Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

March -2019 Report

Client Name JSK Industries Pvt. Ltd.

Cycle 01-03-2019 to 31-03-2019

Day wise Report of SLEEPWALKERS

Sl no Receive Date Project Name Submitted Report

1 04.03.2019 ACSS

PGCIL Fatehgarh
2 23.02.2019 Reviewed and shared the design for costing purpose.
& Bhadla
PGCIL Fatehgarh
3 Submitted final technical documents for GZTACSR.
& Bhadla
PGCIL Fatehgarh
4 Shared the Power Loss calculation for the conductors.
& Bhadla
HTLS Conductor
5 25.02.2019
requirement
PGCIL Fatehgarh
6 18.03.2019 Shared the design for costing purpose.
& Bhadla
PGCIL Fatehgarh
7 Submitted final technical documents for ACSS.
& Bhadla
PGCIL Fatehgarh
8 19.03.2019 Submitted the modified final technical documents for ACSS.
& Bhadla
PGCIL Fatehgarh
9 30.03.2019 Submitted the revised final technical documents for ACSS.
& Bhadla
HTLS-Conductor
10 02.03.2019 Reviewed and shared the final design for costing purpose.
Type confirmation
HTLS-Conductor
11 Shared the Technical Documents for the conductors.
Type confirmation
HTLS-Conductor
12 Submitted final conductor technical documents.
Type confirmation
TSTRANSCO
13 Shared the Sag-Tension Chart for 400m Span.
400KV
TSTRANSCO
14 Shared the Sag-Tension Chart for 250m Span.
400KV
TSTRANSCO
15 Shared the Sag-Tension Chart for 250m Span.
400KV
TSTRANSCO
16 16.03.2019 Reviewed and shared the final design for costing purpose.
400KV
TSTRANSCO
17 Shared the Technical comparison for the conductors.
400KV
ReNew Power
18 07.03.2019
Limited

19 06.03.2019 MSETCL Shared the Technical Documents for the conductors.


20 MSETCL Shared the Technical comparison for the conductors.

APTRANSCO
21 11.03.2019 Shared the Technical Queries for the conductors.
132KV

Egypt- ACSS
22 15.03.2019
220KV
March -2019 Report

d.
Ref No JAS/MAR/DEL/05/18-19
019

wise Report of SLEEPWALKERS

bmitted Report Addressed Date Remarks

gn for costing purpose. 14.03.2019

uments for GZTACSR. 15.03.2019

ation for the conductors. 16.03.2019

purpose. 19.03.2019

uments for ACSS. 19.03.2019

echnical documents for ACSS. 19.03.2019

chnical documents for ACSS. 30.03.2019

l design for costing purpose. 06.03.2019

ents for the conductors. 14.03.2019

hnical documents. 29.03.2019

for 400m Span. 04.03.2019

for 250m Span. 14.03.2019

for 250m Span. 20.03.2019

l design for costing purpose. 18.03.2019

son for the conductors. 19.03.2019

ents for the conductors. 09.03.2019


son for the conductors. 11.03.2019

for the conductors. 28.03.2019