Pump BOQ Typical
Pump BOQ Typical
Sl.
Description of work No. L B H Qtty. Unit Rate Amount
No.
1 Excavation in foundation in ordinarysoil (loam, clay
or sand) including lift up to 1.5m and lead up to
50m. Filling, watering and ramming of excavated
earth into the trenches or into the space between
the building and the sides of foundation trenches
or into the plinth and disposal of surplus earth up
to a distance of 50m. from the centre of the
foundation trenches.
Center to center Length of 23.4
pump house & chlorinating room 4-
= 4.26+2.73+1.53+2.73+4.73+4.73+2.73 = 23.44 1 (4* 0.75 0.90 14.8 m3
0.75
/2)
for step 1 3 0.75 0.20 0.44 m3
for chamber into PH. 1 3.9 0.20 0.20 0.16 m3
total 15.41 m3 72.83 1122.37
2 Concrete with 40 mm gauge brick ballast, local
sand and cement in proportion (12 : 6 :1) in
foundations and floors including supply off all
materials, labour T and P etc. required for proper
completion of the work.
Center to center Length of 23.4
pump house & chlorinating room 4-
= 4.26+2.73+1.53+2.73+4.73+4.73+2.73 = 23.44 1 (4*0. 0.75 0.15 2.47 m3
75/2
)
for step 1 3 0.75 0.08 0.17 m3
for chamber into PH. 1 3.9 0.20 0.08 0.06 m3
total 2.70 m3 2640.47 7129.27
3a I class brick work in 1:6 cement and local sand
mortar in foundation and plinth including supply of
all materials labour, T& p etc. required for proper
completion of the work
1st footing 1 23.4 m3
4-
(4*0. 0.69 0.15 2.28
69/2
)
2nd footing 1 23.4 m3
4-
(4*0. 0.58 0.30 3.84
575/
2)
3rd footing 1 23.4 m3
4-
(4*0. 0.46 0.30 3.11
46/2
)
4th footing 1 23.4 m3
4-
(4*0. 0.35 0.45 3.53
345/
2)
Sl.
Description of work No. L B H Qtty. Unit Rate Amount
No.
for step 1 3 0.6 0.28 0.49 m3
1 3 0.3 0.15 0.13 m3
total 13.38 m3 3813.27 51027.65
3b I class brick work in 1:4 cement and local sand
mortar in foundation and plinth including supply of
all materials labour, T& p etc. required for proper
completion of the work.
for chamber into PH. 1 3.9 0.12 0.53 0.24 m3 3968.26 939.17
3c As in item 3a above but in superstructure
including necessary cutting and moulding of
bricks as required and also including honey comb
brick work thickness of wall not to be less than 1
brick.
1 23.4 m3
4-
(4*0. 0.23 3.00 15.9
23/2
)
Deduction door 1 1.20 0.23 2.10 0.58 m3
1 0.9 0.23 2.1 0.43 m3
window 4 0.9 0.23 1.5 1.24 m3
varandha 1 2.5 0.23 2.1 1.21 m3
1 1.3 0.23 2.1 0.61 m3
varandha (over slab) 1 2.5 0.23 0.7 0.4 m3
1 1.5 0.23 0.7 0.24 m3
total 11.15 m3 4108.27 45789.54
3d As in item 3a above but in 1:4 superstructure
including necessary cutting and moulding of
bricks as required and also including honey comb
brick work thickness of wall not to be less than 1/2
brick wall.(Above verandha slab)
1 2.5 0.12 0.3 0.09 m3
1 1.5 0.12 0.3 0.05 m3
1 3.5 0.12 0.30 0.119 m3
1 2.7 0.12 0.30 0.094 m3
1 2.00 0.12 0.30 0.069 m3
1 1.55 0.12 0.30 0.053 m3
1 2.85 0.12 0.30 0.098 m3
1 1.55 0.12 0.30 0.053 m3
1 1.50 0.12 0.30 0.052 m3
1 2.73 0.12 0.30 0.094 m3
for pillar 2 0.3 0.23 1.25 0.198 m3
total 0.97 m3 4410.76 4278.44
4 20 mm thick damp proof course with cement and
approved course sand in 1:2 including 5% water
proofing materials of in the proportion as specified
for proper complition of the work and including
curing and shuttering as necessary.
1 23.4 m2
4-
(4*0. 0.25 5.73
25/2
)
Deduction 1 1.20 0.25 0.30 m2
'' 1 0.90 0.25 0.23 m2
Sl.
Description of work No. L B H Qtty. Unit Rate Amount
No.
'' 1 1.3 0.25 0.32 m2
'' 1 2.3 0.25 0.57 m2
total 4.32 m2 249.83 1079.27
5 R.C.C work with cement, coarse sand and 20mm
gauge approved stone ballast in proportion of 1:2:4
in lintels of doors and windows,slab&chhaja
excluding supply of reinforcement and its bending,
but including its fixing and binding the same with
0.50mm thick binding wire(to be supplied by the
contractor) and including centering and shuttering,
supply of all materials, labour, T & P etc. required
for proper completion of the work.
Assistant Engineer