Annexure-1 Rates Schedule-HPCL
Annexure-1 Rates Schedule-HPCL
Supports
1 support fabrication (trunion / branch pipe/ RF pad, box / shoe type support , ma MT 63 63
2 support INSTALLATION ( Welding with spools) MT 63 63
B Total cost incl supports fabrication
Note
1 Also provide separte rates for SAW for each MOC.
2 Thk- To be considered as per BOQ. Rates shall be common for this project
irrespective of THK , considering total quantum
%
Amount contribution
0 31%
0 51%
0 2%
0 8%
0 0%
0 8%