PROJECT IOCL WSA PLANT, HALDIA

PROJECT ID ES0164
STATUS OF STRUCTURAL DETAILING & DRAWING
STI & Input for design Structural design Deliverables
Sl.No Description
Input Description Status Output Deliverable Status

Sent on 19.03.19 to cross check the Received on 08.03.19


ES0164-75990100-STI-0004-R3 load data due to height changes of BOM Revised BOM required due to
duct support changes in heght of duct supports

1 Combustion Air ducting Supports ES0164-75571200-LYT-2002-R1 Sent on 25.02.19 (Only for ref) STAAD Output Not received

Structural GA Not received


Load data Not received
Fabrication Drawing Not received
ES0164-75050900-SKT-0020 / R1 Sent on 07.03.19 BOM Received on 15.03.19
EIL STRUCTURE DRAWING A886- Sent on 07.03.19 STAAD Output Received on 15.03.19
205-81-41-08492_0
2 Silencer Supporting structures Support Reaction considered by Sent on 07.03.19 Structural GA Not received
EIL for silencer structure
ES0164-75990100-STI-0007-R0 Sent on 15.03.19 Load data Not received
Fabrication Drawing Not received
ES0164-75990100-STI-0002-R2 Sent on 15.03.19 BOM Not received
STAAD Output Not received
3 Boiler Steam Drum Platform Structural GA Not received
Load data Not received
Fabrication Drawing Not received
ES0164-75990100-STI-0008-R0 Sent on 15.03.19 BOM Not received
STAAD Output Not received
4 Boiler Damper attending Structural GA Not received
Platform
Load data Not received
Fabrication Drawing Not received
ES0164-75990100-STI-0003-R3 Sent on 19.03.19 BOM Not received

5 Superheater Supporting
Structures
EIL load / reaction on Superheater Sent on 19.03.19 STAAD Output Not received
Superheater Supporting columns
5
Structures Structural GA Not received
Load data Not received
Fabrication Drawing Not received
ES0164-75990100-STI-0001-R3 Sent on 20.03.19 BOM Not received
STAAD Output Not received
6 Burner and Combustor Platform Structural GA Not received
Structures
Load data Not received
Fabrication Drawing Not received
Will be sent later BOM Not received
STAAD Output Not received
7 Burner inlet damper attending Structural GA Not received
platform
Load data Not received
Fabrication Drawing Not received
PROJECT IOCL WSA PLANT, HALDIA
PROJECT ID ES0164
STATUS OF STRUCTURAL DETAIL
STI & Input for design
Sl.No Description
Input Description

ES0164-75990100-STI-0004-R3

ES0164-75571200-LYT-2002-R1
1 Combustion Air ducting Supports

ES0164-75050900-SKT-0020 / R1

EIL STRUCTURE DRAWING A886-205-


81-41-08492_0

2 Silencer Supporting structures


Support Reaction considered by EIL for
silencer structure

ES0164-75990100-STI-0007-R0

ES0164-75990100-STI-0002-R2

3 Boiler Steam Drum Platform

ES0164-75990100-STI-0008-R0

4 Boiler Damper attending Platform

ES0164-75990100-STI-0003-R3

EIL load / reaction on Superheater


columns
5 Superheater Supporting Structures
5 Superheater Supporting Structures

ES0164-75990100-STI-0001-R3

Burner and Combustor Platform


6 Structures
STATUS OF STRUCTURAL DETAILING & DRAWING
STI & Input for design Structural design Deliverables
Status Output Deliverable

Sent on 19.03.19 to cross check the


load data due to height changes of BOM
duct support

Sent on 25.02.19 (Only for ref) STAAD Output section AA


section BB
section CC
section DD

Structural GA
Load data
Fabrication Drawing
Sent on 07.03.19 BOM

Sent on 07.03.19 STAAD Output

Sent on 07.03.19 Structural GA

Sent on 15.03.19 Load data


Fabrication Drawing
Sent on 15.03.19 BOM
STAAD Output
Structural GA
Load data
Fabrication Drawing
Sent on 15.03.19 BOM
STAAD Output
Structural GA
Load data
Fabrication Drawing
Sent on 19.03.19 BOM

Sent on 19.03.19 STAAD Output

Structural GA
Load data
Fabrication Drawing
Sent on 20.03.19 BOM
STAAD Output
Structural GA
Load data
Fabrication Drawing
Status (NTC ENGG) Status (IJT)

Received on 08.03.19
NOT FINISHED Revised BOM required due to changes in
heght of duct supports

NOT FINISHED Not received


FINISHED
NOT FINISHED
FINISHED

NOT FINISHED Not received


NOT FINISHED Not received
NOT FINISHED Not received
FINISHED Received on 15.03.19

FINISHED Received on 15.03.19

FINISHED Not received

NOT FINISHED Not received


NOT FINISHED Not received
NOT FINISHED Not received
NOT FINISHED Not received
NOT FINISHED Not received
NOT FINISHED Not received
NOT FINISHED Not received
NOT FINISHED Not received
NOT FINISHED Not received
NOT FINISHED Not received
NOT FINISHED Not received
NOT FINISHED Not received
NOT FINISHED Not received

NOT FINISHED Not received

NOT FINISHED Not received


NOT FINISHED Not received
NOT FINISHED Not received
NOT FINISHED Not received
NOT FINISHED Not received
NOT FINISHED Not received
NOT FINISHED Not received
NOT FINISHED Not received