Summary On Andhra Pradesh Solar Policy
Summary On Andhra Pradesh Solar Policy
India blessed with more solar power compared to any other countries in the world.
Countries like India have more agricultural lands which need huge electricity and continuous
electricity in the long run.
Using different ways of getting electricity can be achieved by making the farmers, corporate and
industrialists to know about the “solar power”.
Andhra Pradesh is state were 24% of electricity is used in agricultural sectors.
Andhra Pradesh has an availability of 300 sunny days in a calendar year...
Government of Ap implemented various schemes regarding the solar power policy in 2012 and
2015.
The schemes helped in setup of solar power projects in Andhra Pradesh.
Solar power projects help the farmers getting the huge and continuous electricity through solar.
Setup of solar power projects helps farmers, corporate and industrial like small sector industries.
ApDISCOMS would procure around 2000MW of solar power capacity in a phased manner within
the next five year(s).
The tenure may move in to long term pf PPA of 25 years with developers who are selected
based on a competitive procurement process as per the tariff based competitive bidding
guidelines notified by the ministry of power.
Setup of solar power projects also help in getting the income by selling to the outside of Andhra
Pradesh to third parties.
Solar parks: initially government of Ap will develop 400 MW capacity solar parks this help in the
building up of power evacuation, water requirements and internal roads.
Solar rooftop projects: Andhra Pradesh government promote the rooftop systems in public
buildings, domestic, commercial and industrial establishment on gross or net meter basis.
Solar pump sets: over 50,000 solar power pumpsets will be operational in next five year(s).
Energy banking: 5% of energy delivered at point of drawl in the approval of
APTRANSCO/APDISCOMS.
Land plays a major role in setup of solar power projects, district collector play a major role in the
acquiring the land in particular area.
Pollution clearance: NOC/CONSENT for establishment under pollution control laws..
NODAL AGENCY: NREDCAP shall act as a nodal agency under this policy and as decided by the
government from time to time.
The approval from administrative plays a major role in the setup of solar projects.
Project monitoring committee is treated as a high level committee which monitors the progress
of implementation of the solar power projects.
Solar manufacturing: it helps in the promote solar manufacturing facility that can help develop
the solar eco system and support job creation potentialin the state.
Review of power projects after two years or as and when need arises in view of any
technological breakthrough or to remove any inconsistency with electricity act 2003.
Power to remove difficulties play a major role in setup of solar power projects to get a clearance
of manufacturing the solar projects.