KERALA STATE ELECTRICITY BOARD LTD.

(Incorporated under the Indian Companies Act,1956)

RMU WORKS OF KUTTIYADI (3x25 MW)


HYDRO ELECTRIC PROJECT

e-TENDER No.: CEPED/04/2017-18

VOLUME – 4

SCHEDULE OF PRICES
AND
TECHNICAL PARTICULARS

Office of the Chief Engineer


(Projects – Electrical Designs), #201,
Vydyuthi Bhavanam, Pattom P.O.
Thiruvananthapuram,
Pin – 695 004
Kerala State, India
Phone: +91 471 2555030
Fax: +91 471 2447672 BHUVANENDRA PRASAD T R
e-mail: ceped@kseb.in CHIEF ENGINEER
ceprojects@ksebnet.com (Projects-Electrical Designs)
KERALA STATE ELECTRICITY BOARD LTD.
(Incorporated under the Indian Companies Act,1956)

VOLUME – 4

SCHEDULE OF PRICES
AND
TECHNICAL PARTICULARS

CERTIFICATE

Certified that this ‘Schedule of Prices and Technical Particulars' Document for the
Execution of Electromechanical works for Kuttiyadi 3 × 25 MW HEP RMU Works contains
serially numbered pages from 1 to 51

Office of the Chief Engineer


(Projects – Electrical Designs), #201,
Vydyuthi Bhavanam, Pattom P.O.
Thiruvananthapuram,
Pin – 695 004
Kerala State, India
Phone: +91 471 2555030
Fax: +91 471 2447672 BHUVANENDRA PRASAD T R
e-mail: ceped@kseb.in CHIEF ENGINEER
ceprojects@ksebnet.com (Projects-Electrical Designs)
Table of Contents
1 SECTION – 1 SCHEDULE OF PRICES...........................................................................1
1.1 General......................................................................................................................1
1.1.1 Instructions for Completing the Schedules........................................................1
1.1.2 Terms of Payment for E & M equipment............................................................3
2 SECTION – II SCHEDULE OF TECHNICAL PARTICULARS..........................................5
2.1 Schedule-B1 Guaranteed Performance Figures.......................................................5
2.1.1 Turbine................................................................................................................5
2.1.2 Generator...........................................................................................................5
3 SECTION – III GURANTEED TECHNICAL PARTICULARS............................................7
3.1 Schedule-B2 Guaranteed Technical Particulars........................................................7
3.1.1 Turbine................................................................................................................7
3.1.2 Generator.........................................................................................................17
3.1.3 Protection and Local Control............................................................................39
E & M Equipment Price Schedule & GTP

1 SECTION – 1 SCHEDULE OF PRICES

1.1 General

1.1.1 Instructions for Completing the Schedules


1 This Schedule comprises typical forms for completion by the Bidder.

◦ The first form, BoQ1 sheet of the BoQ document (xls - Excel format) shall be
used for quoting the price for the design, planning, engineering, manufacture
and supply of equipment.

◦ The prices for Erection, Testing and Commissioning of the equipment shall
be quoted in the second form, BoQ2 sheet of the BoQ document (xls - Excel
format).

◦ The bidders shall indicate the rates of all taxes and duties such as Goods
and Services Tax (GST) and any other taxes in the relevant BoQ sheet as
required in Clause 4.1 of Part 4 of Conditions of Bid and Contract.

◦ The rates of different taxes & levies considered shall be mentioned by the
bidder.

1.1 Bidders shall quote for the entire package on a single source responsibility
basis on the following lines:

1.1.1 Plant & equipment, materials and other components to be supplied from
abroad shall be quoted on CIF (Indian Port) price basis in Indian Rupees
only. Bidder shall also quote the corresponding FOB Price. The cost towards
customs duty, port clearance, handling at port, inland transportation and
inland transit insurance for delivery to the project site shall be quoted
separately in Indian Rupees.

1.1.2 All other plant & equipment, materials etc... manufactured / fabricated in
India shall be quoted on ex-works price basis (including packing & forwarding
charges) in Indian Rupees and the cost towards inland transportation and

Projects Electrical Designs Bid Document - Volume-4 Page 1


E & M Equipment Price Schedule & GTP

inland transit insurance shall be quoted separately in Indian Rupees.

1.1.3 The price of services for supervision, erection, testing and commissioning
etc... shall be quoted as an independent item in Indian Rupees.

1.2 The bidders shall quote their prices in the same format given in the BoQ1
and BoQ2 sheets of BoQ document and no other formats devised by the
contractor will be accepted. The split up details of the taxes and duties shall
be submitted by the Bidder separately.

1.3 The rates of different taxes and duties considered shall be mentioned by the
bidder clearly. The KSEBL will deduct all applicable taxes and duties from the
contractor’s bill and remit the same to the concerned authorities.

1.4 Service Tax, if payable on freight charges will be to the supplier's account.
However documentary proof of having paid service tax shall be produced
along with the invoice.
1.5 The Bidder shall submit the split up details of the taxes and duties separately.
1.6 The quantity mentioned for each item is only an estimate and the bidder shall
have to supply the actual quantity as per requirement within the overall
quoted rate. However, if the actual quantity is less than the estimate quantity,
payment shall be effected only for the actual quantity based on the unit rate.
1.7 Mandatory Spares: All spares required during the Defects liability period,
needs to be compulsorily provide by the Contractor and the priced list
(Volume-4 Annexure-1 Mandatory Spares) and a list with same items but
without price (Volume-3 Annexure-1 Mandatory Spares) also is to be
provided by the Contractor. It also needs to be specified that any spare other
than that specified in the list is necessitated during the defects liability period,
the same will be deemed to have been included in the mandatory list and will
have to be provided free of cost by the Contractor.
1.8 Recommended Spares: The Contractor shall provide a priced list of spares
(Volume-4 Annexure-2 Recommended Spares) with unit rates that may be
required for a two year period after the defects liability period. The Contractor
shall also provide a list with same items but without price (Volume-3

Projects Electrical Designs Bid Document - Volume-4 Page 2


E & M Equipment Price Schedule & GTP

Annexure-2 Recommended Spares). Based on the list, KSEBL may issue


separate order for the needed spares, based on the rates quoted by the
Contractor.
1.9 Other items, if any, that are not specifically indicated in the BoQ Document
on sheets BoQ1 and BoQ2, and the bidder wishes to be included in the BoQ
document, may be included in the “Any Other items” head, but the detailed
priced list is to be provided using the Annexures “Volume-4 Annexure-3
Other Items – Supply” and “Volume-4 Annexure-4 Other Items – Service”,
keeping the Grand Total Amount tally with Amount column of BoQ1 and
BoQ2 sheets respectively. The Contractor should also provide corresponding
list of items above but without price using the Annexures “Volume-3
Annexure-3 Other Items – Supply” and “Volume-3 Annexure-4 Other Items –
Service”.
1.10 The last sheet of the BoQ document, (BoQ3 sheet) is the consolidation of
sheets BoQ1(Supply) & BoQ2(Service). Bidder shall fill only the Name of the
Bidder column and Quantity column. The Quantity column for quantity entry of
this sheet shall be filled as “1” (one) as this rate in no way affect the quoted price
of any of the items. This entry is for the sake of validation to be successful. The
two items in BoQ3 sheet namely Supply ( BoQ1) and Service (BoQ2) are taken
from the extract of respective sheets. The total amount column of this sheet
(BoQ3) shows the quoted price (Supply + Service) by the bidder.

1.1.2 Terms of Payment for E & M equipment

The terms of payment for the supply and services of hydro-mechanical and electro-
mechanical equipment will be as follows:
For Supply:
a) 80% of the FOR value of materials together with 100% value of taxes &
duties (including statutory variations) and freight and insurance shall be paid
on prorata basis against receipt of materials at site as certified by the
concerned Engineer-in-charge.
b) 20% of the FOR value of materials shall be paid unit-wise on completion of
erection, testing and commissioning of each unit to the satisfaction of the

Projects Electrical Designs Bid Document - Volume-4 Page 3


E & M Equipment Price Schedule & GTP

engineer in charge after clearing of all punch points, if any.


For Services:
a) 80% of the erection charges together with taxes and duties (including
statutory variations) prescribed for each item shall be paid on prorata basis
on completion of erection works of such item.
b) Balance 20% of the erection charges shall be paid unit wise on completion of
erection, testing and commissioning of each unit to the satisfaction of the
engineer in charge after clearing of all punch points, if any.

Projects Electrical Designs Bid Document - Volume-4 Page 4


E & M Equipment Price Schedule & GTP

2 SECTION – II SCHEDULE OF TECHNICAL PARTICULARS

2.1 Schedule-B1 Guaranteed Performance Figures


This schedule provides the guaranteed performance values for the turbine
generator units and also for all the auxiliary equipment and system, including
contract price adjustments for failure to meet the guaranteed values. The contents
comprise a series of schedules to be completed by the bidder separately for each
unit, as follows. The bidder shall fill in the values at each percentages of load
mentioned and shall calculate and furnish the weighted average efficiency.

2.1.1 Turbine
Output, efficiency and discharge at the net effective head: 640 m
% of Load
Items
110 100 90 80 70 60
Output
(MW)
Efficiency
(%)
Discharge
(m3/sec)

Weighted Average Efficiency at 0.9pf: %.

For every short fall of 0.1% in weighted average efficiency after taking into account
IEC tolerance, a penalty of 0.5% of ex-works contract price on pro-rata basis for
each of the turbine having short fall will be levied. If the shortfall is 2% or more, the
turbine will be rejected.

For the purpose of comparison of tenders, the quoted price shall be equalised for
the shortage in weighted average efficiency at the rate of 0.5% of the ex-works
Contract Price for each 0.1% shortfall in efficiency.

2.1.2 Generator
Efficiency of the generator at rated voltage and frequency at 75°C:

Projects Electrical Designs Bid Document - Volume-4 Page 5


E & M Equipment Price Schedule & GTP

% Load 0.9 pf upf


110 % %
100 % %
90 % %
80 % %
70 % %
60 % %

Weighted Average Efficiency at 0.9 pf: %.

For every shortfall of 0.1% in weighted average efficiency after taking into account
IEC tolerance, a penalty of 0.5% of ex-works Contract price on pro-rata basis for
each of the generator having shortfall will be levied. If the shortfall is 2% or more,
the generator will be rejected.

For the purpose of comparison of tenders, the quoted price shall be equalised for
the shortage in weighted average efficiency at the rate of 0.5% of the ex-works
Contract Price for each 0.1% shortfall in efficiency.
Note: These instructions shall be re-written and converted to a set of "Notes" and to
be included in the schedule which shall form part of the Contract, if any, is awarded.

Projects Electrical Designs Bid Document - Volume-4 Page 6


E & M Equipment Price Schedule & GTP

3 SECTION – III GURANTEED TECHNICAL PARTICULARS

3.1 Schedule-B2 Guaranteed Technical Particulars


The name of manufacturer, address and country of manufacture shall be specified
for all equipment. The following minimum particulars of equipment shall be
furnished by the bidder separately for each unit.

3.1.1 Turbine
Sl. Item Description Particulars
No.

1. Make of the main turbine parts

Whether bidder is using a previous model


test on a similar turbine and if so has
2.
submitted the test report along with his
tender.
3.
a Output, efficiency and discharge at net effective head of 640 m

Items % Load
110 100 90 80 70 60
Output
(MW)
Efficiency
(%)
Discharge
(m³/sec)

Continuous overload capacity expressed


b
as a percentage of rated output

4. Point of best efficiency

Performance curve (Hill Diagram)


5. Please Select
attached?
6. Weighted average efficiency

Projects Electrical Designs Bid Document - Volume-4 Page 7


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
7. Speed

a Specific speed

b Rated speed

Direction of rotation when viewed from


c Please Select
Non-drive end
d Maximum runaway speed

e Steady state runaway speed

Duration for which the turbine can run


f
safely at runaway speed
8.
Momentary rise in speed on suddenly reducing the load to zero from different
a
values expressed as a percentage of rated speed (not exceeding)
Sl. No Item Description Particulars
1. Full load %

2. ¾ Full load %

3. ½ Full load %

4. ¼ Full load %

b Time of Gate / Nozzle closure for the above regulation

Sl. No Item Description Particulars


1. Full load rejection Sec

2. ¾ Full load rejection Sec

3. ½ Full load rejection Sec

4. ¼ Full load rejection Sec

9.
Momentary drop in speed on increasing load from zero to different values
a expressed as a percentage of rated speed

Projects Electrical Designs Bid Document - Volume-4 Page 8


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
Sl. No Item Description Particulars
1. Full load %

2. ¾ Full load %

3. ½ Full load %

4. ¼ Full load %
When 60 % load is applied
5. suddenly and balance in five %
seconds

b Time of Gate / Nozzle opening for the above regulation

Sl. Item Description Particulars


No
1. Full load Sec

2. ¾ Full load Sec

3. ½ Full load Sec

4. ¼ Full load Sec

Maximum water hammer pressure Tm2


10.
Whether a hydraulic gradient drawing is
Please Select
11. furnished ?
Flywheel effect required and available for
regulation as above with supporting Please Select
12.
Calculations attached?
Sl. Item Description Particulars
No
1. For the entire generating unit kgm²
Contribution from the turbine
2. kgm²
rotating parts
3. From matching generator parts kgm²

Projects Electrical Designs Bid Document - Volume-4 Page 9


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.

Load on thrust bearing


13.

Sl. Item Description Particulars


No
1. Due to turbine rotating parts kg
2. Due to maximum hydraulic thrust kg
3. Total originating from the turbine kg

14.
Cavitation guarantee per 1000 hours of
a Less than kg
operation
b Elevation of centre line of runner

Maximum noise level at various places /


dB
15. locations

Factor of safety
16.
Guaranteed minimum factor of safety
a under worst conditions based on yield
point of the material

Name and location of the part having the


b
factor of safety in (a) above

Principal stresses in the materials used


17.

Heaviest and largest items


18.

Name and mass of the heaviest piece of


a
equipment for shipment

Name and dimension of the largest piece


b
for transport

c Heaviest assembly to be lifted by crane

Projects Electrical Designs Bid Document - Volume-4 Page 10


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.

Runner
19.

a Material

b Discharge diameter

c Inlet diameter

d Number of buckets

Shaft
20.

a Material

b Diameter

c Flange diameter

Shaft Sealing
21.

a Type

b Diameter of shaft sealing

c Cooling water required

Guide Bearing
22.

a Type

b Number of pads and size

c Material of bearing pads

d Bearing Diameter

Cooling water required (Quantity and


e
pressure)

f Height of bearing

Projects Electrical Designs Bid Document - Volume-4 Page 11


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
g Normal working temperature of bearing

h Maximum temperature of bearing

i Grade of oil and quantity

Main Inlet Valve with outlet and inlet pipes


23.

a Type

b Normal diameter

c Diameter of servomotor

d Stroke of servomotor

e Design head

f Leakage when valve is fully closed


Number of piezo-meter tapping and
g
gauges

h Seals Provided

i Range of oil pressure

High pressure compressed air system


24.

a Number of compressors

b Free air delivery of compressor

c Rating of motor

Projects Electrical Designs Bid Document - Volume-4 Page 12


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.

d Receiver capacity

Governing system
25.
a Governor Cubicle

i Make

ii Type

iii Description and method of operation

iv Range of adjustment of permanent speed


droop

v Sensitivity

Range of adjustment of speed setting


vi
level

vii Governor opening and closing time

viii Details of joint control

Range of adjustment of opening and


ix
closing time

x Speed dead band

xi Loose items for mounting on control desk

b Signal Generator

i Type

Projects Electrical Designs Bid Document - Volume-4 Page 13


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
ii Rated capacity

ii
Rated voltage
i
i
Rated frequency
v

c Governor Oil Pump

i Number of oil pumps for each unit

ii Type

ii
Capacity
i
i
Type of operation Please Select
v
d Sump Tank
i Dimension of sump tank

ii Total effective volume

ii Total volume of oil in the governing


i system
e Oil Pressure Vessel
i Number of vessels

ii Dimensions

ii
Normal volume of oil
i
i
Normal working pressure
v
Minimum working pressure for safe
v
operation
v
Quantity of governor oil for first filling
i
v
Type of governor oil
ii
a Preferred oil type

Projects Electrical Designs Bid Document - Volume-4 Page 14


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.

b
) Alternative oil type

26. Turbine Shaft

a Material & Composition

b Diameter

c Flange diameter

d Length

e Weight

Shaft Sealing
27.

a Type

b Diameter of shaft sealing

c Cooling water required

Cooling water requirement


28.

a Turbine bearing

b Turbine shaft seal

Cooling Water System


29.
a Source Please Select

b No. of pumps

c Rating of each pump

Projects Electrical Designs Bid Document - Volume-4 Page 15


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.

d Capacity of duplex strains

e Material and size of strainer element

Dewatering and Drainage System


30.

a No. of pumps Dewatering / Drainage

b Type

c Discharge of each pump

d Total dynamic head

Turbine flow meter


31.

a Type

b Range of flow measurement

c Brief description

List of drawings and drawing issue


Please Select
32. schedule attached?

Quality Assurance Program


33.
Outline description of the Quality
a Assurance Program used by the bidder Please Select
attached?

Projects Electrical Designs Bid Document - Volume-4 Page 16


E & M Equipment Price Schedule & GTP

3.1.2 Generator
Sl. Item Description Particulars
No.
A. General

1. Make

Standards followed for the manufacture of


2.
equipment

3. Type and reference

B. Technical Guarantees

1. Rated speed rpm


2. Rated voltage 11000 V
3. Rated frequency 50 Hz
4.
Maximum continuous rated output at rated
a
voltage and frequency
Continuous overload capacity expressed as
b
a percentage of rated output
The efficiency of the generator is
guaranteed to be not less than that as
5. determined in section 1-13 of ANSI standard %
C50.1 for the conditions of rated output, 0.9
pf lagging, 11000 V, 50 Hz
6. Efficiency of the generator at rated voltage and frequency at 75° C

% of Load 0.9 pf 1.0 pf


110 % %

100 % %
a
90 % %

80 % %

Weighted Average Efficiency at 0.9pf and at


b
110, 100, 90 and 80% Efficiencies

Projects Electrical Designs Bid Document - Volume-4 Page 17


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
Total loss in kW of the generator at 0.9 pf and rated terminal conditions subdivided
7.
follows:
% of Load
Item Description
110 100 90 80 75 70 60 50

Stator copper loss

Field copper loss

Core iron loss

Windage and friction


loss

Stray loss

8. Rotor Inertia Constant (H) kWs/kVA


Maximum temperature of stator winding by
9. °C
RTD at maximum continuous rating
Maximum temperature of rotor winding by
10. °C
resistance at maximum continuous rating
Maximum continuous value of negative
11. phase sequence current (I2) A

Maximum transient value of I2² t under


12.
system fault conditions
Maximum continuous output at zero pf
13. leading, rated voltage, frequency and 5% kVAR
positive excitation
Maximum continuous output at zero pf
14. kVAR
lagging, rated voltage and frequency

15. Transient reactance X'd (not more than) pu

16. Sub-transient reactance X"d (not less than) pu

Primary split phase circulating current when


17. A
a turn of the winding is short-circuited
18. Guaranteed inherent regulation of the machine at rated output and:

a 0.9 pf lagging %

b Unity pf %

19. Maximum current density:

Projects Electrical Designs Bid Document - Volume-4 Page 18


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
a In stator A/mm2

b In rotor A/mm2

20. Safety requirements under runaway conditions:


Maximum speed (runaway speed) which all
a parts of generator can withstand safely for
15 minutes
Name and location of part or parts stressed
b
to maximum under runaway conditions
Guaranteed minimum factor of safety based
c
on yield point of material

d Principal stresses in the materials used

C. Generator Characteristics
Calculated losses of generator at continuous maximum rating, 0.9 pf, 11000 V,
1.
50Hz, 75°C:

a Armature kW

b Field kW

c Stray loss kW

d Core kW

Windage and friction with bearing loss due


e kW
to all weights and turbine thrust specified

f Excitation system kW

2. Maximum continuous rating kVA

Continuous overload capacity without


3. %
injurious temperature rise
4. Rating at zero pf:

a Under excited kVA

b Over excited kVA

Rating with one heat exchanger out of


5. kVA
service

Direct axis synchronous reactance (Xd) pu


6.
(Maximum value, saturated)

Projects Electrical Designs Bid Document - Volume-4 Page 19


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
7. Direct axis transient reactance (X'd):

a Unsaturated pu

b Saturated pu

Direct axis subtransient reactance (X''d)


8. pu
(saturated)
Direct axis transient open circuit time
9. constant (T'do) sec

Direct axis subtransient open circuit time


10. constant (T"do) sec

Direct axis transient short circuit time


11. constant (T'd) sec

Direct axis subtransient short circuit time


12. constant (T"d) sec

Quadrature axis synchronous reactance


13. (Xq) pu

14. Quadrature axis transient reactance (X'q) pu

Quadrature axis subtransient reactance


15. (X"q) pu

16. Negative sequence reactance (X2) pu

17. Zero sequence reactance (X0) pu

18. Potier reactance (Xp) pu

19. Short circuit ratio (SCR) not less than pu

Short circuit time constant for armature


20. winding (Ta) sec

Flywheel effect (MR²) of generator rotating


parts (with rotor inertia constant H as
21. specified in the "Guarantees")
(MR² here is mass times radius squared)
Telephone harmonic factor at no load with
22. %
static exciter
23. Peak 3-phase line-to-line terminal short kA
circuit current at rated kVA, voltage and
power factor with excitation control

Projects Electrical Designs Bid Document - Volume-4 Page 20


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
(instantaneous value with DC component)
Peak 3-phase line-to-line terminal short
circuit current at rated kVA, voltage and
24.
power factor, with automatic voltage
regulator control:

a At time zero kA

b At 2 seconds kA

At 10 second (instantaneous values, with


c kA
DC component)

25. Maximum phase to ground fault current A

Maximum temperature of stator core at


26. °C
continuous maximum rating

27. Rated line voltage, star (wye) connection V

28. Rated frequency Hz

29. Number of field poles Nos

30. Rated speed Rpm

31. Stator winding, overall insulation class

32. Stator winding, parallel paths per phase

33. Stator coils, coil insulation class

34. Stator coils, turns of coil

35. Field winding, overall insulation class

36. Field winding, parallel paths

Field winding type, flat (strip on edge, bend


37. Please Select
on edge)
Damper winding, interconnected between
38. Please Select
poles
Radial air gap, measured between pole
39. mm
centre and stator teeth iron

40. Stator internal diameter mm

Projects Electrical Designs Bid Document - Volume-4 Page 21


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
41. Stator core length, including vent ducts mm

42. Field current at no load, rated voltage A

Field current at maximum continuous rated


43. A
load, rated voltage and power factor
44. Field current for field flashing during run up:

a Estimated A

b Maximum A

c Duration sec

45. Stator winding resistance per phase at 75°C Ohms

46. Rotor winding:

a Resistance at 75°C Ohms

b Inductance at 75°C Henries

47. Capacitance of stator winding:

a Single phase to earth Micro Farads

b Three phase to earth Micro Farads

Maximum magnetic flux density in air gap


48. Lines/mm²
(peak value of fundamental)

49. Critical speed of the unit rpm

50. Vertical movement of the shaft:

a With rotor jacked mm

b Under running conditions mm

51. Maximum anticipated vibration:

a Frequency Hz

b Peak to peak maximum permitted amplitude mm

Peak to peak maximum permitted amplitude


c mm
short time
Cooling water and air requirements for each generator at continuous maximum
52.
rating with cooling water temperature at:

Projects Electrical Designs Bid Document - Volume-4 Page 22


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
Sl.
Item Description 32°C 25.5°C 20.5°C
No.
Water for all bearing
a)
cooling (dm3/s)
Water for generator
b)
cooling (dm3/s)
Water for generator fire
c)
protection (dm3/s)
Air for generator cooling
d)
(m3/s)
Estimated make up air for
generator cooling (station
e)
heating component)
(m3/s)

Thrust bearing (State any necessary qualifying factors when giving the following
53.
data)

a Make

b Type

c Position (above or below rotor spider) Please Select


Maximum permitted shoe temperature, short
d °C
time

e Maximum permitted oil temperature °C

At maximum continuous rating, specified turbine thrust and weight at 32°C cooling
f
water

(i) Average oil temperature, continuous °C

Thrust plus weight assumed (thrust from


(ii) kN
turbine)
Bearing loading, plus/minus 10% [This
loading is a nominal figure only, given by
(iii) kPa
(Thrust plus weight, kN)/(Total surface area
of shoes, m²)]
g Maximum continuous thrust plus weight (at kN

Projects Electrical Designs Bid Document - Volume-4 Page 23


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
no extra cost)
Time, generator can run without bearing
h damage at rated speed, without cooling minutes
water
i Time, generator can run without damage to the bearing at 10% of normal speed,

(i) with cooling water minutes

(ii) without cooling water minutes

Lowest speed of generator at which the


j thrust bearing will operate continuously rpm
without damage
Whether capable of emergency run down,
k with thrust bearing oil pressure system Please Select
inoperative

l Quantity of bearing oil required

m Bearing Oil

(i) Preferred Type

(ii) Alternative oil type

Type of shoe babbit (with metal) e.g., ASME


n
grade

54. Upper guide bearing

a Type

Method of cooling (coolers common with


b
thrust bearing preferred)

Oil temperature at maximum continuous


c rating generator load and 32ºC cooling ºC
water (hot oil)
55. Lower guide bearing

a Type

Projects Electrical Designs Bid Document - Volume-4 Page 24


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.

b Method of cooling

Oil temperature at maximum continuous


c rating generator load and 32ºC cooling ºC
water (hot oil)
56. Brakes
Time required for brakes to bring the rotor to
a rest from 30% speed with 2% torque applied sec
and no excitation
Maximum speed at which brakes can be
b applied in an emergency without sustaining rpm
serious damage to generator or brakes

c Preferred brake pressure kPa

d Volume of air required for one application m3

57. Thrust bearing heat exchanger


Whether exchanger is in tank around
a Please Select
bearing

b Total number of exchangers (remote type)

Minimum number of exchangers (short time)


c required for generator maximum continuous
rating
System capable of dissipating bearing
d kW
continuous total kW loss, un-fouled

e Internal diameter of tubes mm

f Tube material

g Tube water velocity m/sec

Number of cooler sections that can be


h
isolated by valves

i Total number of cooler sections in series

j Total number of cooler sections in parallel

Pressure drop across complete cooler


k kPa
system, un-fouled
Pressure drop across complete cooler
l kPa
system, fouled

Projects Electrical Designs Bid Document - Volume-4 Page 25


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
m Test pressure per cooler kPa

n Cleaning method

58. Lower guide bearing heat exchanger

a Type

b Internal tube diameter mm

c Tube material

d Water velocity m/s

e Cleaning method

59. Upper guide bearing heat exchanger

a Type

b Internal tube diameter mm

c Tube material

d Water velocity m/s

e Cleaning method

60. Generator Cooling Air to Water Heat Exchangers

a Type

b Number of coolers

Minimum number of coolers to maintain


c
generator maximum continuous rating

d Tube internal diameter mm

Projects Electrical Designs Bid Document - Volume-4 Page 26


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.

e Tube internal shape (round, oval etc...)

f Tube water velocity m/s

g Cleaning method

h Estimated heat radiated from the generator cover

(i) With insulated cover kW

(ii) Without insulation kW

61. Masses and Dimensions

a Mass of generator fully assembled kg

b Mass of stator fully assembled kg

c Mass of rotating parts kg

d Mass of heaviest piece for shipping kg

e Total mass for shipping kg

f Heaviest assembly to be handled by crane during construction:

(i) Mass kg

(ii) Name of the assembly

g Heaviest assembly to be handled by crane during maintenance:

(i) Mass kg

(ii) Name of the assembly

h Length of generator lower stub shaft mm

i Diameter of lower stub shaft mm

j Mass of lower stub shaft kg

Projects Electrical Designs Bid Document - Volume-4 Page 27


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
k Stator Shipping
Number of stator sections for shipping (if
(i)
shipped in sections)

(ii) Mass of each section kg

l Rotor Shipping
Number of rotor spider sections for shipping
(i)
(if shipped in sections)

(ii) Mass of each section kg

Area and weight of equipment requiring


m
indoor storage

n Mass of the thrust bearing kg

B. Static Excitation System

1. Type of system, manufacturer's designation

2. Type of system, IEEE 421 designation

3. Manufacturer of the system

4. Number of rectifier bridges used

5. Rating of each rectifier bridge

Manufacturer of Automatic Voltage


6.
Regulator

Nominal DC voltage from exciter (ceiling


7. V
volt)

8. Nominal continuous rating of exciter kW

Maximum continuous DC current from


9. A
exciter

10. Maximum short time DC current from exciter A

Projects Electrical Designs Bid Document - Volume-4 Page 28


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
a Time for above current sec

Excitation ceiling DC voltage, (constant rated primary voltage on excitation


11.
transformer) with:

a Exciter on no load V

b Exciter with DC current as in 9. above V

c As 11.a except negative ceiling V

Excitation overall response time to 1% step


12. sec
voltage change of generator at no load
Excitation (total system plus generator field
impedance) response time to reach 95% of
13. ceiling voltage 11.b (starting from generator sec
field current for maximum continuous rated
generator load)
Minimum AC supply voltage to give
14. V
satisfactory operation
Output controlled rectifiers rated forward
15. A
RMS current per cell
16. Control range of generator voltage, generator on no load, rated speed and voltage

a Automatic control %

b Hand control %

17. Excitation system gain:

a Maximum pu

b Minimum pu

Continuous generator line frequency at which excitation system will be


18.
undamaged:

a Minimum frequency (run up) Hz

b Maximum frequency (runaway speed) Hz

19. Protection systems

20. Alarms

Projects Electrical Designs Bid Document - Volume-4 Page 29


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
21. Generator field breaker:

a Make

b Rated voltage V DC

c Rated continuous current A DC

d Maximum continuous permissible current A DC

e Maximum short-time voltage V DC

f Maximum short-time current A DC

Maximum interrupting current of main


g A DC
contacts at rated short-time voltage
Maximum interrupting voltage of main
h V DC
contacts

i Closing time of main contacts sec

j Opening time of main contacts sec

k Field discharge resistor

(i) Type

(ii) Rating Ohms, kWs

l Exceptions and/or additions (detail)

22. Field flashing unit:

a Make

b Rated volts input V AC

c Maximum current A DC

d Maximum output volts V DC

e Maximum output current A DC

Projects Electrical Designs Bid Document - Volume-4 Page 30


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
f Net mass kg

23. Generator Neutral Cubicle


a Disconnect switch

(i) Make and Type

(ii) Rated voltage kV

(iii) Current A

(iv) BIL kVp

b Neutral Resister

(i) Make and Type

(ii) Resistance ohms

(iii) Rating A

o
(iv) Maximum temperature rise C
c Grounding transformer

(i) Make and Type

(ii) Rating

• Continuous kVA

• Short time kVA

d Mass of cubicle kg

e Dimensions

(i) Length m

(ii) Width m

(iii) Height m

Outline & schematic drawings with


f Please Select
descriptive literature enclosed?
24. Excitation power transformer:

Projects Electrical Designs Bid Document - Volume-4 Page 31


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.

a Make

Nominal continuous rating, as three phase


b kVA
conventional transformer

c Primary voltage rating V

d Reactance, based on rating b and c above %

e Primary tappings %

f Primary BIL kVp

g Insulation type (dry, other)

h Insulation class Please Select

i Ventilation

j Primary (HV) connection

k Secondary (LV) connection

l Secondary voltage rating %

m Secondary tapping (if any) %

n Secondary BIL kVp

o Materials used:

(i) Conductor

(ii) Insulation

p Estimated mass complete kg

q Estimated mass for installation kg

r Dimensions:

(i) Length mm

(ii) Width mm

(iii) Height mm

Projects Electrical Designs Bid Document - Volume-4 Page 32


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
25. Mass and dimensions:

a Net mass of complete system kg

b Description and mass of major components kg

c Largest part to be shipped:

(i) Description

(ii) Mass kg

(iii) Length mm

(iv) Width mm

(v) Height mm

Descriptive Data and Drawing - Generator and Excitation - All data and
C.
drawings for evaluation shall be furnished.
1. Layout drawings included? (This shall
include:
a. Outline and part section of
generator, indicating pit size needed, Please Select
lifting requirements, foundation
points.
b. Outline and mass of cubicles
2. Summary of Erection Procedures
included? (This shall include:
Please Select
a. Preferred
b. Alternative
Details of excitation system included?
(This shall include:
a. Schematics, typical instruction
manual extracts, full description of
operation and performance of major
3. Please Select
components
b. Characteristic curves showing
relationship of output voltage, ceiling
voltage and negative ceiling voltage
for variations in AC supply
4. Performance curves for generator
included? (This shall include:
a. Open and short circuit excitation Please Select
b. Other excitation curves
c. Capability diagram (P-Q diagram)

Projects Electrical Designs Bid Document - Volume-4 Page 33


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
5. Descriptive data for generator included?
(This shall include:
a. Stator frame, core, winding and
insulation
b. Rotor, field poles, winding and
insulation
c. Shaft
d. Bearing, lubrication and oil lifting
systems
e. Air and oil cooling systems
f. Fire protection
g. Temperature detectors
Please Select
h. Details of shipment
i. List of all equipment to be provided
by sub-suppliers
j. Material maximum unit stresses,
yield point and ultimate strength for
the main components (shaft, rotor
spider, rim, lower and upper
brackets, stator frame etc.)
k. List of all tools and special devices
for servicing, maintenance and
dismantling of the generators (use
additional sheets as required)
D. Cooling Water System
1. Centrifugal Pump Motor Set

a Make of pump and motor

b Type of pump and motor

c Speed in rpm at full load rpm

d Direction of rotation

e Size of discharge outlet of pump

Distance from the centre line of outlet to


f
the bottom of the base plate

g Type of impeller and material for pump

Projects Electrical Designs Bid Document - Volume-4 Page 34


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
h No. of stages for pump

i Total shut-off head for pump

(i) Per stage

(ii) For the complete unit

Total minimum dynamic head for the pump


j
with minimum tailrace level
Total maximum dynamic head for the
k
pump with maximum tailrace level
l Pump discharge:

(i) At minimum dynamic head as at (j above

(ii) At maximum dynamic head as at (k above

m Pump efficiency at:


Minimum dynamic head and rated
(i)
discharge (at that head)
Maximum dynamic head and rate
(ii)
discharge (at that head)
Average of the maximum and minimum
(iii)
head and rated discharge (at that head)

n Recommended output of driving motor

o Size of discharge pipe and material

p Size of suction pipe and material

q Rated HP of motors

r Full load current of motors A

s Rated rpm of motors

t Locked rotor current of motors A

u Starting current of motor A

v Power factor at rated voltage and frequency of motors:

(i) Full load

(ii) Three fourth load

Projects Electrical Designs Bid Document - Volume-4 Page 35


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
(iii) Half load

w Efficiency at rated voltage and frequency of motors:

(i) Full load

(ii) Three fourth load

(iii) Half load

Locked rotor torque as a percentage of full


x
load torque of motors

y Bearing types and size of motors

z Overall efficiency of the pumping set at:


Minimum dynamic head and discharge at
(i)
that head
Maximum dynamic head and discharge at
(ii)
that head

aa Weight of one complete pumping unit kg

2. Duplex Strainers

a Type

b Design pressure

c Design flow rate

d Material of construction:

(i) Strainer body

(ii) Strainer basket

e Size of perforations in basket

f Gross area of basket

g Net area of openings in the basket

h Details of end connections and end valves

Projects Electrical Designs Bid Document - Volume-4 Page 36


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.

i Details of pressure gauge connections

j Pressure drop across strainers:

(i) For clear flow

For clogged conditions (for alarm and


(ii)
annunciation)

k Hydro-static test pressure:

(i) For body

(ii) For basket

l Overall dimensions and weight

3. Piping

a Make

b Type

c Size

d Material

4. Valves

a Make

b Type

c Size

d Material

(i) Casing

(ii) Fitting

Projects Electrical Designs Bid Document - Volume-4 Page 37


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
Arrangement provided for adjusting the
e outlet pressure in case of pressure
reducing valves
E. Unit Control Boards
Instruments and meters (Ammeter, Voltmeter, Wattmeter, kVAR meter and kWH
1.
meter)

a Type of instrument

b Size

c Whether magnetically shielded or not Please Select

d Limits of error in the effective range

e Maximum scale length angular movement

f Whether tropicalised Please Select

g Short time overload capacity

h VA burden:

(i) Current coil

(ii) Potential coil

i Power consumption:

(i) Current coil

(ii) Potential coil

Temperature at which the instruments are


j
calibrated

Description leaflet reference numbers


k
submitted

l Maker's name and country

Projects Electrical Designs Bid Document - Volume-4 Page 38


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
m Type of selector switch

n Range

o Mounting details and drawings

2. Annunciators

a Type of Annunciator

b Type and particulars of window

c Particulars of wiring

d Rated voltage

e Power consumption

f Instantaneous making capacity of contacts

g Breaking capacity of contacts

h Overall dimensions of annunciator

i Descriptive leaflet numbers

F. Quality Assurance Program


An outline description of the quality
1. assurance program used by the tenderer Please Select
attached separately?

3.1.3 Protection and Local Control


Sl. Item Description Particulars
No.
1. Local Control Panels

Projects Electrical Designs Bid Document - Volume-4 Page 39


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.

a) Manufacturer

b) Size of panel (H x W x D)

c) Colour of panel

d) Weight of each panel

e) Construction details (drawing)

f) Overall layout

2. Local Control Panels Equipment


a) Indicating instruments

i) Manufacturer

ii) Voltmeter Type & Accuracy Class

iii) Ammeter Type & Accuracy Class

b) Integrating Meters

i) Manufacturer

ii) Type & Accuracy Class

c) Terminal Blocks

i) Type

ii) Manufacturer

Projects Electrical Designs Bid Document - Volume-4 Page 40


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.

iii) Mounting method

3. Transducers
a) Amps

i) Manufacturer

ii) Type & Accuracy Class

iii) Output

b) Volts

i) Manufacturer

ii) Type & Accuracy Class

iii) Output

c) Frequency

i) Manufacturer

ii) Type & Accuracy Class

iii) Output

d) Watt

i) Manufacturer

ii) Type & Accuracy Class

Projects Electrical Designs Bid Document - Volume-4 Page 41


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
iii) Output

e) VAR

i) Manufacturer

ii) Type & Accuracy Class

iii) Output

f) Alternative combined multifunction units

i) Manufacturer

ii) Type & Accuracy Class

iii) Output

4. Protection Equipment
a) Relay and Control Panels

Sl. Item Description Generator Generator


No. Transformer

a. Manufacturer

b. Size of panel (H x W x D)

c. Type of panel

d. Colour of panel

e. Weight of each panel

f. Total number of panels

Proposed layout (Attached


g.
Drawing No.)

Projects Electrical Designs Bid Document - Volume-4 Page 42


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
b) Generator-Transformer Protection

i) Manufacturer

ii) Type

iii) Current rating

iv) Power supply

a Voltage range (V)

b Demand (VA)

v) MMI type

vi) Modem or direct access ? Please Select

vii) Software type

viii) Protection features available

a Standard 1

b Standard 2

c Standard 3

d Standard 4

e Standard 5

f Standard 6

g Standard 7

h Standard 8

i Optional 1

j Optional 2

k Optional 3

l Optional 4

Projects Electrical Designs Bid Document - Volume-4 Page 43


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
m Optional 5

n Optional 6

o Optional 7

p Optional 8

ix) Logic outputs

x) Number of program matrix

xi) Fault record types:

a Oscillographic

b Status

c Alarm

d Resolution

xii) Surge withstand standard and rating:

a Power supply

b CT or VT input

c Output circuits

d Modem / Data

e LAN

f Communication Protocol

c) Generator Differential Protection

i) Manufacturer

ii) Type

iii) Current rating (A)

iv) Power supply:

Projects Electrical Designs Bid Document - Volume-4 Page 44


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
a Voltage range (V)

b Demand (VA)

v) Relay CT burden (VA)

vi) Maximum CT secondary resistance (ohm)

vii) Maximum total lead burden (ohm)

Minimum sensitivity to earth faults or setting


viii)
range (% of CT rating)
Minimum sensitivity to phase faults or
ix)
setting range (% of CT rating)

x) Through-fault stability limit (kA rms)

d) Transformer Differential Protection

i) Manufacturer

ii) Type

iii) Current rating (A)

iv) Power supply:

a Voltage range (V)

b Demand (VA)

v) Relay CT burden (VA)

vi) Maximum CT secondary resistance (ohm)

vii) Maximum total lead burden (ohm)

Minimum sensitivity to earth faults or setting


viii)
range (% of CT rating)
Minimum sensitivity to phase faults or
ix)
setting range (% of CT rating)

x) Through-fault stability limit (kA rms)

xi) Communication Protocol

Projects Electrical Designs Bid Document - Volume-4 Page 45


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
e) Circuit Breaker Failure Protection

i) Manufacturer

ii) Type

iii) Current rating

iv) Power supply:

a Voltage range

b Demand

v) Current detector:

a Setting range

b Thermal range

c Relay burden

d Reset time

e Minimum operating current

f Maximum reset current

vi) Range of timer

vii) Operating times of current detector:

a At 3 times setting current

b At 10 times setting current

viii) Data storage

ix) LAN protocol

x) Communication Protocol

xi) Modem option

xii) Access software

Projects Electrical Designs Bid Document - Volume-4 Page 46


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
Current Detectors and Over-current Protection (Provide the following data for all
f)
backup over-current, neutral over-current and bus over-current relays)
Sl. Item Description Backup Over- Neutral Over- Bus Over-
No. current current current

a. Manufacturer

b. Type

c. Current rating

d. Power supply:

i) Voltage range

ii) Demand

Relay burden at 3 times


e. minimum operating
current:

i) Instantaneous (50)

ii) Inverse time (51)

f. Setting range:

i) Instantaneous (50)

ii) Inverse time (51)

Characteristic curves
g. Please Select Please Select Please Select
available?
Time multiplier setting
h.
range, inverse time (51)
i. Minimum pickup:

i) Instantaneous (50)

ii) Inverse time (51)

j. Maximum reset:

i) Instantaneous (50)

ii) Inverse time (51)

Projects Electrical Designs Bid Document - Volume-4 Page 47


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
Sl. Item Description Backup Over- Neutral Over- Bus Over-
No. current current current
k. Number of contacts:

i) Instantaneous (50)

ii) Inverse time (51)

l. Data storage

m. LAN protocol

n. Modem option

o. Access software

g) Over voltage Protection

i) Manufacturer

ii) Type

iii) Rating (V)

iv) Setting range (V)

v) Maximum reset (%)

vi) Operating time at 150% setting

h) Under voltage Protection

i) Manufacturer

ii) Type

iii) Setting range (V)

iv) Minimum pick-up (V)

v) Maximum reset (V)

Projects Electrical Designs Bid Document - Volume-4 Page 48


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
vi) Time delay setting range (%)

Interposing and Auxiliary Tripping Relays (Provide the following data for all closing
i)
and tripping control, protection trip, trip target repeat and alarm auxiliary relays)
Sl. Trip Alarm
Item Description Trip Repeat Status
No. Lockout Repeat

a Manufacturer

b Type

Number and type


c
of contacts

d Type of resetting

Coil voltage rating


e
(V)

f Coil burden (VA)


▪ Operating time
g
(ms)
Contact(s) rating,
h make and break
duties
Coil to contact
i insulation level
(Vrms)
Single or double
j Please SelectPlease Select Please Select Please Select
pole switched
Hz ac immunity,
k N/A N/A
level not trip
Capacitance
l discharge test N/A N/A
level

j) Time Delay Relays

Projects Electrical Designs Bid Document - Volume-4 Page 49


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.
Sl.
Item Description Type-1 Type-2 Type-3 Type-4
No

a. Manufacturer

b. Type

c. Time range

Number and type


d.
of contacts

e. Contact rating:

i Make

ii Break

f. Power supply:

i Voltage Range (V)

ii Demand (VA)

k) Miscellaneous Generator Protection


i) State if any offered relays are at stage

a Design

b Prototype testing

c Prototype in-service experience

d Pre-production

e Production / in-service

Any test report available (type test or type


ii) Please Select
approval test)
Any independent laboratory reports
iii) Please Select
available

Projects Electrical Designs Bid Document - Volume-4 Page 50


E & M Equipment Price Schedule & GTP

Sl. Item Description Particulars


No.

Number of relays installed and years of


iv)
experience

v) Major user(s)

vi) Service performance data available? Please Select

vii) Electronic components:

a Component testing used

b Component standards used

c Quality control method used

viii) Guaranteed availability of spares (years)

List of attached drawings, bulletins, design


ix)
briefs and documentation

Note: Technical Particulars for other power house equipment such as Governor system,
Generator Line and Neutral cubicles, Segregated Phase Bus duct, 415V LT AC
Boards, DC Boards, UPS, PLC / SCADA system, Feeder protection panel
(Numerical distance protection & Over current backup (2 OC +1 EF) protection
scheme), Fire protection system, Air conditioning etc... that are deemed to have
necessary for the commissioning of the Renovated, Modernized & Uprated KHEP
(3x27.5MW) Power house as per specifications shall also be furnished.

Projects Electrical Designs Bid Document - Volume-4 Page 51