediate Cross Girders = 1.784 cum


Quantitiy of Concrete in End Cross Girders = 10.684 cum
Total Quantity of Concrete in Cross Girders = = 12 cum

Total Quantity of Concrete in RCC Girders and Slab = 100.00 cum


Total Quantity of Steel in RCC Girders and Slab = 18.00 MT
Calculation of Quantities for RCC Precast Girder of 15.85m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 15.85 m
Length of Superstructure between bearings = 14.91 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 1
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.33 m
Number of End Cross Girders = 2
Length of end Cross Girders = 9.63 m
Thickness of end Cross Girders = 0.50 m
Length of Intermediate Portion = 11.31 m
Length of Flared Portion = 1.80 m
Length of End Portion = 2.30 m
Thickness of Deck Slab = 0.25 m
Thickness of Girder at mid portion = 0.625 m
Thickness of Girder at end portion = 0.375 m

0
0 A
0 B

1.11 C

0.625
Section of Girder at ends

Crossection Area of A = 0 sqm


Crossection Area of B = 0.000 sqm
Crossection Area of C = 0.694 sqm
Total Area = 0.694 sqm

0.9

0.625 0.375

Section of Girder in Flared portion


Total Area = 0.636 sqm

0.625
0.125 0.125
0.375
0.25 A
0.15 B

0.31 C

0.15 D
0.25 E
0.125 0.125

0.625
Section of Girder in intermediate portion

Crossection Area of A = 0.156 sqm


Crossection Area of B = 0.075 sqm
Crossection Area of C = 0.116 sqm
Crossection Area of D = 0.075 sqm
Crossection Area of E = 0.156 sqm
Total Area = 0.579 sqm

Quantitiy of Concrete in one Girder in End Portion = 1.596 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 6.546 cum
Quantitiy of Concrete in one Girder in Flared Portion = 1.145 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 1.784 cum
Quantitiy of Concrete in one End Cross Girder = 5.342 cum
16.413
Quantity of Concrete in deck slab in one carriageway = 47.550 cum
Total Quantity of Concrete in deck slab = = 48 cum

Quantitiy of Concrete in Girders in End Portion = 6.383 cum


Quantitiy of Concrete in Girders in Intermediate Portion = 26.183 cum
Quantitiy of Concrete in Girders in Flared Portion = 4.581 cum
Total Quantity of Concrete in RCC Girders = = 37 cum

Quantitiy of Concrete in Intermediate Cross Girders = 1.784 cum


Quantitiy of Concrete in End Cross Girders = 10.684 cum
Total Quantity of Concrete in Cross Girders = = 12 cum

Total Quantity of Concrete in RCC Girders and Slab = 100.00 cum


Total Quantity of Steel in RCC Girders and Slab = 18.00 MT
Calculation of Quantities for RCC Precast Girder of 14.85m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 14.85 m
Length of Superstructure between bearings = 13.91 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 1
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.33 m
Number of End Cross Girders = 2
Length of end Cross Girders = 9.63 m
Thickness of end Cross Girders = 0.50 m
Length of Intermediate Portion = 10.31 m
Length of Flared Portion = 1.80 m
Length of End Portion = 2.30 m
Thickness of Deck Slab = 0.25 m
Thickness of Girder at mid portion = 0.625 m
Thickness of Girder at end portion = 0.375 m

0
0 A
0 B

1.01 C

0.625
Section of Girder at ends

Crossection Area of A = 0 sqm


Crossection Area of B = 0.000 sqm
Crossection Area of C = 0.631 sqm
Total Area = 0.631 sqm

0.9

0.625 0.375

Section of Girder in Flared portion


Total Area = 0.586 sqm

0.625
0.125 0.125
0.375
0.25 A
0.15 B

0.21 C

0.15 D
0.25 E
0.125 0.125

0.625
Section of Girder in intermediate portion

Crossection Area of A = 0.156 sqm


Crossection Area of B = 0.075 sqm
Crossection Area of C = 0.079 sqm
Crossection Area of D = 0.075 sqm
Crossection Area of E = 0.156 sqm
Total Area = 0.541 sqm

Quantitiy of Concrete in one Girder in End Portion = 1.452 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 5.580 cum
Quantitiy of Concrete in one Girder in Flared Portion = 1.055 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 1.492 cum
Quantitiy of Concrete in one End Cross Girder = 4.861 cum
14.440
Quantity of Concrete in deck slab in one carriageway = 44.550 cum
Total Quantity of Concrete in deck slab = = 45 cum

Quantitiy of Concrete in Girders in End Portion = 5.808 cum


Quantitiy of Concrete in Girders in Intermediate Portion = 22.321 cum
Quantitiy of Concrete in Girders in Flared Portion = 4.221 cum
Total Quantity of Concrete in RCC Girders = = 32 cum

Quantitiy of Concrete in Intermediate Cross Girders = 1.492 cum


Quantitiy of Concrete in End Cross Girders = 9.721 cum
Total Quantity of Concrete in Cross Girders = = 11 cum

Total Quantity of Concrete in RCC Girders and Slab = 90.00 cum


Total Quantity of Steel in RCC Girders and Slab = 16.20 MT
Calculation of Quantities for RCC Precast Girder of 17.6m Span

Number of carriageways = 1 (always 1)


Carriageway Width = 11.00 m
Formation Width = 12.00 m
Length of Superstructure between expansion joints = 17.60 m
Length of Superstructure between bearings = 16.66 m
Number of Main Girders = 4
Spacing between c/c of main girders = 3.000 m
length of cantilever portion on each side = 1.500 m
Number of Intermediate Cross Girders = 1
Length of intermediate Cross Girders = 9.00 m
Thickness of intermediate Cross Girders = 0.33 m
Number of End Cross Girders = 2
Length of end Cross Girders = 9.63 m
Thickness of end Cross Girders = 0.50 m
Length of Intermediate Portion = 13.06 m
Length of Flared Portion = 1.80 m
Length of End Portion = 2.30 m
Thickness of Deck Slab = 0.25 m
Thickness of Girder at mid portion = 0.625 m
Thickness of Girder at end portion = 0.375 m

0
0 A
0 B

1.26 C

0.625
Section of Girder at ends

Crossection Area of A = 0 sqm


Crossection Area of B = 0.000 sqm
Crossection Area of C = 0.788 sqm
Total Area = 0.788 sqm

0.9

0.625 0.375

Section of Girder in Flared portion


Total Area = 0.711 sqm

0.625
0.125 0.125
0.375
0.25 A
0.15 B

0.46 C

0.15 D
0.25 E
0.125 0.125

0.625
Section of Girder in intermediate portion

Crossection Area of A = 0.156 sqm


Crossection Area of B = 0.075 sqm
Crossection Area of C = 0.173 sqm
Crossection Area of D = 0.075 sqm
Crossection Area of E = 0.156 sqm
Total Area = 0.635 sqm

Quantitiy of Concrete in one Girder in End Portion = 1.811 cum


Quantitiy of Concrete in one Girder in Intermediate Portion = 8.293 cum
Quantitiy of Concrete in one Girder in Flared Portion = 1.280 cum
Quantitiy of Concrete in one Intermediate Cross Girder = 2.223 cum
Quantitiy of Concrete in one End Cross Girder = 6.064 cum
19.671
Quantity of Concrete in deck slab in one carriageway = 52.800 cum
Total Quantity of Concrete in deck slab = = 53 cum

Quantitiy of Concrete in Girders in End Portion = 7.245 cum


Quantitiy of Concrete in Girders in Intermediate Portion = 33.172 cum
Quantitiy of Concrete in Girders in Flared Portion = 5.121 cum
Total Quantity of Concrete in RCC Girders = = 46 cum

Quantitiy of Concrete in Intermediate Cross Girders = 2.223 cum


Quantitiy of Concrete in End Cross Girders = 12.128 cum
Total Quantity of Concrete in Cross Girders = = 14 cum

Total Quantity of Concrete in RCC Girders and Slab = 115.00 cum


Total Quantity of Steel in RCC Girders and Slab = 20.70 MT
3.223
Span 50.5
Width of top Flange 0.350
Width of bottom Flange 0.580
Height of Web 3.159
Main Girders

Thickness of Web 0.012


Thickness of Top Flange 0.032
Thickness of bottom Flange 0.032
Length of Girder 50.546
No of Girders 4
Steel (cum) 13.7
Steel in main girders (MT) 107.5
Width of top Flange 0.300
Width of bottom Flange 0.300
Height of Web 3.159
Cross Girders

Thickness of Web 0.012


Thickness of Top Flange 0.020
Thickness of bottom Flange 0.020
Length of Girder 7.650
No of Girders 4
Steel (cum) 1.527
Steel in cross girders (MT) 12.004
Vertical Stiffners

Height of Stiffner 3.159


Width of Stiffner 0.144
Thickness of Stiffner 0.012
No of Stiffners 809
Steel in Stiffners (cum) 4.4
Steel in Stiffners (MT) 34.7
Dia of stud head 0.038
Dia of stud shaft 0.025
Length of stud head 0.025
Studs

Length of stud shaft 0.125


No of Studs 2696
Steel in Stud (cum) 0.242
Steel in Stud (MT) 1.901
Total Steel (MT) 156.1
Add 10% extra 172
Quantitiy of Steel per cubic metre

Particulars Weight Unit


FOUNDATION
Open foundation 80 Kg/m3
SUBSTRUCTURE
Pier 120 Kg/m3
Pier Cap 180 Kg/m3
Abutment and Abutment Cap 160 Kg/m3
PUP 80 Kg/m3
VUP 100 Kg/m3
SUPERSTRUCTURE
RCC Solid Slab 90 Kg/m3
RCC T-beam Girder and Slab 180 Kg/m3
HYSD Steel in Deck Slab of PSC Girder 160 Kg/m3
HYSD Steel in Prescast PSC Girder 120 Kg/m3
PSC Steel in Prescast PSC Girder 60 Kg/m3
The Louis Berger Group, Inc

Concrete in Footing Straight Portion Cum


Length of Retaining Wall on Each Side m
Concrete in Retaining Wall m
Backfilling Behind Abutment Walls Cum
Volume of Concrete per square Meter in superstructure

BILL OF QUANT
7. Bridge/ Structure Works
Item
Description of Item Unit Rate
No.
A. Dismantling
6.01 Dismantling of
a) Brick Masonry Cum -
b) Stone Masonry Cum -
c) PCC Cum -
d) RCC Cum -
e) Wearing course/Pavement Cum -
6.02 Dredging and disposing of silting Cum -
B. Foundations -
6.03 Earthwork in excavation -
a) In all types of Soil/Clay Cum -
b) In ordinary Rock Cum -
c) In hard Rock Cum -
6.04 PCC of Grade M 15 Cum -
6.05 PCC of Grade M20 in cut off walls Cum -
6.06 RCC in open foundations -
a) Grade M 25 Cum -
b) Grade M 30 Cum -
6.07 Piles of 1200 mm diameter -
a) 0-10m depth Lm -
b) 10-20m depth Lm -
c) 20-30m depth Lm -
6.08 Carrying out load test on any pile -
a) Initial Load Test on test pile for 2.0 times the design load -
1.2 m Dia Pile MT -
b) Routine pile load test on working pile for a test load of 1.5 times -
1.2 m Dia Pile (2% of piles in total). MT -
c) Initial Horizontal pile load test on test pile for a test load of 2.0 times -
1.2 m Dia Pile MT -
6.09 RCC grade M 35 in pile cap Cum -
6.10 Cutting edge for well foundations MT -

1 of 150
The Louis Berger Group, Inc

BILL OF QUANT
6.11 RCC of Grade M30 in well curbs Cum -
6.12 RCC of Grade M30 in well steining Cum -
6.13 Sinking of well foundations -
a) 7.0 m dia. Well -
(i) 0 - 3m depth Lm -
(ii) 3 - 10m depth Lm -
(iii) 10 - 15m depth Lm -
(iv) 15 - 20m depth Lm -
b) 6.0 m dia. Well -
(i) 0 - 3m depth Lm -
(ii) 3 - 10m depth Lm -
(iii) 10 - 15m depth Lm -
(iv) 15 - 20m depth Lm
6.14 RCC grade M 25 in bottom Plug Cum -
6.15 filling sand in the dredge holes of the wells Cum -
6.16 RCC grade M 25 in Top / Intermediate Plug Cum -
6.17 RCC grade M 30 in well cap Cum -
6.18 Providing & fixing in position HYSD (TMT) Fe 500 grade reinforcement
bars in open foundations,Pile, Pile caps, Well caps, well steining ,box MT -
cell structures and well kerb
C. Substructures -
6.19 RCC in piers, pier cap, pedestals, cantilever/counterfort abutments,
abutment cap, dirt walls, wing walls, retaining walls, median wall etc -

a) Grade M 30 Cum -
b) Grade M 35 Cum -
6.20 RCC in box cell structures -
a) Grade M 25 Cum -
b) Grade M 30 Cum -
6.21 HYSD (TMT) Fe 500 grade reinforcement bars in abutment wall,
abutment cap, dirt wall, pier, pier caps and retaining wall, box cell etc. MT -

6.22 Back filling behind abutments, wing walls, return wall etc. Cum -
6.23 Filter media behind abutment, retaining wall and return wall Cum -
6.24 100mm diameter PVC pipe for weep holes in retaining wall, abutment
Nos. -
wall, wing/return wall, median wall
D. Superstructures -
6.25 RCC grade M-35 in Solid Slab Cum -
6.26 HYSD (TMT) Fe 500 grade reinforcement bars in RCC Solid Slab MT -
6.27 RCC M-35 in T-beam Girders, cross girders and deck slab Cum -
6.28 HYSD (TMT) Fe 500 grade reinforcement bars in T-beam Girders,
MT -
cross girders and deck slab
6.29 Cast-in-situ grade M-45 in deck slab and cross-griders for Pre-stressed
Cum -
Concrete girders
6.30 HYSD (TMT) Fe 500 grade reinforcement bars in in deck slab, girders
MT -
and cross-griders of PSC girder superstructure
6.31 Pre-stressed Concrete in Pre-cast I beam girders Cum -
2 of 150
The Louis Berger Group, Inc

BILL OF QUANT
6.32 High tensile steel wires/strands MT -
6.33 Structural Steel MT
E. Miscellaneous -
6.34 Wearing Coat Sqm -
6.35 Bearings -
a) POT cum PTFE -
(i) Fixed Bearing Nos. -
(ii)Free/Guided Bearing Nos. -
b) Elastomeric Bearings Cu Cm -
c) Tar paper bearing Sqm -
6.36 Expansion Joints -
a) Filler type joints Lm -
b) Strip seal type Lm -
6.37 Drainage spouts Nos. -
6.38 RCC grade M40 in crash barrier Cum -
6.39 PCC grade M 15 below approach slabs Cum -
6.40 RCC grade M 30 in approach slabs Cum -
6.41 PVC downtake and runner pipe Lm -
6.42 Painting structure Nos. -
6.43 Hand packed boulder pitching on slopes of embankment Cum -
6.44 Filter material underneath stone pitching Cum -
6.45 Rigid apron Cum -
6.46 Boulder apron Cum -
6.47 RCC M20 in head walls Cum -
6.48 sub soil investigation/confirmatory boreholes Lm -
a) Depth between 0m to 10m m 1,000
b) Depth between 10m to 20m m 1,200
c) Depth between 20m to 30m m
d) Depth between 30m to 40m m
G. Rehabilitation of Structures -
6.49 Cleaning and removal of vegetation growth from structures, channel
Sqm.
and protective works as per directions of the Engineer.
6.50 Replacement of RCC railing including reinforcement as per MORT&H
Specifications Section 1500, 1600, 1700, 2200, 2815 and Clause 2703

a) Railing in M30 grade m

3 of 150
The Louis Berger Group, Inc

39.7678865418 39.7678865418 44.95822704 49.34439554 49.34439554 44.95822704


4.1 4.1 4.1 0 0 4.1
33.743 33.743 33.743 0 0 33.743
617.67 617.67 598.27 0 0 598.27
1.1 1.1 1.1 1.1

OF QUANTITIES
Bridge at Bridge at
Minor Bridge at Km
Minor Bridge at Km 35.860
22.680

- -
- -
- -
- -
- -
- -
- -
- -
354 354 1,416.89 - 533 298 298 533
- -
- -
12 12 47.23 - 13 7 7 13
- -
- -
- -
106 106 425.72 - 120 49 49 120
- -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- -
- -
- - - - - - - -
- -
- - - - - - - -
- -
- - - - - - - -
- - - - - - - -
- - - - - - - -

4 of 150
The Louis Berger Group, Inc

OF QUANTITIES
- - - - - - - -
- - - - - - - -
- -
- -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
- - - - - - - -
- -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -

9 9 10 4 4 10
34.06 -
- -

- -
- -
138 138 553.99 - 145 69 69 145
- -
- -
- - - - - - - -

17 17 18 9 9 18
67.04 -
618 618 2,470.69 - 598 - - 598
72 72 286.03 - 57 1 1 57
51 51 37 37
202.40 -
- -
154 - 308.09 - 148 148 148 -
14 - 27.73 - 13 13 13 -
- - - - - - - -
- - - - - -
- -

- - - - - -
- -

- - - - - -
- -
- - - - - - - -
5 of 150
The Louis Berger Group, Inc

OF QUANTITIES
- - - - - - - -
- -
- -
205 - 410.74 - 204 127 127 -
- -
- -
- - - - - - - -
- - - - - - - -
- - - - - - - -
7 7 28.80 - 7 8 8 7
- -
14 14 55.43 - 16 16 16 16
- - - - - - - -
3 - 5.84 - 3 3 3 -
11 - 22.40 - 11 7 7 -
6 6 25.92 - 6 6
13 13 50.40 - 13 - - 13
- - - - - - - -
1 - 2.00 - 1 - - -
18 18 70.80 - 14 - - 14
9 9 35.40 - 7 - - 7
- -
- -
- - - - - - - -
- - - - - -
10 20.00 20,000.00 10 10
5 10.00 12,000.00 5 5
- -
- -
- - - - - - - -
- - 300 575 575 300
- -

- - - - - -
- -
- - - - 37 37 37 -

6 of 150
The Louis Berger Group, Inc

Concrete in Footing Straight Portion Cum


Length of Retaining Wall on Each Side m
Concrete in Retaining Wall m
Backfilling Behind Abutment Walls Cum
Concrete in T-beam superstructure Cum
For Pile Foundation
Top Level of Pile Cap m
Width of Pile Cap m
Length of Pile Cap m
Depth of Pile Cap m
Dia of Piles m
Number of Piles m
Length of each Pile m
Concrete in Piles Cum
For Well Foundation
Top Level of Well Cap m
Outer Dia of Well m
Inner Dia of Well m
Length of Well m
Length of Well Cap m
Width of Well Cap m
Thickness of Well Cap m
Thickness of Well Steining m
Height of Well Curb m
Thickness of Top Plug m
Thickness of Bottom Plug m
Outer Area of Well m
Inner Area of Well m
Well Dia Bottom m
PSC Girders (SuperStructure)
Concrete in Deck Slab Cum
Concrete in PSC Girders Cum
Concrete in Cross Girders Cum
HYSD Steel in deck slab, Girders and cross girders MT
Prestressed Steel in PSC Girders MT
PSC Box Girder (SuperStructure)
Total Depth of PSC Box Girder m
Total quantity of Concrete in PSC Box Girder Cum
HYSD Steel in PSC Box Girder MT
Prestressed Steel in PSC Box Girder MT
RCC Box Girder (SuperStructure)
Total Depth of RCC Box Girder m
Total quantity of Concrete in RCC Box Girder Cum
HYSD Steel in RCC Box Girder MT
RCC Voided Slab (SuperStructure)
Total Depth of RCC Voided Slab m
Total quantity of Concrete in RCC Voided Slab Cum
HYSD Steel in RCC Voided Slab MT
Volume of Concrete per square Meter in superstructure

1 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
7. Bridge/ Structure Works
Item
Description of Item Unit
No.
A. Dismantling
6.01 Dismantling of
a) Brick Masonry Cum
b) Stone Masonry Cum
c) PCC Cum
d) RCC Cum
e) Wearing course/Pavement Cum
6.02 Dredging and disposing of silting Cum
B. Foundations
6.03 Earthwork in excavation
a) In all types of Soil/Clay Cum
b) In ordinary Rock Cum
c) In hard Rock Cum
6.04 PCC of Grade M 15 Cum
6.05 PCC of Grade M20 in cut off walls Cum
6.06 RCC in open foundations
a) Grade M 25 Cum
b) Grade M 30 Cum
6.07 Piles of 1200 mm diameter
a) 0-10m depth Lm
b) 10-20m depth Lm
c) 20-30m depth Lm
6.08 Carrying out load test on any pile
a) Initial Load Test on test pile for 2.0 times the design load
1.2 m Dia Pile MT
b) Routine pile load test on working pile for a test load of 1.5 times
1.2 m Dia Pile (2% of piles in total). MT
c) Initial Horizontal pile load test on test pile for a test load of 2.0 times
1.2 m Dia Pile MT
6.09 RCC grade M 35 in pile cap Cum
6.10 Cutting edge for well foundations MT

2 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
6.11 RCC of Grade M30 in well curbs Cum
6.12 RCC of Grade M30 in well steining Cum
6.13 Sinking of well foundations
a) 7.0 m dia. Well
(i) 0 - 3m depth Lm
(ii) 3 - 10m depth Lm
(iii) 10 - 15m depth Lm
(iv) 15 - 20m depth Lm
b) 6.0 m dia. Well
(i) 0 - 3m depth Lm
(ii) 3 - 10m depth Lm
(iii) 10 - 15m depth Lm
(iv) 15 - 20m depth Lm
6.14 RCC grade M 25 in bottom Plug Cum
6.15 filling sand in the dredge holes of the wells Cum
6.16 RCC grade M 25 in Top / Intermediate Plug Cum
6.17 RCC grade M 30 in well cap Cum
6.18 Providing & fixing in position HYSD (TMT) Fe 500 grade reinforcement
bars in open foundations,Pile, Pile caps, Well caps, well steining ,box MT
cell structures and well kerb
C. Substructures
6.19 RCC in piers, pier cap, pedestals, cantilever/counterfort abutments,
abutment cap, dirt walls, wing walls, retaining walls, median wall etc

a) Grade M 30 Cum
b) Grade M 35 Cum
6.20 RCC in box cell structures
a) Grade M 25 Cum
b) Grade M 30 Cum
6.21 HYSD (TMT) Fe 500 grade reinforcement bars in abutment wall,
abutment cap, dirt wall, pier, pier caps and retaining wall, box cell etc. MT

6.22 Back filling behind abutments, wing walls, return wall etc. Cum
6.23 Filter media behind abutment, retaining wall and return wall Cum
6.24 100mm diameter PVC pipe for weep holes in retaining wall, abutment
Nos.
wall, wing/return wall, median wall
D. Superstructures
6.25 RCC grade M-35 in Solid Slab Cum
6.26 HYSD (TMT) Fe 500 grade reinforcement bars in RCC Solid Slab MT
6.27 RCC M-35 in T-beam Girders, cross girders and deck slab Cum
6.28 HYSD (TMT) Fe 500 grade reinforcement bars in T-beam Girders,
MT
cross girders and deck slab
6.29 RCC Cast-in-situ grade M-45 in deck slab and cross girders of PSC
Cum
Girders
6.30 HYSD (TMT) Fe 500 grade reinforcement bars in RCC cast-in-situ
MT
deck slab, girders and Cross Girders

3 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
6.31 Pre-stressed Concrete in Pre-cast I beam girders and cross girders
Cum
6.32 High tensile steel wires/strands in Girders MT
6.33 Structural Steel MT
E. Miscellaneous
6.34 Wearing Coat Sqm
6.35 Bearings
a) POT cum PTFE
(i) Fixed Bearing Nos.
(ii) Free/Guided Bearing Nos.
b) Elastomeric Bearings Cu Cm
c) Tar paper bearing Sqm
6.36 Expansion Joints
a) Filler type joints Lm
b) Strip seal type Lm
6.37 Drainage spouts Nos.
6.38 RCC grade M40 in crash barrier Cum
6.39 PCC grade M 15 below approach slabs Cum
6.40 RCC grade M 30 in approach slabs Cum
6.41 PVC downtake and runner pipe Lm
6.42 Painting structure Nos.
6.43 Hand packed boulder pitching on slopes of embankment Cum
6.44 Filter material underneath stone pitching Cum
6.45 Rigid apron Cum
6.46 Boulder apron Cum
6.47 RCC M20 in head walls Cum
6.48 Sub soil investigation/confirmatory boreholes Lm
a) Depth between 0m to 10m m
b) Depth between 10m to 20m m
c) Depth between 20m to 30m m
d) Depth between 30m to 40m m
G. Rehabilitation of Structures
6.49 Cleaning and removal of vegetation growth from structures, channel
Sqm.
and protective works as per directions of the Engineer.
6.50 Replacement of RCC railing including reinforcement as per MORT&H
Specifications Section 1500, 1600, 1700, 2200, 2815 and Clause 2703

a) Railing in M30 grade m


6.51 Reconstruction of 300mm thick slope pitching as per MORT&H
Sqm.
Specifications Section 2500
6.52 Providing Cement concrete M-15 grade as leveling course (Mat
Concrete) below approach slab including centering and shuttering all
complete job as per drawing and MORT&H Specifications Sections Cum.
1500 & 1700.

4 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
6.53 Providing Reinforced cement concrete M-30 grade in approach slab
including reinforcement for existing bridges complete as per drawing
and MORT&H Specifications sections 1500, 1600, 1700 and clause Cum.
2704.

5 of 150
The Louis Berger Group, Inc

6 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES

Rate

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

7 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-

-
-
-
-
-

-
-
-
-
-
-
-
-

8 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-

9 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES

10 of 150
The Louis Berger Group, Inc

Concrete in Footing Straight Portion Cum


Length of Retaining Wall on Each Side m
Concrete in Retaining Wall m
Backfilling Behind Abutment Walls Cum
Concrete in T-beam superstructure Cum
For Pile Foundation
Top Level of Pile Cap m
Width of Pile Cap m
Length of Pile Cap m
Depth of Pile Cap m
Dia of Piles m
Number of Piles m
Length of each Pile m
Concrete in Piles Cum
For Well Foundation
Top Level of Well Cap m
Outer Dia of Well m
Inner Dia of Well m
Length of Well m
Length of Well Cap m
Width of Well Cap m
Thickness of Well Cap m
Thickness of Well Steining m
Height of Well Curb m
Thickness of Top Plug m
Thickness of Bottom Plug m
Outer Area of Well m
Inner Area of Well m
Well Dia Bottom m
PSC Girders (SuperStructure)
Concrete in Deck Slab Cum
Concrete in PSC Girders Cum
Concrete in Cross Girders Cum
HYSD Steel in deck slab, Girders and cross girders MT
Prestressed Steel in PSC Girders MT
PSC Box Girder (SuperStructure)
Total Depth of PSC Box Girder m
Total quantity of Concrete in PSC Box Girder Cum
HYSD Steel in PSC Box Girder MT
Prestressed Steel in PSC Box Girder MT
RCC Box Girder (SuperStructure)
Total Depth of RCC Box Girder m
Total quantity of Concrete in RCC Box Girder Cum
HYSD Steel in RCC Box Girder MT
RCC Voided Slab (SuperStructure)
Total Depth of RCC Voided Slab m
Total quantity of Concrete in RCC Voided Slab Cum
HYSD Steel in RCC Voided Slab MT
Volume of Concrete per square Meter in superstructure

1 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
7. Bridge/ Structure Works
Item
Description of Item Unit
No.
A. Dismantling
6.01 Dismantling of
a) Brick Masonry Cum
b) Stone Masonry Cum
c) RCC Cum
d) RCC Cum
e) Wearing course/Pavement Cum
6.02 Dredging and disposing of silting Cum
B. Foundations
6.03 Earthwork in excavation
a) In all types of Soil/Clay Cum
b) In ordinary Rock Cum
c) In hard Rock Cum
6.04 PCC of Grade M 15 Cum
6.05 PCC of Grade M20 in cut off walls Cum
6.06 RCC in open foundations
a) Grade M 25 Cum
b) Grade M 30 Cum
6.07 Piles of 1200 mm diameter
a) 0-10m depth Lm
b) 10-20m depth Lm
c) 20-30m depth Lm
6.08 Carrying out load test on any pile
a) Initial Load Test on test pile for 2.0 times the design load
1.2 m Dia Pile MT
b) Routine pile load test on working pile for a test load of 1.5 times
1.2 m Dia Pile (2% of piles in total). MT
c) Initial Horizontal pile load test on test pile for a test load of 2.0 times
1.2 m Dia Pile MT
6.09 RCC grade M 35 in pile cap Cum
6.10 Cutting edge for well foundations MT

2 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
6.11 RCC of Grade M30 in well curbs Cum
6.12 RCC of Grade M30 in well steining Cum
6.13 Sinking of well foundations
a) 7.0 m dia. Well
(i) 0 - 3m depth Lm
(ii) 3 - 10m depth Lm
(iii) 10 - 15m depth Lm
(iv) 15 - 20m depth Lm
b) 6.0 m dia. Well
(i) 0 - 3m depth Lm
(ii) 3 - 10m depth Lm
(iii) 10 - 15m depth Lm
(iv) 15 - 20m depth Lm
6.14 RCC grade M 25 in bottom Plug Cum
6.15 filling sand in the dredge holes of the wells Cum
6.16 RCC grade M 25 in Top / Intermediate Plug Cum
6.17 RCC grade M 30 in well cap Cum
6.18 Providing & fixing in position HYSD (TMT) Fe 500 grade reinforcement
bars in open foundations,Pile, Pile caps, Well caps, well steining ,box MT
cell structures and well kerb
C. Substructures
6.19 RCC in piers, pier cap, pedestals, cantilever/counterfort abutments,
abutment cap, dirt walls, wing walls, retaining walls, median wall etc

a) Grade M 30 Cum
b) Grade M 35 Cum
6.20 RCC in box cell structures
a) Grade M 25 Cum
b) Grade M 30 Cum
6.21 HYSD (TMT) Fe 500 grade reinforcement bars in abutment wall,
abutment cap, dirt wall, pier, pier caps and retaining wall, box cell etc. MT

6.22 Back filling behind abutments, wing walls, return wall etc. Cum
6.23 Filter media behind abutment, retaining wall and return wall Cum
6.24 100mm diameter PVC pipe for weep holes in retaining wall, abutment
Nos.
wall, wing/return wall, median wall
D. Superstructures
6.25 RCC grade M-35 in Solid Slab Cum
6.26 HYSD (TMT) Fe 500 grade reinforcement bars in RCC Solid Slab MT
6.27 RCC M-35 in T-beam Girders, cross girders and deck slab Cum
6.28 HYSD (TMT) Fe 500 grade reinforcement bars in T-beam Girders,
MT
cross girders and deck slab
6.29 RCC Cast-in-situ grade M-45 in deck slab and cross girders of PSC
Cum
Girders
6.30 HYSD (TMT) Fe 500 grade reinforcement bars in RCC cast-in-situ
deck slab, girders and Cross Girders MT
6.31 Pre-stressed Concrete in Pre-cast I beam girders Cum
3 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
6.32 High tensile steel wires/strands in Girders MT
6.33 Structural Steel MT
E. Miscellaneous
6.34 Wearing Coat Sqm
6.35 Bearings
a) POT cum PTFE
(i) Fixed Bearing Nos.
(ii) Free/Guided Bearing Nos.
b) Elastomeric Bearings Cu Cm
c) Tar paper bearing Sqm
6.36 Expansion Joints
a) Filler type joints Lm
b) Strip seal type Lm
6.37 Drainage spouts Nos.
6.38 RCC grade M40 in crash barrier Cum
6.39 PCC grade M 15 below approach slabs Cum
6.40 RCC grade M 30 in approach slabs Cum
6.41 PVC downtake and runner pipe Lm
6.42 Painting structure Nos.
6.43 Hand packed boulder pitching on slopes of embankment Cum
6.44 Filter material underneath stone pitching Cum
6.45 Rigid apron Cum
6.46 Boulder apron Cum
6.47 RCC M20 in head walls Cum
6.48 Sub soil investigation/confirmatory boreholes
a) Depth between 0m to 10m Lm
b) Depth between 10m to 20m Lm
c) Depth between 20m to 30m Lm
d) Depth between 30m to 40m Lm
G. Rehabilitation of Structures
6.49 Cleaning and removal of vegetation growth from structures, channel
Sqm.
and protective works as per directions of the Engineer.
6.50 Replacement of RCC railing including reinforcement as per MORT&H
Specifications Section 1500, 1600, 1700, 2200, 2815 and Clause 2703

a) Railing in M30 grade m


6.51 Reconstruction of 300mm thick slope pitching as per MORT&H
Sqm.
Specifications Section 2500
6.52 Providing Cement concrete M-15 grade as leveling course (Mat
Concrete) below approach slab including centering and shuttering all
complete job as per drawing and MORT&H Specifications Sections Cum.
1500 & 1700.
6.53 Providing Reinforced cement concrete M-30 grade in approach slab
including reinforcement for existing bridges complete as per drawing
and MORT&H Specifications sections 1500, 1600, 1700 and clause Cum.
2704.

4 of 150
The Louis Berger Group, Inc

75.6 160
0
0.0
0.0

80 80
140 140
40 40
36 36
8 8

0.7 0.7

5 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES

Rate

- - -
- - -
- - -
- - -
- - -
- - -
-
-
- 393 364
-
-
- 11 10
- - -
-
-
- 125 160
-
- - -
- - -
- - -
-
-
- - -
-
- - -
-
- - -
- - -
- - -

6 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
- - -
- - -
-
-
- - -

-
- - -
- - -

- - -
- - -
- - -
- - -

- 10 13

-
- 57 48
-
-
- - -

- 9 8

- - -
- - -
- - -
-
- - -
- - -
- - -
- - -

- 120 120

- 36 36
- 140 140
7 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
- 8 8

-
- 409 332
-
-
-
-
- 38,400 76,800
- - -
-
- - -
- 12 12
- 8 8
- 22 18
6
- 13 -
- 36 36
- 1 -
- - -
- - -
- - -
- - -
- - -
-
10 10
5 5

- -
-
- -

- -

- -
- -

- -

- -

8 of 150
The Louis Berger Group, Inc

Distance between Soffit and base slab top m


For Wing Wall
Minimum Height of Wing Wall above ground Level m
Maximum Height of Wing Wall above ground Level m
Depth of Wing Wall below Ground Level m
Average Height of Wing Wall m
Length of Wing Wall m
Average Area of Wing Wall m
Volume of Concrete per square Meter in superstructure

BILL OF QUANTITIES
7. Bridge/ Structure Works
Item
Description of Item Unit
No.
A. Dismantling
6.01 Dismantling of
a) Brick Masonry Cum
b) Stone Masonry Cum
c) RCC Cum
d) RCC Cum
e) Wearing course/Pavement Cum
6.02 Dredging and disposing of silting Cum
B. Foundations
6.03 Earthwork in excavation
a) In all types of Soil/Clay Cum
b) In ordinary Rock Cum
c) In hard Rock Cum
6.04 PCC of Grade M 15 Cum
6.05 PCC of Grade M20 in cut off walls Cum
6.06 RCC in open foundations
a) Grade M 25 Cum
b) Grade M 30 Cum
6.07 Piles of 1200 mm diameter
a) 0-10m depth Lm
b) 10-20m depth Lm
c) 20-30m depth Lm
6.08 Carrying out load test on any pile
a) Initial Load Test on test pile for 2.0 times the design load
1.2 m Dia Pile MT
b) Routine pile load test on working pile for a test load of 1.5 times
1.2 m Dia Pile (2% of piles in total). MT
c) Initial Horizontal pile load test on test pile for a test load of 2.0 times
1.2 m Dia Pile MT
6.09 RCC grade M 35 in pile cap Cum
6.10 Cutting edge for well foundations MT

1 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
6.11 RCC of Grade M30 in well curbs Cum
6.12 RCC of Grade M30 in well steining Cum
6.13 Sinking of well foundations
a) 7.0 m dia. Well
(i) 0 - 3m depth Lm
(ii) 3 - 10m depth Lm
(iii) 10 - 15m depth Lm
(iv) 15 - 20m depth Lm
b) 6.0 m dia. Well
(i) 0 - 3m depth Lm
(ii) 3 - 10m depth Lm
(iii) 10 - 15m depth Lm
(iv) 15 - 20m depth Lm
6.14 RCC grade M 25 in bottom Plug Cum
6.15 filling sand in the dredge holes of the wells Cum
6.16 RCC grade M 25 in Top / Intermediate Plug Cum
6.17 RCC grade M 30 in well cap Cum
6.18 Providing & fixing in position HYSD (TMT) Fe 500 grade reinforcement
bars in open foundations,Pile, Pile caps, Well caps, well steining ,box MT
cell structures and well kerb
C. Substructures
6.19 RCC in piers, pier cap, pedestals, cantilever/counterfort abutments,
abutment cap, dirt walls, wing walls, retaining walls, median wall etc

a) Grade M 30 Cum
b) Grade M 35 Cum
6.20 RCC in box cell structures
a) Grade M 25 Cum
b) Grade M 30 Cum
6.21 HYSD (TMT) Fe 500 grade reinforcement bars in abutment wall,
abutment cap, dirt wall, pier, pier caps and retaining wall, box cell etc. MT

6.22 Back filling behind abutments, wing walls, return wall etc. Cum
6.23 Filter media behind abutment, retaining wall and return wall Cum
6.24 100mm diameter PVC pipe for weep holes in retaining wall, abutment
Nos.
wall, wing/return wall, median wall
D. Superstructures
6.25 RCC grade M-35 in Solid Slab Cum
6.26 HYSD (TMT) Fe 500 grade reinforcement bars in RCC Solid Slab MT
6.27 RCC M-35 in T-beam Girders, cross girders and deck slab Cum
6.28 HYSD (TMT) Fe 500 grade reinforcement bars in T-beam Girders,
MT
cross girders and deck slab
6.29 Cast-in-situ grade M-45 in deck slab and cross girders of PSC Girders
Cum
6.30 HYSD (TMT) Fe 500 grade reinforcement bars in RCC cast-in-situ
MT
deck slab, girders and Cross Girders

2 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
6.31 Pre-stressed Concrete in Pre-cast I beam girders and cross girders
Cum
6.32 High tensile steel wires/strands in Girders MT
6.33 Structural Steel MT
E. Miscellaneous
6.34 Wearing Coat Sqm
6.35 Bearings
a) POT cum PTFE
(i) Fixed Bearing Nos.
(ii) Free/Guided Bearing Nos.
b) Elastomeric Bearings Cu Cm
c) Tar paper bearing Sqm
6.36 Expansion Joints
a) Filler type joints Lm
b) Strip seal type Lm
6.37 Drainage spouts Nos.
6.38 RCC grade M40 in crash barrier Cum
6.39 PCC grade M 15 below approach slabs Cum
6.40 RCC grade M 30 in approach slabs Cum
6.41 PVC downtake and runner pipe Lm
6.42 Painting structure Nos.
6.43 Hand packed boulder pitching on slopes of embankment Cum
6.44 Filter material underneath stone pitching Cum
6.45 Rigid apron Cum
6.46 Boulder apron Cum
6.47 RCC M20 in head walls Cum
6.48 Sub soil investigation/confirmatory boreholes Lm
a) Depth between 0m to 10m m
b) Depth between 10m to 20m m
c) Depth between 20m to 30m m
d) Depth between 30m to 40m m
G. Rehabilitation of Structures
6.49 Cleaning and removal of vegetation growth from structures, channel
Sqm.
and protective works as per directions of the Engineer.
6.50 Replacement of RCC railing including reinforcement as per MORT&H
Specifications Section 1500, 1600, 1700, 2200, 2815 and Clause 2703

a) Railing in M30 grade m


6.51 Reconstruction of 300mm thick slope pitching as per MORT&H
Sqm.
Specifications Section 2500
6.52 Providing Cement concrete M-15 grade as leveling course (Mat
Concrete) below approach slab including centering and shuttering all
complete job as per drawing and MORT&H Specifications Sections Cum.
1500 & 1700.

3 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
6.53 Providing Reinforced cement concrete M-30 grade in approach slab
including reinforcement for existing bridges complete as per drawing
and MORT&H Specifications sections 1500, 1600, 1700 and clause Cum.
2704.

4 of 150
The Louis Berger Group, Inc

5.5 5.5 5.5

0.7 0.7 0.7

Rate

- - - -
- - - -
- - - -
- - - -
- - - -
- 788 788 973 973 838 838
- - - -
- - - -
- 373 373 452 452 394 394
- - - -
- - - -
- 33 33 40 40 35 35
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

5 of 150
The Louis Berger Group, Inc

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - -
- - - -
- - - -
- - - -
- - - -

- - - -

- - - -

- - - -

- - - -
- - - -
- - - -
- - - -
- 622 622 757 757 659 659

- 62 62 76 76 66 66

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -

- - - -

6 of 150
The Louis Berger Group, Inc

- - - -
- - - -
- - -
- - - -
- 414 414 468 468 428 428
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- 55 55 68 68 59 59
- - - -
- 2 2 2 2 2 2
- 11 11 13 13 12 12
26 26 26 26 26 26
- 58 58 58 58 58 58
- 10 10 10 10 10 10
- 1 1 1 1 1 1
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
10 10 10 10 10 10
5 5 5 5 5 5
- - -
- - -
- - - -
- - - - - -

- - - - - -

- - - - - -
- - - - - -

- - - - - -

7 of 150
The Louis Berger Group, Inc

- - - - - -

8 of 150
The Louis Berger Group, Inc

5.5 5.5 5.0

0.7 0.7 0.5

Underpass

- - -
- - -
- - -
- - -
- - -
788 788 788 788 450 450
- - -
- - -
373 373 373 373 190 190
- - -
- - -
33 33 33 33 20 20
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

9 of 150
The Louis Berger Group, Inc

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -

- - -

- - -

- - -
- - -
- - -
- - -
622 622 622 622 308 308

62 62 62 62 25 25

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -

- - -

10 of 150
The Louis Berger Group, Inc

- - -
- - -
- - -
- - -
414 414 414 414 306 306
- - -
- - -
- - -
- - -
- - -
- - -
- - -
55 55 55 55 55 55
- - -
2 2 2 2 2 2
11 11 11 11 8 8
26 26 26 26 26 26
58 58 58 58 58 58
10 10 10 10 9 9
1 1 1 1 1 1
- - -
- - -
- - -
- - -
- - -
- - -
10 10 10 10 10 10
5 5 5 5 5 5
- - -
- - -
- - -
- - - - - -

- - - - - -

- - - - - -
- - - - - -

- - - - - -

11 of 150
The Louis Berger Group, Inc

- - - - - -

12 of 150
The Louis Berger Group, Inc

5.0 5.0 5.0

0.5 0.5 0.5

- - -
- - -
- - -
- - -
- - -
450 450 450 450 450 450
- - -
- - -
191 191 190 190 190 190
- - -
- - -
20 20 20 20 20 20
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

13 of 150
The Louis Berger Group, Inc

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -

- - -

- - -

- - -
- - -
- - -
- - -
316 316 308 308 308 308

25 25 25 25 25 25

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -

- - -

14 of 150
The Louis Berger Group, Inc

- - -
- - -
- - -
- - -
307 307 306 306 306 306
- - -
- - -
- - -
- - -
- - -
- - -
- - -
55 55 55 55 55 55
- - -
2 2 2 2 2 2
8 8 8 8 8 8
26 26 26 26 26 26
58 58 58 58 58 58
9 9 9 9 9 9
1 1 1 1 1 1
- - -
- - -
- - -
- - -
- - -
- - -
10 10 10 10 10 10
5 5 5 5 5 5
- - -
- - -
- - -
- - - - - -

- - - - - -

- - - - - -
- - - - - -

- - - - - -

15 of 150
The Louis Berger Group, Inc

- - - - - -

16 of 150
The Louis Berger Group, Inc

5.0

0.5

-
-
-
-
-
450 450
-
-
190 190
-
-
20 20
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

17 of 150
The Louis Berger Group, Inc

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
308 308

25 25

-
-
-
-
-
-
-
-

18 of 150
The Louis Berger Group, Inc

-
-
-
-
306 306
-
-
-
-
-
-
-
55 55
-
2 2
8 8
26 26
58 58
9 9
1 1
-
-
-
-
-
-
10 10
5 5
-
-
-
- -

- -

- -
- -

- -

19 of 150
The Louis Berger Group, Inc

- -

20 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
7. Bridge/ Structure Works
Item
Description of Item Unit
No.
A. Dismantling
6.01 Dismantling of
a) Brick Masonry Cum
b) Stone Masonry Cum
c) PCC Cum
d) RCC Cum
e) Wearing course/Pavement Cum
6.02 Dredging and disposing of silting Sqm
B. Foundations
6.03 Earthwork in excavation
a) In all types of Soil/Clay Cum
b) In ordinary Rock Cum
c) In hard Rock Cum
6.04 PCC of Grade M 15 Cum
6.05 PCC of Grade M20 in cut off walls Cum
6.06 RCC in open foundations
a) Grade M 25 Cum
b) Grade M 35 Cum
6.07 Piles of 1200 mm diameter
a) 0-10m depth Lm
b) 10-20m depth Lm
c) 20-30m depth Lm
6.08 Carrying out load test on any pile
a) Initial Load Test on test pile for 2.0 times the design load
1.2 m Dia Pile MT
b) Routine pile load test on working pile for a test load of 1.5 times
1.2 m Dia Pile (2% of piles in total). MT
c) Initial Horizontal pile load test on test pile for a test load of 2.0 times
1.2 m Dia Pile MT
6.09 RCC grade M 35 in pile cap Cum
6.10 Cutting edge for well foundations MT
6.11 RCC of Grade M30 in well curbs Cum
6.12 RCC of Grade M30 in well steining Cum
6.13 Sinking of well foundations
a) 7.0 m dia. Well
(i) 0 - 3m depth Lm
(ii) 3 - 10m depth Lm
(iii) 10 - 15m depth Lm
(iv) 15 - 20m depth Lm
b) 6.0 m dia. Well
(i) 0 - 3m depth Lm
(ii) 3 - 10m depth Lm

1 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
(iii) 10 - 15m depth Lm
(iv) 15 - 20m depth Lm
6.14 RCC grade M 25 in bottom Plug Cum
6.15 filling sand in the dredge holes of the wells Cum
6.16 RCC grade M 25 in Top / Intermediate Plug Cum
6.17 RCC grade M 30 in well cap Cum
6.18 Providing & fixing in position HYSD (TMT) Fe 500 grade reinforcement
bars in open foundations,Pile, Pile caps, Well caps, well steining ,box MT
cell structures and well kerb

2 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
C. Substructures
6.19 RCC in piers, pier cap, pedestals, cantilever/counterfort abutments,
abutment cap, dirt walls, wing walls, retaining walls, median wall etc

a) Grade M 30 Cum
b) Grade M 35 Cum
6.20 RCC in box cell structures
a) Grade M 25 Cum
b) Grade M 30 Cum
6.21 HYSD (TMT) Fe 500 grade reinforcement bars in abutment wall,
abutment cap, dirt wall, pier, pier caps and retaining wall, box cell etc. MT

6.22 Back filling behind abutments, wing walls, return wall etc. Cum
6.23 Filter media behind abutment, retaining wall and return wall Cum
6.24 100mm diameter PVC pipe for weep holes in retaining wall, abutment
Nos.
wall, wing/return wall, median wall
D. Superstructures
6.25 RCC grade M-35 in Solid Slab Cum
6.26 HYSD (TMT) Fe 500 grade reinforcement bars in RCC Solid Slab MT
6.27 RCC M-35 in T-beam Girders, cross girders and deck slab Cum
6.28 HYSD (TMT) Fe 500 grade reinforcement bars in T-beam Girders,
MT
cross girders and deck slab
6.29 RCC Cast-in-situ grade M-45 in deck slab and cross girders of PSC
Cum
Girders
6.30 HYSD (TMT) Fe 500 grade reinforcement bars in RCC cast-in-situ
MT
deck slab, girders and Cross Girders
6.31 Pre-stressed Concrete in Pre-cast I beam girders and cross girders
Cum
6.32 High tensile steel wires/strands in Girders MT
6.33 Structural Steel MT
E. Miscellaneous
6.34 Wearing Coat Sqm
6.35 Bearings
a) POT cum PTFE
(i) Fixed Bearing Nos.
(ii) Free/Guided Bearing Nos.
b) Elastomeric Bearings Cu Cm
c) Tar paper bearing Sqm
6.36 Expansion Joints
a) Filler type joints Lm
b) Strip seal type Lm
6.37 Drainage spouts Nos.
6.38 RCC grade M40 in crash barrier Cum
6.39 PCC grade M 15 below approach slabs Cum
6.40 RCC grade M 30 in approach slabs Cum
6.41 PVC downtake and runner pipe Lm
6.42 Painting structure Nos.
3 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
6.43 Hand packed boulder pitching on slopes of embankment Cum
6.44 Filter material underneath stone pitching Cum
6.45 Rigid apron Cum
6.46 Boulder apron Cum
6.47 RCC M20 in head walls Cum
6.48 Sub soil investigation/confirmatory boreholes
a) Depth between 0m to 10m m
b) Depth between 10m to 20m m
c) Depth between 20m to 30m m
d) Depth between 30m to 40m m

4 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
G. Rehabilitation of Structures
6.49 Cleaning and removal of vegetation growth from structures, channel
Sqm.
and protective works as per directions of the Engineer.
6.50 Replacement of RCC railing including reinforcement as per MORT&H
Specifications Section 1500, 1600, 1700, 2200, 2815 and Clause 2703

a) Railing in M30 grade m


6.51 Reconstruction of 300mm thick slope pitching as per MORT&H
Sqm.
Specifications Section 2500
6.52 Providing Cement concrete M-15 grade as leveling course (Mat
Concrete) below approach slab including centering and shuttering all
complete job as per drawing and MORT&H Specifications Sections Cum.
1500 & 1700.
6.53 Providing Reinforced cement concrete M-30 grade in approach slab
including reinforcement for existing bridges complete as per drawing
and MORT&H Specifications sections 1500, 1600, 1700 and clause Cum.
2704.
6.54 Replacement of cement concrete floor consisting of first layer of
300mm thick in M15 grade and second layer of 150mm thick in M20 Sqm.
grade, as per MORT&H Specifications Section 2500
6.55 Sealing of cracks in existing bridges by Epoxy Resin as per MORT&H
Sqm.
Specifications section 2800.
6.56 Applying epoxy mortar over leached, honey-combed and spalled
concrete surface with 5 mm. thick epoxy mortar complete as per Sqm.
MORT&H Specifications Section 2804.
6.57 Providing Flush or raised pointing in exposed portion with cement
mortar 1:3 (1 cement : 3 fine sand) as per MORT&H Specifications Sqm.
Section 1400.
6.58 Providing Reinforced cement concrete M-25 grade in repair of
damaged Abutment, Pier, Wing/retaining wall, Head Wall complete as
MORT&H specifications Clause 2700 and direction of Engineer. Cum.

6.59 Providing 65 mm thick wearing course consistingof 40 mm thick


asphaltic concrete covered by 25 mm thick mastic asphalt on top Sqm.
complete as per Technical Specification Section 2700
6.60 Repair of Railings of Existing Bridges by Cement Mortar1:3 Plastering
Sqm.
all complete per MORT&H Specifications section 1300.
6.61 a) Cleaning, servicing, greasing of all the existing metallic bearings
in Bridges all complete job complete as per MORT&H Specifications No.
sections 2000 & 2800.
b) Replacement of Damaged Bearings by suitable designed metallic
bearing confirming to IRC 83 (Part I) duly approved by Engineer, after
lifting the span by suitable arrangement, true to line and level in No.
existing Bridges conforming to IRC 83 (Part I) complete as per
MORT&H Specifications Clauses 2003, 2004.

5 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
c) Replacement of Damaged Bearings by elastomeric bearings
conforming to IRC 83 (Part II) Section IV after lifting the span by
suitable arrangement, all complete job with all accessories as per Cu.cm.
MORT&H Specifications Clause 2005 and approved by Engineer.
6.62 Providing and fixing new drainage spouts in replacement of existing
damaged drainage spouts for bridges complete as per Drawing and No.
MORT&H Specifications Clause 2705.
6.63 Supplying and fixing filler type expansion joints of 20 mm. wide
complete as per drawing and MORT&H Specifications Section 2600. m

6.64 Dismantling and removal of existing damaged expansion joint and


providing and fixing buried type expansion joint as per MORTH
Modified Interim Specification for expansion joint, drawing and m
Technical specification.
6.65 Cost of launching of girders Job
6.66 Providing & laying random rubble stone masonry in cement mortar 1:3
(1 cement : 3 coarse sand) works complete as per drg. and MORT&H Cum
Specifications Section 1400.
6.67 Cleaning of expansion gaps Lm
Sub Total

6 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES

Qty Rate Amount

- -
6,228 -
650 -
8,658 -
422 -
2.0 -

77,942 -
- -
- -
2,523 -
- -

- -
27,009 -

- -
- -
- -

- -

- -

- -
- -
- -
- -
- -

- -
- -

- -
- -
-
- -

7 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
- -
- -
- -
- -
- -
- -

2,161 -

8 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES

- -
17,037 -

- -
4,830 -

2,598 -

58,199 -
5,174 -
3,248 -

2,397 -
216 -
1,505 -
271 -

8,939 -

2,514 -

9,035 -
543 -
175 -

39,295 -

1 -
5 -
8,563,200 -
328 -

1,192 -
1,997 -
745 -
2,146 -
1,150 -
2,308 -
885 -
83 -
9 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES
1,483 -
742 -
- -
- -
- -
-
1,620
810
-
-

10 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES

24,660 -

251 -
- -

1,160 -

- -

345 -

- -

- -

- -

- -

380 -

- -

- -

- -

11 of 150
The Louis Berger Group, Inc

BILL OF QUANTITIES

- -

5 -

- -

- -

- -

25

742
Sum -

12 of 150
BOT BOQ

Bill of Quantities

Item Description Unit Quantity

Bill No : 1 SITE CLERANCE AND DISMANTLING


1.01 Clearing and grubbing road land, embankment, drain,
cross drainage structures including uprooting rank
vegetation, grass, bush scrubs, saplings and trees of
girth up to 300mm, removal of stumps, disposal of
unserviceable material and stacking of serviceable Ha 2.00
material up to a lead of 1000m from road boundary as
per MORT&H specification clause 201.

1.02 Dismantling upto 1.5 metre in foundation and/or 1.5


metre above ground level including T&P and
scaffolding wherever necessary, sorting the
dismantled material, disposal of unserviceable
material with in a lead of 1000 metre complete as per
MORT&H specifications clause 202.

a) Brick/stone structures in cement mortar Cu.m. 6,228


b) Plain Cement Concrete Cu.m. 650
c) Reinforced Cement Concrete Cu.m. 8,658
d) Kilometre/5th km stone including foundation
No.
concrete if any
e) Hectometre/Boundary stone including foundation
No.
concrete if any
f) Pavement Bituminous courses Cu.m. 422
g) Non bituminous base/sub-base courses Cu.m.
h) Sign Boards / bill boards No.
i) Stone pitching/brick/stone soiling Cu.m.
j) Boulder apron Cu.m.
k) Kutcha structure Sqm.
l) R.C.C. pipe up to 1.00m dia m
1.03 Disposal of unserviciable dismanted material by
mechanical transport for extra lead beyond initial lead
of 1 km as per MORT&H specifications Section 200. Cu.m.

1.04 Cutting and removal of stumps & roots of felled trees


above 300 mm girth and back filling of pits to required
compaction as per MORT&H specifications clause
201, work will be carried out by ensuring all safty
measures to on going traffic as per MORT&H
specifications clause 112.

a) above 300m upto 600mm Nr.


b) above 600m upto 900mm Nr.
c) above 900mm upto 1800mm Nr.
d) above 1800mm Nr.
1.05 Marking 50 mm x 50 mm furrows at 45 degree to the
centre line of the road and at one metre interval in the
existing thin bituminous wearing course including
sweeping and taking out material as per clause Sqm.
404.3.1

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 13 of 150


1.06 Shifting of Utilities complete as per Technical
Specifications Clause 201.

1. Telephone Lines m
2. Low tension Electric Lines m
3. OFC Cables m
4. Water lines m
5. Gas Pipelines (encasing in concrete and protective m
measures)
6. Shifting High tension Electric Lines m
7. Shifting High Tension Towers No.
1.07 Milling of existing bituminous surface with milling
machine mounted on 4 wheel with rear loading
conveyor system and mechanical drum drive complete
as per MORT&H specifications clause 202 and Cu.m.
additioanl specifications.

1.08 Rebate towards the salvage value of dismantled


materials from pavements and structures as per
MORT&H specifications clause 202 (measurement as
per full qty of dismantling).

a) Brick/stone structures in cement mortar Cu.m.


b) Plain Cement Concrete Cu.m.
c) Reinforced Cement Concrete Cu.m.
d) Kilometre/5th km stone including foundation
No.
concrete if any
e) Hectometre/Boundary stone including foundation
No.
concrete if any
f) Pavement Bituminous courses Cu.m.
g) Non bituminous base/sub-base courses Cu.m.
h) Sign Boards / bill boards No.
i) Stone pitching/brick/stone soiling Cu.m.
j) Boulder apron Cu.m.
k) Kutcha structure Sqm.
l) R.C.C. pipe up to 1.00m dia m
1.09 Rebate for material obtained after milling of existing
bituminous surface with milling machine. Cu.m.

Sub Total

Bill No. 2 EARTH WORK


2.01 Earthwork in excavation necessary for construction of
roadway including all leads and lifts complete as per
MORT&H specifications clause 301.

(a) Excavation in all types of soils Cu.m


(b) Excavation in Soft Rock Cu.m
(c) Excavation in Hard Rock - requiring blasting Cu.m
2.02 Construction of embankment with suitable material
obtained from roadway, drainage excavation etc. with all
leads and lifts, compacting to 95% of modified proctor
density, all complete as per drawings and MORT&H Cu.m
Specifications Clause 305.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 14 of 150


2.03 Construction of embankment with approved material
from with all leads and lifts, compacting to 95% of modified
proctor density, all complete as per drawings and MORT&H
Specifications Clause 305.

a) with soil from borrow Cu.m


b) with pond ash Cu.m
2.04 Construction of subgrade and Earthen shoulder
satisfying the requirements of minimum soaked CBR
value as indicated in the drawings with approved
material from borrow areas, with all leads & lifts,
compacting to 97% of modified proctor density, all complete Cu.m
as per MORT&H Specifications Clause 305 & 407.

2.05 Loosening and recompacting sub-grade in all kinds of


soil, compacting to 97% of modified proctor density, all
complete as per MORT&H Specifications Clauses 301 Cu.m
& 305.

2.06 Filling in median/island with approved material with all


leads and lifts complete as per MORT&H
Specifications Clauses 305 & 407. Cu.m

2.07 Disposal of surplus earth/rock beyond an initial lead of


1 km. as per MORT&H specifications section 200. Cu.m

2.08 Rockfill Embankment from excavated rock (where


embankment ht is more than 2m and less than 8m)
complete as per MORT&H specifications clause 305 & Cu.m
additional Technical specifications.

2.09 Preparation of rock cut surface for road formation by


leveling with Lean concrete compete as per MORT&H
Sqm.
specifications sub-clause 301.6

2.10 Rebate towards salvage value of Hard rock available


from excatation (measurement same as of full quantity
of excavated hard rock). Cu.m

2.11 Filling in median/island with excavated material with all


leads and lifts complete as per MORT&H
Specifications Clauses 305 & 407. Cu.m

2.12 Earth filling between RE Wall Cu.m

Sub Total
Bill No. 3 GRANULAR SUB-BASE AND BASE COURSES
3.01 Providing, laying & compacting Granular Sub-base at
OMC complete as per MORT&H Specifications Clause
401 (Grading–I of Table–400-1). Cu.m.

3.02 Providing, laying & compacting drainage layer/filter


layer complete as per deg. & MORT&H Specifications
Clause 401 (Grading-I of Table 400-2). Cu.m.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 15 of 150


3.03 Providing and laying Wet Mix Macadam base and
profile corrective course of required thickness
complete as per MORT&H Specifications Clause 406. Cu.m.

Sub Total
Bill No. 4 BITUMINOUS COURSES
4.01 Scarifying exisging bituminous road surface 50-70mm
along with pre-mix carpet and surface dressing but
without disturbing the base as per MORT&H Sqm.
specifications clause 501.

4.02 Providing & laying bituminous primer coat over


granular surface with bitumen emulsion complete as
per Technical Specifications Clause 502 @ 6.0 to 9.0 Sqm.
kg/10 sq.m.

4.03 Providing & laying tack coat with bituminous Emulsion


all complete as per MORT&H Specifications Clause
503

(i) On granular surface treated with primer or dry and


hungry bituminous surface @ 2.5 to 3.0kg/10 sq.m. Sq.m.

(ii) On normal Bituminous surface @ 2.0 to 2.5 Kg/10


sq.m. Sq.m.

4.04 Providing & laying Profile corrective course all


complete asper Technical Specifications Clause 501 &
507.

a) With DBM Cu.m


b) With WMM Cum.
c) With GSB Cum.
4.05 Providing & relaying after milling and recycling of
existing bituminous pavement material including cost
of adding new bitumen, fresh untreated aggregates
and recycling agent complete as approved by the
Engineer to produce recycled dense graded
Cu.m.
bitumunous macadam (DBM) mix conforming to
clause 507 & 517 of MORT&H specifications. (cost of
milling excluded)

4.06 Providing & laying Bituminous Macadam course of


required thickness on prepared surface complete as
per drawing and MORT&H Specifications Clause 504 Cu.m.

4.07 Providing & laying Dense Bituminous Macadam


course of required thickness on prepared surface
complete as per drawing and MORT&H Specifications
Clause 507 (excluding milling quantity) Cu.m.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 16 of 150


4.08 Providing & laying Bituminous Concrete wearing
course using crumb rubber modified bitumen (CRMB-
60, only refinery produced) complete as per drawing
and MORT&H Specifications Clause 509 & 521. Cu.m.

Sub Total
Bill No : 5 CULVERTS
5.01 Earthwork in excavation of foundation for structures
including pipe culverts in all types of soil including
lead & lifts complete as per drawings and MORT&H Cum.
specifications clauses 304 & 2903.

5.02 Back filling behind abutments, wing walls and return


walls with selelcted granular material of approved
quality with all leads and lifts complete as per drg. and Cum.
MORT&H specifications clauses 305 & 2907.

5.03 Providing filter media behind abutments, wing walls,


return walls and box structures with well packed
materials to specified thickness with smaller size
towards the soil and bigger size towards the wall with Cum.
all leads and lifts complete as per drg. and MORT&H
specifications clauses 305 & 309

5.04 Cement Concrete / Reinforced Cement Concrete in


open foundation / levelling course including centering
and shuttering but excluding reinforcement all
complete as per drg. and MORT&H specifications
sections 1500, 1700 and 2100.

a) M-10 grade Cum.


b) M-15 grade Cum.
c) M-20 grade Cum.
d) M-25 grade Cum.
5.05 Cement Concrete / Reinforced Cement Concrete in
sub-structure including form work but excluding
reinforcement complete as per drg. and MORT&H
specifications sections 1500, 1700 and 2200.

a) M-20 grade Cum.


b) M-25 grade Cum.
c) M-30 grade Cum.
5.06 Reinforced Cement Concrete in super-structure
including centring and shuttering but excluding
reinforcement complete as per drg. and MORT&H
specifications sections 1500, 1700 and 2300.

a) M-25 grade Cum.


b) M-30 grade Cum.
5.07 Providing Reinforced Cement Concrete M-25 grade in
box culvert including centering and shuttering but
excluding reinforcement complete as per drg. and
MORT&H specifications sections 1500, 1700, 2100, Cum.
2200 & 2300.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 17 of 150


5.08 Supplying, fitting & placing in position HYSD / TMT bar
reinforcement complete as per drg. and MORT&H
specifications sections 1600.

Foundation / Sub-structure / Superstructure MT


5.09 Providing & laying Tar Paper Bearing complete on
abutments/piers as per drg. and MORT&H
specifications section 2000. Sqm.

5.10 Providing & fixing filler type expansion joints complete


as per drg. and Technical specifications section 2600
m

5.11 Providing weep holes in brick masonry / plain /


reinforced concrete abutment, wing walls / return wall
with 100mm dia AC pipe, extending through the full
width of structure with slope of IV:20H towards Nr.
draining face complete as per drg. and MORT&H
specifications clause 2706.

5.12 Providing, laying & jointing RCC NP4 pipe including


testing complete as per drg. & MORT&H specifications
section 2900.

a) 900mm dia m
b) 1000mm dia m
c) 1200mm dia m
5.13 Providing & laying stone boulder apron complete as
per drg. & MORT&H specifications section 2500. Cum.

5.14 Providing & laying filter material underneath stone


boulder pitching on slopes complete as per drg. and
MORT&H specifications section 2500. Cum.

5.15 Providing & laying stone boulder pitching on slopes


complete as per drg. and MORT&H specifications
section 2500. Cum.

5.16 Providing & laying selected granular material for pipe


bedding as per drg. and MORT&H specifications
Cum.
section 2900.

5.17 Providing cement concrete in curtain wall complete as


per drg. and MORT&H specifications sections 1500,
1700, 2100, 2200 & clause 2507.

a) M-15 grade Cum.


b) M-20 grade Cum.
5.18 Providing Reinforced Cement Concrete complete as
per drg. and MORT&H specifications sections 1500,
1600, 1700, 2100, 2200 & clause 2703.

a) Railing M-30 grade m


b) Crash barrier including safety kerb M-40 grade Cum.
5.19 Providing & fixing drainage Spout complete as per
drawing & MORT&H Specifications Clause 2705. Nr.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 18 of 150


5.20 Providing plain cement concrete levelling course
under the approach slabs complete as per drg. and
MORT&H specifications sections 1700, 2100 and
2700.

a) M-15 grade Cum.


5.21 Providing Reinforced Cement Concrete in approach
slabs including form work & reinforcement complete
as per drg. and MORT&H specifications sections
1500, 1600, 1700, 2100 and clause 2704.

a) M-30 grade Cum.


5.22 Providing 20mm thick compressible board as
expansion joint in culverts all complete as per drg. and
m
MORT&H specifications clause 2600.

5.23 Providing & fixing Burried type expansion joint


complete as per drg. and MORT&H specifications
clause 2604. m

5.24 Brick masonry in cement mortar 1:3 (1 cement : 3


coarse sand) in flooring, sub-structure complete as
Cum.
per drg. and MORT&H Specifications Section 1300.

5.25 Providing cement mortar plaster 1:3 (1 cement : 3


coarse sand) complete as per drg. and MORT&H
Specifications clause 1312 Sqm.

5.26 Providing & fixing Marker Post for Burried culverts as


per drg. and IRC-7-1971 including painting with
synthetic enamel paint complete as per drg. and No.
directions of the Engineer.

5.27 Numbering of culverts including painting with synthetic


enamel paint as per drg. and IRC-7-1971 and
directions of the Engineer. No.

Sub Total
Bill No : 6 BRIDGES / FLY OVERS / UNDER PASSES / ROBS
6.01 Earthwork in excavation of foundations for structures
including all leads and lifts complete as per drawings
and MORT&H specifications clause 304.

(a) In all types of soil Cum. -


(b) In soft/ordinary rock Cum. 77,942
(c) In hard rock Cum. -
6.02 Back filling behind abutments, wing walls, and return
walls with selected granular material of approved
quantity including all leads and lifts, complete as per
drg. and MORT&H specifications clause 305 & clause Cum. 58,199
710.1.4 of IRC:78

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 19 of 150


6.03 Providing & laying filter media behind abutments, wing
walls, return walls and box structures with well packed
material to the specified thickness with smaller size
towards the soil and bigger size towards the wall
complete with all leads and lifts as per drg. and Cum. 5,174
MORT&H specifications clause 305 and clause
710.1.4 of IRC:78.

6.04 Providing & laying plain cement concrete / Reinforced


Cement Concrete in foundations / levelling course
including form work but excluding the cost of
reinforcement complete as per drg. and MORT&H
specifications sections 1500, 1700 and 2100.

a) M-15 grade Cum. 2,523


b) M-20 grade Cum. -
c) M-25 grade Cum. -
d) M-30 grade Cum. -
6.05 Supplying, fabricating and fixing in position mild steel
cutting edge with MS anchorages for well foundations
including welding, splicing and making provisions for
fixing of reinforcements of well curb as per approved MT -
drg. and MORT&H specifications sections 1200 and
1900.

6.06 Providing & laying cement concrete / Reinforced


Cement Concrete including form work but excluding
the cost of reinforcement complete as per drg. and
MORT&H specifications sections 1200, 1500 & 1700.

a) Well curb
i) M-35 grade Cum. -
ii) M-30 grade Cum. -
b) Well steining
i) M-30 grade Cum. -
ii) M-25 grade Cum. -
c) Well cap
i) M-35 grade Cum. -
ii) M-30 grade Cum. -
d) Intermediate plug
i) M-25 grade Cum. -
e) Top plug Cum. -
i) M-25 grade Cum. -
6.07 Sinking of wells through all types of strata (other than
pneumatic method of sinking) for all water depths as
per site conditions complete as per drg. and MORT&H
specifications section 1200.

a) For 7.0m dia well


i) Depth 0.00m to 3.00m m -
ii) Depth 3.00m to 10.00m m -
iii) Depth 10.00m to 15.00m m -
iv) Depth 15.00m to 20.00m m -
v) Depth 20.00m to 25.00m m -
vi) Depth 25.00m to 30.00m m -
b) For 6.0m dia well

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 20 of 150


i) Depth 0.00m to 3.00m m -
ii) Depth 3.00m to 10.00m m -
iii) Depth 10.00m to 15.00m m -
iv) Depth 15.00m to 20.00m m -
v) Depth 20.00m to 25.00m m -
vi) Depth 25.00m to 30.00m m -
6.08 Supplying & filling sand in wells complete as per drg.
and MORT&H specifications clause 1209. Cum. -

6.09 Providing bored cast-in-situ R.C.C. vertical piles


excluding reinforcement complete as per drg. and
MORT&H specifications sections 1100 & 1700.

a) 1200mm dia piles (M-35 grade concrete) m -


b) 1000m dia piles (M-35 grade concrete) m -
6.10 Providing & laying reinforced cement concrete in pile
caps including form work but excluding the cost of
reinforcement complete as per drg. and MORT&H
specifications sections 1100, 1500 & 1700.

a) M-35 grade Cum. -


6.11 Providing & laying plain cement concrete / Reinforced
Cement Concrete in sub-structure including form work
but excluding the cost of reinforcement complete as
per drg. and MORT&H specifications sections 1500,
1700 & 2200.

a) M-20 grade Cum. -


b) M-25 grade Cum. -
c) M-30 grade Cum. 4,830
d) M-35 grade Cum. 17,037
e) M-40 grade Cum. -
6.12 Providing & laying Reinforced Cement Concrete in
super-structure including form work but excluding the
cost of reinforcement complete as per drg. and
MORT&H specifications sections 1500, 1700 & 2300.

a) Solid slab
i) M-30 grade Cum. -
ii) M-35 grade Cum. 2,397
iii) M-40 grade Cum. -
b) T-beam and slab
i) M-30 grade Cum. -
ii) M-35 grade Cum. 1,505
iii) M-40 grade Cum. -
6.13 Providing & laying structural cement concrete for
prestressed concrete in super-structure including form
work but excluding the cost of reinforcement complete
as per drg. and MORT&H specifications sections
1500, 1700, 1800 & 2300.

a) M-40 grade in slab & I-girder Cum. -


b) M-45 in slab Cum. 8,939
c) M-40 grade in box girder Cum. -
d) M-45 grade in box girder Cum. -

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 21 of 150


6.14 Supplying, placing and fixing TMT/HYSD bar
reinforcement complete as per drg. and MORT&H
specifications section 1600.

a) For sub-structure MT 2,598


b) For super-structure MT 3,001
6.15 Providing high tensile steel strands including all
accessories for stressing and jacking operations and
grouting etc. complete as per drg. and MORT&H MT 543
specifications section 1800.
6.16 Supply & placing in position void formers complete as
per additional Technical specifications clause.
a) 900mm dia m -
b) 800mm dia m -
c) 700mm dia m -
6.17 Supply & fixing of bearings complete as per drg. and
MORT&H specifications section 2000.

a) Tar paper bearing Sqm. 328


b) Elastomeric bearing Cu.cm. 8,563,200
6.18 Supply & fixing of POT / PTFE bearings complete as
per drg. and IRC:83 (Part-III)-2002.

a) Sliding bearing
i) Capacity 5000 KN No. -
ii) Capacity 3500 KN No. -
iii) Capacity 2000 KN No. 5
iv) Capacity 1750 KN No. -
v) Capacity 1200 KN No. -
vi) Capacity 1000 KN No. -
b) Fixed bearing
i) Capacity 5000 KN No. -
ii) Capacity 3500 KN No. -
iii) Capacity 2000 KN No. -
iv) Capacity 1750 KN No. 1
v) Capacity 1200 KN No. -
vi) Capacity 1000 KN No. -
c) Pin bearing
i) Capacity 5000 KN No. -
ii) Capacity 3500 KN No. -
iii) Capacity 2000 KN No. -
iv) Capacity 1750 KN No. -
v) Capacity 1200 KN No. -
vi) Capacity 1000 KN No. -
6.19 Providing & fixing of expansion joints complete as per
drg. and MORT&H specifications section 2600

a) 50mm vide strip seal joints m -


b) 40mm vide strip seal joints m 1,997
c) 20mm vide filler type joints m -
6.20 Providing Burried type expansion joint complete as
per drg. and MORT&H modified specifications
complere. m 1,192

6.21 Providing & fixing drainage Spouts complete as per


drawing & MORT&H Specifications Clause 2705. No. 745

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 22 of 150


6.22 Providing & fixing 150mm dia PVC rain water down
pipe in overpasses, ROBs, flyovers including bends
and shoes etc. fixed on walls/columns by clamps m 885
complete as per drg. and additional technical
specifications.
6.23 Providing & laying 65mm thick wearing course
consisting of 40mm thick asphaltic concrete covered
by 25mm thick mastic asphalt on top complete as Sqm. 39,295
MORT&H specifications section 2700.

6.24 Providing cement concrete railing in M-30 grade


including form work and reinforcement complete as
per drawing & MORT&H Specifications sections 1500, m -
1600, 1700, 2200 & 2703.

6.25 Providing cement concrete crash barrier in M-40


grade including safety kerb, reinforcement and G.I.
pipe complete as per drawing & MORT&H
Specifications sections 1500, 1600, 1700, 2200 & Cum. 2,146
clause 809.

6.26 Providing & laying plain cement concrete in levelling


course under the approach slab complete as per drg.
and MORT&H specifications sections 1700, 2100 and
2700.
a) M-15 grade Cum. 1,150
6.27 Providing & laying reinforced cement concrete in
approach slab including form work and reinforcement
complete as per drg. and MORT&H specifications
sections 1500, 1600, 1700 & 2100 and clause 2704.

a) M-30 grade Cum. 2,308


6.28 Providing & laying Brick masonry in cement mortar 1:3
(1 cement : 3 coarse sand) in floor protection,
foundation, sub-structure complete as per drg. and Cum. -
MORT&H Specifications Section 1300.

6.29 Providing & laying random rubble stone masonry in


cement mortar 1:3 (1 cement : 3 coarse sand) in floor
protection, foundation, sub-structure complete as per
drg. and MORT&H Specifications Section 1400. Cum. -

6.30 Providing & laying boulder apron complete as per drg.


Cum. -
& MORT&H specifications section 2500.
6.31 Providing & laying 150mm thick flat stone flooring in
cement mortar 1:3 (1 cement : 3 coarse sand) for rigid
apron embedded in 300mm thick cement concrete M-
15 over 150mm thick levelling course in cement
concrete M-10 complete as per drg. and MORT&H Sqm. -
Specifications Sections 1500, 1700, 2100 & clause
2505.

6.32 Providing & laying filter material underneath stone


boulder pitching on slopes complete as per drg. and
Cum. 742
MORT&H specifications section 2500.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 23 of 150


6.33 Providing & laying stone boulder pitching on slopes
with cement mortar filled joints in 1:3 (1 cement : 3
coarse sand) complete as per drg. and MORT&H Cum. 1,483
specifications section 2500.

6.34 Providing weep holes in brick masonry / plain /


reinforced concrete abutments, wing walls / return
walls etc. with 100mm dia A.C. pipe, extending
through the full width of structure with slope of IV:20H No. 3,248
towards draining face complete as per drg. and
MORT&H specifications clause 2706.

6.35 Painting of Bridge No. and span arrangement as per


drg., IRC:7-1971 and MORT&H specifications section
No. 83
800.

6.36 Providing NP 150mm dia PVC service pipe of


approved quality in foot path complete as per drg. &
directions of the Engineer. m -

6.37 Providing & erecting thrie metal beam Crash Barrier of


dimension & location complete as per drawing &
MORT&H Specifications clause 810 and additional
Technical specifications.

a) Metal beam crash barrier with single face Thrie


m -
beam.
b) Metal beam crash barrier with double face thrie
m -
beam.
6.38 Carrying out initial test for board cast-in-site piles
complete as per MORT&H specifications section 1100
No. -

6.39 Carrying out routine test for board cast-in-site piles


complete as per MORT&H specifications section 1100
No. -

6.40 Carrying out confirmatory bores up to required depths


at each foundation location of brdige complete in all
respects including testing as per MORT&H
specifications section 2400 and interpretation of bore
data and presentation of the results as per IRC:78-
1981

a) Depth between 0m to 10m m 1,620


b) Depth between 10m to 20m m 810
c) Depth between 20m to 30m m -
d) Depth between 30m to 40m m -
6.41 Providing & constructing gabion structures / crated
boulder at embankment toe for erosion control with
wire crates of size 2m x 1m x 0.60m each made from
4mm galvanised steel wire @ 32 kg per 10 m2 Cum. -
conforming to IS:280 & IS:4826 all complete as per
drg. and MORT&H specifications section 700

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 24 of 150


6.42 Construction of reinforced earth retaining structures
together with construction of earth work in layers,
assembling and erection of reinforcing elements and
placing of facing panels and all associated
components as per MORT&H specifications section
3100 and approved design and drg. of specialised
firm.

a) Providing and erecting precast reinforced concrete


facia panels of M-35 grade including untensioned
reinforcement, soil reinforcing elements with all
fixtures and accessories and drainage system Sqm. -
complete

b) Providing & laying levelling pad in cement


concrete M-15 grade below facia panels including
earth work in excavation, back filling and profiling of
fore slope complete as per drg. and MORT&H Cum. -
Specifications Sections 300, 1500, 1700 & 2100.

c) Providing filter media behind reinforced earth


panel with well packed materials to specified thickness
with smaller size towards the soil and bigger size
towards the wall complete with all leads and lifts as Cum. -
per approved design, drg. and MORT&H
specifications clauses 305 & 2504.

d) Filling, grading and compaction with selected soil


meeting approved design parameters in layers in soil
reinforced zone complete Cum. -

e) Providing & fixing in position 100mm dia C.I. drain


pipe all complete as per drg. & Technical
specifications. m -

f) Providing RE wall coping beam in cement concrete


M-30 grade including shuttering & reinforcement
complete as per MORT&H specifications sections Cum. -
1500, 1700 & 2300.
6.43 a) Providing & laying in position RCC crash barrier
with friction slab at RE wall location including form
work and reinforcement complete as per drg. and
MORT&H specifications sections 1500, 1700 & 2700 Cum. -

b) Providing & laying M-15 grade levelling course


below friction slab complete as per drg. and MORT&H
Specifications Sections 1500 & 1700. Cum. -

6.44 Providing & applying 2 coats of water based cement


paint to unplastered concrete surface after cleaning
the surface of dirt and dust, oil and grease,
effloresence and applying paint @ 1 Ltr. for 2m2 area Sqm. -
complete as per additional specifications.

REHABILITATION OF EXISTING BRIDGES

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 25 of 150


6.45 Cleaning and removal of vegetation growth from
structures, channel and protective works as per
directions of the Engineer. Sqm. 24,660

6.46 Replacement of RCC railing including reinforcement


as per MORT&H Specifications Section 1500, 1600,
1700, 2200, 2815 and Clause 2703

a) Railing in M30 grade m 251


6.47 Reconstruction of 300mm thick slope pitching as per
MORT&H Specifications Section 2500 Sqm. -

6.48 Providing Cement concrete M-15 grade as leveling


course (Mat Concrete) below approach slab including
centering and shuttering all complete job as per
drawing and MORT&H Specifications Sections 1500 & Cum. 1,160
1700.

6.49 Providing Reinforced cement concrete M-30 grade in


approach slab including reinforcement for existing
bridges complete as per drawing and MORT&H
Specifications sections 1500, 1600, 1700 and clause Cum. -
2704.

6.50 Replacement of cement concrete floor consisting of


first layer of 300mm thick in M15 grade and second
layer of 150mm thick in M20 grade, as per MORT&H Sqm. 345
Specifications Section 2500

6.51 Sealing of cracks in existing bridges by Epoxy Resin


as per MORT&H Specifications section 2800. Sqm. -

6.52 Applying epoxy mortar over leached, honey-combed


and spalled concrete surface with 5 mm. thick epoxy
mortar complete as per MORT&H Specifications Sqm. -
Section 2804.

6.53 Providing Flush or raised pointing in exposed portion


with cement mortar 1:3 (1 cement : 3 fine sand) as
per MORT&H Specifications Section 1400. Sqm. -

6.54 Providing Reinforced cement concrete M-25 grade in


repair of damaged Abutment, Pier, Wing/retaining wall,
Head Wall complete as MORT&H specifications Cum. -
Clause 2700 and direction of Engineer.

6.55 Providing 65 mm thick wearing course consistingof 40


mm thick asphaltic concrete covered by 25 mm thick
mastic asphalt on top complete as per Technical Sqm. 380
Specification Section 2700

6.56 Repair of Railings of Existing Bridges by Cement


Mortar1:3 Plastering all complete per MORT&H Sqm. -
Specifications section 1300.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 26 of 150


6.57 a) Cleaning, servicing, greasing of all the existing
metallic bearings in Bridges all complete job complete
as per MORT&H Specifications sections 2000 & 2800. No. -

b) Replacement of Damaged Bearings by suitable


designed metallic bearing confirming to IRC 83 (Part I)
duly approved by Engineer, after lifting the span by
suitable arrangement, true to line and level in
existing Bridges conforming to IRC 83 (Part I) No. -
complete as per MORT&H Specifications Clauses
2003, 2004.

c) Replacement of Damaged Bearings by


elastomeric bearings conforming to IRC 83 (Part II)
Section IV after lifting the span by suitable
arrangement, all complete job with all accessories as Cu.cm. -
per MORT&H Specifications Clause 2005 and
approved by Engineer.

6.58 Providing and fixing new drainage spouts in


replacement of existing damaged drainage spouts for
bridges complete as per Drawing and MORT&H No. 5
Specifications Clause 2705.

6.59 Supplying and fixing filler type expansion joints of 20


mm. wide complete as per drawing and MORT&H
Specifications Section 2600. m -

6.60 Dismantling and removal of existing damaged


expansion joint and providing and fixing buried type
expansion joint as per MORTH Modified Interim
Specification for expansion joint, drawing and m -
Technical specification.

6.61 Cost of launching of girders Job -


6.62 Supplying, placing and fixing TMT/HYSD bar
reinforcement complete as per drg. and MORT&H
specifications section 1600.
6.63 a) Foundation MT 2,161
Providing & laying Reinforced Cement Concrete in
foundations including form work but excluding the cost
of reinforcement complete as per drg. and MORT&H
specifications sections 1500, 1700 and 2100.

a) M-35 grade Cum. 27,009


6.64 Providing & laying structural cement concrete for
prestressed concrete in super-structure including form
work but excluding the cost of reinforcement complete
as per drg. and MORT&H specifications sections
1500, 1700, 1800 & 2300.
a) M-45 grade in I-girder and cross girders Cum. 9,035
6.65 Providing, laying, joinitng complete Structural Steel in
Superstructure as per drg. And MORT&H MT 175
specifications

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 27 of 150


6.66 Providing & laying random rubble stone masonry in
cement mortar 1:3 (1 cement : 3 coarse sand) works
complete as per drg. and MORT&H Specifications Cum. 25
Section 1400.
6.67 Cleaning of expansion gaps Lm 742
Providing & laying plain cement concrete / Reinforced
Cement Concrete in foundations / levelling course
including form work but excluding the cost of
reinforcement complete as per drg. and MORT&H
specifications sections 1500, 1700 and 2100.

6.68 a) M-35 grade Cum.


Sub Total
Bill No. 7 DRAINAGE AND PROTECTIVE WORKS
7.01 Earthwork in excavation for construction of surface
unlined drains, ditch drain, open/covered drain,
foundation of toe wall, head wall, retaining wall to
required line and grade complete as per drg. or
directed by Engineer and as per MORT&H
specifications clauses 301 & 309

a) In all types of soil including marshy soil Cum.


b) Ordinary rock Cum.
c) Hard rock (blasting prohibited) Cum.
7.02 Construction of open/covered drain complete as per
drg. and MORT&H specifications sections 300, 1000,
1500, 1600, 1700, 2100 & 2200.

a) Providing & laying cement concrete M-15 grade in


levelling course including form work below foundations
of drains, bedding of pipe drains and dissipation basin
etc. complete as per drg. and MORT&H specifications Cum.
referred above.

b) Providing and laying PCC/RCC M-20 grade for


lined drains, drainage chute median drain etc.
including the cost of form work but excluding the cost
of reinforcement complete as per drg. and MORT&H Cum.
Specifications referred above.

c) Providing & fixing in position HYSD / TMT Fe 415


grade bar reinforcement in base, walls and slab of
RCC drains complete as per drg. and MORT&H MT
specifications sections 1600.

d) Supply, fitting and fixing in position M.S. grating


(size 800 x 200mm) at inlet to the covered drain
complete as per drg. and Technical Specifications. No.

7.03 Construction of reinforced cement concrere M-20


grade inlet chamber / catch pit / gully pit with
reinforced Polyelastomer grating fitted with reinforced
cement polymer concrete (RCPC) frame of medium
duty etc. including form work and reinforcement all
complete as per drg and MORT&H Specifications
sections 300, 1000, 1500, 1600, 1700, 2100 & 2200.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 28 of 150


a) Catch pit size 850 x 850mm No.
b) Catch pit size 1000 x 1000mm No.
7.04 Providing, laying and jointing RCC Pipes to dewater
Catch Pit / median drain as per drawings and
MORT&H Specifications section 2900.

a) 150mm dia NP 4 RCC pipe m


b) 300mm dia NP 4 RCC pipe m
c) 450mm dia NP 4 RCC pipe m
d) 600mm dia NP 4 RCC pipe m
7.05 Providing and fixing 200 mm dia PVC pipe through
footpath to discharge surface runoff to side drain as
shown in drawing and as directed by the Engineer. m

7.06 Providing and fixing 100mm dia PVC pipes of


approved quality including all fixtures and accessories
in walls of drains as per drawings and directions of the m
Engineer.

7.07 Providing & laying stone pitching on slopes for erosion


protection and open drain and drain joining rain water
harvesting pit complete as per drg. and MORT&H
specifications section 2500 and as directed by the Cum.
Engineer.

7.08 Providing & laying filter media underneath pitching


complete as per drg. and MORT&H specifications
Cum.
clause 2504.

7.09 Providing reinforced cement concrete / plain cement


concrete in head wall / toe wall / retaining wall
including cost of all meterials, form work, labour,
mixing, transportation, placing, vibration, curing etc.
but excluding the cost of reinforcement complete as
per drg. and MORT&H specifications sections 1500 &
1700

i) M-15 grade Cum.


ii) M-20 grade Cum.
iii) M-25 grade Cum.
iv) M-30 grade Cum.
7.10 Providing & fixing in position HYSD / TMT Fe 415
grade bar reinforcement in head walls / retaining walls
complete as per drg. and MORT&H specifications MT
section 1600.

7.11 Providing Brick masonry in cement mortar 1:3 (1


cement : 3 coarse sand) for lined covered drains/
head wall/ toe wall/ retaining walls etc. complete as
per drg. and MORT&H Specifications Section 1000 & Cum.
1300.

7.12 Providing random rubble stone masonry in cement


mortar 1:3 (1 cement : 3 coarse sand) for lined
covered drains/ head wall/ toe wall/ retaining walls etc.
complete as per drg. and MORT&H Specifications Cum.
Section 1000 & 1400.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 29 of 150


7.13 Providing weep holes in toe/retaining walls with
100mm dia A.C. pipe, extending through the full width
of wall complete as per drg. and MORT&H No.
specifications clause 2706.

7.14 Providing filter media behind toe/retaining wall with


well packed materials to specified thickness with
smaller size towards the soil and bigger size towards
the wall complete with all leads and lifts as per drg. Cum.
and MORT&H specifications clauses 305 & 309

7.15 Construction of drainage chute in cement concrete M-


20 grade with foundation concrete M-15 grade
complete as per drawings and MORT&H m
Specifications Sections 300, 1500 and 1700 including
construction of bell mouth at entry.
7.16 Construction of energy decipating basin at toe of
chute in cement concrete M-15 complete as per
drawings and MORT&H Specifications Sections 300, No.
1500 and 1700.

7.17 Constructing Median Drain in precast M-20 grade


including cover, form work and reinforcement as per
Drawing and MORT&H Specification sections 300, m
1500 & 1700 and clause 309.

7.18 Turfing with sods of embankment slopes, earthen


verge and other locations complete as per MORT&H
Specifications Clause 307. Sqm.

7.19 Constructing rain water harvesting recharge trench


cum recharge shaft / well including grating passage
joining storm water drain and trench having brick
walls, RCC cover slab and filled with layers of coarse
sand, gravel and boulders, grating having brick walls
and CC 1:2:4 base and M.S. pipe shaft packed with
No.
gravel, provided with wire screen and bottom plug
complete as per Drawing, direction of the Engineer
and MORT&H Specifications sections 300, 1000,
1300, 1500, 1600 & 1700.

7.20 Construction Gully chamber of internal size 750 x 750


x 1400mm on one end of median at super elevated
portions in BW 1:3 having base concrete of M-15 and
top cover of RCC (M-20) provided with inlet grating
complete as per Drawing and MORT&H Specifications No.
sections 300, 1300, 1500, 1600 & 1700.

7.21 Providing RCC railing in M-20 grade over RCC


retaining walls, drain walls, high embankments etc.
complete as per Drawing and MORT&H Specifications
sections 1500, 1600, 1700, 2100, 2200 & clause m
2703.

Sub Total
Bill No. 8 TOLL PLAZA

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 30 of 150


8.01 Construction of embankment in Toll Plaza portion with
approved material from outer borrow with all leads and
lifts, compacting to 95% of modified proctor density, all Cum.
complete as per drawings and MORT&H Specifications.

8.02 Construction of subgrade satisfying the requirements


of minimum soaked CBR value as indicated in the
drawing with approved material from borrow areas,
with all leads & lifts, compacting to 97% of modified Cum.
proctor density, all complete as per MORT&H
Specifications Clause 305.
8.03 Providing and laying Granular Sub-base (drainage
layer) complete as per MORT&H Specifications Cum.
Clause 401. Grading–I (Table –400-2).
8.04 Providing & laying dry lean concrete sub-base
including coarse and fine aggregate to the specified
gradation with all leads and lifts etc. complete as per Cum.
MORT&H specifications clause 601.
8.05 Providing & laying quality concrete of M-40 grade
including 125micron thick impermeable plastic sheet
membrane and fixing dowels, tie bars, seals for joints
and finishing, with all leads and lifts complete as per Cum.
MORT&H specifications clause 602.

8.06 Filling in median/island with approved material with all


leads and lifts complete as per MORT&H Specification Cum.
Clauses 305 & 407.
8.07 Construction of plain cement concrete kerb M-20
grade complete as per drawing & MORT&H Lm
Specifications Clause 408.
8.08 Construction of New Jersey type barrier including
reinforcement complete as per drawing and Cum.
confoirming to relevant specifications.
8.09 Providing & laying cement cocnrete M-15 in
foundations for steel tubular built up columns of
Canopy & BULL NOSE including excavation etc. Cum.
complete.
8.10 Providing & laying cement cocnrete M-30 grade
concrete including Steel Reinforcement embedding Cum.
steel tubular columns of canopy.
8.11 Providing & Fixing of steel fabricated structure for
canopy as per IS 875 including cost of all materials,
labour transportation,incidentals, painting with
synthetic enamel paint of approved shade complete) MT
including facia and cladding as per drawing & as
directed by engineer in charge.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 31 of 150


8.12 Providing & fixing tracdek Hirib profiled sheeting 1000-
1020 cover width, 28/30mm crests @ 250-255mm c/c
manufactured out of 0.47mm TCT hi-tensile bare
galvalume steel (AZ-150 gsm. Aluminium-zinc alloy
metallic coating of total both sides 550 Mpa yield
stress as per AS-1397). The sheet shall be fixed by
means of galvanised self drilling, self tapping
fasteners (12-14x55 withEPDM seals). Including
providing & fixing TRAC 84 C ceiling system
comprising of 84mm x 12.5mm deep panels with
23.9mm flange roll formed out of 0.5mm thick alloy AA
3105/3005/5050 chromatised and stove enamelled
(coil coated) on the both sides. Panels shall be fixed
on to roll formed carriers 32mm wide x 39mm deep
out of 0.6mm galvanised sheet with cut outs to hold
the panels in a module of 100mm at max.1.6m c/c.
Carriers to be suspended from roof/truss by 4mm dia Sq.m.
galvanised steel wire rod hangers with suspension
clips at max 1.3m c/c. Hangers fixed to roof by “J”
hooks and nylon inserts or to truss members by
regular industrial grade 18 G wire. Edge profile/wall
angle to be 19 x 19 x 0.5mm thick of aluminium
matching the colour of panel. including flashing,
cappings, ridges etc. in required girth for similar
material with self drilling, self-stitching fasteners at
max. 500mm c/c along the length of clipping/flashing.
Entire operation shall include all necessary
accessories.

8.13 Providing and laying 25 mm thick precast cement


concrete chequered tiles of grade M-20 in ordinary
grey cement laid in cement mortar 1:3 over 50 mm
thick cement concrete M-15 grade and 150 mm thick Sq.m.
granular sub-base including pointing of tiles with neat
cement all complete as per drawing & MORT&H
Specifications clause 409.

8.14 Supplying and installation of structural skelton of toll


booth made of 60 x 60 x 2.5mm thick special
aluminium section including false ceiling, flooring,
finishinhg, furniture, internal electrification etc.
complete as per drawing and conforming to relevant
specifications including protection barrier.

a) Single booth No.


b) Double booth No.
8.15 a) Providing and installing Toll Plaza equipments
including electrically operated barrier gates complete
as per drg and additional technical specifications. No.

8.15 b) Providing & fixing Weigh in motion Nr


8.16 Providing Toll Plaza Administratice Building including
all allied buildings and providing water supply
including all pipes, fittings, tanks, tube well, pumps,
valves etc. complete with septic tank, sewer lines, Sqm.
internal roads, compound wall, etc. all complete as per
drg. and MORT&H specifications clause 120 and
additional specifications.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 32 of 150


8.17 Providing and installing power generator 125KVA at
Toll Plaza complete as per drg and additional technical No.
specifications.
8.18 Construction of accommodation for traffic aid post, first
aid room, security guard / change room complete as
per drg and direction of Engineer-in-chage Sqm.

8.19 Construction of accommodation & post for Medial aid


post & 2 residential quarters for Doctor complete as Sqm.
per drg and direction of Engineer.
8.20 Construction of underground fuel tank complete as per
No.
drg and direction of Engineer.
8.21 Pavement marking with hot applied thermoplastic
paints conforming to ASTM D36/BS-3262 (Part - I) as
per drawing & Technical Specifications Clause 803. Sqm.

Toll Plaza Drainage


8.22 Excavation trenches of required width for RCC drains
and disposal of surplus excavated soil with all leads
and lifts complete as per MORT&H Specifications Cum.
Clauses 2903.
8.23 Construction of RCC drain with M-20 grade concrete
including HYSD reinforcement complete.
a) Drain under footpath as per drawing and direction
m
of Engineer.
8.24 Providing, laying & jointing reinforced cement cocnrete
pipes NP4 including testing of joints all complete as
per MORT&H specifications section 2900.

a) 200mm dia m
8.25 Providing & Laying of Cement Concrete M-15 grade in
foundation for RCC drain as per drg. and MORT&H Cum.
specifications section 1500 & 1700.
8.26 Construction of brick masonry manhole chamber of
internal size 600 x 900 mm including reinforced
cement concrete M-20 grade cover slab with medium
duty MS manhole frame and cover, inside cement No.
plaster 1:3 with neat cement punning, C.C. benching
and pipe connections complete as per drawings and
direction of Engineer.

8.27 Construction of cement concrete M-20 grade chute as


m
per enclosed drawing and direction of Engineer.
8.28 Construction of cement concrete M-20 grade
dissipation basin as epr drg. and direction of Engineer. No.

8.29 Providing and fixing kerb inlet complete in all respects


as per drawing and as directed by Engineer. No.

8.30 Providing & constructing utility ducts with 300mm dia


NP4 RCC pipes including casting of M-15 grade
cement concrete cradle complete as per drg. & m
MORT&H specifications section 2900.
8.31 Providing internal & external electrification i/c
equipment in toll plaza canopy, booths and
administrative bldg. and other ancilliary buildings Job
complete as per specifications and direction of
Engineer.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 33 of 150


8.32 Airconditioning i/c equipments of toll booths and
administrative building and other ancillianry buildings
complete as per specifications and directions of Job
Engineer.
Toll Plaza Electrical Works
8.33 Providing high mast lighting complete as per
No.
specifications and direction of Engineer.
8.34 Providing electrical connection i/c transformer
complete as per specifications and direction of No.
Engineer.
Toll Plaza Vehicles
8.35 Providing Ambulance No.
8.36 Providing Highway petrol vehicle No.
8.37 Providing crane of 20T capacity No.
8.38 Providing water tanker for fire fighting etc. No.

Sub Total
Bill No. 9 BUS BAYS
9.01 Clearing and grubbing road land including uprooting
rank vegetation, grass, bush scrubs, saplings and
trees of girth up to 300mm, removal and stacking of
serviceable material up to 100m from road boundary Ha
as per MORT&H specification clause 201.

9.02 Earthwork in excavation necessary for construction of


roadway in all types of soils including all lifts and leads
complete as per MORT&H Specifications Clause Cum.
301.in BC Soils

9.03 Construction of embankment with approved material


from borrow areas with all leads and lifts, compacting to
95% of modified proctor density, all complete as per Cum.
drawings and MORT&H Specifications Clause 305.

9.04 Construction of subgrade satisfying the requirements


of minimum soaked CBR value as indicated in the
drawing with approved material from borrow areas, with
all leads & lifts, compacting to 97% of modified proctor density, Cum.
all complete as perdrg. & MORT&H Specifications Clause 305.

9.05 Filling in median/island with approved material with all


leads and lifts complete as per MORT&H Specification
Cum.
Clauses 305 & 407.

9.06 Providing and laying Granular Sub-base (drainage


layer) complete as per MORT&H Specifications
Cum.
Clause 401. Grading–I (Table –400-2).

9.07 Providing and laying Wet Mix Macadam base course


of required thickness complete as per MORT&H
Specifications Clause 406. Cum.

9.08 Providing bituminous primer coat over granular


surface with bitumen emulsion complete as per
MORT&H Specifications Clause 502 @ 6.0 to 9.0 Sqm.
kg/10 sq.m.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 34 of 150


9.09 Providing tack coat with bituminous Emulsion all
complete as per MORT&H Specifications Clause 503

(i) On granular surface treated with primer and on


hungary bituminous surface @2.5 to 3.0 kg/10sq.m. Sqm.

(ii) On Bituminous surface @ 2.0 to 2.5 Kg/10 sq.m.


Sqm.

9.10 Providing & laying Dense Bituminous Macadam


course of required thickness on prepared surface
complete as per MORT&H Specifications Clause 507 Cum.

9.11 Providing & laying Bituminous Concrete wearing


course (using modified bitumen from refinery) of
required thickness on prepared surface complete as Cum.
per MORT&H Specifications Clauses 509 & 521.

9.12 Providing and Laying M-20 Footpath Slab complete as


per drawing and MORT&H Specifications clauses 300,
1500, 1600, 1700 and 409. Sqm.

9.13 Pavement marking with hot applied thermoplastic


paints conforming to ASTM D36/BS-3262 (Part - I) as
per drawing & MORT&H Specifications Clause 803. Sqm.

9.14 Construction of plain cement concrete kerb M-20


grade complete as per drawing and MORT&H
Specifications clause 408. including paints complete Lm

9.15 Providing and applying two coats of synthetic enamel


paint including primer to kerb surfaces etc. complete
as per MORT&H Specifications clause 803. Sqm.

9.16 Supplying and fixing at site retro-reflectorised type


sign boards/signs made of encapsulated lense type of
reflective sheeting fixed over aluminum sheeting 2.0
mm thick with minimum coefficient of retro-reflection
(determined in accordance with ASTM Standards)
No.
complete including vertical pipes, angles, posts etc. all
complete as per drawings and MORT&H
Specifications clause 801.

9.17 Providing & fixing guard railing with tubular steel


sections at foot path / medians / islands etc including
foundation concrete and painting with approved paint
etc. all complete as per drawing & MORT&H Lm
Specifications Clauses 808, 300, 1500, 1700 & 1900.

9.18 Providing shelters for bus passengers as per drawing


and MORT&H Specifications section 300, 1500, 1600
and 1700 Nr.

9.19 Providing & fixing drainage Spout complete as per


drawing & MORT&H Specifications Clause 2705. Nr.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 35 of 150


9.20 Construction of covered Rectangular RCC M-20 lined
Drains of base width 1.0m to 1.50m underneath
sidewalks at the edge of service roads in urban
sections including RCC cover slab and reinforcement Lm
complete as per drg and MORT&H Specifications
Clauses 300, 1500, 1600, 1700, 2100 & 2200.

9.21 Arrow Marking Nr.


9.22 Sand filling below tiles Sqm.
9.23 Pitched Drain Lm

Sub Total
Bill No. 10 TRUCK LAY BYES
10.01 Clearing and grubbing road land including uprooting
rank vegetation, grass, bush scrubs, saplings and
trees of girth up to 300mm, removal and stacking of
serviceable material up to 100m from road boundary Ha
as per MORT&H specification clause 201.

10.02 Earthwork in excavation necessary for construction of


roadway in all types of soils including all lifts and leads
complete as per MORT&H Specifications Clause 301. Cum.

10.03 Construction of embankment with approved material


from borrow areas with all leads and lifts, compacting to
95% of modified proctor density, all complete as per Cum.
drawings and MORT&H Specifications Clause 305.

10.04 Construction of subgrade satisfying the requirements


of minimum soaked CBR value as indicated in the
drawing with approved material from borrow areas, with
all leads & lifts, compacting to 97% of modified proctor Cum.
density, all complete as per MORT&H Specifications Clause
305.

10.05 Providing and laying Granular Sub-base (drainage


layer) complete as per MORT&H Specifications
Cum.
Clause 401. Grading–I (Table –400-2).

10.06 Providing and laying Wet Mix Macadam base course


of required thickness complete as per MORT&H
Specifications Clause 406. Cum.

10.07 Providing bituminous primer coat over granular


surface with bituminous emulsion complete as per
MORT&H Specifications Clause 502 @ 6.0 to 9.0 Sqm.
kg/10 sq.m.

10.08 Providing tackcoat with bituminious emulsions all


complete as per MORT&H specifications clause 503.

(i) On granular surface treated with primer and on


hungary bituminous surface @2.5 to 3.0kg/10 sq.m. Sqm.

(ii) On Bituminous surface @ 2.0 to 2.5 Kg/10 sq.m. Sqm.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 36 of 150


10.09 Providing & laying Dense Bituminous Macadam
course of required thickness on prepared surface
complete as per MORT&H Specifications Clause 507 Cum.

10.10 Providing & laying Bituminous Concrete wearing


course using modified bitumen from the refinery of
required thickness on prepared surface complete as Cum.
per MORT&H Specifications Clause 509 & 521.

10.11 Filling in median/island with approved material with all


leads and lifts complete as per MORT&H
Specification Clauses 305 & 407. Cum.

10.12 Providing and installing Pedestrian Guard rail at urban


locations as per drawings and MORT&H
Specifications Clause 808 and sections 300, 1500, Rm
1700 and 1900.

10.13 Providing and Laying M-20 Footpath Slab complete as


per drawing and MORT&H Specifications clause 300,
Sqm.
1500, 1600, 1700 and 409.

10.14 Construction of plain cement concrete kerb M-20


grade complete as per drawing & MORT&H
Specifications Clause 408. including Painting Lm

10.15 Providing and applying two coats of synthetic enamel


paint including primer to kerb surfaces etc. complete
as per MORT&H Specifications clause 803. Sqm.

10.16 Supplying and fixing at site retro-reflectorised type


sign boards/signs made of encapsulated lense type of
reflective sheeting fixed over aluminum sheeting 2.0
mm thick with minimum coefficient of retro-reflection
(determined in accordance with ASTM Standard )
Sqm.
complete including vertical pipes, angles, posts etc. all
complete as per drawing and MORT&H
Specifications clause 801.

10.17 Pavement marking with hot applied thermoplastic


paints conforming to ASTM D36/BS-3262 (Part - I) as
per drawing & MORT&H Specifications Clause 803. Sqm.

a) Road Marking Arrow Nr.


10.18 Construction of way side amenities
a) Providing & erecting tube well, a drinking water
kiosk, well sheltered from the sun and rain with
platform cum washing area paved with cement
concrete tiles complete with drainage accessories up
to the designated outfall, site clearance, compaction Nr.
and levelling etc. complete as per drawing and
additional specifictions.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 37 of 150


b) Construction of toilet block provided with fittings
and fixtures complete including paving the
sorrounding area with tiles and constructing a soak pit
in truck parking area complete as per drg. and Nr.
direction of the Engineer.

c) Construction of restaurant, workshop, first aid


room, shop etc. in truck parking area complete as per
Sqm.
drg. and direction of the Engineer.

10.19 Providing and Fixing Post mounted and/or a swivel


type theft, vandal and fire proof, litter bin of minimum
30 litres capacity,made of material resistant to wear
and tear such as to require minimal maintanence No.
having drainage holes for periodical flushing complete
as per requirement of users.

Sub Total
Bill No. 11 JUNCTIONS AND INTERSECTIONS
11.01 Clearing and grubbing road land including uprooting
rank vegetation, grass, bush scrubs, saplings and
trees of girth up to 300mm, removal and stacking of
serviceable material up to 100m from road boundary Ha
as per MORT&H specification clause 201.

11.02 Earthwork in excavation necessary for construction of


roadway in all types of soils including all lifts and leads
complete as per MORT&H Specifications Clause 301. Cum.

11.03 Construction of embankment with approved material


from borrow areas with all leads and lifts, compacting to
95% of modified proctor density, all complete as per Cum.
drawings and MORT&H Specifications Clause 305.

11.04 Construction of subgrade satisfying the requirements


of minimum soaked CBR value as indicated in the
drawing with approved material from borrow areas, with
all leads & lifts, compacting to 97% of modified proctor Cum.
density, all complete as per MORT&H Specifications Clause
305.

11.05 Filling in median/island with approved material with all


leads and lifts complete as per MORT&H Specification
Cum.
Clauses 305 & 407.

11.06 Providing and laying Granular Sub-base (drainage


layer) complete as per MORT&H Specifications
Cum.
Clause 401. Grading–I (Table –400-2).

11.07 Providing and laying Wet Mix Macadam base course


of required thickness complete as per MORT&H
Cum.
Specifications Clause 406.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 38 of 150


11.08 Providing bituminous primer coat over granular
surface with bitumen emulsion complete as per
MORT&H Specifications Clause 502 @ 6.0 to 9.0 Sqm.
kg/10 sq.m.

11.09 Providing tack coat with bituminous Emulsion all


complete as per MORT&H Specifications Clause 503

(i) On granular surface treated with primer and on


hungary bituminous surface @2.5 to 3.0kg/10 sq.m. Sqm.

(ii) On Bituminous surface @ 2.0 to 2.5 Kg/10 sq.m.


Sqm.

11.10 Providing & laying Dense Bituminous Macadam


course of required thickness on prepared surface
complete as per MORT&H Specifications Clause 507 Cum.

11.11 Providing & laying Bituminous Concrete wearing


course (using modified bitumen from refinery) of
required thickness on prepared surface complete as Cum.
per MORT&H Specifications Clauses 509 & 521.

11.12 Providing & fixing M.S. railing for traffic islands /


median including foundation concrete M-15 grade and
painting with approved paint etc. complete job as per
drawing and MORT&H Specifications Sections 300, m
1500, 1700 & 1900.

11.13 Providing PCC M-15 grade in foundation of Brick


Masonry walls in Junction Island all complete job as
per MORT&H Specifications Section 1700 & 1700. Cum.

11.14 Providing Brick Work in Cement Mortar 1:3 (1 cement


: 3 coarse sand) required for Repair and
Reconstruction of Junction Island all complete as per Cum.
MORT&H Specifications Section 1300.

11.15 Providing Cement Plaster with Cement Mortar 1:3 (1


cement : 3 cosrase sand) over Brick Masonry walls all
complete as per MORT&H Specifications Section Sqm.
1300.

11.16 Providing cement concrete M-20 grade channel kerb


including painting complete as per Drawing and
MORT&H Specification Clause 408. m

11.17 Providing cement concrete M-20 grade median kerb


including painting of kerbs as per Drawing and
MORT&H Specifications Clause 408. m

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 39 of 150


11.18 Providing and laying 25mm thick precast cement
concrete chequered tiles of M-20 grade in ordinary
grey cement laid in cement mortar 1:3 over 50mm
thick cement concrete M-15 grade and 150mm thick
granular sub-base including pointing tiles with neat Sqm.
cement complete as per drawings and MORT&H
Specifications clause 409.

11.18a Utility Duct pipe


a) 150mm Dia m
b) 300mm Dia m
11.18b Hume pipe (For Crossing Drain)
a) 600mm Dia m
b) 900mm Dia m
c) 1200mm Dia m
11.18c M-15 PCC in Foundation Cum.
11.18d Head Wall PCC M-20 Cum.
11.19 Dismentling of existing road Cum.
11.20 Earthen Shoulder Cum.

Sub Total
Bill No. 12 TRAFFIC SIGNS, MARKINGS AND ROAD APPURTENCES.
12.01 Pavement marking with hot applied thermoplastic
paints with reflectorising glass beads conforming to
ASTM D36/BS-3262 (Part - I) as per drawing &
MORT&H Specifications Clause 803.

a) Lane/centre line / edge marking / transverse and


any other marking Sq.m.

a-1) "STOP" word Nr.


b) Directional arrows, lettering etc. as per drg. No. 61
of MORT&H type design & intersection of National
Highways. Nr.

12.02 Providing and applying two coats of synthetic enamel


paint including primer to concrete kerb surfaces etc.
complete as per MORT&H Specifications clause 803. Sq.m.

12.03 Supplying and fixing at site retro-reflectorised type


sign boards/signs made of encapsulated lense type of
reflective sheeting fixed over aluminum sheeting 2.0
mm thick with minimum coefficient of retro-reflection
(determined in accordance with ASTM Standard
E:810) as indicated in Table 800-1 complete including
vertical pipes, angles, posts etc. all complete as per
drawings and MORT&H Specifications clause 801.

A) Mandatory /Regulatory Signs of Size.


i) Circular 600 mm dia. Nr.
ii) Octagon 900 mm height (for “STOP”). Nr.
iii) Triangular 900 mm size (for “GIVE WAY”). Nr.
(iv) Speed limit 600mm dia Nr.
B) Cautionary/Warning Signs-Triangular 900mm size
Nr.

C) Informatory Signs

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 40 of 150


a) Direction and Place Identification signs
i) Advance Direction/Destination signs Nr.
ii) Direction signs 1200 x 700 mm Nr.
iii) Reassurance signs 1200 x 1800mm Nr.
iv) Place Identification Signs 900x1200mm Nr.
v) Truck Lay Bye signs 800x600 Nr.
vi) Toll Booth Ahead signs 900x1200mm Nr.
b) Facility and Other Useful information Signs
800x600mm Nr.

c) Route Marker Signs


i) NH Route marker signs of size 450x600mm
Nr.

ii) Side road marker signs 450x600mm Nr.


12.04 Providing and fixing retro-reflectorised road
delineators complete as per drawing and MORT&H
Specifications Clause 805.

a) Cluster of Red Reflectors. Nr.


b) Road way delineators.
i) Roadway indicators (Post type) Nr.
ii) Hazard markers Nr.
iii) Object marker Nr.
c) Cats Eye Nr.
12.05 Supplying and fixing tubular gantry mounted overhead
sign board including RCC M-30 foundations and
reinforcement and all incidental works complete as per
drawings and MORT&H Specifications clause 802.

a) 4000 mm cantilever arm with 3500 mm x 1000 mm


No.
board
b) 11,000 to 14250 mm single span gantry with 8000
No.
mm x 1000 mm board
12.06 Construction of plain cement concrete kerb M-20
grade complete as per drawing & MORT&H
Specifications Clause 408.

a) Kerb. Cum.
b) Kerb with channel Cum.
12.07 Providing and laying cement concrete M-15 in
foundation complete as per drawings and MORT&H
Specifications clause 408.

a) Kerb Lm
b) Kerb with channel. Lm
12.08 Providing and fixing reinforced cement concrete M-20
grade stones including excavation, foundation
concrete and reinforcement and inscription etc. all
complete as per MORT&H Specifications Section 800.

i) Hectometer stone. Nr.


ii) 5th km. stone. Nr.
iii) km. stone. Nr.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 41 of 150


12.09 Providing and fixing M-20 guard post 250mm dia x
1.25m long including reinforcement 4 Nos. 12mm dia
vertical bars and 5 Nos. stirrups 6mm dia, duly
embedded in cement concrete grade M-15, 550mm x
550mm x 650mm, including painting etc. complete as Nr.
per drawing & MORT&H Specifications sections 300,
1500, 1600, 1700, 2100 and 2200.

12.10 Providing and fixing reinforced cement concrete M-20


grade precast Road land (ROW) boundary pillars
200mm dia x 0.9m long including reinforcement 4
Nos. 6mm dia vertical bars and 5 No. stirrups 6mm
dia, duly embedded in cement concrete grade M-15,
Nr.
500mm x 500mm x 750mm including painting etc.
complete, as per drawing & MORT&H Specifications
sections 300, 1500, 1600, 1700, 2100 and 2200

12.11 Providing, fabricating and fixing Thrie Beam Metal


Crash Barrier at high embankment( Curve Portion)
locations complete as per drawing & MORT&H
Specifications clause 810 and sections 300, 1500, Lm
1600, 1700, 1900 and 2100

12.12 Providing, fabricating and fixing W shaped Metal


beam Crash Barrier at high embankment locations
complete as per drawing & MORT&H Specifications
clause 810 and sections 300, 1500, 1600, 1700, 1900 Lm
and 2100

12.13 Providing and laying 25 mm thick precast cement


concrete chequered tiles of grade M-20 in ordinary
grey cement, laid in cement mortar 1:3 over 75 mm
thick cement concrete M-15 grade including pointing
of tiles with neat cement all complete as per drawing & Sq.m.
MORT&H Specifications clause 409.

12.14 Providing and installing Pedestrian Guard rail of G.I.


pipes at urban locations as per drawings and
MORT&H Specifications Clause 808 and sections Rm
300, 1500, 1700 and 1900.

12.15 Providing & fixing 19 degree tilted one-way road studs


with 1 x 43 glass elements complete fixed on road
surface with adhesive as approved by Independent
consultant and as per BS:873 Part-IV (1987) replaced No.
partly with BSEN 1463-1:1998.

12.16 Providing LED (Light Emitting Diode) at intersections


and median opening as per standard design and
direction of the Independent consultant. No.

12.17 Providing blinkers signal at all intersections witn SH /


MDR / ODR category roads in rural areas with
preferably non-conventional energy source like solar
energy in accordance with relevant IRC /IS codes and No.
as per direction of independent consultant.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 42 of 150


12.18 Providing speed breakers on all side roads
intersecting the Project Highway as per standard
No.
design and direction of independent consultant.

12.19 Providing Highway Traffic Management System


(HTMS) to collect / disseminate in formation for traffic
and incident management and for the safety of users
in accordance with IEC 364, with minimum of
CENELEC standards EN 50128 software inte grity
level 2. The system shall comprise following sub-
systems:

a) Emergency communication system, istalled at the


spacing of 2km., in a staggered manner on either side
of the Highway and connected to the contral centre
through the transmission system of optical fibre cable
and copper cables with suitable interfacing.

b) Mobile communication systerm shall have mobile


sets, ambulances, cranes and partrolling vehicles.

c) Variable message signs shall be provided at an


interval of 10km. in each direction of traffic.
d) Meterological Data System shall be installed at an
interval of 25km.
e) Automatic traffic counter cum classifier syster shall
be install at minimum two locations.

f) Provision of installing of vedio cameras shall be


made available at all major intersections and atleast 4
vedio cameras shall be made available at any of the one job
identfied location.

g) Power supply system.

Sub Total

Bill No. 13 MISCELLANEOUS


13.01 Plantation of trees as per MOEF guidelines in
one/two rows depending upon space available on
either side of road within ROW (including planting with
manure, gardening and maintenance) complete as per Nr.
MORT&H Specifications Clause 308.

13.02 Turfing of embankment slopes, verge earthen


shoulders and other locations with grass sods all
complete as per MORT&H Specifications Clause 307. Sqm.

13.03 Plantation of shrubs in central median including


planting with manure, gardening and maintenance
complete as per MORT&H Specifications Clause 308. Nr.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 43 of 150


13.04 a) Supply of color record photographs with negatives
and two colour prints in approved size there from
mounted in album as per MORT&H Specifications Nr.
Clause 125.

b) Same as above but additional prints of colour


record photographs Nr.

13.05 Supplying of color video cassettes and digitized CD


ROMs during construction as per MORT&H
Specifications Clause 126. Set

13.06 Carrying out earthwork for restoration of rain cuts &


earthen shoulders maintenance along the ROW as Cum.
per MORT&H Specifications clause 302.
13.07 Carrying out repairs to pot holes and perform
necessary patching to existing bituminous Carriage
way conforming as per MORT&H Specifications Cum.
clause 302.

13.08 Renewal coat on existing road with 25 mm SDBC as


per MORT&H Specification clause 508 to the area of
Sqm.
the existing Carriage way.

13.09 Coordinating with respective service provider /


authorities for cutting of trees, shifting of utilities and
removal of enchrochment etc. as per MORT&H L.S.
specifications clause 110.

13.10 Relocation / construction of cultural properties such as


Temples / Mosque as identified and as per directions
Sqm.
of the Engineer

13.11 Providing site office for the independent consultant


including furnishing the same complete as per
Sqm.
MORT&H specifications clause 120.

13.12 Maintaining site office for the independent consultant


and other supervisory staff complete as per MORT&H
month
specifications clause 120.

13.13 Providding and maintaining Vehicles for the


independent consultant and his staff including driver,
POL etc. complete as per MORT&H specifications Veh-
month
clause 124.

13.14 Providing and maintaining mobile phones of NOKIA or


equivalent make with SIM card for use of PIU
including roaming and using charges Rs. 3,000/- per Phone
month
month subject to increase every year with 5%.

13.15 Construction and provision of highway / material


engineering laboratory with latest state of art material
testing equipments as per MORT&H specifications Sqm.
clause 121.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 44 of 150


13.16 Maintaining of field laboratory with regular water
supply, stand by power system and consumables etc.
complete as per MORT&H specifications clause 121. month

13.17 Construction of temporary diversion where necessary


and maintenance there of including traffic control and
safety devices complete as per MORT&H m
specifications clause 112.

13.18 Providing & fixing chain link fencing to protect the


ROW on either side of the road as per drg and
direction of the Engineer, including excavation, angle
iron fixed in M-15 grade concrete complete as per m
MORT&H specifications sections 300, 1700 & 1900.

13.19 Providing & fixing 1.2 meters high G.I. barbed wire
fencing with 1.8m angle iron posts 40mm x 40mm x
6mm placed every metres contre to centre founded in
M-15 grade cement concrete, 0.6 metre below ground m
level, every 15th post, last but one end post and c

13.20 Supply of O&M vehicles


a Vehicle for Highway Maintainanace
b Vehicle for Coridoor Control
c Vehicle for Traffic Aid POST
d Vehicle for medical aid post
e Crane for Rescue Post
f Ambulance
g Water Tanker for fire fighting and Watering plants

Sub Total
Bill No. 14 HIGHWAY LIGHTING
For 2 Leg Lighting
14.01 Project roads in urban / semi urban areas. Km
14.02 Approaches to fly over
14.03 Major junctions Nr.
14.04 Toll Plaza
14.05 Truck lay byes Nr.
14.06 Underpass Nr.
14.07 Base camp Nr.
For 1 Leg Lighting
14.01 Project roads in urban / semi urban areas. Km
14.02 Approaches to fly over
14.03 Major junctions
14.04 Toll Plaza
14.05 Truck lay byes
14.06 Bus bays
14.07 Base camp

Sub Total
Bill No. 15 ENVIRONMENT MITIGATION MEASURES
(As per D.P.R.)
1 Environmental monitoring during construction and 3
years thereafter = 48.96 lakhs considering 2/3 for
construction period only.

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 45 of 150


2 Environmental training activities for 3 yrs immediately
after construction = 18.93 lakhs (not for construction
period). KM

3 Compensatory afforestation.
4 Cost of planting new trees = Nos.
5 Plantation on water logged areas.
6 Plantation at Bus Parks / Truck Parks

Sub Total

419163577.xlsx, BOQ Bridges, 05/04/2019, 08:19:52, Page 46 of 150