Economic Load Dispatch Report
-----------------------------------------------------------------------------------
-----------
Project Name: ELD

Algorithm : Genetic Algorithm


Power Demand = 500.000000 MW
No of generation = 3
Type of plant : Thermal

Cost Characteristics
F =
0.00800000 5.30000000 500.00000000
0.01200000 5.50000000 400.00000000
0.01800000 5.80000000 200.00000000

Generation Lower Limit:


Pmin(1)= 200.00000000 MW
Pmin(2)= 150.00000000 MW
Pmin(3)= 100.00000000 MW

Generation Upper Limit:


Pmax(1)= 450.00000000 MW
Pmax(2)= 350.00000000 MW
Pmax(3)= 225.00000000 MW

B-Coffifient Matrix
B =
0.00000000 0.00000000 0.00000000
0.00000000 0.00000000 0.00000000
0.00000000 0.00000000 0.00000000

Generation Schedule:
P(1)= 200.00000000
P(2)= 160.00987745
P(3)= 163.84826853

Cost and Transmission Lost Details:

Total Cost, F = 28958.99 Rs/hr

Transmission Loss, PL = 0.00 MW

Time taken to execute program, t = 1.37500000 Seconds


-----------------------------------------------------------------------------------
-----------