Professional Documents
Culture Documents
X Visto Por / Seen From X Detalle / Detail A 1/6 Detalle Extremo Eje L.A. / D.E. Shaft End Detail
X Visto Por / Seen From X Detalle / Detail A 1/6 Detalle Extremo Eje L.A. / D.E. Shaft End Detail
X
A DETALLE EXTREMO EJE L.A. / D.E. SHAFT END DETAIL A
VISTO POR / SEEN FROM X
APPROX. 3756 5
DETALLE / DETAIL A
APPROX. 1937 5 APPROX. 1819 5 q 2350
1/6
13 ACB0
3,2
O 390
1 x45v
5
B ACB2 B
APPROX. 873
11
0
10 O 362
1,6
-0.03
R
ACB2
15
°
APPROX. 1500
C
4 x20v
C SPB C
PCB
3,2
n O 0.3 A O 360 h8
SPB PCB
DETALLE / DETAIL D
1/6
M16-30/40 (8x45º)
APPROX. 3495
para INDAR / for INDAR
D D
5
5
960
03
1150
5
APPROX. 1545
1000
5
5
45°
09 13
APPROX. 1995
APPROX. 3515
E E
APPROX. 5340
867
80 80 80
11 12 ACB0
Entrada cables
80
08 Cables entry
O2
01
07
50
5
DETALLE / DETAIL C
02 1/3
M42
F F
5 Entrada cables
Cables entry
1890
5
5
1700
5
1595
1411,5
14
120
This present document and its contents are confidential, and are the exclusive intellectual and / or industrial property of INDAR, in addition to any technology, design, invention, work, process, know-how, calculation, manual, method, solution, idea, improvement, drawing, diagram, modification, contribution
and, in short, any associated information or documentation involving industrial or intellectual property developed or supplied by INDAR on the occasion of the quote, order execution or incorporated into the design or operation of the supply. The recipient may not use such property in his favour or in that of a
110
120°
VISTO POR / SEEN FROM Y
It is strictly forbidden to totally or partially reproduce this document and to misuse it and / or to show it to third parties. The infringing parties shall be required to pay the corresponding compensation for damages and any other legal or criminal responsibilities the infringement may give rise to.
G G
22
11
550
5
2
470
5 O 44
50
(O 61,3 )
60°
3,2
B
120°
A
04
H
733
5 CENTRO TURBINA H
06 07
TURBINE CENTER
952
12
O
69
117
7,5°7,5° 15°
15° 13 3,2 lo tanto la responsabilidad en este aspecto recaerá exclusivamente sobre el
° 15 cliente o sobre terceros. La responsabilidad de la operación de cementación
15 °
queda fuera del alcance de INDAR.
15 16
6,3 O 2050 H8
J INDAR does not include any design or calculation of the machine foundation; J
O 2170 f7 thereby responsibility in this regard rests solely with the client or third parties. In
addition, the grouthing operation is normaly outside the scope and responsibility
O 2220 H8 of INDAR.
18°
O 3000
third party for purposes other than the fulfilment of the order and the operation and maintenance of the supply, without the prior written consent of INDAR.
1271,17
All the cross references apply to the last revision in force of the document.
3,2
13
0 3,2
1 x45v 12 TP-CO1 Entrada agua cojinete L.O. / N.D.E. bearing water inlet
05 Actualizacion general / General updated 26-01-2017 J.I. N.O.A N.O.A
1 x45v
30
O42 (16x) 03 TP-AC1 Salida agua caliente / Hot water outlet GENERAL DIMENSIONAL DRAWING
18°
20
18° (Para tornillo M36 / For screw M36) 60 02 TP-AF1 Entrada agua fría / Fresh water inlet
9° 01 (1x) Refrigerador de tubo símple / Single tube cooler Drawn I.C.A. 03-05-2012 Drawing Nr. Rev. Scale
(No suministro INDAR / Not INDAR supply) 80 ACB2 Caja Auxiliares L.O. / N.D.E. Auxiliary Box Checked P.G. 03-05-2012 11006535 05 1/15
M ACB0 Caja Auxiliares Principal / Main Auxiliary Box
Approved P.G. 03-05-2012 Code Sheet DIN M
SPB Caja de Neutro / Star Point Box
PCB Caja Conexiones Potencia / Power Connection Box Dimensions in mm H-5060310-3D010 1 1 A1