STAAD.

Pro Report
To: From:

Copy to: Date: Ref:


05/03/2019 ca/ Document1
21:11:00

Job Information

Engineer Checked Approved


Name:
Date: 05-Mar-19

Project ID
Project Name

Structure Type SPACE FRAME

Number of Nodes 3 Highest Node 3


Number of Elements 2 Highest Beam 2

Number of Basic Load Cases -2


Number of Combination Load Cases 1

Included in this printout are data for:


All The Whole Structure

Included in this printout are results for load cases:


Type L/C Name
Primary 1 BEBAN HIDUP
Primary 2 BEBAN MATI
Combination 3 COMBINATION LOAD CASE 3

Nodes
X Y Z
Node
(m) (m) (m)
1 0.000 0.000 0.000
2 5.000 0.000 0.000
3 13.170 0.000 0.000

Beams
Length 
Beam Node A Node B Property
(m) (degrees)
1 1 2 5.000 1 0
2 2 3 8.170 2 0

09/05/2019
Supports
X Y Z rX rY rZ
Node
(kip/in) (kip/in) (kip/in) (kip-ft/deg) (kip-ft/deg) (kip-ft/deg)
1 Fixed Fixed Fixed - - -
2 Fixed Fixed Fixed - - -
3 Fixed Fixed Fixed Fixed Fixed Fixed

1 BEBAN HIDUP : Beam Loads


Da Ecc.
Beam Type Direction Fa Fb Db
(m) (m)
1 CON kg GY -5.17E 3 1.100 - - 5.000
2 TRAP lbf/ft GY -1.82E 3 3.700 -4.11E 3 5.800 -

Node Displacements
X Y Z Resultant rX rY rZ
Node L/C
(in) (in) (in) (in) (rad) (rad) (rad)
1 1:BEBAN HIDUP 0.000 0.000 0.000 0.000 0.167 0.000 -0.0
2:BEBAN MATI 0.000 0.000 0.000 0.000 0.000 0.000 0.0
3:COMBINATION 0.000 0.000 0.000 0.000 0.267 0.000 -0.0
2 LOAD CASE
1:BEBAN 3
HIDUP 0.000 0.000 0.000 0.000 0.060 0.000 -0.0
2:BEBAN MATI 0.000 0.000 0.000 0.000 0.000 0.000 0.0
3:COMBINATION 0.000 0.000 0.000 0.000 0.096 0.000 -0.0
3 LOAD CASE
1:BEBAN 3
HIDUP 0.000 0.000 0.000 0.000 0.000 0.000 0.0
2:BEBAN MATI 0.000 0.000 0.000 0.000 0.000 0.000 0.0
3:COMBINATION 0.000 0.000 0.000 0.000 0.000 0.000 0.0
LOAD CASE 3

Beam End Forces Envelope


Sign convention is as the action of the joint on the beam.
Fx Fy Fz Mx My Mz
Beam Node Envelope
(kg) (kg) (kg) (kip-in) (kip-in) (kip-in)
1 1 +ve 0.000 3.21E 3 0.000 0.000 0.000 0.000
- 1:BEBAN - - - -
0.000 HIDUP 0.000 0.000 0.000 0.000 0.000
- - - - - -
2 -ve 0.000 0.000 0.000 2.24E 3 0.000 359.042
- - - 1:BEBAN - 1:BEBAN
0.000 -1.96E 3 0.000 HIDUP 0.000 0.000 HIDUP 0.000
- 1:BEBAN - - - -
2 2 +ve 0.000 HIDUP2.75E 3 0.000 2.24E 3 0.000 359.042
- 1:BEBAN - 1:BEBAN - 1:BEBAN
0.000 HIDUP 0.000 0.000 HIDUP 0.000 0.000 HIDUP 0.000
- - - - - -
3 -ve 0.000 0.000 0.000 2.24E 3 0.000 1.05E 3
- - - 1:BEBAN - 1:BEBAN
0.000 -6.51E 3 0.000 HIDUP 0.000 0.000 HIDUP 0.000
- 1:BEBAN - - - -
HIDUP

09/05/2019
Whole Structure Displacements 0.0393701in:1m 1 BEBAN HIDUP

Beam Maximum Moments


Distances to maxima are given from beam end A.
Length d Max My d Max Mz
Beam Node A L/C
(m) (m) (kip-in) (m) (kip-in)
1 1 5.000 1:BEBAN HIDUP Max +ve 0.000 0.000 5.000 359.042
Max -ve 0.000 0.000 1.250 -280.447
2:BEBAN MATI Max +ve 0.000 0.000 0.000 0.000
Max -ve 0.000 0.000 0.000 0.000
3:COMBINATION Max +ve 0.000 0.000 5.000 574.468
LOAD CASE 3 Max -ve 0.000 0.000 1.250 -448.715
2 2 8.170 1:BEBAN HIDUP Max +ve 0.000 0.000 8.170 1.05E 3
Max -ve 0.000 0.000 4.766 -616.334
2:BEBAN MATI Max +ve 0.000 0.000 0.000 0.000
Max -ve 0.000 0.000 0.000 0.000
3:COMBINATION Max +ve 0.000 0.000 8.170 1.68E 3
LOAD CASE 3 Max -ve 0.000 0.000 4.766 -986.135

Whole Structure Mz 590.551kip-in:1m 1 BEBAN HIDUP

Beam Maximum Shear Forces


Distances to maxima are given from beam end A.
Length d Max Fz d Max Fy
Beam Node A L/C
(m) (m) (kg) (m) (kg)
1 1 5.000 1:BEBAN HIDUP Max +ve 0.000 0.000 0.000 3.21E 3
Max -ve 0.000 0.000 5.000 -1.96E 3
2:BEBAN MATI Max +ve 0.000 0.000 0.000 0.000
Max -ve 0.000 0.000 0.000 0.000
3:COMBINATION Max +ve 0.000 0.000 0.000 5.13E 3
LOAD CASE 3 Max -ve 0.000 0.000 5.000 -3.14E 3
2 2 8.170 1:BEBAN HIDUP Max +ve 0.000 0.000 0.000 2.75E 3
Max -ve 0.000 0.000 8.170 -6.51E 3
2:BEBAN MATI Max +ve 0.000 0.000 0.000 0.000
Max -ve 0.000 0.000 0.000 0.000

09/05/2019
3:COMBINATION Max +ve 0.000 0.000 0.000 4.4E 3
LOAD CASE 3 Max -ve 0.000 0.000 8.170 -10.4E 3

Whole Structure Fy 7143.19kg:1m 1 BEBAN HIDUP