This document appears to be a cover sheet for engineering drawings related to the construction of desalination and power plants in Yanbu, Saudi Arabia. It identifies the client as the Saline Water Conversion Corporation of Saudi Arabia for Project Yanbu Phase 3 under Contract 20314. The engineer is identified as Fichtner GmbH & Co. KG and the contractor as SEPCOIII Electric Power Construction Corp. The drawings relate to GE steam power systems as a subcontractor for the project located in Yanbu on the west coast.
This document appears to be a cover sheet for engineering drawings related to the construction of desalination and power plants in Yanbu, Saudi Arabia. It identifies the client as the Saline Water Conversion Corporation of Saudi Arabia for Project Yanbu Phase 3 under Contract 20314. The engineer is identified as Fichtner GmbH & Co. KG and the contractor as SEPCOIII Electric Power Construction Corp. The drawings relate to GE steam power systems as a subcontractor for the project located in Yanbu on the west coast.
This document appears to be a cover sheet for engineering drawings related to the construction of desalination and power plants in Yanbu, Saudi Arabia. It identifies the client as the Saline Water Conversion Corporation of Saudi Arabia for Project Yanbu Phase 3 under Contract 20314. The engineer is identified as Fichtner GmbH & Co. KG and the contractor as SEPCOIII Electric Power Construction Corp. The drawings relate to GE steam power systems as a subcontractor for the project located in Yanbu on the west coast.
Project Name Switchgear Name Panel Type Document Title Ekc Dwg. No. Total Sheet:::::: 11039-0-LWD-08 54 Bahregan Storage Tanks Development IRP/23, SS1/IRP/23, SS2/IRP/23