Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

101 102 103 104 105 106 107 108

A 1 1 1 A
1 1 1

S.S.1 S.S.1

M A 45 M A 54
38 47
S.S.2 S.S.2 S.S.1
B B
WLC WLC
P1 P2 P1 P2 M A

39 42 46 48 51 55 56 59
S.S.2 S.S.2
STOP STOP STOP STOP STOP WLC
and they should neither be copied nor given to a third person without the prior permission of Company

P1 P2 P1 P2
40 43 49 52 57
NO START START NO NO START START NO NO START
C9 C10 C11 C12 C13
41 44 50 53 58
C C

C9 C10 C11 C12 C13


N9 ON N10 ON N11 ON N12 ON N13 ON

NC NC NC NC NC
O/L9 O/L10 O/L11 O/L12 O/L13

0N 0N

D D
The contents of this Drawing are the sole property of

100 100

NO NO NO NO NO
O/L9 O/L10 O/L11 O/L12 O/L13

68 69 70 71 72
O/L O/L O/L O/L O/L
9 10 11 12 13

E E

SUMP PUMP CLEAR WATER PUMP CENTRIFUGE PUMP


1 HP 2 NOS (1W/1S) 3 HP 2 NOS (1W/1S) 3 HP 1 NO
3 PHASE 3 PHASE 3 PHASE

REV. I- II- III- IV-

Date Name PROJECT:- JOB NO DRG. NO. REV.


F Drawn 10-04-19 MANOJ KUMAR Work R0 F

Checked S.SHARMA
ROOT ENGINEERING Details
CONSULTANT:- ITEM
SHEET NO. 02
Approved S.SHARMA Order No. NO. OF SHEET 03

You might also like