Deliverables March 2019
Deliverables March 2019
1 04.03.2019 ACSS
PGCIL Fatehgarh
2 23.02.2019 Reviewed and shared the design for costing purpose.
& Bhadla
PGCIL Fatehgarh
3 Submitted final technical documents for GZTACSR.
& Bhadla
PGCIL Fatehgarh
4 Shared the Power Loss calculation for the conductors.
& Bhadla
HTLS Conductor
5 25.02.2019
requirement
PGCIL Fatehgarh
6 18.03.2019 Shared the design for costing purpose.
& Bhadla
PGCIL Fatehgarh
7 Submitted final technical documents for ACSS.
& Bhadla
PGCIL Fatehgarh
8 19.03.2019 Submitted the modified final technical documents for ACSS.
& Bhadla
PGCIL Fatehgarh
9 30.03.2019 Submitted the revised final technical documents for ACSS.
& Bhadla
HTLS-Conductor
10 02.03.2019 Reviewed and shared the final design for costing purpose.
Type confirmation
HTLS-Conductor
11 Shared the Technical Documents for the conductors.
Type confirmation
HTLS-Conductor
12 Submitted final conductor technical documents.
Type confirmation
TSTRANSCO
13 Shared the Sag-Tension Chart for 400m Span.
400KV
TSTRANSCO
14 Shared the Sag-Tension Chart for 250m Span.
400KV
TSTRANSCO
15 Shared the Sag-Tension Chart for 250m Span.
400KV
TSTRANSCO
16 16.03.2019 Reviewed and shared the final design for costing purpose.
400KV
TSTRANSCO
17 Shared the Technical comparison for the conductors.
400KV
ReNew Power
18 07.03.2019
Limited
APTRANSCO
21 11.03.2019 Shared the Technical Queries for the conductors.
132KV
Egypt- ACSS
22 15.03.2019
220KV
March -2019 Report
d.
Ref No JAS/MAR/DEL/05/18-19
019
purpose. 19.03.2019