ENERGY CONSERVATION IN INDUSTRY. (CASE STUDY) - REVAMPING THE PUSHER-TYPE REHEATING FURNACE OF THE STEEL ROLLING MILL (17699.en) PDF
ENERGY CONSERVATION IN INDUSTRY. (CASE STUDY) - REVAMPING THE PUSHER-TYPE REHEATING FURNACE OF THE STEEL ROLLING MILL (17699.en) PDF
This publication has been made available to the public on the occasion of the 50th anniversary of the
United Nations Industrial Development Organisation.
DISCLAIMER
This document has been produced without formal United Nations editing. The designations
employed and the presentation of the material in this document do not imply the expression of any
opinion whatsoever on the part of the Secretariat of the United Nations Industrial Development
Organization (UNIDO) concerning the legal status of any country, territory, city or area or of its
authorities, or concerning the delimitation of its frontiers or boundaries, or its economic system or
degree of development. Designations such as “developed”, “industrialized” and “developing” are
intended for statistical convenience and do not necessarily express a judgment about the stage
reached by a particular country or area in the development process. Mention of firm names or
commercial products does not constitute an endorsement by UNIDO.
Any part of this publication may be quoted and referenced for educational and research purposes
without additional permission from UNIDO. However, those who make use of quoting and
referencing this publication are requested to follow the Fair Use Policy of giving due credit to
UNIDO.
CONTACT
/7-699 LIMITED
ID/WG.494/6(SPEC.}
28 August 1989
Uniled Nations Industrial Development Orpnization ORIGINAL: ENGLISH
--------------------------------------------·
Regional Workshop on E.1ergy
Conservation in Industry
Cairo, F.gypt, 1-5 October 1989
Prepared by
ll. H. Ismail**
UWIDO Consultant
• The views expressed in this paper are those of the author and do not
necessarily ~etlect the views of the Secretariat or UlfIDO. This document
has not been edited.
** Ministry of Industry, FQptian Copper Works, Alexandria, Egypt.
V.89-58894
- 1 -
.
energy consumption can be achieved.Some actions that have
alread7 been taken are:
-- Since the oil crisis,the Ministries of Petroleum 1Elect-
ricity and Indust17,as well as national scientific and
.
technical organizati~~s,have begun to pr:;vide awareness
of the benefits of energy conserration.
6 20 xIOJ
72 x IO 15 x !OJ 500
- 3 -
A) Completed projects.
In this field the company has executed the following
projects:
-.-. The I st project entitled"Oxygon Lancing and Oxygen
enrichment in steel melting furnaces"
-- The 2nd project,entitled " Revamping the Pusher-Type
reheating furnace of the steel rolling mill " is the
emphasis of
. thi~ case study.·
B) ~ROJECT PARTICIPANTS:
I~ UNDP/ UNIDO
2. Tabbin Institute for Metallurgical Studies ( TIMS )
). AF-Energikonsult ( Sweden)
4. Egyptian Copper Works ( E.c.w. )
C) OBJECT OF DEVELorr.mNTs
A continuous pusher-type reheating furnace is used in the
Egrptian Copper Works(E.C.~.) for reheating steel billets
bef oi·e rolling ( FIG. J )
-------------------------
- 6 -
·The audit included all the items of heat loss from the furnaco,
in particular,of heat loss from waste gasses,heat loss from the
lining,heat loss due to infiltration and heat loss by radiation
from the furnace openings •
.
The results of the study showed a high rate of fuel consumption
which was estimated at 67Lit./ton of heated billets.
Comparing this figure with the interna~ional records for th~
The analysis showed that the major oart of these losses is due
to; inefficient utilization of the heat in waste gases;
inadequate burning condition3;lack of automatic corrtrol of the
- 1 -
E) FURNACE REVAUPIHG 1
F) PROJECT PERFORMANCE : I
r. Basis of evaluation:
-- The approved project documents
-- The approved TIJif> energy audit and technical report for
energy performance and the pre-estiJtated savings.
- The UBDP consultants• technical report.
-- The approved furnace performance eTaluation after
revamping.
J. Payback period
From oil saving point of evaluations·
- According to local oil prices, the payback period of the
project will be about IO yeers.
0