To - Do List For 6th May 2019 To 11th May 2019

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 14

Accountability UJ

Pending Customers
JAS TR
Date

Hold
1. TANTRANSCO
6th May 2019 Panther equivalent
(Monday) HTLS conductor
In process

New Task
7th May 2019 3. Tanzania - Project
(Tuesday) (Clarification)
Completed

8th May 2019


(Wednesday)

5. ACSR Panther &


9th May 2019 Zebra technical
(Thusday) comparison (Case
Study)

10th May 2019 7. JSK Projects -


(Friday) (Type test status)

11th May 2019


(Saturday)
JAS Pending = 6
1 Sikkim Project
2 Technical Data comparison Required for 220kV D/C line
3 Egypt ACSS
4 Deliverable report April.
5 Test Report for ACFR Moose and Yamuna
6 Tanzania - Project (Clarification)
7 TANTRANSCO Panther equivalent HTLS conductor
8 JSK Projects - Type test status
9
10
T
UJ

HELI SW Remarks JAS

2. Tender Updates 2. 6th May'19


for May

4.Enquiry for GTP 4. 7th May'19


(STACIR)

6. NEA China
conductor (ACCC & 6. 8th May'19
ACFR details)
TR Pending = 7 Heli
CFCC data sheet stress at 1% values. APTRANSCO Project
Corona power loss reduction. ACSR Blujay eq. HTLS conductors
ACFR Book Tender Updates for May
ACSR Panther & Zebra technical comparison (Case study) Enquiry for GTP (STACIR)
ACFR Manufacturing precautions
ACFR preference sizes
Data sheet for vibration study
To- Do- List (Project & Ex
KP

TR HELI SW Remarks
Pending = 1 SW Pending =
O Project PITCUL System Analysis
y eq. HTLS conductors Electrical Parameters
dates for May NEA China conductor comments
GTP (STACIR) NEA WolF conductor comparison
Software for conductor design (Convensional conductors)
NEA China conductor (ACCC & ACFR details)
oject & Execution)
SB

JAS TR HELI SW

1. Corona power
loss reduction.
(Final Verification) 3. Electrical
parameters. (500
2. ACFR KV)
Manufacturing
precautions

4. NEA Wolf
conductor
4

conductors)
TG

Remarks JAS TR HELI

4. 8 _May_19
Total no: of task = 26
Hold = 1
Delivered task = 7
Pending task = 18
TG

SW Remarks
ENQUIRY No.of
TARGET REVISED TARGET
Sl No STATUS RECIEVED Days DURATION
DATE DATE
DATE Delayed

Not Yet
1 8/4/2019 8/10/2019 6 8/15/2019 12
Started

2
3
4
5
6
7
REVISED TARGET SW
TASK
DATE/ ACTUAL FTR Customer DESCRIPTION Account
TYPE
FINISH DATE Manager

8/16/2019 100% RFQ UJ


DELIVERABLE % DONE REMARKS /Status

0% 25%

0% 0%