Professional Documents
Culture Documents
Kseb Tender Specs
Kseb Tender Specs
VOLUME – 4
SCHEDULE OF PRICES
AND
TECHNICAL PARTICULARS
VOLUME – 4
SCHEDULE OF PRICES
AND
TECHNICAL PARTICULARS
CERTIFICATE
Certified that this ‘Schedule of Prices and Technical Particulars' Document for the
Execution of Electromechanical works for Kuttiyadi 3 × 25 MW HEP RMU Works contains
serially numbered pages from 1 to 51
1.1 General
◦ The first form, BoQ1 sheet of the BoQ document (xls - Excel format) shall be
used for quoting the price for the design, planning, engineering, manufacture
and supply of equipment.
◦ The prices for Erection, Testing and Commissioning of the equipment shall
be quoted in the second form, BoQ2 sheet of the BoQ document (xls - Excel
format).
◦ The bidders shall indicate the rates of all taxes and duties such as Goods
and Services Tax (GST) and any other taxes in the relevant BoQ sheet as
required in Clause 4.1 of Part 4 of Conditions of Bid and Contract.
◦ The rates of different taxes & levies considered shall be mentioned by the
bidder.
1.1 Bidders shall quote for the entire package on a single source responsibility
basis on the following lines:
1.1.1 Plant & equipment, materials and other components to be supplied from
abroad shall be quoted on CIF (Indian Port) price basis in Indian Rupees
only. Bidder shall also quote the corresponding FOB Price. The cost towards
customs duty, port clearance, handling at port, inland transportation and
inland transit insurance for delivery to the project site shall be quoted
separately in Indian Rupees.
1.1.2 All other plant & equipment, materials etc... manufactured / fabricated in
India shall be quoted on ex-works price basis (including packing & forwarding
charges) in Indian Rupees and the cost towards inland transportation and
1.1.3 The price of services for supervision, erection, testing and commissioning
etc... shall be quoted as an independent item in Indian Rupees.
1.2 The bidders shall quote their prices in the same format given in the BoQ1
and BoQ2 sheets of BoQ document and no other formats devised by the
contractor will be accepted. The split up details of the taxes and duties shall
be submitted by the Bidder separately.
1.3 The rates of different taxes and duties considered shall be mentioned by the
bidder clearly. The KSEBL will deduct all applicable taxes and duties from the
contractor’s bill and remit the same to the concerned authorities.
1.4 Service Tax, if payable on freight charges will be to the supplier's account.
However documentary proof of having paid service tax shall be produced
along with the invoice.
1.5 The Bidder shall submit the split up details of the taxes and duties separately.
1.6 The quantity mentioned for each item is only an estimate and the bidder shall
have to supply the actual quantity as per requirement within the overall
quoted rate. However, if the actual quantity is less than the estimate quantity,
payment shall be effected only for the actual quantity based on the unit rate.
1.7 Mandatory Spares: All spares required during the Defects liability period,
needs to be compulsorily provide by the Contractor and the priced list
(Volume-4 Annexure-1 Mandatory Spares) and a list with same items but
without price (Volume-3 Annexure-1 Mandatory Spares) also is to be
provided by the Contractor. It also needs to be specified that any spare other
than that specified in the list is necessitated during the defects liability period,
the same will be deemed to have been included in the mandatory list and will
have to be provided free of cost by the Contractor.
1.8 Recommended Spares: The Contractor shall provide a priced list of spares
(Volume-4 Annexure-2 Recommended Spares) with unit rates that may be
required for a two year period after the defects liability period. The Contractor
shall also provide a list with same items but without price (Volume-3
The terms of payment for the supply and services of hydro-mechanical and electro-
mechanical equipment will be as follows:
For Supply:
a) 80% of the FOR value of materials together with 100% value of taxes &
duties (including statutory variations) and freight and insurance shall be paid
on prorata basis against receipt of materials at site as certified by the
concerned Engineer-in-charge.
b) 20% of the FOR value of materials shall be paid unit-wise on completion of
erection, testing and commissioning of each unit to the satisfaction of the
2.1.1 Turbine
Output, efficiency and discharge at the net effective head: 640 m
% of Load
Items
110 100 90 80 70 60
Output
(MW)
Efficiency
(%)
Discharge
(m3/sec)
For every short fall of 0.1% in weighted average efficiency after taking into account
IEC tolerance, a penalty of 0.5% of ex-works contract price on pro-rata basis for
each of the turbine having short fall will be levied. If the shortfall is 2% or more, the
turbine will be rejected.
For the purpose of comparison of tenders, the quoted price shall be equalised for
the shortage in weighted average efficiency at the rate of 0.5% of the ex-works
Contract Price for each 0.1% shortfall in efficiency.
2.1.2 Generator
Efficiency of the generator at rated voltage and frequency at 75°C:
For every shortfall of 0.1% in weighted average efficiency after taking into account
IEC tolerance, a penalty of 0.5% of ex-works Contract price on pro-rata basis for
each of the generator having shortfall will be levied. If the shortfall is 2% or more,
the generator will be rejected.
For the purpose of comparison of tenders, the quoted price shall be equalised for
the shortage in weighted average efficiency at the rate of 0.5% of the ex-works
Contract Price for each 0.1% shortfall in efficiency.
Note: These instructions shall be re-written and converted to a set of "Notes" and to
be included in the schedule which shall form part of the Contract, if any, is awarded.
3.1.1 Turbine
Sl. Item Description Particulars
No.
Items % Load
110 100 90 80 70 60
Output
(MW)
Efficiency
(%)
Discharge
(m³/sec)
a Specific speed
b Rated speed
2. ¾ Full load %
3. ½ Full load %
4. ¼ Full load %
9.
Momentary drop in speed on increasing load from zero to different values
a expressed as a percentage of rated speed
2. ¾ Full load %
3. ½ Full load %
4. ¼ Full load %
When 60 % load is applied
5. suddenly and balance in five %
seconds
14.
Cavitation guarantee per 1000 hours of
a Less than kg
operation
b Elevation of centre line of runner
Factor of safety
16.
Guaranteed minimum factor of safety
a under worst conditions based on yield
point of the material
Runner
19.
a Material
b Discharge diameter
c Inlet diameter
d Number of buckets
Shaft
20.
a Material
b Diameter
c Flange diameter
Shaft Sealing
21.
a Type
Guide Bearing
22.
a Type
d Bearing Diameter
f Height of bearing
a Type
b Normal diameter
c Diameter of servomotor
d Stroke of servomotor
e Design head
h Seals Provided
a Number of compressors
c Rating of motor
d Receiver capacity
Governing system
25.
a Governor Cubicle
i Make
ii Type
v Sensitivity
b Signal Generator
i Type
ii
Rated voltage
i
i
Rated frequency
v
ii Type
ii
Capacity
i
i
Type of operation Please Select
v
d Sump Tank
i Dimension of sump tank
ii Dimensions
ii
Normal volume of oil
i
i
Normal working pressure
v
Minimum working pressure for safe
v
operation
v
Quantity of governor oil for first filling
i
v
Type of governor oil
ii
a Preferred oil type
b
) Alternative oil type
b Diameter
c Flange diameter
d Length
e Weight
Shaft Sealing
27.
a Type
a Turbine bearing
b No. of pumps
b Type
a Type
c Brief description
3.1.2 Generator
Sl. Item Description Particulars
No.
A. General
1. Make
B. Technical Guarantees
100 % %
a
90 % %
80 % %
Stray loss
a 0.9 pf lagging %
b Unity pf %
b In rotor A/mm2
C. Generator Characteristics
Calculated losses of generator at continuous maximum rating, 0.9 pf, 11000 V,
1.
50Hz, 75°C:
a Armature kW
b Field kW
c Stray loss kW
d Core kW
f Excitation system kW
a Unsaturated pu
b Saturated pu
a At time zero kA
b At 2 seconds kA
a Estimated A
b Maximum A
c Duration sec
a Frequency Hz
Thrust bearing (State any necessary qualifying factors when giving the following
53.
data)
a Make
b Type
At maximum continuous rating, specified turbine thrust and weight at 32°C cooling
f
water
m Bearing Oil
a Type
a Type
b Method of cooling
f Tube material
n Cleaning method
a Type
c Tube material
e Cleaning method
a Type
c Tube material
e Cleaning method
a Type
b Number of coolers
g Cleaning method
(i) Mass kg
(i) Mass kg
l Rotor Shipping
Number of rotor spider sections for shipping
(i)
(if shipped in sections)
a Exciter on no load V
a Automatic control %
b Hand control %
a Maximum pu
b Minimum pu
20. Alarms
a Make
b Rated voltage V DC
(i) Type
a Make
c Maximum current A DC
(iii) Current A
b Neutral Resister
(iii) Rating A
o
(iv) Maximum temperature rise C
c Grounding transformer
(ii) Rating
• Continuous kVA
d Mass of cubicle kg
e Dimensions
(i) Length m
(ii) Width m
(iii) Height m
a Make
e Primary tappings %
i Ventilation
o Materials used:
(i) Conductor
(ii) Insulation
r Dimensions:
(i) Length mm
(ii) Width mm
(iii) Height mm
(i) Description
(ii) Mass kg
(iii) Length mm
(iv) Width mm
(v) Height mm
Descriptive Data and Drawing - Generator and Excitation - All data and
C.
drawings for evaluation shall be furnished.
1. Layout drawings included? (This shall
include:
a. Outline and part section of
generator, indicating pit size needed, Please Select
lifting requirements, foundation
points.
b. Outline and mass of cubicles
2. Summary of Erection Procedures
included? (This shall include:
Please Select
a. Preferred
b. Alternative
Details of excitation system included?
(This shall include:
a. Schematics, typical instruction
manual extracts, full description of
operation and performance of major
3. Please Select
components
b. Characteristic curves showing
relationship of output voltage, ceiling
voltage and negative ceiling voltage
for variations in AC supply
4. Performance curves for generator
included? (This shall include:
a. Open and short circuit excitation Please Select
b. Other excitation curves
c. Capability diagram (P-Q diagram)
d Direction of rotation
q Rated HP of motors
2. Duplex Strainers
a Type
b Design pressure
d Material of construction:
3. Piping
a Make
b Type
c Size
d Material
4. Valves
a Make
b Type
c Size
d Material
(i) Casing
(ii) Fitting
a Type of instrument
b Size
h VA burden:
i Power consumption:
n Range
2. Annunciators
a Type of Annunciator
c Particulars of wiring
d Rated voltage
e Power consumption
a) Manufacturer
b) Size of panel (H x W x D)
c) Colour of panel
f) Overall layout
i) Manufacturer
b) Integrating Meters
i) Manufacturer
c) Terminal Blocks
i) Type
ii) Manufacturer
3. Transducers
a) Amps
i) Manufacturer
iii) Output
b) Volts
i) Manufacturer
iii) Output
c) Frequency
i) Manufacturer
iii) Output
d) Watt
i) Manufacturer
e) VAR
i) Manufacturer
iii) Output
i) Manufacturer
iii) Output
4. Protection Equipment
a) Relay and Control Panels
a. Manufacturer
b. Size of panel (H x W x D)
c. Type of panel
d. Colour of panel
i) Manufacturer
ii) Type
b Demand (VA)
v) MMI type
a Standard 1
b Standard 2
c Standard 3
d Standard 4
e Standard 5
f Standard 6
g Standard 7
h Standard 8
i Optional 1
j Optional 2
k Optional 3
l Optional 4
n Optional 6
o Optional 7
p Optional 8
a Oscillographic
b Status
c Alarm
d Resolution
a Power supply
b CT or VT input
c Output circuits
d Modem / Data
e LAN
f Communication Protocol
i) Manufacturer
ii) Type
b Demand (VA)
i) Manufacturer
ii) Type
b Demand (VA)
i) Manufacturer
ii) Type
a Voltage range
b Demand
v) Current detector:
a Setting range
b Thermal range
c Relay burden
d Reset time
x) Communication Protocol
a. Manufacturer
b. Type
c. Current rating
d. Power supply:
i) Voltage range
ii) Demand
i) Instantaneous (50)
f. Setting range:
i) Instantaneous (50)
Characteristic curves
g. Please Select Please Select Please Select
available?
Time multiplier setting
h.
range, inverse time (51)
i. Minimum pickup:
i) Instantaneous (50)
j. Maximum reset:
i) Instantaneous (50)
i) Instantaneous (50)
l. Data storage
m. LAN protocol
n. Modem option
o. Access software
i) Manufacturer
ii) Type
i) Manufacturer
ii) Type
Interposing and Auxiliary Tripping Relays (Provide the following data for all closing
i)
and tripping control, protection trip, trip target repeat and alarm auxiliary relays)
Sl. Trip Alarm
Item Description Trip Repeat Status
No. Lockout Repeat
a Manufacturer
b Type
d Type of resetting
a. Manufacturer
b. Type
c. Time range
e. Contact rating:
i Make
ii Break
f. Power supply:
ii Demand (VA)
a Design
b Prototype testing
d Pre-production
e Production / in-service
v) Major user(s)
Note: Technical Particulars for other power house equipment such as Governor system,
Generator Line and Neutral cubicles, Segregated Phase Bus duct, 415V LT AC
Boards, DC Boards, UPS, PLC / SCADA system, Feeder protection panel
(Numerical distance protection & Over current backup (2 OC +1 EF) protection
scheme), Fire protection system, Air conditioning etc... that are deemed to have
necessary for the commissioning of the Renovated, Modernized & Uprated KHEP