Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

DIE CASTING DIE CALCULATION

CHECKLIST

1. Tonnage.
2. Gate location.
3. Number of gate (should be minimum).
4. Overflow position and quantity.
5. Gate velocity (gate area).
6. Ratio of gate area to sub runner area = 1:2 ~ 2:5.
7. Ratio of gate area to main runner area = 1:3.
8. Main runner area=sub runner area+10%.
9. Runner depth = 5~8 times of the gate depth.
10. Overflow weight =10 to 15 % of component wt.
11. Runner weight =20 to 30 % of component wt.
12. Plunger dia.
13. Ideal Fill ratio =25 ~35%.
14. Plunger velocity= maximum 1.5 to 2.0 m/s.
15. Overflow position and quantity.

You might also like