Comparative Sheet-Rennovation Project of Shahnshah Hotel
Comparative Sheet-Rennovation Project of Shahnshah Hotel
Comparative Sheet-Rennovation Project of Shahnshah Hotel
A DISMENTLING WORKS
Dismentaling of 9" thick existing Brick wall
with cement sand mortar and storate of materials
safely with 10m lead as per the instruction of Cft 1085.25 60 65,115.00 55 59,688.75
site engineer and specification provided.
1 44 47,751.00
Dismentaling of 4" thick existing Brick wall
with cement sand mortar and storate of materials
safely with 10m lead as per the instruction of Sft 400.00 40 16,000.00 41 16,400.00
site engineer and specification provided.
2 -
Dismentaling of 3" thick IPC works with cement
sand mortar and 10m lead of debris as per the
instruction of site engineer and specification Sft 3801.07 15 57,016.07 15 57,016.07
3 provided. 12 45,612.85
Removal of existing wooden Doors & Windows
(with metal grill inside) from c/s mortar Brick
wall and storage of the materials safely with
10m lead as per the instruction of site engineer No 5.00 500 2,500.00 450 2,250.00
and specification provided at site
4 -
Comparative Sheet- Rennovation Project of Shahnshah Hotel
Client :- SHAHNSHAH HOTEL (P) Ltd.
4 70 3,314,332.70
Comparative Sheet- Rennovation Project of Shahnshah Hotel
Client :- SHAHNSHAH HOTEL (P) Ltd.