March -2019 Report

Client Name Hind Aluminium

Cycle 01-03-2019 to 31-03-2019

Day wise Report of SLEEPWALKERS

Sl no Receive Date Project Name Submitted Report

Finalized a design, and shared the technical document o


1 26.02.2019 BSPTCL
conductor.

2 19.02.2019 PGCIL Reviewed and shared the finalized design of conductor.

Shared the comparison of HTLS Conductor with


3 05.03.2019
Conventional Conductors Wolf, Bear, and Bison.

Analysied and shared the design of the conductor for


4 06.03.2019 MSETCL
costing purpose.

5 MSETCL Shared the RMS for the core of the conductor.

Comparison of Low-Sag Conductor with Other equivale


6 04.03.2019
HTLS & Conventional (Zebra & Panther) Conductors
Clarification on HTLS comparisons - ACSR Wolf, Bear &
7 01.03.2019
Bison conductors.

10

11

12

13

14

15

16

17

18

19
20

21

22

23

24

25

26
eport

Ref No Heliconia/MAR/DEL/01/18-19

EPWALKERS

d Report Addressed Date Remarks

the technical document of


02.03.2019

lized design of conductor. 04.03.2019

LS Conductor with
06.03.2019
lf, Bear, and Bison.

gn of the conductor for


06.03.2019

of the conductor. 06.03.2019

uctor with Other equivalent


Not addressed
& Panther) Conductors
isons - ACSR Wolf, Bear &