Scube Status
Scube Status
PROJECT ID ES0164
STATUS OF STRUCTURAL DETAILING & DRAWING
STI & Input for design Structural design Deliverables
Sl.No Description
Input Description Status Output Deliverable Status
1 Combustion Air ducting Supports ES0164-75571200-LYT-2002-R1 Sent on 25.02.19 (Only for ref) STAAD Output Not received
5 Superheater Supporting
Structures
EIL load / reaction on Superheater Sent on 19.03.19 STAAD Output Not received
Superheater Supporting columns
5
Structures Structural GA Not received
Load data Not received
Fabrication Drawing Not received
ES0164-75990100-STI-0001-R3 Sent on 20.03.19 BOM Not received
STAAD Output Not received
6 Burner and Combustor Platform Structural GA Not received
Structures
Load data Not received
Fabrication Drawing Not received
Will be sent later BOM Not received
STAAD Output Not received
7 Burner inlet damper attending Structural GA Not received
platform
Load data Not received
Fabrication Drawing Not received
PROJECT IOCL WSA PLANT, HALDIA
PROJECT ID ES0164
STATUS OF STRUCTURAL DETAIL
STI & Input for design
Sl.No Description
Input Description
ES0164-75990100-STI-0004-R3
ES0164-75571200-LYT-2002-R1
1 Combustion Air ducting Supports
ES0164-75050900-SKT-0020 / R1
ES0164-75990100-STI-0007-R0
ES0164-75990100-STI-0002-R2
ES0164-75990100-STI-0008-R0
ES0164-75990100-STI-0003-R3
ES0164-75990100-STI-0001-R3
Structural GA
Load data
Fabrication Drawing
Sent on 07.03.19 BOM
Structural GA
Load data
Fabrication Drawing
Sent on 20.03.19 BOM
STAAD Output
Structural GA
Load data
Fabrication Drawing
Status (NTC ENGG) Status (IJT)
Received on 08.03.19
NOT FINISHED Revised BOM required due to changes in
heght of duct supports