Penawaran 2017
0%
c
b
VOLUME
A B C D DIMENSI (M2) DIMENSI
NO STA PANJANG (M3) KET
LEBAR TINGGI LEBAR TINGGI =(cXd)+(eXf) RATA RATA
=hXi
a b c d e f g h i j k
SEGMEN 1 42.00 10.39
1 0+000.0 0.30 0.60 0.20 0.30 0.239
0.244 9.00 2.19
2 0+009.0 0.30 0.60 0.20 0.34 0.248
0.248 0.00 0.00
3 0+009.0 0.30 0.60 0.20 0.34 0.248
0.248 16.00 3.98
4 0+025.0 0.30 0.60 0.20 0.34 0.248
0.248 17.00 4.22
5 0+042.0 0.30 0.60 0.20 0.34 0.248
VOLUME
A B C DIMENSI JUMLAH
NO STA DIMENSI (M2) PANJANG KET
TINGGI LEBAR PANJANG RATA RATA (BUAH)
(M1)
a b c d e f g h i j k
SEGMEN 1 42.00 42.00
1 0+000.0 0.40 0.40 1.00
9.00 9.00
2 0+009.0 0.40 0.40 1.00
0.00 0.00
3 0+009.0 0.40 0.40 1.00
16.00 16.00
4 0+025.0 0.40 0.40 1.00
17.00 17.00
5 0+042.0 0.40 0.40 1.00
c
b
VOLUME
A B C DIMENSI JUMLAH
NO STA DIMENSI (M2) PANJANG KET
TEBAL PANJANG LEBAR RATA RATA (BUAH)
(M1)
a b c d e f g h i j k
SEGMEN 1 42.00 42.00
1 0+000.0 0.10 1.00 0.55
9.00 9.00
2 0+009.0 0.10 1.00 0.55
0.00 0.00
3 0+009.0 0.10 1.00 0.55
16.00 16.00
4 0+025.0 0.10 1.00 0.55
17.00 17.00
5 0+042.0 0.10 1.00 0.55
VOLUME
A B DIMENSI (M2) DIMENSI JUMLAH
NO STA (M3) KET
LEBAR TINGGI g=(cXd)*2 RATA RATA (BUAH)
=hXi
a b c d e f g h i j k
SEGMEN 1 42.00 5.04
1 0+000.0 0.10 0.60 0.120
0.120 9.00 1.08
2 0+009.0 0.10 0.60 0.120
0.120 0.00 0.00
3 0+009.0 0.10 0.60 0.120
0.120 16.00 1.92
4 0+025.0 0.10 0.60 0.120
0.120 17.00 2.04
5 0+042.0 0.10 0.60 0.120
VOLUME
A B DIMENSI (M2) DIMENSI JUMLAH
NO STA (M3) KET
LEBAR TEBAL g=(cXd)*2 RATA RATA (BUAH)
=hXi
a b c d e f g h i j k
SEGMEN 1 42.00 0.84
1 0+000.0 0.10 0.10 0.020
0.020 9.00 0.18
2 0+009.0 0.10 0.10 0.020
0.020 0.00 0.00
3 0+009.0 0.10 0.10 0.020
0.020 16.00 0.32
4 0+025.0 0.10 0.10 0.020
0.020 17.00 0.34
5 0+042.0 0.10 0.10 0.020
a1 a2
b1 b2
VOLUME
A1 A2 B1 B2 DIMENSI (M2) DIMENSI
NO STA PANJANG (M3) KET
LEBAR LEBAR TINGGI TINGGI g=(cXe)+(dXf) RATA RATA
=hXi
a b c d e f g h i j k
SEGMEN 1 42.00 1.32
1 0+000.0 - 0.12 - 0.30 0.037
0.034 9.00 0.30
2 0+009.0 - 0.12 - 0.26 0.031
0.031 0.00 0.00
3 0+009.0 - 0.12 - 0.26 0.031
0.031 16.00 0.49
4 0+025.0 - 0.12 - 0.26 0.031
0.031 17.00 0.53
5 0+042.0 - 0.12 - 0.26 0.031
c
b
VOLUME
A B C DIMENSI (M2) DIMENSI
NO STA PANJANG (M3) KET
TEBAL PANJANG LEBAR =(c X d) RATA RATA
=hXi
a b c d e g h i j k
SEGMEN 1 9.00 0.70
1 0+000.0 0.12 0.65 0.078
9.00 0.078 9.00 0.70
2 0+009.0 0.12 0.65 0.078
3 0+009.0
4 0+025.0
5 0+042.0
2 0+005.0
3 0+005.0
4 0+036.0
5 0+036.0
6 0+041.0
7 0+041.0
8 0+072.0
2 0+025.0
3 0+034.0
REKAPITULASI
DIVISI I : UMUM ................................................ Rp. 7,975,000.00
DIVISI II : DRAINASE ................................................ Rp. 165,352,782.37
DIVISI III : PEKERJAAN TANAH ................................................ Rp. 1,666,208.64
DIVISI VII : STRUKTUR ................................................ Rp. 5,006,413.58
TERBILANG : Err:511
DAFTAR KUANTITAS DAN HARGA
REKAPITULASI
DIVISI I : UMUM ................................................ Rp. 7,975,000.00
DIVISI II : DRAINASE ................................................ Rp. 165,352,782.37
DIVISI III : PEKERJAAN TANAH ................................................ Rp. 1,666,208.64
DIVISI VII : STRUKTUR ................................................ Rp. 5,006,413.58
TERBILANG : Err:511
0
0
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM KOTA TANGERANG SELATAN
TAHUN 2017
DIVISI I : UMUM
1.2.4 Mobilisasi dan Demobilisasi ls 7,975,000.00
DIVISI II : DRAINASE
2.1 Galian Untuk Drainase Selokan dan Saluran Air m3 54,198.56
2.1a Galian Untuk Drainase Selokan dan Saluran Air ( Mini Excavator ) m3 45,816.62
2.1b Galian Untuk Drainase Selokan dan Saluran Air ( Manual ) m3 120,480.82
2.1d Galian Tanah Lumpur (Manual) m3 178,648.79
2.1e Galian Tanah Lumpur (Mekanik) m3 60,531.89
2.1f Galian Tanah Lumpur (Mekanik) dengan Ponton m3 105,202.94
2.2a Pasangan Batu Dengan Mortar m3 848,868.25
2.2b Pasangan Batu Dengan Mortar ( Manual ) m3 935,112.08
2.2c Pas. Bata Merah m2 133,989.26
2.2d Pas. Batu Muka m2 197,379.56
2.3 (1)a Gorong - Gorong Pipa Beton Bertulang dia. 50 cm m1 427,929.26
2.3 (1)b Gorong - Gorong Pipa Beton Bertulang dia. 60 cm m1 527,050.60
2.3 (1)c Gorong - Gorong Pipa Beton Bertulang dia. 70 cm m1 623,986.95
2.3 (1)d Gorong - Gorong Pipa Beton Bertulang dia. 80 cm m1 806,962.54
2.3 (1)e Gorong - Gorong Pipa Beton Bertulang dia. 100 cm m1 1,106,828.91
2.3 (1)f Gorong - Gorong Pipa Beton Bertulang dia. 120 cm m1 1,474,611.25
2.3 (1)g Gorong - Gorong Pipa Beton Bertulang dia. 150 cm m1 2,037,329.85
2.3 (3)f Gorong - Gorong Persegi Beton Pracetak Dim. 40 cm m1 1,147,585.00
2.3 (3)g Gorong - Gorong Persegi Beton Pracetak Dim. 50 cm m1 1,461,247.50
2.3 (3)a Gorong - Gorong Persegi Beton Pracetak Dim. 60 cm m1 1,857,339.45
2.3 (3)b Gorong - Gorong Persegi Beton Pracetak Dim. 80 cm m1 3,010,168.13
2.3 (3)h Gorong - Gorong Persegi Beton Pracetak Dim. 80x100 cm m1 3,660,320.63
2.3 (3)c Gorong - Gorong Persegi Beton Pracetak Dim. 100 cm m1 3,969,800.00
2.3 (3)d Gorong - Gorong Persegi Beton Pracetak Dim. 120 cm m1 5,215,480.00
2.3 (3)i Gorong - Gorong Persegi Beton Pracetak Dim. 150 cm m1 7,282,279.17
2.3 (3)j Gorong - Gorong Persegi Beton Pracetak Dim. 200 cm m1 11,666,060.00
2.3 (3)k Gorong - Gorong Persegi Beton Pracetak Dim. 300 x 150 cm m1 20,506,800.00
2.3 (4)g Saluran Terbuka U-Ditch 30 x 30 cm m1 360,880.45
2.3 (4)h Saluran Terbuka U-Ditch 30 x 40 cm m1 402,740.45
2.3 (4)i Saluran Terbuka U-Ditch 30 x 50 cm m1 479,883.50
2.3 (4)a Saluran Terbuka U-Ditch 40 x 40 cm m1 516,683.50
2.3 (4)j Saluran Terbuka U-Ditch 40 x 50 cm m1 576,483.50
2.3 (4)k Saluran Terbuka U-Ditch 40 x 60 cm m1 662,873.73
2.3 (4)b Saluran Terbuka U-Ditch 50 x 50 cm m1 699,213.73
2.3 (4)c Saluran Terbuka U-Ditch 60 x 60 cm m1 889,913.13
2.3 (4)l Saluran Terbuka U-Ditch 60 x 80 cm m1 1,042,058.13
2.3 (4)c Saluran Terbuka U-Ditch 80 x 80 cm m1 1,230,960.00
2.3 (4)d Saluran Terbuka U-Ditch 80 x 100 cm m1 1,429,450.00
2.3 (4)e Saluran Terbuka U-Ditch 100 x 100 cm m1 1,939,495.60
2.3 (4)f Saluran Terbuka U-Ditch 100 x 120 cm m1 2,169,725.60
2.3 (5)a Buis Beton 1/2, dia 20 cm m1 110,444.01
2.3 (5)b Buis Beton 1/2, dia 30 cm m1 151,822.89
2.3 (5)c Buis Beton 1/2, dia 40 cm m1 207,700.39
2.3 (5)d Buis Beton 1/2, dia 50 cm m1 277,369.27
2.3 (5)e Buis Beton 1/2, dia 60 cm m1 355,996.65
2.3 (6)a Tutup U-Ditch 100 (HD) m1 1,065,751.43
2.3 (6)b Tutup U-Ditch 100 (LD) m1 546,526.43
2.3 (6)c Tutup U-Ditch 80 (HD) m1 950,077.17
2.3 (6)d Tutup U-Ditch 80 (LD) m1 332,182.17
2.3 (6)e Tutup U-Ditch 60 (HD) m1 685,835.59
2.3 (6)f Tutup U-Ditch 60 (LD) m1 322,550.59
2.3 (6)g Tutup U-Ditch 50 (HD) m1 559,793.12
2.3 (6)h Tutup U-Ditch 50 (LD) m1 266,428.12
2.3 (6)i Tutup U-Ditch 40 (HD) m1 329,674.81
2.3 (6)j Tutup U-Ditch 40 (LD) m1 198,114.81
2.3 (6)k Tutup U-Ditch 30 (HD) m1 275,807.10
2.3 (6)l Tutup U-Ditch 30 (LD) m1 163,567.10
2.3 (14) Pasangan Batu tanpa Adukan (Aanstamping) m3 480,320.50
2.4 (1) Bahan Porous untuk Bahan Penyaring (Filter) m3 400,489.56
2.4 (3) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan m1 47,734.58
2.5 (1) Pasang/Bongkar Kisdam Tinggi 1 s/d 2 m, Dolken 8 - 10 cm, Karung 50 Kg Diisi Tanah Setempat m1 287,106.47
2.5 (2) Pasang/Bongkar Kisdam Tinggi 1 s/d 2 m, Dolken Ø 8 - 10 cm, Pakai Terpal Plastik m1 219,095.47
2.6 Dewatering/Pengeringan Air dengan Mesin Pompa Jam 122,399.31
2.7 Pasang Suling-Suling, PVC 2", Klas AW, Filter Ijuk m' 28,850.56
2.8 Side Entry Pit / Tangkapan Air Dengan Cover Grill Beton Uk. 39X28X40 Cm bh 691,040.23
UPAH
1 Pekerja Jam 16,800.00 ANALISA 2016
2 Tukang Jam 17,900.00 ANALISA 2016
3 Kepala Tukang Jam 18,650.00 ANALISA 2016
4 Mandor Jam 19,400.00 ANALISA 2016
BAHAN
1 Agregat Pecah Mesin 5 - 10 & 10 - 20 mm M3 215,700.00 SHBJ 2017
2 Agregat Pecah Mesin 20 - 30 mm M3 193,500.00 SHBJ 2017
3 Batu Belah M3 254,700.00 SHBJ 2017
4 Semen Abu - Abu Kg 1,320.00 SHBJ 2017
5 Pasir Pasang M3 264,600.00 SHBJ 2017
6 Pasir Urug M3 188,100.00 SHBJ 2017
7 Pasir Beton M3 268,500.00 SHBJ 2017
8 Koral Beton M3 193,500.00 SHBJ 2017
9 Kansteen Abu - Abu Uk. 10.20.40 K-300 Bh 12,600.00 SURVEY
10 Kansteen Abu - Abu Uk. 16/20.30.40 K-300 Bh 52,000.00 SHBJ 2017
11 Paving Block ; t = 6 cm K-300 M2 90,700.00 ANALISA 2016
12 Paving Block ; t = 8 cm K-300 M2 108,300.00 ANALISA 2016
13 Uskup Paving Block ; t = 6 cm K-300 M2 165,000.00 ANALISA 2016
14 Uskup Paving Block ; t = 8 cm K-300 M2 206,200.00 ANALISA 2016
15 Abu Batu / Screening M3 208,000.00 SHBJ 2017
16 Plastik Alas Gelaran Beton M2 10,900.00 HPS 2016
17 BetonReady Mix (B-0) M3 704,800.00 SHBJ 2017
18 Beton Ready Mix (K-125) M3 740,200.00 SHBJ 2017
19 Beton K-175 ( Ready Mix ) tanpa Pompa M3 743,700.00 SURVEY
20 Beton K-225 ( Ready Mix ) tanpa Pompa M3 778,000.00 SURVEY
21 Beton K-250 ( Ready Mix ) tanpa Pompa M3 794,000.00 SURVEY
22 Beton K-300 ( Ready Mix ) tanpa Pompa M3 799,300.00 SURVEY
23 Beton K-350 ( Ready Mix ) tanpa Pompa M3 843,600.00 SURVEY
24 Beton K-350 ( Ready Mix ) dengan Mini Truck Mixer M3 1,354,700.00 SHBJ
25 Beton K-500 ( Ready Mix ) tanpa Pompa M3 1,073,900.00 SHBJ
26 Acuan Beton dan Perancah M3 3,300,000.00 ANALISA 2016
27 Concrete Curing Ls 73,669.50 SHBJ 2017
28 Kawat Beton Kg 15,100.00 SURVEY
29 Paku segala ukuran ( rata - rata ) Kg 11,600.00 SURVEY
30 Buis Beton Bertulang dia. 50 cm M1 250,800.00 SHBJ 2017
31 Buis Beton Bertulang dia. 60 cm M1 334,100.00 SHBJ 2017
32 Buis Beton Bertulang dia. 70 cm M1 415,500.00 SHBJ 2017
33 Buis Beton Bertulang dia. 80 cm M1 550,200.00 SHBJ 2017
34 Buis Beton Bertulang dia. 100 cm M1 769,500.00 SHBJ 2017
35 Buis Beton Bertulang dia. 120 cm M1 1,035,800.00 SHBJ 2017
36 Buis Beton Bertulang dia. 150 cm M1 1,465,000.00 SHBJ 2017
37 Urugan Pilihan (sirtu) M3 125,200.00 SHBJ 2017
38 Material Pilihan (sirtu) M3 125,200.00 SHBJ 2017
39 Bahan Timbunan (tanah merah) M3 270,000.00 SHBJ 2017
40 Sirtu M3 125,200.00 SHBJ 2017
41 Agregat Kelas C1 (sirtu) M3 125,200.00 SHBJ 2017
42 U-Ditch 30 x 30 cm M1 257,000.00 SURVEY
43 U-Ditch 30 x 40 cm M1 293,400.00 SURVEY
44 U-Ditch 30 x 50 cm M1 354,900.00 SHBJ
45 U-Ditch 40 x 40 cm M1 386,900.00 SHBJ
46 U-Ditch 40 x 50 cm M1 438,900.00 SURVEY
47 U-Ditch 40 x 60 cm M1 507,200.00 SURVEY
48 U-Ditch 50 x 50 cm M1 538,800.00 SURVEY
49 U-Ditch 60 x 60 cm M1 696,100.00 SHBJ
50 U-Ditch 60 x 80 cm M1 828,400.00 SHBJ
51 U-Ditch 80 x 80 cm M1 981,700.00 SURVEY
52 U-Ditch 80 x 100 cm M1 1,154,300.00 SURVEY
53 U-Ditch 100 x 100 cm M1 1,583,200.00 SURVEY
54 U-Ditch 100 x 120 cm M1 1,783,400.00 SURVEY
55 Tutup U-Ditch 30 (HD) M1 231,600.00 SHBJ
56 Tutup U-Ditch 30 (LD) M1 134,000.00 SHBJ 2017
57 Tutup U-Ditch 40 (HD) M1 278,000.00 SURVEY
58 Tutup U-Ditch 40 (LD) M1 163,600.00 SHBJ 2017
59 Tutup U-Ditch 50 (HD) M1 477,600.00 SHBJ
60 Tutup U-Ditch 50 (LD) M1 222,500.00 SHBJ 2017
61 Tutup U-Ditch 60 (HD) M1 586,600.00 SHBJ
KODE HARGA DASAR
NO. URAIAN SATUAN KETERANGAN
SHBJ ( Rp ) 2017
ALAT
1 Dump Truck 3 - 4 m3 Jam 139,100.00 SHBJ 2017
2 Asphalt Sprayer 800 L Jam 116,900.00 SHBJ 2017
3 Compressor 4000 - 6500 liter / menit Jam 111,800.00 SHBJ 2017
4 Wheel Loader 1,00 - 1,60 m3 Jam 332,600.00 SHBJ 2017
5 Asphalt Mixing Plant ( AMP ) Jam 2,359,200.00 SHBJ 2017
6 Generator Set 125 KVA Jam 297,700.00 SHBJ 2017
7 Asphalt Finisher Jam 797,600.00 SHBJ 2017
8 Pneumatic Tyre Roller 8 - 10 ton Jam 347,900.00 SHBJ 2017
9 Crane On Truck Kap. 10 - 15 Ton Jam 497,200.00 SHBJ 2017
10 Motor Grader > 100 HP Jam 335,400.00 SHBJ 2017
11 Vibratory Roller 5 - 8 ton Jam 274,300.00 SHBJ 2017
12 Water Tank Truck 5000 - 8000 liter Jam 223,300.00 SHBJ 2017
13 Water Tank Truck 3000 - 4500 liter Jam 177,300.00 SHBJ 2017
14 Tamper Jam 36,100.00 SHBJ 2017
15 Dump Truck 18 - 21 m3 Jam 367,900.00 SHBJ 2017
16 Tandem Roller 6 - 8 ton Jam 225,800.00 SHBJ 2017
17 Concrete Vibrator Jam 34,400.00 SHBJ 2017
18 Jack Hammer Jam 36,100.00 SHBJ 2017
19 Excavator 80 - 120 HP Jam 387,100.00 SHBJ 2017
20 Truck / Pickup Jam 35,090.00 SHBJ 2017
21 Concrete Mixer 0,30 - 0,60 m3 Jam 61,200.00 SHBJ 2017
22 Buldozer 100 - 150 HP Jam 429,600.00 SHBJ 2017
23 Flat Bed Truck 3 - 4 m3 Jam 237,700.00 SHBJ 2017
24 Fulvi Mixer Jam 107,600.00 SHBJ 2017
25 Mesin Gilas 6 - 10 Ton Jam 353,685.71 SHBJ 2017
26 Mesin Gilas 10 - 18 Ton Jam 482,214.29 SHBJ 2017
27 Pedestrian Roller Jam 45,700.00 SHBJ 2017
28 Stone Crusher Jam 683,600.00 SHBJ 2017
29 Three Wheel Roller 6 - 8 ton Jam 255,200.00 SHBJ 2017
30 Track Loader 75 - 100 HP Jam 202,900.00 SHBJ 2017
31 Trailler Truck 35 - 45 Ton Jam 601,900.00 SHBJ 2017
32 Water Pump 70 - 100 mm Jam 58,000.00 SHBJ 2017
33 Crane On Truck Kap. 25 - 35 Ton Jam 536,000.00 SHBJ 2017
34 Mesin Las Jam 102,700.00 SHBJ 2017
35 Concrete Cutter Jam 15,800.00 SHBJ 2017
36 Bor (Rock Drill Φ 35mm) Jam 98,600.00 SHBJ 2017
37 Pompa dan alat injeksi Jam 142,500.00 SHBJ 2017
38 Pile Driver Jam 86,300.00 SHBJ 2017
39 Bor pile Machine Jam 359,200.00 SHBJ 2017
40 Concr. Pump Jam 125,400.00 SHBJ 2017
41 Baby Wales Jam 46,100.00 SHBJ 2017
42 Mesin Las Listrik Jam 55,300.00 SHBJ 2017
43 Mini Excavator PC 45-75 Jam 103,728.57 SHBJ 2017
A. Sewa Tanah M2 - - -
B. PERALATAN
1 Periksa Lembaran 1.2.2 Ls 1.00 700,000.00 700,000.00
C. FASILITAS KONTRAKTOR
1 Base Camp M2 - - -
2 Kantor / Direksikeet ( Sewa ) Ls 1.00 1,500,000.00 1,500,000.00
3 Barak Pekerja Ls - - -
4 Bengkel M2 - - -
5 Gudang dan Lain - lain M2 - - -
6 Papan Proyek Bh 2.00 300,000.00 600,000.00
D. FASILITAS LABORATURIUM
1 Ruang Laboraturium M2 - - -
2 Peralatan Laboraturium Set - - -
3 Perabotan dan Layanan Set - - -
4 Quality Control Ls 1.00 1,000,000.00 1,000,000.00
5 Quantity Control Ls 1.00 1,000,000.00 1,000,000.00
6 …………………….. …… - - -
7 …………………….. …… - - -
E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT
1 Jembatan Darurat Ls - - -
2 Perkuatan Jembatan Lama Ls - - -
3 Pemeliharaan Jalan Kerja / Samping Ls - - -
4 …………………….. …… - - -
5 …………………….. …… - - -
6 …………………….. …… - - -
B. PERALATAN
1 CRANE 10-15 TON E04 Unit 1 300,000.00 300,000.00
2 DUMP TRUCK 3.5 TON E05 Unit 1 300,000.00 300,000.00
3 JACK HAMMER E23 Unit 1 100,000.00 100,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2142 16,800.00 3,598.56
2 Mandor Jam 0.0535 19,400.00 1,037.90
B BAHAN
C PERALATAN
1 Excavator (E10) Jam 0.0535 387,100.00 20,709.85
2 Dump Truck (E08) Jam 0.1557 139,100.00 21,657.87
3 Alat Bantu Ls 1.0000 125.00 125.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 5.1515 16,800.00 86,545.20
2 Mandor (L03) Jam 0.1515 19,400.00 2,939.10
B BAHAN
C PERALATAN
1 Pickup Jam 0.4070 35,090.00 14,281.63
2 Alat Bantu Ls 1.0000 1,000.00 1,000.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 8.0920 16,800.00 135,945.60
2 Mandor (L03) Jam 0.2380 19,400.00 4,617.20
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
2 Truck/Pick up Jam 0.4042 35,090.00 14,183.97
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 0.2142 16,800.00 3,598.39
2 Mandor (L03) Jam 0.0535 19,400.00 1,038.82
B BAHAN
C PERALATAN
1 Excavator (E10) Jam 0.0535 387,100.00 20,728.25
2 Dump Truck (E08) Jam 0.1889 139,100.00 26,270.97
3 Alat Bantu Ls 1.0000 1,000.00 1,000.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
SATUAN PENGUKURAN : M3
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 0.4444 16,800.00 7,466.67
2 Mandor (L03) Jam 0.1111 19,400.00 2,155.56
B BAHAN
C PERALATAN
1 Excavator (E10) Jam 0.1111 387,100.00 43,011.11
2 Ponton Jam 0.1111 - -
3 Dump Truck Jam 0.2721 139,100.00 37,847.49
4 Alat Bantu Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN :
NO. MATA PEMBAYARAN : 2.2a
JENIS PEKERJAAN : PASANGAN BATU DENGAN MORTAR UNTUK SALURAN
SATUAN PENGUKURAN : M3
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 4.0161 16,800.00 67,470.48
2 Tukang (L02) Jam 1.2048 17,900.00 21,565.92
3 Mandor (L03) Jam 0.4016 19,400.00 7,791.04
B BAHAN
1 Batu Belah (M02) M3 1.0800 254,700.00 275,076.00
2 Semen (M12) Kg 161.2800 1,320.00 212,889.60
3 Pasir Pasang (M01) M3 0.4829 264,600.00 127,775.34
C PERALATAN
1 Concrete Mixer ( E06 ) Jam 0.4016 61,200.00 24,577.92
2 Alat Bantu Ls 1.0000 1,000.00 1,000.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 8.7500 16,800.00 147,000.00
2 Tukang (L02) Jam 1.7500 17,900.00 31,325.00
3 Mandor (L03) Jam 0.8750 19,400.00 16,975.00
B BAHAN
1 Batu Belah (M02) M3 1.0800 254,700.00 275,076.00
2 Semen (M12) Kg 161.2800 1,320.00 212,889.60
3 Pasir Pasang (M01) M3 0.4829 264,600.00 127,775.34
C PERALATAN
1 Alat Bantu Ls 1.0000 2,100.00 2,100.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.4000 16,800.00 40,320.00
2 Tukang Jam 0.8000 17,900.00 14,320.00
3 Kepala Tukang Jam 0.0800 18,650.00 1,492.00
4 Mandor Jam 0.1200 19,400.00 2,328.00
B BAHAN
1 Batu bata merah uk. 22x11x5 cm bata press Buah 70.0000 400.00 28,000.00
2 @Semen Tiga Roda 50 kg Kg 14.3700 1,320.00 18,968.40
3 Pasir Pasang m3 0.0400 264,600.00 10,584.00
C PERALATAN
1 Alat bantu Ls 1.0000 500.00 500.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.9200 16,800.00 32,256.00
2 Tukang Jam 0.9600 17,900.00 17,184.00
3 Kepala Tukang Jam 0.0800 18,650.00 1,492.00
4 Mandor Jam 0.0960 19,400.00 1,862.40
B BAHAN
1 Batu Muka Buah 1.2500 84,100.00 105,125.00
2 @Semen Tiga Roda 50 kg Kg 5.0000 1,320.00 6,600.00
3 Pasir Pasang m3 0.0250 264,600.00 6,615.00
C PERALATAN
1 Alat bantu Ls 1.0000 500.00 500.00
-
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 3.5000 16,800.00 58,800.00
2 Tukang (L02) Jam 0.7000 17,900.00 12,530.00
3 Mandor (L03) Jam 0.7000 19,400.00 13,580.00
B BAHAN
1 Buis Beton Bertulang dia. 50 cm M1 1.0000 250,800.00 250,800.00
2 Pasir M3 0.1292 264,600.00 34,173.09
C PERALATAN
1 Tamper (E25) Jam 0.0389 36,100.00 1,404.31
2 Alat Bantu Ls 1.0000 825.00 825.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 3.5000 16,800.00 58,800.00
2 Tukang (L02) Jam 0.7000 17,900.00 12,530.00
3 Mandor (L03) Jam 0.7000 19,400.00 13,580.00
B BAHAN
1 Buis Beton Bertulang dia. 60 cm M1 1.0000 334,100.00 334,100.00
2 Pasir M3 0.1397 264,600.00 36,951.39
C PERALATAN
1 Tamper (E25) Jam 0.0421 36,100.00 1,518.48
2 Alat Bantu Ls 1.0000 825.00 825.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 3.5000 16,800.00 58,800.00
2 Tukang (L02) Jam 0.7000 17,900.00 12,530.00
3 Mandor (L03) Jam 0.7000 19,400.00 13,580.00
B BAHAN
1 Buis Beton Bertulang dia. 70 cm M1 1.0000 415,500.00 415,500.00
2 Pasir M3 0.1502 264,600.00 39,729.69
C PERALATAN
1 Tamper (E25) Jam 0.0452 36,100.00 1,632.66
2 Alat Bantu Ls 1.0000 825.00 825.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 4.3750 16,800.00 73,500.00
2 Tukang (L02) Jam 0.8750 17,900.00 15,662.50
3 Mandor (L03) Jam 0.8750 19,400.00 16,975.00
B BAHAN
1 Buis Beton Bertulang dia. 80 cm M1 1.0000 550,200.00 550,200.00
2 Pasir M3 0.1617 264,600.00 42,785.82
C PERALATAN
1 Tamper (E25) Jam 0.0487 36,100.00 1,758.24
2 Alat Bantu Ls 1.0000 825.00 825.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 5.8333 16,800.00 98,000.00
2 Tukang (L02) Jam 1.1667 17,900.00 20,883.33
3 Mandor (L03) Jam 1.1667 19,400.00 22,633.33
B BAHAN
1 Buis Beton Bertulang dia. 100 cm M1 1.0000 769,500.00 769,500.00
2 Pasir M3 0.1838 264,600.00 48,620.25
C PERALATAN
1 Tamper (E25) Jam 0.0553 36,100.00 1,998.00
3 Alat Bantu Ls 1.0000 825.00 825.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 5.8333 16,800.00 98,000.00
2 Tukang (L02) Jam 1.1667 17,900.00 20,883.33
3 Mandor (L03) Jam 1.1667 19,400.00 22,633.33
B BAHAN
1 Buis Beton Bertulang dia. 120 cm M1 1.0000 1,035,800.00 1,035,800.00
2 Pasir M3 0.3780 264,600.00 100,018.80
C PERALATAN
1 Tamper (E25) Jam 0.1139 36,100.00 4,110.18
2 Alat Bantu Ls 1.0000 825.00 825.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 7.0000 16,800.00 117,600.00
2 Tukang (L02) Jam 1.4000 17,900.00 25,060.00
3 Mandor (L03) Jam 1.4000 19,400.00 27,160.00
B BAHAN
1 Buis Beton Bertulang dia. 150 cm M1 1.0000 1,465,000.00 1,465,000.00
2 Pasir (M01) M3 0.4935 264,600.00 130,580.10
C PERALATAN
1 Tamper (E25) Jam 0.1486 36,100.00 5,366.07
2 Alat Bantu Ls 1.0000 825.00 825.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 1.7500 16,800.00 29,400.00
2 Mandor (L03) Jam 0.3500 19,400.00 6,790.00
B BAHAN
1 Buis Beton tanpa Tulangan dia. 20 cm M1 1.0000 83,300.00 83,300.00
2 Pasir M3 0.0200 264,600.00 5,292.00
C PERALATAN
1 Tamper (E25) Jam 0.0060 36,100.00 217.47
2 Alat Bantu Ls 1.0000 1,000.00 1,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 1.7500 16,800.00 29,400.00
2 Mandor (L03) Jam 0.3500 19,400.00 6,790.00
B BAHAN
1 Buis Beton tanpa Tulangan dia. 30 cm M1 1.0000 114,800.00 114,800.00
2 Pasir (M01) M3 0.0300 264,600.00 7,938.00
C PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.1111 16,800.00 52,266.67
2 Tukang Jam 0.7778 17,900.00 13,922.22
3 Mandor Jam 0.7778 19,400.00 15,088.89
B BAHAN
1 Gorong - Gorong Kotak Dim. 60 x 60 x 100 M1 1.0000 1,532,800.00 1,532,800.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.5000 16,800.00 58,800.00
2 Tukang Jam 0.8750 17,900.00 15,662.50
3 Mandor Jam 0.8750 19,400.00 16,975.00
B BAHAN
1 Gorong - Gorong Kotak Dim. 80 x 80 x 100 M1 1.0000 2,525,100.00 2,525,100.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.0000 16,800.00 67,200.00
2 Tukang Jam 1.0000 17,900.00 17,900.00
3 Mandor Jam 1.0000 19,400.00 19,400.00
B BAHAN
1 Gorong - Gorong Kotak Dim. 100 x 100 x 10 M1 1.0000 3,346,500.00 3,346,500.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.0000 16,800.00 67,200.00
2 Tukang Jam 1.0000 17,900.00 17,900.00
3 Mandor Jam 1.0000 19,400.00 19,400.00
B BAHAN
1 Gorong - Gorong Kotak Dim. 120 x 120 x 10 M1 1.0000 4,429,700.00 4,429,700.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 5.6000 16,800.00 94,080.00
2 Tukang Jam 1.4000 17,900.00 25,060.00
3 Mandor Jam 1.4000 19,400.00 27,160.00
B BAHAN
1 Gorong - Gorong Kotak Dim. 300 x 200 cm M1 1.0000 - -
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.9091 16,800.00 32,072.73
2 Tukang Jam 0.6364 17,900.00 11,390.91
3 Mandor Jam 0.6364 19,400.00 12,345.45
B BAHAN
1 U-Ditch 30 x 30 Cm M1 1.0000 257,000.00 257,000.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.1000 16,800.00 35,280.00
2 Tukang Jam 0.7000 17,900.00 12,530.00
3 Mandor Jam 0.7000 19,400.00 13,580.00
B BAHAN
1 U-Ditch 40 x 40 Cm M1 1.0000 386,900.00 386,900.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.3333 16,800.00 39,200.00
2 Tukang Jam 0.7778 17,900.00 13,922.62
3 Mandor Jam 0.7778 19,400.00 15,089.32
B BAHAN
1 U-Ditch 50 x 50 Cm M1 1.0000 538,800.00 538,800.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.6250 16,800.00 44,100.00
2 Tukang Jam 0.8750 17,900.00 15,662.50
3 Mandor Jam 0.8750 19,400.00 16,975.00
B BAHAN
1 U-Ditch 60 x 60 Cm M1 1.0000 696,100.00 696,100.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.0000 16,800.00 50,400.00
2 Tukang Jam 1.0000 17,900.00 17,900.00
3 Mandor Jam 1.0000 19,400.00 19,400.00
B BAHAN
1 U-Ditch 80 x 80 Cm M1 1.0000 981,700.00 981,700.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.0000 16,800.00 50,400.00
2 Tukang Jam 1.0000 17,900.00 17,900.00
3 Mandor Jam 1.0000 19,400.00 19,400.00
B BAHAN
1 U-Ditch 80 x 100 Cm M1 1.0000 1,154,300.00 1,154,300.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.5000 16,800.00 58,800.00
2 Tukang Jam 1.1667 17,900.00 20,883.93
3 Mandor Jam 1.1667 19,400.00 22,633.98
B BAHAN
1 U-Ditch 100 x 100 Cm M1 1.0000 1,583,200.00 1,583,200.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.5000 16,800.00 58,800.00
2 Tukang Jam 1.1667 17,900.00 20,883.93
3 Mandor Jam 1.1667 19,400.00 22,633.98
B BAHAN
1 U-Ditch 100 x 120 Cm M1 1.0000 1,783,400.00 1,783,400.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.4000 16,800.00 6,720.00
2 Tukang Jam 0.2667 17,900.00 4,773.33
3 Mandor Jam 0.0667 19,400.00 1,293.33
B BAHAN
1 Buis beton 1/2 dia. 20 cm m' 1.0250 55,600.00 56,990.00
2 Pasir urug m3 0.0800 188,100.00 15,048.00
3 Pasir pasang m3 0.0360 264,600.00 9,525.60
4 Semen PC Kg 0.9000 1,320.00 1,188.00
C PERALATAN
1 Alat bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.6000 16,800.00 10,080.00
2 Tukang Jam 0.4000 17,900.00 7,160.00
3 Mandor Jam 0.1000 19,400.00 1,940.00
B BAHAN
1 Buis beton 1/2 dia. 30 cm m' 1.0250 71,900.00 73,697.50
2 Pasir urug m3 0.1200 188,100.00 22,572.00
3 Pasir pasang m3 0.0540 264,600.00 14,288.40
4 Semen PC Kg 1.3500 1,320.00 1,782.00
C PERALATAN
1 Alat bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.8000 16,800.00 13,440.00
2 Tukang Jam 0.5333 17,900.00 9,546.67
3 Mandor Jam 0.1333 19,400.00 2,586.67
B BAHAN
1 Buis beton 1/2 dia. 40 cm m' 1.0250 100,500.00 103,012.50
2 Pasir urug m3 0.1600 188,100.00 30,096.00
3 Pasir pasang m3 0.0720 264,600.00 19,051.20
4 Semen PC Kg 1.8000 1,320.00 2,376.00
C PERALATAN
1 Alat bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0000 16,800.00 16,800.00
2 Tukang Jam 0.6667 17,900.00 11,933.33
3 Mandor Jam 0.1667 19,400.00 3,233.33
B BAHAN
1 Buis beton 1/2 dia. 50 cm m' 1.0250 140,800.00 144,320.00
2 Pasir urug m3 0.2000 188,100.00 37,620.00
3 Pasir pasang m3 0.0900 264,600.00 23,814.00
4 Semen PC Kg 2.2500 1,320.00 2,970.00
C PERALATAN
1 Alat bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.2000 16,800.00 20,160.00
2 Tukang Jam 0.8000 17,900.00 14,320.00
3 Mandor Jam 0.2000 19,400.00 3,880.00
B BAHAN
1 Buis beton 1/2 dia. 60 cm m' 1.0250 188,700.00 193,417.50
2 Pasir urug m3 0.2400 188,100.00 45,144.00
3 Pasir pasang m3 0.1080 264,600.00 28,576.80
4 Semen PC Kg 2.7000 1,320.00 3,564.00
C PERALATAN
1 Alat bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3500 16,800.00 5,880.00
2 Tukang Jam 0.1169 17,900.00 2,092.51
3 Mandor Jam 0.1169 19,400.00 2,267.86
B BAHAN
1 Tutup U-Ditch 100 (HD) M1 1.0000 915,500.00 915,500.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3500 16,800.00 5,880.00
2 Tukang Jam 0.1169 17,900.00 2,092.51
3 Mandor Jam 0.1169 19,400.00 2,267.86
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3234 16,800.00 5,433.12
2 Tukang Jam 0.1078 17,900.00 1,929.62
3 Mandor Jam 0.1078 19,400.00 2,091.32
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3234 16,800.00 5,433.12
2 Tukang Jam 0.1078 17,900.00 1,929.62
3 Mandor Jam 0.1078 19,400.00 2,091.32
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3003 16,800.00 5,045.04
2 Tukang Jam 0.1001 17,900.00 1,791.79
3 Mandor Jam 0.1001 19,400.00 1,941.94
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3003 16,800.00 5,045.04
2 Tukang Jam 0.1001 17,900.00 1,791.79
3 Mandor Jam 0.1001 19,400.00 1,941.94
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2800 16,800.00 4,704.00
2 Tukang Jam 0.0931 17,900.00 1,666.49
3 Mandor Jam 0.0931 19,400.00 1,806.14
B BAHAN
C PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2800 16,800.00 4,704.00
2 Tukang Jam 0.0931 17,900.00 1,666.49
3 Mandor Jam 0.0931 19,400.00 1,806.14
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2625 16,800.00 4,410.00
2 Tukang Jam 0.0875 17,900.00 1,566.25
3 Mandor Jam 0.0875 19,400.00 1,697.50
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2625 16,800.00 4,410.00
2 Tukang Jam 0.0875 17,900.00 1,566.25
3 Mandor Jam 0.0875 19,400.00 1,697.50
B BAHAN
C PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
A. TENAGA
B. BAHAN
C. PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.8000 16,800.00 47,040.00
2 Mandor Jam 0.7000 19,400.00 13,580.00
B BAHAN
1 Agregat Pecah Mesin 20 - 30 mm M3 0.5500 193,500.00 106,425.00
2 Pasir M3 0.5500 264,600.00 145,530.00
C PERALATAN
1 Tamper Jam 0.9639 36,100.00 34,796.79
2 Alat Bantu Ls 1.0000 880.00 880.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1667 16,800.00 19,600.00
2 Tukang Jam 0.5833 17,900.00 10,441.67
3 Mandor Jam 0.5833 19,400.00 11,316.67
B BAHAN
1 Pipa Porous m' 1.0500 - -
C PERALATAN
1 Alat Bantu Ls 1.0000 150.00 150.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.6690 16,800.00 78,439.20
2 Mandor Jam 1.1690 19,400.00 22,678.60
B BAHAN
1 Karung Plastik 50 Kg Bh 12.0000 6,120.00 73,440.00
2 Kawat Beton Kg 1.0000 15,100.00 15,100.00
3 Dolken Ø 5-7 x 350-400 cm Btg 2.0000 30,000.00 60,000.00
C PERALATAN
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.6690 16,800.00 78,439.20
2 Mandor Jam 1.1690 19,400.00 22,678.60
B BAHAN
1 Terpal Plastik L = 120 cm m 1.1000 13,000.00 14,300.00
2 Kawat Beton Kg 1.0000 15,100.00 15,100.00
3 Dolken Ø 5-7 x 350-400 cm Btg 2.0000 30,000.00 60,000.00
C PERALATAN
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.9996 16,800.00 16,793.28
2 Tukang Jam 0.9996 17,900.00 17,892.84
3 Mandor Jam 0.2499 19,400.00 4,848.06
B BAHAN
1 Solar Liter 3.0000 4,900.00 14,700.00
C PERALATAN
1 Water Pump Jam 0.9000 58,000.00 52,200.00
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.4320 16,800.00 7,257.60
2 Tukang Jam 0.7200 17,900.00 12,888.00
3 Kepala Tukang Jam 0.0720 18,650.00 1,342.80
4 Mandor Jam 0.0216 19,400.00 419.04
B BAHAN
1 Pipa PVC, WAVIN, Standard, Ø 2" Batang 0.1000 18,800.00 1,880.00
2 Ijuk Ikat 0.0625 20,800.00 1,300.00
C
1
BACK
Back
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.9091 16,800.00 32,072.73
2 Tukang Jam 0.6364 17,900.00 11,390.91
3 Mandor Jam 0.6364 19,400.00 12,345.45
B BAHAN
1 U-Ditch 30 x 40 Cm M1 1.0000 293,400.00 293,400.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.1000 16,800.00 35,280.00
2 Tukang Jam 0.7000 17,900.00 12,530.00
3 Mandor Jam 0.7000 19,400.00 13,580.00
B BAHAN
1 U-Ditch 30 x 50 Cm M1 1.0000 354,900.00 354,900.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.1000 16,800.00 35,280.00
2 Tukang Jam 0.7000 17,900.00 12,530.00
3 Mandor Jam 0.7000 19,400.00 13,580.00
B BAHAN
1 U-Ditch 40 x 50 Cm M1 1.0000 438,900.00 438,900.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.3333 16,800.00 39,200.00
2 Tukang Jam 0.7778 17,900.00 13,922.62
3 Mandor Jam 0.7778 19,400.00 15,089.32
B BAHAN
1 U-Ditch 40 x 60 Cm M1 1.0000 507,200.00 507,200.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.6250 16,800.00 44,100.00
2 Tukang Jam 0.8750 17,900.00 15,662.50
3 Mandor Jam 0.8750 19,400.00 16,975.00
B BAHAN
1 U-Ditch 60 x 80 Cm M1 1.0000 828,400.00 828,400.00
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2471 16,800.00 4,151.28
2 Tukang Jam 0.0826 17,900.00 1,478.54
3 Mandor Jam 0.0826 19,400.00 1,602.44
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2471 16,800.00 4,151.28
2 Tukang Jam 0.0826 17,900.00 1,478.54
3 Mandor Jam 0.0826 19,400.00 1,602.44
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.8000 16,800.00 47,040.00
2 Tukang Jam 0.7000 17,900.00 12,530.00
3 Mandor Jam 0.7000 19,400.00 13,580.00
B BAHAN
1 Gorong - Gorong Kotak Dim. 50 x 50 cm M1 1.0000 1,196,500.00 1,196,500.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.5455 16,800.00 42,763.64
2 Tukang Jam 0.6364 17,900.00 11,390.91
3 Mandor Jam 0.6364 19,400.00 12,345.45
B BAHAN
1 Gorong - Gorong Kotak Dim. 40 x 40 cm M1 1.0000 930,400.00 930,400.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.5000 16,800.00 58,800.00
2 Tukang Jam 0.8750 17,900.00 15,662.50
3 Mandor Jam 0.8750 19,400.00 16,975.00
B BAHAN
1 Gorong - Gorong Kotak Dim. 80 x 100 cm M1 1.0000 3,090,450.00 3,090,450.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.6667 16,800.00 78,400.00
2 Tukang Jam 1.1667 17,900.00 20,883.33
3 Mandor Jam 1.1667 19,400.00 22,633.33
B BAHAN
1 Gorong - Gorong Kotak Dim. 150 x 150 cm M1 1.0000 6,209,500.00 6,209,500.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
2 Excavator 80 - 120 HP Jam 1.1667 - -
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 5.6000 16,800.00 94,080.00
2 Tukang Jam 1.4000 17,900.00 25,060.00
3 Mandor Jam 1.4000 19,400.00 27,160.00
B BAHAN
1 Gorong - Gorong Kotak Dim. 200 x 200 cm M1 1.0000 9,997,100.00 9,997,100.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
2 Excavator 80 - 120 HP Jam 1.4000 - -
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 5.6000 16,800.00 94,080.00
2 Tukang Jam 1.4000 17,900.00 25,060.00
3 Mandor Jam 1.4000 19,400.00 27,160.00
B BAHAN
1 Gorong - Gorong Kotak Dim. 300 x 150 cm M1 1.0000 17,684,700.00 17,684,700.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
2 Crane 20 Ton Jam 1.4000 - -
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.9545 16,800.00 16,036.36
2 Tukang Jam 0.3182 17,900.00 5,695.45
3 Mandor Jam 0.3182 19,400.00 6,172.73
B BAHAN
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2945 16,800.00 4,947.60
2 Mandor Jam 0.0736 19,400.00 1,427.84
B BAHAN
C PERALATAN
1 Excavator (E10) Jam 0.0736 103,728.57 7,634.42
2 Dump Truck (E08) Jam 0.1848 139,100.00 25,705.68
3 Alat Bantu Ls 1.0000 125.00 125.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 0.1071 16,800.00 1,799.20
2 Mandor (L03) Jam 0.0535 19,400.00 1,037.90
B BAHAN
C PERALATAN
1 Excavator (E10) Jam 0.0535 387,100.00 20,709.85
2 Dump Truck (E08) Jam 0.1537 139,100.00 21,379.67
3 Alat Bantu Ls 1.0000 1,500.00 1,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 5.1948 16,800.00 87,272.73
2 Mandor (L03) Jam 0.1623 19,400.00 3,149.35
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
2 Pick Up Jam 0.4227 35,090.00 14,831.03
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 6.3492 16,800.00 106,666.67
2 Mandor (L03) Jam 0.1984 19,400.00 3,849.21
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
2 Pick Up Jam 0.4748 35,090.00 16,661.21
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 7.3733 16,800.00 123,870.97
2 Mandor (L03) Jam 0.2304 19,400.00 4,470.05
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
2 Pick Up Jam 0.5211 35,090.00 18,284.75
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 8.1633 16,800.00 137,142.86
2 Mandor (L03) Jam 0.2551 19,400.00 4,948.98
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
2 Pick Up Jam 0.5471 35,090.00 19,198.98
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 8.7912 16,800.00 147,692.31
2 Mandor (L03) Jam 0.2747 19,400.00 5,329.67
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
2 Pick Up Jam 0.5755 35,090.00 20,194.52
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0000 16,800.00 16,800.00
2 Mandor Jam 0.1250 19,400.00 2,425.00
B BAHAN
C PERALATAN
1 Compressor Jam 0.1250 111,800.00 13,975.00
2 Jack Hammer Jam 0.1250 36,100.00 4,512.50
3 Wheel Loader Jam 0.1250 332,600.00 41,575.00
4 Dump Truck Jam 0.2631 139,100.00 36,597.21
5 Alat Bantu Ls 1.0000 250.00 250.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 0.2362 16,800.00 3,968.16
2 Mandor (L03) Jam 0.0591 19,400.00 1,146.54
B BAHAN
1 Urugan Pilihan (EI-322) M3 0.5000 125,200.00 62,600.00
C PERALATAN
1 Excavator Jam 0.0591 387,100.00 22,877.61
2 Bulldozer Jam 0.0226 429,600.00 9,708.96
3 Alat Bantu Ls 1.0000 660.00 660.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 0.7753 16,800.00 13,025.04
2 Mandor (L03) Jam 0.0775 19,400.00 1,503.50
B BAHAN
1 Urugan Pilihan (EI-322) M3 0.5000 125,200.00 62,600.00
C PERALATAN
1 Excavator Jam 0.0775 387,100.00 30,000.25
2 Bulldozer Jam 0.0226 429,600.00 9,708.96
3 Alat Bantu Ls 1.0000 600.00 600.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 1.0467 16,800.00 17,584.56
2 Mandor (L03) Jam 0.0872 19,400.00 1,691.68
B BAHAN
C PERALATAN
1 Excavator Jam 0.0872 387,100.00 33,755.12
2 Bulldozer Jam 0.0226 429,600.00 9,708.96
3 Alat Bantu Ls 1.0000 600.00 600.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 10.0000 16,800.00 168,000.00
2 Mandor (L03) Jam 0.5000 19,400.00 9,700.00
B BAHAN
C PERALATAN
1 Pick Up Jam 0.4771 35,090.00 16,741.44
2 Alat Bantu Ls 1.0000 600.00 600.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1
2
B BAHAN
C PERALATAN
1 Dump Truck ( E08 ) Jam 0.0117 139,100.00 1,627.47
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0714 16,800.00 1,199.52
2 Mandor Jam 0.0178 19,400.00 345.32
B BAHAN
1 Bahan Timbunan (Tanah(M08) M3 1.2000 270,000.00 324,000.00
C PERALATAN
1 Whell Loader (E15) Jam 0.0178 332,600.00 5,920.28
2 Dump Truck (E08) Jam 0.0994 139,100.00 13,826.54
3 Motor Grader (E13) Jam 0.0061 335,400.00 2,045.94
4 Vibro Roller (E19) Jam 0.0100 274,300.00 2,743.00
5 Water Tanker (E23) Jam 0.0070 223,300.00 1,563.10
6 Alat Bantu Ls 1.0000 1,000.00 1,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0714 16,800.00 1,199.52
2 Mandor Jam 0.0178 19,400.00 345.32
B BAHAN
1 Material Pilihan (M09) M3 1.2000 125,200.00 150,240.00
C PERALATAN
1 Motor Grader (E13) Jam 0.0117 335,400.00 3,924.18
2 Vibro Roller (E19) Jam 0.0214 274,300.00 5,870.02
3 Water Tanker (E23) Jam 0.0070 223,300.00 1,563.10
4 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.4518 16,800.00 7,590.24
2 Mandor Jam 0.1506 19,400.00 2,921.64
C PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.1000 16,800.00 35,280.00
2 Mandor Jam 0.0700 19,400.00 1,358.00
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 500.00 500.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.5000 16,800.00 58,800.00
2 Mandor Jam 0.1400 19,400.00 2,716.00
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0161 16,800.00 270.48
2 Mandor Jam 0.0040 19,400.00 77.60
B BAHAN
C PERALATAN
1 Motor Grader (E13) Jam 0.0025 335,400.00 838.50
2 Vibro Roller (E19) Jam 0.0040 274,300.00 1,097.20
3 Alat Bantu Ls 1.0000 350.00 350.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0700 16,800.00 1,176.00
2 Mandor Jam 0.0140 19,400.00 271.60
B BAHAN
C PERALATAN
1 Dump Truck Jam 0.0228 139,100.00 3,165.60
2 Alat Bantu Ls 1.0000 350.00 350.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0140 16,800.00 235.20
2 Mandor Jam 0.0140 19,400.00 271.60
B BAHAN
C PERALATAN
1 Excavator (E10) Jam 0.0054 387,100.00 2,072.82
2 Dump Truck Jam 0.0114 367,900.00 4,186.28
3 Alat Bantu Ls 1.0000 350.00 350.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.6667 16,800.00 78,400.56
2 Tukang Jam 4.6667 17,900.00 83,533.93
3 Mandor Jam 2.3333 19,400.00 45,266.02
B BAHAN
C PERALATAN
1 Dump Truck Jam 0.5000 139,100.00 69,550.00
2 Alat Bantu Ls 1.0000 45,454.55 45,454.55
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 9.3333 16,800.00 156,799.44
2 Tukang Jam 9.3333 17,900.00 167,066.07
3 Mandor Jam 4.6667 19,400.00 90,533.98
B BAHAN
C PERALATAN
1 Dump Truck Jam 1.0000 139,100.00 139,100.00
2 Alat Bantu Ls 1.0000 90,909.09 90,909.09
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 14.0000 16,800.00 235,200.00
2 Tukang Jam 14.0000 17,900.00 250,600.00
3 Mandor Jam 7.0000 19,400.00 135,800.00
B BAHAN
C PERALATAN
1 Dump Truck Jam 1.5000 139,100.00 208,650.00
2 Alat Bantu Ls 1.0000 90,909.09 90,909.09
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.2048 16,800.00 20,240.96
2 Mandor Jam 0.2410 19,400.00 4,674.70
C PERALATAN
1 Stamper Jam 0.2410 36,100.00 8,698.80
2 Alat Bantu Ls 1.0000 600.00 600.00
A. TENAGA
1 Pekerja jam 0.1414 16,800.00 2,375.33
2 mandor jam 0.0177 19,400.00 342.87
B. BAHAN
1 Geotekstile M2 1.0500 - -
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : ………………………………………….
NO. MATA PEMBAYARAN : 3.7 (2)
JENIS PEKERJAAN : GEOGRID
SATUAN PENGUKURAN : M2
A. TENAGA
1 Pekerja jam 0.1414 16,800.00 2,375.33
2 mandor jam 0.0177 19,400.00 342.87
B. BAHAN
1 Geogrid M2 1.0500 - -
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2499 16,800.00 4,198.32
2 Mandor Jam 0.0357 19,400.00 692.58
B BAHAN
1 Agregat Pecah Mesin 20 - 30 mm M3 0.2643 193,500.00 51,142.05
2 Agregat Pecah Mesin 5 - 10 & 10 - 20 mm M3 0.6293 215,700.00 135,740.01
3 Pasir Pasang M3 0.3650 264,600.00 96,579.00
C PERALATAN
1 Motor Grader Kap. 100 HP Jam 0.0117 335,400.00 3,928.71
2 Tandem Roller Jam 0.0357 225,800.00 8,060.69
3 Water Tanker Jam 0.0141 223,300.00 3,138.76
4 Alat Bantu Ls 1.0000 240.00 240.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.9996 16,800.00 16,793.28
2 Mandor Jam 0.0714 19,400.00 1,385.16
B BAHAN
1 Agregat Pecah Mesin 20 - 30 mm M3 0.2643 193,500.00 51,142.05
2 Agregat Pecah Mesin 5 - 10 & 10 - 20 mm M3 0.6293 215,700.00 135,740.01
3 Pasir Pasang M3 0.3650 264,600.00 96,579.00
C PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.0080 16,800.00 33,734.40
2 Mandor Jam 0.4016 19,400.00 7,791.04
B BAHAN
1 Agregat Pecah Mesin 20 - 30 mm M3 0.2643 193,500.00 51,142.05
2 Agregat Pecah Mesin 5 - 10 & 10 - 20 mm M3 0.6293 215,700.00 135,740.01
3 Pasir Pasang M3 0.3650 264,600.00 96,579.00
C PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2499 16,800.00 4,198.32
2 Mandor Jam 0.0357 19,400.00 692.58
B BAHAN
1 Agregat Pecah Mesin 20 - 30 mm M3 0.3776 193,500.00 73,065.60
2 Agregat Pecah Mesin 5 - 10 & 10 - 20 mm M3 0.5664 215,700.00 122,172.48
3 Sirtu M3 0.3147 125,200.00 39,400.44
C PERALATAN
1 Motor Grader Kap. 100 HP Jam 0.0117 335,400.00 3,928.71
2 Tandem Roller Jam 0.0357 225,800.00 8,060.69
3 Water Tanker Jam 0.0141 223,300.00 3,138.76
4 Alat Bantu Ls 1.0000 240.00 240.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.9996 16,800.00 16,793.28
2 Mandor Jam 0.0714 19,400.00 1,385.16
B BAHAN
1 Agregat Pecah Mesin 20 - 30 mm M3 0.2643 193,500.00 51,142.05
2 Agregat Pecah Mesin 5 - 10 & 10 - 20 mm M3 0.6293 215,700.00 135,740.01
3 Sirtu M3 0.3650 125,200.00 45,698.00
C PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.0080 16,800.00 33,734.40
2 Mandor Jam 0.4016 19,400.00 7,791.04
B BAHAN
1 Agregat Pecah Mesin 20 - 30 mm M3 0.2643 193,500.00 51,142.05
2 Agregat Pecah Mesin 5 - 10 & 10 - 20 mm M3 0.6293 215,700.00 135,740.01
3 Sirtu M3 0.3650 125,200.00 45,698.00
C PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2499 16,800.00 4,198.32
2 Mandor Jam 0.0357 19,400.00 692.58
B BAHAN
1 Agregat Pecah Mesin 20 - 30 mm M3 0.1384 193,500.00 26,780.40
2 Agregat Pecah Mesin 5 - 10 & 10 - 20 mm M3 0.6167 215,700.00 133,022.19
3 Sirtu M3 0.5034 125,200.00 63,025.68
C PERALATAN
1 Motor Grader Kap. 100 HP Jam 0.0039 335,400.00 1,309.57
2 Tandem Roller Jam 0.0357 225,800.00 8,060.69
3 Water Tanker Jam 0.0141 223,300.00 3,138.76
4 Alat Bantu Ls 1.0000 240.00 240.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2499 16,800.00 4,198.32
2 Mandor Jam 0.0357 19,400.00 692.58
B BAHAN
C PERALATAN
1 Motor Grader Kap. 100 HP Jam 0.0117 335,400.00 3,928.71
2 Tandem Roller Jam 0.0357 225,800.00 8,060.69
3 Water Tanker Jam 0.0141 223,300.00 3,138.76
4 Alat Bantu Ls 1.0000 240.00 240.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0710 16,800.00 17,992.80
2 Tukang Jam 0.4685 17,900.00 8,386.15
3 Mandor Jam 0.1339 19,400.00 2,597.66
B BAHAN
1 Beton K-225 Ready Mix M3 1.0500 778,000.00 816,900.00
2 Multiplek 9mm Lembar 0.0770 112,000.00 8,624.00
3 Acuan / Kayu Bekesting M3 0.0068 3,300,000.00 22,440.00
4 Paku / Angker Kg 0.1106 11,600.00 1,282.79
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 10.0000 10,900.00 109,000.00
C PERALATAN
1 Concrete Vibrator Jam 0.0669 34,400.00 2,301.36
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0710 16,800.00 17,992.80
2 Tukang Jam 0.4685 17,900.00 8,386.15
3 Mandor Jam 0.1339 19,400.00 2,597.66
B BAHAN
1 Beton K-500 Ready Mix M3 1.0500 1,073,900.00 1,127,595.00
2 Multiplek 9mm Lembar 0.0770 112,000.00 8,624.00
3 Acuan / Kayu Bekesting M3 0.0028 3,300,000.00 9,240.00
4 Paku / Angker Kg 0.0321 11,600.00 372.82
5 Joint Sealent M1 0.8000 35,300.00 28,240.00
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 4.0000 10,900.00 43,600.00
C PERALATAN
1 Concrete Vibrator Jam 0.0669 34,400.00 2,301.36
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0710 16,800.00 17,992.80
2 Tukang Jam 0.4685 17,900.00 8,386.15
3 Mandor Jam 0.1339 19,400.00 2,597.66
B BAHAN
1 Beton K-350 Ready Mix M3 1.0500 843,600.00 885,780.00
2 Multiplek 9mm Lembar 0.0770 112,000.00 8,624.00
3 Acuan / Kayu Bekesting M3 0.0045 3,300,000.00 14,850.00
4 Paku / Angker Kg 0.0457 11,600.00 530.58
5 Joint Sealent M1 1.3333 35,300.00 47,065.49
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 6.6667 10,900.00 72,667.03
C PERALATAN
1 Concrete Vibrator Jam 0.0669 34,400.00 2,301.36
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0710 16,800.00 17,992.80
2 Tukang Jam 0.4685 17,900.00 8,386.15
3 Mandor Jam 0.1339 19,400.00 2,597.66
B BAHAN
1 Beton K-350 Ready Mix M3 1.0500 843,600.00 885,780.00
2 Multiplek 9mm Lembar 0.0770 112,000.00 8,624.00
3 Acuan / Kayu Bekesting M3 0.0035 3,300,000.00 11,550.00
4 Paku / Angker Kg 0.0377 11,600.00 437.78
5 Joint Sealent M1 1.0000 35,300.00 35,300.00
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 5.0000 10,900.00 54,500.00
C PERALATAN
1 Concrete Vibrator Jam 0.0669 34,400.00 2,301.36
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0710 16,800.00 17,992.80
2 Tukang Jam 0.4685 17,900.00 8,386.15
3 Mandor Jam 0.1339 19,400.00 2,597.66
B BAHAN
1 Beton K-350 Ready Mix M3 1.0500 843,600.00 885,780.00
2 Multiplek 9mm Lembar 0.0770 112,000.00 8,624.00
3 Acuan / Kayu Bekesting M3 0.0028 3,300,000.00 9,240.00
4 Paku / Angker Kg 0.0321 11,600.00 372.82
5 Joint Sealent M1 0.8000 35,300.00 28,240.00
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 4.0000 10,900.00 43,600.00
C PERALATAN
1 Concrete Vibrator Jam 0.0669 34,400.00 2,301.36
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.6707 16,800.00 28,067.76
2 Tukang Jam 0.5221 17,900.00 9,345.59
3 Mandor Jam 0.2088 19,400.00 4,050.72
B BAHAN
1 Beton K-350 Ready Mix Mini Mixer M3 1.0500 1,354,700.00 1,422,435.00
2 Multiplek 9mm Lembar 0.0770 112,000.00 8,624.00
3 Acuan / Kayu Bekesting M3 0.0046 3,300,000.00 15,180.00
4 Paku / Angker Kg 0.0465 11,600.00 539.86
5 Joint Sealent M1 1.3333 35,300.00 47,065.49
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 6.6667 10,900.00 72,667.03
C PERALATAN
1 Concrete Vibrator Jam 0.1044 34,400.00 3,591.36
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.6707 16,800.00 28,067.76
2 Tukang Jam 0.5221 17,900.00 9,345.59
3 Mandor Jam 0.2088 19,400.00 4,050.72
B BAHAN
1 Beton K-350 Ready Mix Mini Mixer M3 1.0500 1,354,700.00 1,422,435.00
2 Multiplek 9mm Lembar 0.0770 112,000.00 8,624.00
3 Acuan / Kayu Bekesting M3 0.0035 3,300,000.00 11,550.00
4 Paku / Angker Kg 0.0377 11,600.00 437.78
5 Joint Sealent M1 1.0000 35,300.00 35,300.00
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 5.0000 10,900.00 54,500.00
C PERALATAN
1 Concrete Vibrator Jam 0.1044 34,400.00 3,591.36
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.6707 16,800.00 28,067.76
2 Tukang Jam 0.5221 17,900.00 9,345.59
3 Mandor Jam 0.2088 19,400.00 4,050.72
B BAHAN
1 Beton K-350 Ready Mix Mini Mixer M3 1.0500 1,354,700.00 1,422,435.00
2 Multiplek 9mm Lembar 0.0770 112,000.00 8,624.00
3 Acuan / Kayu Bekesting M3 0.0028 3,300,000.00 9,240.00
4 Paku / Angker Kg 0.0321 11,600.00 372.82
5 Joint Sealent M1 0.8000 35,300.00 28,240.00
6 Concrete Curing Ls 1.0000 73,669.50 73,669.50
7 Plastik M2 4.0000 10,900.00 43,600.00
C PERALATAN
1 Concrete Vibrator Jam 0.1044 34,400.00 3,591.36
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0710 16,800.00 17,992.80
2 Tukang Jam 0.4685 17,900.00 8,386.15
3 Mandor Jam 0.1339 19,400.00 2,597.66
B BAHAN
1 Beton K-125 Ready Mix M3 1.0500 740,200.00 777,210.00
2 Multiplek 9mm Lembar 0.0770 112,000.00 8,624.00
3 Acuan / Kayu Bekesting M3 0.0068 3,300,000.00 22,440.00
4 Paku / Angker Kg 0.0641 11,600.00 744.02
5 Concrete Curing Ls 1.0000 73,669.50 73,669.50
6 Plastik M2 10.0000 10,900.00 109,000.00
C PERALATAN
1 Concrete Vibrator Jam 0.0669 34,400.00 2,301.36
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0710 16,800.00 17,992.80
2 Tukang Jam 0.4685 17,900.00 8,386.15
3 Mandor Jam 0.1339 19,400.00 2,597.66
B BAHAN
1 Beton K-125 Ready Mix M3 1.0500 740,200.00 777,210.00
2 Multiplek 9mm Lembar 0.0766 112,000.00 8,579.20
3 Acuan / Kayu Bekesting M3 0.0046 3,300,000.00 15,180.00
4 Paku / Angker Kg 0.0465 11,600.00 539.27
5 Concrete Curing Ls 1.0000 73,669.50 73,669.50
6 Plastik M2 6.6667 10,900.00 72,667.03
C PERALATAN
1 Concrete Vibrator Jam 0.0669 34,400.00 2,301.36
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0710 16,800.00 17,992.80
2 Tukang Jam 0.4685 17,900.00 8,386.15
3 Mandor Jam 0.1339 19,400.00 2,597.66
B BAHAN
1 Beton B-0 Ready Mix M3 1.0500 704,800.00 740,040.00
2 Acuan / Kayu Bekesting M3 0.0107 3,300,000.00 35,310.00
3 Paku / Angker Kg 0.0856 11,600.00 992.96
4 Concrete Curing Ls 1.0000 73,669.50 73,669.50
C PERALATAN
1 Concrete Vibrator Jam 0.0669 34,400.00 2,301.36
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0710 16,800.00 17,992.80
2 Tukang Jam 0.4685 17,900.00 8,386.15
3 Mandor Jam 0.1339 19,400.00 2,597.66
B BAHAN
1 Beton B-0 Ready Mix M3 1.0500 704,800.00 740,040.00
2 Acuan / Kayu Bekesting M3 0.0054 3,300,000.00 17,820.00
3 Paku / Angker Kg 0.0432 11,600.00 501.12
4 Concrete Curing Ls 1.0000 73,669.50 73,669.50
C PERALATAN
1 Concrete Vibrator Jam 0.0669 34,400.00 2,301.36
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0710 16,800.00 17,992.80
2 Tukang Jam 0.4685 17,900.00 8,386.15
3 Mandor Jam 0.1339 19,400.00 2,597.66
B BAHAN
1 Beton B0 Ready Mix M3 1.0500 704,800.00 740,040.00
2 Acuan / Kayu Bekesting M3 0.0036 3,300,000.00 11,880.00
3 Paku / Angker Kg 0.0288 11,600.00 334.08
4 Concrete Curing Ls 1.0000 73,669.50 73,669.50
C PERALATAN
1 Concrete Vibrator Jam 0.0669 34,400.00 2,301.36
2 Alat Bantu Ls 1.0000 750.00 750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2857 16,800.00 4,799.76
2 Tukang Jam 0.0571 17,900.00 1,022.09
3 Kep. Tukang Jam 0.0571 18,650.00 1,064.92
4 Mandor Jam 0.0286 19,400.00 554.84
B BAHAN
1 Kerb Uk. 10.20.40 K-300 Bh 2.6250 12,600.00 33,075.00
2 Semen Kg 1.5843 1,320.00 2,091.28
3 Pasir Pasang M3 0.0044 264,600.00 1,164.24
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2857 16,800.00 4,799.76
2 Tukang Jam 0.0571 17,900.00 1,022.09
3 Kep. Tukang Jam 0.0571 18,650.00 1,064.92
4 Mandor Jam 0.0286 19,400.00 554.84
B BAHAN
1 Kerb Uk. 16/20.30.40 K-300 Bh 2.6250 52,000.00 136,500.00
2 Semen Kg 3.1685 1,320.00 4,182.43
3 Pasir Pasang M3 0.0088 264,600.00 2,328.48
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3500 16,800.00 5,880.00
2 Tukang Jam 0.0700 17,900.00 1,253.00
3 Kep. Tukang Jam 0.0700 18,650.00 1,305.50
4 Mandor Jam 0.0350 19,400.00 679.00
B BAHAN
1 Paving Block ; t = 6 cm K-300 M2 1.0500 90,700.00 95,235.00
2 Abu Batu M3 0.0525 208,000.00 10,920.00
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3684 16,800.00 6,189.12
2 Tukang Jam 0.0737 17,900.00 1,319.23
3 Kep. Tukang Jam 0.0737 18,650.00 1,374.51
4 Mandor Jam 0.0672 19,400.00 1,303.68
B BAHAN
1 Paving Block ; t = 8 cm K-300 M2 1.0500 108,300.00 113,715.00
2 Abu Batu M3 0.0525 208,000.00 10,920.00
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3889 16,800.00 6,533.52
2 Tukang Jam 0.0778 17,900.00 1,392.62
3 Kep. Tukang Jam 0.0778 18,650.00 1,450.97
4 Mandor Jam 0.0389 19,400.00 754.66
B BAHAN
1 Topi Uskup ; t = 6 cm K-300 M2 1.0500 165,000.00 173,250.00
2 Abu Batu M3 0.0525 208,000.00 10,920.00
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.4516 16,800.00 7,586.88
2 Tukang Jam 0.0903 17,900.00 1,616.37
3 Kep. Tukang Jam 0.0903 18,650.00 1,684.10
4 Mandor Jam 0.0452 19,400.00 876.88
B BAHAN
1 Topi Uskup ; t = 8 cm K-300 M2 1.0500 206,200.00 216,510.00
2 Abu Batu M3 0.0525 208,000.00 10,920.00
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0301 16,800.00 505.68
2 Mandor Jam 0.0060 19,400.00 116.40
B BAHAN
1 Prime Coat Kg 1.0300 14,000.00 14,420.00
C PERALATAN
1 Asphalt Sprayer Jam 0.0030 116,900.00 350.70
2 Air Compressor Jam 0.0031 111,800.00 346.58
3 Dump Truck Jam 0.0030 139,100.00 417.30
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0301 16,800.00 505.68
2 Mandor Jam 0.0060 19,400.00 116.40
B BAHAN
1 Tack Coat Kg 1.0300 12,300.00 12,669.00
C PERALATAN
1 Asphalt Sprayer Jam 0.0030 116,900.00 350.70
2 Air Compressor Jam 0.0063 111,800.00 704.34
3 Dump Truck Jam 0.0030 139,100.00 417.30
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
1.
2.
3.
4.
5. Asphalt Finisher Jam 0.0290 797,600.00 23,111.20
6. Tandem Roller Jam 0.0285 225,800.00 6,440.53
7 P. Tyre Roller Jam 0.0082 347,900.00 2,838.37
8 Alat Bantu Ls 1.0000 0.00 0.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1334 16,800.00 2,241.12
3 Mandor Jam 0.0191 19,400.00 370.54
B BAHAN
1 Material Hotmix ( HRS - WC ) Ton 1.0300 1,260,000.00 1,297,800.00
C PERALATAN
1 Asphalt Finisher Jam 0.0191 797,600.00 15,234.16
2 Tandem Roller Jam 0.0343 225,800.00 7,744.94
3 Pneumatic Tyre Roller Jam 0.0192 347,900.00 6,679.68
4 Alat Bantu Ls 1.0000 120.00 120.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1906 16,800.00 3,202.08
2 Mandor Jam 0.0191 19,400.00 370.54
B BAHAN
1 Material Hotmix AC - WC Ton 1.0300 1,148,000.00 1,182,440.00
C PERALATAN
1 Asphalt Finisher Jam 0.0191 797,600.00 15,234.16
2 Tandem Roller Jam 0.0348 225,800.00 7,857.84
3 Pneumatic Tyre Roller Jam 0.0249 347,900.00 8,662.71
4 Alat Bantu Ls 1.0000 150.00 150.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2000 16,800.00 3,360.00
2 Mandor Jam 0.0200 19,400.00 388.00
B BAHAN
1 Material Hotmix AC - WC Ton 1.0300 1,148,000.00 1,182,440.00
C PERALATAN
1 Baby Wales Jam 0.0246 46,100.00 1,134.06
2 Alat Bantu Ls 1.0000 150.00 150.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1906 16,800.00 3,202.08
2 Mandor Jam 0.0191 19,400.00 370.54
B BAHAN
1 Material Hotmic ( AC - BC ) Ton 1.0300 1,105,800.00 1,138,974.00
C PERALATAN
1 Asphalt Finisher Jam 0.0191 797,600.00 15,234.16
2 Tandem Roller Jam 0.0148 225,800.00 3,341.84
3 Pneumatic Tyre Roller Jam 0.0257 347,900.00 8,941.03
4 Alat Bantu Set 1.0000 2,400.00 2,400.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1906 16,800.00 3,202.08
2 Mandor Jam 0.0191 19,400.00 370.54
B BAHAN
1 Laston Lapis Antara Leveling ( AC - BC L ) Ton 1.0489 1,105,800.00 1,159,873.62
C PERALATAN
1 Asphalt Finisher Jam 0.0191 797,600.00 15,234.16
2 Tandem Roller Jam 0.0148 225,800.00 3,341.84
3 Pneumatic Tyre Roller Jam 0.0111 347,900.00 3,861.69
4 Alat Bantu Ls 1.0000 2,100.00 2,100.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1044 16,800.00 18,553.92
2 Tukang Jam 1.2149 17,900.00 21,746.71
3 Mandor Jam 0.1104 19,400.00 2,141.76
B BAHAN
1 Beton K-350 Ready Mix M3 1.0500 843,600.00 885,780.00
2 Acuan / Kayu Bekesting M3 0.2000 3,300,000.00 660,000.00
3 Paku / Angker Kg 1.6000 11,600.00 18,560.00
C PERALATAN
1 Concrete Vibrator Jam 0.1104 34,400.00 3,797.76
2 Alat Bantu Ls 1.0000 900.00 900.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1044 16,800.00 18,553.92
2 Tukang Jam 1.2149 17,900.00 21,746.71
3 Mandor Jam 0.1104 19,400.00 2,141.76
B BAHAN
1 Beton K-300 Ready Mix M3 1.0500 799,300.00 839,265.00
2 Acuan / Kayu Bekesting M3 0.2000 3,300,000.00 660,000.00
3 Paku / Angker Kg 1.6000 11,600.00 18,560.00
C PERALATAN
1 Concrete Vibrator Jam 0.1104 34,400.00 3,797.76
2 Alat Bantu Ls 1.0000 900.00 900.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.8835 16,800.00 14,842.80
2 Tukang Jam 1.2149 17,900.00 21,746.71
3 Mandor Jam 0.1104 19,400.00 2,141.76
B BAHAN
1 Beton K-250 Ready Mix M3 1.0500 794,000.00 833,700.00
2 Acuan / Kayu Bekesting M3 0.2000 3,300,000.00 660,000.00
3 Paku / Angker Kg 1.6000 11,600.00 18,560.00
C PERALATAN
1 Concrete Vibrator Jam 0.1104 34,400.00 3,797.76
2 Alat Bantu Ls 1.0000 900.00 900.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.3655 16,800.00 22,939.76
2 Tukang Jam 1.3655 17,900.00 24,441.77
3 Mandor Jam 0.6827 19,400.00 13,244.98
B BAHAN
1 Pasir Beton M3 0.5205 268,500.00 139,767.12
2 Batu Pecah / Split Uk. 1-2 cm M3 0.7302 193,500.00 141,303.20
3 Semen Abu - Abu Kg 326.0000 1,320.00 430,320.00
4 Acuan / Kayu Bekesting M3 0.1000 3,300,000.00 330,000.00
5 Paku / Angker Kg 0.8000 11,600.00 9,280.00
C PERALATAN
1 Concrete Mixer Jam 0.6827 61,200.00 41,783.13
2 Alat Bantu Ls 1.0000 2,500.00 2,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.3655 16,800.00 22,939.76
2 Tukang Jam 1.3655 17,900.00 24,441.77
3 Mandor Jam 0.6827 19,400.00 13,244.98
B BAHAN
1 Pasir Beton M3 0.5671 268,500.00 152,272.60
2 Koral Beton M3 0.7203 193,500.00 139,375.09
3 Semen Abu - Abu Kg 276.0000 1,320.00 364,320.00
4 Acuan / Kayu Bekesting M3 0.1000 3,300,000.00 330,000.00
5 Paku / Angker Kg 0.8000 11,600.00 9,280.00
C PERALATAN
1 Concrete Mixer Jam 0.6827 61,200.00 41,783.13
2 Alat Bantu Ls 1.0000 2,500.00 2,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.7309 16,800.00 45,879.52
2 Tukang Jam 1.3655 17,900.00 24,441.77
3 Mandor Jam 1.3655 19,400.00 26,489.96
B BAHAN
1 Semen abu - abu Kg 211.1500 1,320.00 278,718.00
2 Pasir Pasang M3 0.4095 264,600.00 108,353.70
3 Koral Beton M3 0.5775 193,500.00 111,746.25
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(1) a
JENIS PEKERJAAN : UNIT PRACETAK GELAGAR I BENTANG 20.6 METER, TINGGI 125 CM
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
1. Unit Pracetak Gelagar I, Bentang 20.6 m, Tinggi 125 cm unit 1.0000 43,770,400.00 43,770,400.00
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(1) b
JENIS PEKERJAAN : UNIT PRACETAK GELAGAR I BENTANG 25.6 METER, TINGGI 160 CM
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
1. Unit Pracetak Gelagar I, Bentang 25.6 m, Tinggi 160 cm unit 1.0000 54,713,700.00 54,713,700.00
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(1) c
JENIS PEKERJAAN : UNIT PRACETAK GELAGAR I BENTANG 30.6 METER, TINGGI 170 CM
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(1) d
JENIS PEKERJAAN : UNIT PRACETAK GELAGAR I BENTANG 35.6 METER, TINGGI 170 CM
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) f
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 11.6 M H = 0.57 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) j
JENIS PEKERJAAN : UNIT VOID SLAB L = 15.6 M H = 0.66 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.3 (1)
JENIS PEKERJAAN : BAJA TULANGAN ( POLOS )
SATUAN PENGUKURAN : KG
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1050 16,800.00 1,764.00
2 Tukang Jam 0.0350 17,900.00 626.50
3 Mandor Jam 0.0350 19,400.00 679.00
B BAHAN
1 Besi Beton ( Polos ) Kg 1.0500 7,241.63 7,603.71
2 Kawat Beton Kg 0.0200 15,100.00 302.00
C PERALATAN
1 Alat Bantu Ls 1.0000 150.00 150.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1050 16,800.00 1,764.00
2 Tukang Jam 0.0350 17,900.00 626.50
3 Mandor Jam 0.0350 19,400.00 679.00
B BAHAN
1 Besi Beton ( Ulir ) Kg 1.0500 7,261.79 7,624.88
2 Kawat Beton Kg 0.0200 15,100.00 302.00
C PERALATAN
1 Alat Bantu Ls 1.0000 150.00 150.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1050 16,800.00 1,764.00
2 Tukang Jam 0.0350 17,900.00 626.50
3 Mandor Jam 0.0175 19,400.00 339.50
B BAHAN
1 Welded Wiremesh Kg 1.0200 15,900.00 16,218.00
2 Kawat Beton Kg 0.0200 15,100.00 302.00
C PERALATAN
1 Alat Bantu Ls 1.0000 150.00 150.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1111 16,800.00 1,866.67
2 Tukang Jam 0.0556 17,900.00 994.44
3 Mandor Jam 0.0556 19,400.00 1,077.78
B BAHAN
1 Cerucuk Bambu 8 - 10 cm, 5 - 6 m Btg 0.2000 23,100.00 4,620.00
C PERALATAN
1 Alat Bantu Ls 1.0000 210.00 210.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1111 16,800.00 1,866.67
2 Tukang Jam 0.0556 17,900.00 994.44
3 Mandor Jam 0.0556 19,400.00 1,077.78
B BAHAN
1 Cerucuk Dolken 8 - 10 cm,3 - 4 m Btg 0.3333 37,500.00 12,500.00
C PERALATAN
1 Alat Bantu Ls 1.0000 210.00 210.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
JUMLAH
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN HARGA
KUANTITAS (Rp)
( Rp. )
A. TENAGA
1 Pekerja Jam 0.2603 16,800.00 4,373.05
2 Tukang Jam 0.0521 17,900.00 931.88
3 Mandor Jam 0.0260 19,400.00 504.98
B. BAHAN
C. PERALATAN
1 Dump Truck 3-4 m³, 100 HP, Kap. 6 ton Jam 0.0433 139,100.00 6,024.49
2 Crane 10-15 TON, 150 HP, Kap. 15 ton Jam 0.0260 536,000.00 13,952.10
3 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
JUMLAH
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN HARGA
KUANTITAS (Rp)
( Rp. )
A. TENAGA
1 Pekerja Jam 0.2975 16,800.00 4,997.77
2 Tukang Jam 0.0595 17,900.00 1,065.00
3 Mandor Jam 0.0297 19,400.00 577.12
B. BAHAN
C. PERALATAN
1 Dump Truck 3-4 m³, 100 HP, Kap. 6 ton Jam 0.0433 139,100.00 6,024.49
2 Crane 10-15 TON, 150 HP, Kap. 15 ton Jam 0.0297 536,000.00 15,945.26
3 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
JUMLAH
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN HARGA
KUANTITAS (Rp)
( Rp. )
A. TENAGA
1 Pekerja Jam 0.3347 16,800.00 5,622.49
2 Tukang Jam 0.0669 17,900.00 1,198.13
3 Mandor Jam 0.0335 19,400.00 649.26
B. BAHAN
C. PERALATAN
1 Dump Truck 3-4 m³, 100 HP, Kap. 6 ton Jam 0.0433 139,100.00 6,024.49
2 Crane 10-15 TON, 150 HP, Kap. 15 ton Jam 0.0335 536,000.00 17,938.42
3 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
JUMLAH
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN HARGA
KUANTITAS (Rp)
( Rp. )
A. TENAGA
1 Pekerja Jam 0.3719 16,800.00 6,247.21
2 Tukang Jam 0.0744 17,900.00 1,331.25
3 Mandor Jam 0.0372 19,400.00 721.40
B. BAHAN
C. PERALATAN
1 Dump Truck 3-4 m³, 100 HP, Kap. 6 ton Jam 0.0511 139,100.00 7,112.25
2 Crane 10-15 TON, 150 HP, Kap. 15 ton Jam 0.0372 536,000.00 19,931.58
Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
SATUAN PENGUKURAN : M1
JUMLAH
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN HARGA
KUANTITAS (Rp)
( Rp. )
A. TENAGA
1 Pekerja Jam 0.2603 16,800.00 4,373.05
2 Tukang Jam 0.0521 17,900.00 931.88
3 Mandor Jam 0.0260 19,400.00 504.98
B. BAHAN
1 Sheet Pile Beton Bertulang Pracetak uk. 30 x 12 cm meter 1.0500 3,209,700.00 3,370,185.00
C. PERALATAN
1 Dump Truck 3-4 m³, 100 HP, Kap. 6 ton Jam 0.0316 139,100.00 4,396.66
2 Crane 10-15 TON, 150 HP, Kap. 15 ton Jam 0.0260 536,000.00 13,952.10
Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
SATUAN PENGUKURAN : M1
JUMLAH
PERKIRAAN HARGA SATUAN
NO. KOMPONEN SATUAN HARGA
KUANTITAS (Rp)
( Rp. )
A. TENAGA
1 Pekerja Jam 0.2975 16,800.00 4,997.77
2 Tukang Jam 0.0595 17,900.00 1,065.00
3 Mandor Jam 0.0297 19,400.00 577.12
B. BAHAN
1 Sheet Pile Beton Bertulang Pracetak uk. 40 x 15 cm meter 1.0500 5,349,400.00 5,616,870.00
C. PERALATAN
1 Dump Truck 3-4 m³, 100 HP, Kap. 6 ton Jam 0.0362 139,100.00 5,033.28
2 Crane 10-15 TON, 150 HP, Kap. 15 ton Jam 0.0297 536,000.00 15,945.26
Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
SATUAN PENGUKURAN : M1
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.8925 16,800.00 14,993.31
2 Tukang Jam 0.2231 17,900.00 3,993.75
3 Mandor Jam 0.1116 19,400.00 2,164.21
B BAHAN
C PERALATAN
1 Pile Driver jam 0.1116 86,300.00 9,627.40
2 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
SATUAN PENGUKURAN : M1
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.9817 16,800.00 16,492.64
2 Tukang Jam 0.2454 17,900.00 4,393.13
3 Mandor Jam 0.1227 19,400.00 2,380.63
B BAHAN
C PERALATAN
1 Pile Driver jam 0.1227 86,300.00 10,590.14
2 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
SATUAN PENGUKURAN : M1
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1602 16,800.00 19,491.30
2 Tukang Jam 0.2900 17,900.00 5,191.88
3 Mandor Jam 0.1450 19,400.00 2,813.48
B BAHAN
C PERALATAN
1 Pile Driver jam 0.1450 86,300.00 12,515.62
2 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
SATUAN PENGUKURAN : M1
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.6734 16,800.00 28,112.45
2 Tukang Jam 0.3347 17,900.00 5,990.63
3 Mandor Jam 0.1673 19,400.00 3,246.32
B BAHAN
C PERALATAN
1 Pile Driver jam 0.1673 86,300.00 14,441.10
2 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.6426 16,800.00 10,795.18
2 Tukang Jam 0.1606 17,900.00 2,875.50
3 Mandor Jam 0.0803 19,400.00 1,558.23
B BAHAN
C PERALATAN
1 Pile Driver jam 0.0803 86,300.00 6,931.73
2 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.8936 16,800.00 15,012.05
2 Tukang Jam 0.1787 17,900.00 3,199.00
3 Mandor Jam 0.0894 19,400.00 1,733.53
B BAHAN
C PERALATAN
1 Pile Driver jam 0.0894 86,300.00 7,711.55
2 Alat Bantu Ls 1.0000 500.00 500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.5783 16,800.00 76,915.66
2 Tukang Jam 2.2892 17,900.00 40,975.90
3 Mandor Jam 0.7631 19,400.00 14,803.21
B BAHAN
1 Beton K-250 Ready Mix m3 0.1257 794,000.00 99,776.98
2 Baja Tulangan kg 31.4159 7,261.79 228,135.99
C PERALATAN
1 Bore Pile jam 0.7631 359,200.00 274,088.35
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 9.6770 16,800.00 162,573.60
2 Mandor Jam 1.9354 19,400.00 37,546.76
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 2,000.00 2,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 7.7416 16,800.00 130,058.88
2 Mandor Jam 1.5483 19,400.00 30,037.02
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 2,000.00 2,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 11.2000 16,800.00 188,160.00
2 Tukang (L02) Jam 2.8000 17,900.00 50,120.00
3 Mandor (L03) Jam 1.4000 19,400.00 27,160.00
B BAHAN
1 Batu Belah (M02) M3 1.1700 254,700.00 297,999.00
2 Semen (M12) Kg 176.4000 1,320.00 232,848.00
3 Pasir Pasang (M01) M3 0.3961 264,600.00 104,808.06
C PERALATAN
1 Alat Bantu Ls 1.0000 2,100.00 2,100.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 5.4618 16,800.00 91,758.24
2 Tukang (L02) Jam 1.3655 17,900.00 24,442.45
3 Mandor (L03) Jam 0.6827 19,400.00 13,244.38
B BAHAN
1 Batu Belah (M02) M3 1.1700 254,700.00 297,999.00
2 Semen (M12) Kg 176.4000 1,320.00 232,848.00
3 Pasir Pasang (M01) M3 0.3961 264,600.00 104,808.06
C PERALATAN
1 Concrete Mixer ( E06 ) Jam 0.6827 61,200.00 41,781.24
2 Water Tanker (E23) Jam 0.0248 177,300.00 4,397.04
3 Alat Bantu Ls 1.0000 1,200.00 1,200.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 5.2500 16,800.00 88,200.00
2 Tukang Jam 2.6250 17,900.00 46,987.50
3 Mandor Jam 0.8750 19,400.00 16,975.00
B BAHAN
1 Batu Belah M3 1.1000 254,700.00 280,170.00
2 Kawat Bronjong Kg 15.0000 23,000.00 345,000.00
C PERALATAN
1 Alat Bantu Ls 1.0000 400.00 400.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 12.5000 16,800.00 210,000.00
2 Mandor Jam 1.6667 19,400.00 32,333.33
B BAHAN
C PERALATAN
1 Pick Up Ls 0.2843 35,090.00 9,977.40
2 Alat Bantu Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.6000 16,800.00 26,880.00
2 Mandor Jam 0.4000 19,400.00 7,760.00
B BAHAN
C PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.4016 16,800.00 6,746.88
2 Tukang Jam 0.2677 17,900.00 4,791.83
3 Mandor Jam 0.1339 19,400.00 2,597.66
B BAHAN
1 Joint Sealent kg 0.8278 35,300.00 29,219.58
C PERALATAN
1 Concrete Cutter Machine Jam 0.1339 15,800.00 2,115.62
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.0417 16,800.00 17,500.56
2 Tukang Jam 0.6944 17,900.00 12,429.76
3 Mandor Jam 0.3472 19,400.00 6,735.68
B BAHAN
1 Joint Sealent M3 0.0004 35,300.00 14.12
C PERALATAN
1 Concrete Cutter Machine Jam 0.1389 15,800.00 2,194.62
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 3.6400 16,800.00 61,152.00
2 Tukang Jam 1.8200 17,900.00 32,578.00
3 Kepala Tukang Jam 0.1820 18,650.00 3,394.30
4 Mandor Jam 0.1820 19,400.00 3,530.80
B BAHAN
1 Papan 2/20 klas kuat III M3 0.0450 2,236,800.00 100,656.00
2 Paku segala ukuran (rata-rata) Kg 0.3000 11,600.00 3,480.00
C PERALATAN
1 Alat Bantu Ls 1.0000 2,500.00 2,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 4.2000 16,800.00 70,560.00
2 Tukang Jam 2.9400 17,900.00 52,626.00
3 Mandor Jam 0.2100 19,400.00 4,074.00
B BAHAN
1 Rangka Kayu 5/7 Kelas II
Borneo Segala Ukuran M3 0.0608 2,193,400.00 133,358.72
2 Paku segala ukuran ( rata - rata ) Kg 0.3000 11,600.00 3,480.00
C PERALATAN
1 Alat Bantu Ls 1.0000 2,500.00 2,500.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 5.8800 16,800.00 98,784.00
2 Tukang Jam 4.1160 17,900.00 73,676.40
3 Mandor Jam 0.2940 19,400.00 5,703.60
B BAHAN
1 Rangka Kayu 5/7 Kelas II
Borneo Segala Ukuran M3 0.0851 2,193,400.00 186,658.34
2 Paku segala ukuran ( rata - rata ) Kg 0.4200 11,600.00 4,872.00
C PERALATAN
1 Alat Bantu Ls 1.0000 3,500.00 3,500.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 7.5600 16,800.00 127,008.00
2 Tukang Jam 5.2920 17,900.00 94,726.80
3 Mandor Jam 0.3780 19,400.00 7,333.20
B BAHAN
1 Rangka Kayu 5/7 Kelas II
Borneo Segala Ukuran M3 0.1094 2,193,400.00 239,957.96
2 Paku segala ukuran ( rata - rata ) Kg 0.5400 11,600.00 6,264.00
C PERALATAN
1 Alat Bantu Ls 1.0000 4,500.00 4,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 9.6600 16,800.00 162,288.00
2 Tukang Jam 6.7620 17,900.00 121,039.80
3 Mandor Jam 0.4830 19,400.00 9,370.20
B BAHAN
1 Rangka Kayu 5/7 Kelas II
Borneo Segala Ukuran M3 0.1398 2,193,400.00 306,637.32
2 Paku segala ukuran ( rata - rata ) Kg 0.6900 11,600.00 8,004.00
C PERALATAN
1 Alat Bantu Ls 1.0000 5,750.00 5,750.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0200 16,800.00 336.00
2 Mandor Jam 0.0033 19,400.00 64.02
B BAHAN
1 Bahan Grouting Kg 1.0300 - -
C PERALATAN
1 Bor (Rock Drill Φ 35mm) jam 0.0625 98,600.00 6,162.50
2 Air Compresor jam 0.0625 111,800.00 6,987.50
3 Pompa dan alat injeksi jam 0.0033 - -
5 Alat Bantu LS 1.0000 250.00 250.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.4000 16,800.00 23,520.00
2 Tukang Jam 1.0500 17,900.00 18,795.00
3 Kepala Tukang Jam 0.1050 18,650.00 1,958.25
4 Mandor Jam 0.0700 19,400.00 1,358.00
B BAHAN
1 Semen Kg 5.5610 1,320.00 7,340.52
2 Pasir Pasang Kg 0.0260 264,600.00 6,879.60
C PERALATAN
1 Alat Bantu Ls 1.0000 250.00 250.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.2000 16,800.00 20,160.00
2 Tukang Jam 0.1800 17,900.00 3,222.00
3 Kepala Tukang Jam 0.0270 18,650.00 503.55
4 Mandor Jam 0.0041 19,400.00 78.57
B BAHAN
1 Semen Kg 4.3200 1,320.00 5,702.40
2 Pasir Pasang Kg 0.0160 264,600.00 4,233.60
C PERALATAN
1 Alat Bantu Ls 1.0000 250.00 250.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.2000 16,800.00 20,160.00
2 Tukang Jam 0.1800 17,900.00 3,222.00
3 Kepala Tukang Jam 0.0270 18,650.00 503.55
4 Mandor Jam 0.0041 19,400.00 78.57
B BAHAN
1 Semen Kg 8.5200 1,320.00 11,246.40
2 Pasir Pasang m3 0.0170 264,600.00 4,498.20
C PERALATAN
1 Alat Bantu Ls 1.0000 250.00 250.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.98 16,800.00 16,464.00
2 Tukang Jam 0.74 17,900.00 13,156.50
3 Kepala Tukang Jam 0.07 18,650.00 1,370.78
4 Mandor Jam 0.05 19,400.00 950.60
B BAHAN
1 Semen Kg 3.9360 1,320.00 5,195.52
2 Pasir Pasang m3 0.0260 264,600.00 6,879.60
C PERALATAN
1 Alat Bantu Ls 1.0000 250.00 250.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1750 16,800.00 2,940.00
2 Tukang Jam 0.1750 17,900.00 3,132.50
3 Kep. Tukang Jam 0.0875 18,650.00 1,631.88
4 Mandor Jam 0.0875 19,400.00 1,697.50
B BAHAN
C PERALATAN
1 Alat Bantu Ls 1.0000 600.00 600.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.4800 16,800.00 8,064.00
2 Tukang Jam 0.0480 17,900.00 859.20
3 Kepala Tukang Jam 0.0240 18,650.00 447.60
4 Mandor Jam 0.4800 19,400.00 9,312.00
B BAHAN
1 Besi Profil kg 1.0500 15,400.00 16,170.00
C PERALATAN
1 Alat bantu Ls 1.0000 1,000.00 1,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.8640 16,800.00 14,515.20
2 Tukang Jam 1.4400 17,900.00 25,776.00
3 Kepala Tukang Jam 0.1440 18,650.00 2,685.60
4 Mandor Jam 0.0432 19,400.00 838.08
B BAHAN
1 Pipa Galvanis 3" m' 1.2000 219,800.00 263,760.00
C PERALATAN
1 Perlengkapan Ls 1.0000 50,000.00 50,000.00
Penawar,
BACK -
-
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.4000 16,800.00 6,720.00
2 Tukang Jam 0.1600 17,900.00 2,864.00
3 Kepala Tukang Jam 0.0240 18,650.00 447.60
4 Mandor Jam 0.0080 19,400.00 155.20
B BAHAN
C PERALATAN
1 Perlengkapan Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.0000 16,800.00 33,600.00
2 Tukang Jam 0.8000 17,900.00 14,320.00
3 Kepala Tukang Jam 0.1200 18,650.00 2,238.00
4 Mandor Jam 0.0400 19,400.00 776.00
B BAHAN
1 Mur / Baut (untuk jembatan) Bh 1.0000 - -
C PERALATAN
1 Perlengkapan Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 2.0000 16,800.00 33,600.00
2 Tukang Jam 0.8000 17,900.00 14,320.00
3 Kepala Tukang Jam 0.1200 18,650.00 2,238.00
4 Mandor Jam 0.0400 19,400.00 776.00
B BAHAN
1 Angkur Bh 1.0000 94,300.00 94,300.00
2 Kawat Beton Kg 0.0200 15,100.00 302.00
C PERALATAN
1 Perlengkapan Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
A. TENAGA
1 Pekerja Jam 14.0000 16,800.00 235,200.00
2 Tukang Jam 7.0000 17,900.00 125,300.00
3 Mandor Jam 3.5000 19,400.00 67,900.00
B. BAHAN
1 Expansion Joint tipe Asphaltic Plug kg 20.0000 41,900.00 838,000.00
2 Besi Siku 40X40X5 kg 6.0000 0.00 0.00
C. PERALATAN
1 Concrete Cutter Jam 0.8500 15,800.00 13,430.00
2 Mesin Las Listrik Jam 0.2500 55,300.00 13,825.00
3 Alat Bantu Ls 1.0000 800.00 800.00
HARGA JUMLAH
PERKIRAAN
NO. SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.5600 16,800.00 9,408.00
2 Tukang Jam 0.8400 17,900.00 15,036.00
3 Kepala Tukang Jam 0.0320 18,650.00 596.80
4 Mandor Jam 0.0200 19,400.00 388.00
B BAHAN
1 Cat Dasar Kayu/Besi Nippon Paint - Bodelac Metal Primer kg 0.2000 99,500.00 19,900.00
2 Dempul DUCO (SANPOLAC) kg 0.1500 49,700.00 7,455.00
3 Cat Kayu/Besi ICI/Catylac Gloss - Warna Khusus liter 0.1700 54,300.00 9,231.00
Cat dasar
4 Cat Kayu/Besi ICI/Catylac Gloss - Warna Khusus liter 0.3500 54,300.00 19,005.00
Cat penutup 3 kali
C PERALATAN
1 Perlengkapan Ls 1.0000 1,000.00 1,000.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.1600 16,800.00 2,688.00
2 Tukang Jam 0.5040 17,900.00 9,021.60
3 Kepala Tukang Jam 0.0480 18,650.00 895.20
4 Mandor Jam 0.0240 19,400.00 465.60
B BAHAN
1 Plamur Tembok Nippon Paint - Matex Putty (Water Type) ( kg 0.1000 29,900.00 2,990.00
2 Cat dasar Mowilex liter 0.1000 26,000.00 2,600.00
Cat dasar
3 Cat Tembok (Ext. & Int.) Nippon Paint - Matex (1 kg) liter 0.2600 86,500.00 22,490.00
Cat penutup 2 kali
C PERALATAN
1 Alat Bantu Ls 1.0000 - -
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 5.4217 16,800.00 91,084.34
2 Tukang Jam 2.7108 17,900.00 48,524.10
3 Mandor Jam 0.9036 19,400.00 17,530.12
B BAHAN
1 Beton K-250 Ready Mix m3 0.1963 794,000.00 155,901.54
2 Baja Tulangan kg 39.2699 7,261.79 285,169.99
C PERALATAN
1 Bore Pile jam 0.9036 359,200.00 324,578.31
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.3655 16,800.00 22,940.40
2 Tukang Jam 1.3655 17,900.00 24,442.45
3 Mandor Jam 0.7560 19,400.00 14,666.40
B BAHAN
1 bh 1.0000 1,250,000.00 1,250,000.00
PC concrete pilar railling motif precast fabric uk. 910x500x300
C PERALATAN
1 Alat Bantu Ls 1.0000 10,000.00 10,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.3655 16,800.00 22,940.40
2 Tukang Jam 1.3655 17,900.00 24,442.45
3 Mandor Jam 0.7560 19,400.00 14,666.40
B BAHAN
1 bh 1.0000 1,500,000.00 1,500,000.00
PC concrete railling motif precast fabric uk. 1500x740x220
C PERALATAN
1 Alat Bantu Ls 1.0000 10,000.00 10,000.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) b
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 7.6 M H = 0.57 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) c
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 8.6 M H = 0.57 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) d
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 9.6 M H = 0.57 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) e
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 10.6 M H = 0.57 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) g
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 12.6 M H = 0.66 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) h
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 13.6 M H = 0.66 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2.(2) i
JENIS PEKERJAAN : UNIT VOIDED SLAB L = 14.6 M H = 0.66 M
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2677 16,800.00 4,497.36
2 Mandor Jam 0.1339 19,400.00 2,597.66
B BAHAN
C PERALATAN
1 Excavator (E10) Jam 0.1339 387,100.00 56,626.31
2 Dump Truck (E08) Jam 0.2719 139,100.00 34,789.61
3 Alat Bantu Ls 1.0000 125.00 125.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1044 16,800.00 18,553.92
2 Tukang Jam 1.2149 17,900.00 21,746.71
3 Mandor Jam 0.1104 19,400.00 2,141.76
B BAHAN
1 Beton K-500 Ready Mix M3 1.0500 1,073,900.00 1,127,595.00
2 Acuan / Kayu Bekesting M3 0.2000 3,300,000.00 660,000.00
3 Paku / Angker Kg 1.6000 11,600.00 18,560.00
C PERALATAN
1 Concrete Vibrator Jam 0.1104 34,400.00 3,797.76
2 Alat Bantu Ls 1.0000 900.00 900.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.0400 16,800.00 672.00
2 Tukang Jam 0.0200 17,900.00 358.00
3 Mandor Jam 0.0100 19,400.00 194.00
B BAHAN
1 Gebalan Rumput manila - tandur M2 1.1000 41,400.00 45,540.00
C PERALATAN
1 Alat Bantu Ls 1.0000 1,150.00 1,150.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2800 16,800.00 4,704.00
2 Tukang Jam 0.1400 17,900.00 2,506.00
3 Mandor Jam 0.0700 19,400.00 1,358.00
B BAHAN
1 Pohon Trembesi, diameter 4 cm Pot 1.0000 341,600.00 341,600.00
C PERALATAN
1 Alat Bantu Ls 1.0000 250.00 250.00
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2800 16,800.00 4,704.00
2 Tukang Jam 0.1400 17,900.00 2,506.00
3 Mandor Jam 0.0700 19,400.00 1,358.00
B BAHAN
1 Pohon Bintaro diameter 5 cm Pot 1.0000 513,000.00 513,000.00
C PERALATAN
1 Alat Bantu Ls 1.0000 250.00 250.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN :
NO. MATA PEMBAYARAN : 8.3 (3)c
JENIS PEKERJAAN : POHON BOUGENVILLE HAWAII ; T = 60,00 CM
SATUAN PENGUKURAN : BH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.2800 16,800.00 4,704.00
2 Tukang Jam 0.1400 17,900.00 2,506.00
3 Mandor Jam 0.0700 19,400.00 1,358.00
B BAHAN
1 Bougenville Hawaii ; t = 60 cm Pot 1.0000 174,700.00 174,700.00
2 Tanah untuk media Tanam M3 0.0233 111,400.00 2,595.62
C PERALATAN
1 Alat Bantu Ls 1.0000 250.00 250.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1584 16,800.00 19,461.12
2 Tukang Jam 0.2896 17,900.00 5,183.84
3 Mandor Jam 0.1448 19,400.00 2,809.12
B BAHAN
1 Tiang Lampu type tunggal bh 1.0000 - -
2 Lampu Merkuri 250 watt bh 1.0000 - -
C PERALATAN
1 Flat Bed Truck Jam 0.1448 237,700.00 34,418.96
2 Alat Bantu Ls 1.0000 3,500.00 3,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1584 16,800.00 19,461.12
2 Tukang Jam 0.2896 17,900.00 5,183.84
3 Mandor Jam 0.1448 19,400.00 2,809.12
B BAHAN
1 Tiang Lampu type ganda bh 1.0000 - -
2 Lampu Merkuri 250 watt bh 1.0000 - -
C PERALATAN
1 Flat Bed Truck Jam 0.1448 237,700.00 34,418.96
2 Alat Bantu Ls 1.0000 3,500.00 3,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1584 16,800.00 19,461.12
2 Tukang Jam 0.2896 17,900.00 5,183.84
3 Mandor Jam 0.1448 19,400.00 2,809.12
B BAHAN
1 Tiang Lampu type tunggal bh 1.0000 - -
2 Lampu Merkuri 400 watt bh 1.0000 - -
C PERALATAN
1 Flat Bed Truck Jam 0.1448 237,700.00 34,418.96
2 Alat Bantu Ls 1.0000 3,500.00 3,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 1.1584 16,800.00 19,461.12
2 Tukang Jam 0.2896 17,900.00 5,183.84
3 Mandor Jam 0.1448 19,400.00 2,809.12
B BAHAN
1 Tiang Lampu type Tunggal bh 1.0000 3,540,000.00 3,540,000.00
2 Lampu Merkuri 400 watt bh 1.0000 248,900.00 248,900.00
C PERALATAN
1 Flat Bed Truck Jam 0.1448 237,700.00 34,418.96
2 Alat Bantu Ls 1.0000 3,500.00 3,500.00
BACK
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3500 16,800.00 5,880.00
2 Tukang Jam 0.1167 17,900.00 2,088.93
3 Mandor Jam 0.1167 19,400.00 2,263.98
B BAHAN
1 Beton Pracetak uk. 50 x 136 cm
; t = 15 cm, K-300 Bh 1.0000 #REF! #REF!
C PERALATAN
I ASUMSI
II URUTAN KERJA
1 BAHAN
2 ALAT
2.a TAMPER
Lanjutan
V x Fa x 60
Kapasitas produksi / M3 : Q2 7.5455 M3 / Jam
Ts1
diperlukan :
- Sekop = 3 buah
- Alat bantu lainnya
3 TENAGA
Volume Pekerjaan = - M1
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja Jam 0.3500 16,800.00 5,880.00
2 Tukang Jam 0.1167 17,900.00 2,088.93
3 Mandor Jam 0.1167 19,400.00 2,263.98
B BAHAN
1 Beton Pracetak uk. 50 x 136 cm
; t = 10 cm, K-300 Bh 1.0000 #REF! #REF!
C PERALATAN
I ASUMSI
II URUTAN KERJA
1 BAHAN
2 ALAT
2.a TAMPER
Lanjutan
V x Fa x 60
Kapasitas produksi / M3 : Q2 7.5455 M3 / Jam
Ts1
diperlukan :
- Sekop = 3 buah
- Alat bantu lainnya
3 TENAGA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A TENAGA
1 Pekerja (L01) Jam 8.7500 16,800.00 147,000.00
2 Tukang (L02) Jam 1.7500 17,900.00 31,325.00
3 Mandor (L03) Jam 0.8750 19,400.00 16,975.00
B BAHAN
1 Semen (M12) Kg 403.2000 #REF! #REF!
2 Pasir Pasang (M01) M3 1.2072 #REF! #REF!
C PERALATAN
1 Alat Bantu Ls 1.0000 2,100.00 2,100.00
Penawar,
……………………………………………
BACK
-
-
URAIAN TEKNIK ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
I ASUMSI
II URUTAN KERJA
1 Semen, pasir dan air dicampur dan diaduk menjadi mortar dengan
menggunakan alat bantu
2 Batu dibersihkan dan dibasahi seluruh permukaannya sebelum
dipasang
3 Penyelesaian dan perapihan setelah pemasangan
1 BAHAN
2 ALAT
diperlukan :
- Sekop = 2 buah
- Pacul = 2 buah
- Sendok Semen = 2 buah
- Ember Cor = 4 buah
- Gerobak Dorong = 1 buah
3 TENAGA
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 jam 1.0040 - -
2. Alat Bantu LS 1.0000 500.00 500.00
BACK
URAIAN TEKNIS ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2 (1) b
JENIS PEKERJAAN : UNIT VOIDED SLAAB BENTANG 15 METER, TINGGI 52 CM
SATUAN PENGUKURAN : BUAH
I. ASUMSI
1 Voided Slaab dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00 jam
3 Tinggi PC Voided Slaab H 0.52 M
4 Bentang PC Voided Slaab L 15.00 M
5 Menggunakan beton K500
6 Komponen baja tulangan 250 kg/m3
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00 Buah sepasang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu memuat dan membongkar T1 35.00 menit
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00 menit
Ts2 50.00 menit
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 5.00 Buah
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 5.00 orang
- Pekerja P 18.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.40 jam
- Tukang = (Tk x Tb) : Qt (L02) 7.00 jam
- Pekerja = (Tk x P) : Qt (L01) 25.20 jam
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2 (1) b
JENIS PEKERJAAN : UNIT VOIDED SLAAB BENTANG 20 METER, TINGGI 52 CM
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 jam 1.1044 - -
2. Alat Bantu LS 1.0000 500.00 500.00
BACK
URAIAN TEKNIS ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2 (1) b
JENIS PEKERJAAN : UNIT VOIDED SLAAB BENTANG 20 METER, TINGGI 52 CM
SATUAN PENGUKURAN : BUAH
I. ASUMSI
1 Voided Slaab dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00 jam
3 Tinggi PC Voided Slaab H 0.52 M
4 Bentang PC Voided Slaab L 15.00 M
5 Menggunakan beton K500
6 Komponen baja tulangan 250 kg/m3
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00 Buah sepasang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu memuat dan membongkar T1 40.00 menit
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00 menit
Ts2 55.00 menit
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 4.00 Buah
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 5.00 orang
- Pekerja P 18.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.75 jam
- Tukang = (Tk x Tb) : Qt (L02) 8.75 jam
- Pekerja = (Tk x P) : Qt (L01) 31.50 jam
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2 (1) b
JENIS PEKERJAAN : UNIT VOIDED SLAAB BENTANG 25 METER, TINGGI 52 CM
SATUAN PENGUKURAN : BUAH
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN SATUAN SATUAN HARGA
KUANTITAS
( Rp. ) ( Rp. )
A. TENAGA
B. BAHAN
C. PERALATAN
1. Crane 1 jam 1.2048 - -
2. Alat Bantu LS 1.0000 500.00 500.00
BACK
URAIAN TEKNIS ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
NAMA PAKET KEGIATAN : -
NO. MATA PEMBAYARAN : 7.2 (1) b
JENIS PEKERJAAN : UNIT VOIDED SLAAB BENTANG 25 METER, TINGGI 52 CM
SATUAN PENGUKURAN : BUAH
I. ASUMSI
1 Voided Slaab dicetak di lokasi Pekerjaan
2 Jam kerja efektif per-hari Tk 7.00 jam
3 Tinggi PC Voided Slaab H 0.52 M
4 Bentang PC Voided Slaab L 15.00 M
5 Menggunakan beton K500
6 Komponen baja tulangan 250 kg/m3
7 Faktor kehilangan bahan 1.10
2. ALAT
2.a CRANE 1 (E31)
Kapasitas V2 1.00 Buah sepasang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu memuat dan membongkar T1 45.00 menit
- dan lain-lain ( termasuk mengatur dan menggeser) T2 15.00 menit
Ts2 60.00 menit
3. TENAGA
Produksi per hari (tergantung pada pekerjaan pembesian) Qt 3.00 Buah
Kebutuhan tenaga (di lokasi pekerjaan) :
- Mandor M 1.00 orang
- Tukang Tb 5.00 orang
- Pekerja P 18.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 2.33 jam
- Tukang = (Tk x Tb) : Qt (L02) 11.67 jam
- Pekerja = (Tk x P) : Qt (L01) 42.00 jam