A G Construction: Date Dls No. Curring

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

A G Construction

Name Of Project :- Proposed Construction Of Major Bridge New BG Rail Line On Ahemadabad - Beed

Name Of Site :- Chainagae N0.129635 at Shirur Kasar

Name Of Sub Cont :- Vibhishan Kolhe

Bill Peroid :- 09/03/2019 To 31/03/2019 Date: 31/03/2019

Sr. No. Date DLS No. Curring Sleep Form Concreting

1 9-Mar-19 93 1 0
2 10-Mar-19 95 1 0
3 11-Mar-19 96 1 0
4 12-Mar-19 97 1 12
5 13-Mar-19 98 1 12
6 14-Mar-19 99 1 12
7 15-Mar-19 100 1 12
8 16-Mar-19 101 1 12
9 17-Mar-19 102 1 12
10 18-Mar-19 103 1 7
11 19-Mar-19 104 1 7
12 20-Mar-19 105 1 0
13 22-Mar-19 106 1 0
14 23-Mar-19 107 1 6
15 24-Mar-19 108 2 12
16 25-Mar-19 109 2 12
17 26-Mar-19 110 2 12
18 27-Mar-19 111 2 12
19 28-Mar-19 112 2 12
20 29-Mar-19 113 2 12
21 30-Mar-19 114 2 12
22 31-Mar-19 119 2 3
Total 30 179

Prepared By Checked By. Authorized By. Accepted By Sub Cont.


A G Construction
Name Of Project :- Proposed Construction Of Major Bridge New BG Rail Line On Ahe.- Beed
Name Of Site :- Chainagae N0.129635 at Shirur Kasar Bill.No. :-
Name Of Sub Cont:- Vibhishan Kolhe
Bill Peroid :- 09/03/2019 To 31/03/2019 Date :- 31/03/2019
ABSTRACT SHEET
Sr.No Item Discription Unit Qty. Rate Amount
5 Deparmetal Labour Supply

Labour Charges For The Following Work On The Site.


Carpenter, Electrition, Mechanical, Curing, Concreting,
a Material Shifting, Cement Loading Unloading, Cleanning For Nos 179 500 89500
The PCC, Steel Scrap Loading, Quality Lab etc.(Skill)

Labour Charges For The Following Work On The Site.


Carpenter, Electrition, Mechanical, Curing, Concreting,
b Material Shifting, Cement Loading Unloading, Cleanning For Nos 30 350 10500
The PCC, Steel Scrap Loading, Quality Lab etc.(UnSkill Male
Labour)

Total 100000
Dedection
Gross Payment 100000

Prepeard By. Checked By. Authorized By. Accepted By Sub Cont.