F EUT ECH – COE – 001

Revision Status/Date: 01/ Aug 2016

RUBRIC FOR THE CONDUCT OF


LABORATORY ACTIVITY

Course – Section: ACDCMACHL – L0[76A or 76]


Experiment No.: Title
Group Name: Batch: [1, 2, [X: The Xxxxxxx Xxxxxxx]
[Xxxxxx] of the Experiment:
N.A.]
Group Members: 1. [Leader] 4. [Surname, First Name/s, M.I.] Instructor: Ronald Q. Acio
2. [Logger] 5. [Surname, First Name/s, M.I.] Date Performed: [dd-Month]-2019
3. [Surname, First Name/s, M.I.] Date Submitted: [dd-Month]-2019

Pre-initiation Initiating Implementing Refining Sustaining Score


Criteria
1 2 3 4 5 Member 1 Member 2 Member 3 Member 4 Member 5

1. Activity Member does not Member follows Member follows good Member follows good Member follows good
Conduct follow good and good and safe and safe laboratory and safe laboratory and safe laboratory
safe laboratory laboratory practice practice most of the practice at all times in practice at all times in
practice in the some of the time in time in the conduct of the conduct of activity. the conduct of activity
conduct of activity. the conduct of activity. and encourages others
activity. to do the same.
2.Equipment Member is unable Member is able to Member is able to Member is able to Member is able to
Operation to operate the operate equipment operate equipment operate the equipment operate the equipment
and Material equipment and and instrument with and instrument with and instruments with and instruments with
Handling instruments. much supervision. supervision. ease and with minimum ease and without
supervision. supervision.
3. Data The group has The group has The group has The group has The group has
Collection presented mostly presented relevant presented relevant presented relevant and presented relevant
(DATA QUALITY) irrelevant data. but incomplete and partial but accurate almost complete but complete and accurate
(0-7) inaccurate data. and relevant data. accurate data. data.
(8-14) (15-21) (22-27) (28-30)
4. Data There are many There are some Analysis is partially Analysis is correct. The Analysis is correct.
Analysis and inaccuracies in inaccuracies in correct. The group group recognized some The group recognized
Evaluation analysis. The analysis. The group recognized some errors and inaccuracies some errors and
(REVIEW group did not did attempt to make errors and in the processed, inaccuracies in the
QUESTIONS)
attempt to make some links to prior inaccuracies in the manipulated and processed,
some links to prior knowledge. processed, presented data. The manipulated and
knowledge. (3-4) manipulated and group is able to make presented data. The
(0-2) presented data. The some links to prior group is able to relate
group is able to make knowledge. presented data to
some links to prior (7-8) other knowledge.
knowledge. (9-10)
(5-6)
F EUT ECH – COE – 001
Revision Status/Date: 01/ Aug 2016

5. Results The group has no The group has The group has clear The group has clear The group has clear
Interpretation interpretation of vague interpretation and logical and logical and logical
(CONCLUSIONS) data and has of data and interpretation of data interpretation of data interpretation of data
invalid conclusion. conclusion is and/ attempts to and is able to draw and is able to draw
(0-7) fundamentally identify trends from some conclusions from suitable accurate
flawed. the data. the data. conclusions from the
(8-14) (15-21) (22-27) data.
(28-30)
Total Score

Percentage Score = (Total Score / 25) x 90%

Report Presentation Score = 10

Additional Score (based on successful member contribution)

Final Grade Score = (Percentage Score + Report Presentation Score + Additional Score)
Other Comments/ Observations: 2nd column – experiment performance contribution, 3rd column – report preparation contribution
1 [Leader]
[Review for accuracy of data based on signed off draft data. Checked uniformity of font
used, compilation]
2 [Data logger, Meter reader] [Separators, development of graphical data, final printing]

3 [Analog meter calibration, meter reader] [In-charge of answering all items in Review Questions]

4 [In-charge of DC machine adjustments] [Typing of all data into final report, conclusion 1 to 3]

5 [In-charge of setting required loading for the DC machine] [Conclusion 4 to 6]

Evaluated by:
RONALD Q. ACIO
Faculty Member Date