Professional Documents
Culture Documents
Form 1.4 Training Needs Training Needs (Learning Outcomes) Module Title/Module of Instruction
Form 1.4 Training Needs Training Needs (Learning Outcomes) Module Title/Module of Instruction
Form 1.4 Training Needs Training Needs (Learning Outcomes) Module Title/Module of Instruction
4 TRAINING NEEDS
Training Needs ( Learning Outcomes) Module Title/Module of Instruction
Perform roughing-in activities, wiring Performing roughing-in activities,
and cabling works for single-phase wiring and cabling works for single-
distribution, power, lighting, and phase distribution, power, lighting,
auxiliary systems and auxiliary systems
1. Install electrical metallic/non-
metallic (PVC conduit)
2. Install wire ways and cable tray
3. Install auxiliary terminal cabinet and
distribution panel
4. Prepare for cable pulling and
installation
5. Perform wiring and cabling lay-out
6. Notify completion of work
Install electrical protective devices, Installing electrical protective
for distribution, power, lighting, devices, for distribution, power,
auxiliary, lightning protection and lighting, auxiliary, lightning
grounding systems protection and grounding systems
1. Plan and prepare work
2. Install electrical protective devices
3. Install lighting fixture and auxiliary
outlet
4. Notify completion of work
Install wiring devices of floor and Installing wiring devices of floor and
wall mounted outlets, lighting wall mounted outlets, lighting
fixture/switches and auxiliary fixture/switches and auxiliary
outlets outlets
1. Select wiring devices
2. Install wiring devices
3. Install lighting fixture/switches
4. Notify completion of work
document #:
CBLM on date developed: Issued by:
Trainers Methodology Level 1 November 2018 Subic Bay page
EIM NC-II developed by: Colleges, Inc. 1of1
E.D. PADULLON
date modified:
modified by: revision #:00