Removal of Existing Condenser Pipe at Riser Brenner Centre

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

Removal of Existing

Condenser Pipe at Riser


Brenner Centre
Site Survey Conducted on 16th February 2019
• ATS contacted a contractor to conduct a site survey at Brenner Centre
regarding the Existing Condenser Pipes at Riser to be removed.

• As per the outcome of the site survey, dismantling the riser pipes with
Pipe Saw is the less feasible tool to carry out this work due to space
constraint.

• The following slides contains photos and measurements taken during


the site survey for educational purposes.
Scope of Work to be Removed Existing Condenser Pipe at Riser
Legend
Cored holes

Cut off point

Condenser Pipe Lifting belt


Front View of Existing Condenser Pipe at Riser to be Removed

1) Distance between CHW pipe


2) Distance between
& Condenser Pipe
Condenser Pipe Condenser Pipes

4) Distance between back 3) Distance between


Condenser Pipes to wall Condenser Pipe to column
1) Distance between CHW & Condenser Pipe
• Distance between Chilled
Water Pipe (Left in picture)
& Condenser Pipe (Right in
picture): 180mm
2) Distance between Condenser Pipes
• Distance between
Condenser Pipes: 45mm
3) Distance between Condenser Pipe to column
• Distance between
Condenser Pipes to column:
210mm
4) Distance between back Condenser Pipe to Wall
• Distance between back
Condenser Pipes to Wall:
225mm

225mm
Alternate Surrounding Views of Existing Condenser Pipe at Riser

2) Above View B
1) Above View A
Condenser Pipe

3) Below View