Pile Settlement Sample Manual Calculations PDF

You might also like

Download as pdf
Download as pdf
You are on page 1of 5
(") poke? tLe IN DENSE SAND : Tae Y= 20 bye f Bose vesistance $= 30° Qy= Ny Ov" (p84) fev - 30° > Ng = 20 = ¥2Z - wz = 20 (24) — lo (34) = 240 bia 39, = 30% 340 = 1lO.2M > TbMn. Fostim for dune sand § = 30° (assume rool, pil) Fiim = 9.6MtA Ly Oy’ > rb 20m D=\.05m cet Ng ton = GO =P ob Se, Tate 9, > 46Hta 9 sch. WIA x Gy = 5 OB Kage & 31 MN Shap vesictance Ts = Bou = (KtuS)(8-K 2 Co.38 9 we = Geta i 10)% = 4622 MA Kt, 2 As-fu mu: 46 ween) LE =F = §.64l ASN wwe Ubimate axial lead ae =O + Os 2231+ 09 = HN AI < 100 bia (2) Délven PILE in CLAY : Sus So 452 [> Seale = Zo leo’ & Base vesistanm (4.32) TS =2.5 | BaNe Su = 63° ba OAKo.4w whut Ne= 4 Cree ) Sus 50 +6s4= To bla Qr= De = (o-4)°(680) = 100.8 EN. Shalt wsslance Ctohel tress cppidacl D Ts - & Su Ah 2m, whee C7. 6» Su=56+5x2= bokla d= ——— Se - 82 2(Sy6.°) =@p_10) x2 +20 = 0.38 Siow (Hf clay ) Glow )= 3 4 4 ? asf @D)ts ds * [404 (0-39 )(50+52) de = 30.44 304 [2°74 = 54. 7kN Wutinecte, pie cayoety Q=Qp+ Os = 100.94547 = 155.5) ea Q,-2 = ie ~ 62.2 —N FS (27 20lp EXAM QUESTION. : GO ands ov dune sand) (0) Bods resistance [ioe evsourtvedegn 5 Sti asec «Guo 20em — | Bote Assume ox = |.0 l= Sie > O-8 G=k& =!1K20 = 20 &= (FA de =Groi5)(20fL]” = 2408 tin) Dong sity cand : fe 2 2N = 2x 30 = 60¢ Cs oe Be kts b = &x0.1s)(60)(5) = 2 BN Qs deine) = 240+ (PO = 420 —N End bemAre (on sara> Pye “SOORN = BOD X30 = TOOOKRH < Thm Q, = POO (COIS xXO.K) = Zo2ky C4.6ub) Ultimate Gyacrty Q = 420+ 2o2 = 622 EN pew Q_ Sr l_o5nk PS = @= d60 23 CC) Use THE EQUIVALENT RAFT CONCEPT To CALCULME THe SETLEMEAT of the vile Rurdation fe oa tod load of Zo006N. (Assume nuutal plane od |5-5m)

You might also like