DESIGN FOR NON-DESIGNERS

This document is intended for employees


that do not have a professional background
or formal training in the industries of
architecture, interior design, planning,
engineering, or construction. It provides
a very brief description of how we deliver
building projects to clients. However,
our industry is in a constant state of rapid
development.

The clients we work for and the way we deliver


our work has vastly changed over the last ten
years, and it surely will again in the coming
decade. In order that we keep this document
manageable and easy to read, it focuses on
a very basic form of project delivery. Keep in
mind that there may be many differences in
the project work at Cannon Design.

SPRING 2011
WHAT WE DO
Cannon Design offers a variety of consulting clients prefer to work with Cannon for architecture
services related to buildings, but our core business or engineering services only, and outside firms for
is the planning, design and engineering of built other design services.
environments. Many times, we begin work with
clients well before they know what they need, As with most professional services, our work is
and well after a building is actually in place. We divided into phases, which generally end with
work on projects that involve completely new milestones in the form of delivered reports,
construction from the “ground up,” and also documents, drawings, or some other set of
renovations to existing buildings (both interior and materials (known as deliverables). We do not
exterior renovations). always provide services in each phase for every
client. Some projects require a full range of
Architects and interior designers lead most tasks services while others require initial analysis and
related to building design and planning. Structural, planning only.
mechanical, electrical, and plumbing engineers
lead the development and design of building Cannon Design also offers services related to the
systems that support the building and provide physical construction of buildings. One example is
heating, cooling, plumbing, fire protection, and a construction management, in which Cannon acts as
host of other services. Cannon Design offers all of the coordinator for construction activities such as
these disciplines in house, although some bidding projects or hiring contractors.

SPRING 2011
WHO WE WORK FOR
Cannon Design primarily works in the markets users) but rather someone who works for them to
of healthcare, college and university, Pre K-12 protect their best interests. For instance, when
education, public / government, sports, science we work on a Veterans Administration hospital,
and technology, corporate interiors, and corporate our client is the United States General Services
commercial. We occasionally work in other Administration, but the end users are of course
specialized sectors, depending on the type of clinical staff from the V.A.
opportunity. We chose to enter (and exit) markets
based on a complex array of opportunities, growth, A very important part of our work is balancing the
contraction, and the risks that each market involves. desires of many decision makers. In large and
complex organizations, the people who make
Generally, our “client” is the entity with whom key decisions may never step foot in a space we
we hold a contract. Clients can vary widely, design. We are responsible for balancing the
and take the form of hospitals, school districts, expectations of both our direct client and the
municipalities, public and private corporations, people who will use the buildings we design.
individuals, real estate developers, foundations,
federal governments, investment companies, and
other organizations. Sometimes, our client is not
the people who will inhabit the building (the end

SPRING 2011
HOW WE WIN WORK
A discussion of services cannot begin without paced process with tight deadlines. During this
first understanding how we win new projects. For time, Cannon Design identifies a proposed project
many reasons, few organizations simply hand new team, evaluates the schedule, and calculates a fee
projects to design firms without requiring some for services and expenses. These are generally
type of proposal and, in many cases, a face to face assembled into a proposal book along with written
interview. This is true even for clients with whom and photographic collateral that demonstrates
we hold a strong relationship (often called legacy our expertise. When possible, we submit our
clients). proposals as electronic files rather than as physical
documents.
When considering new work, most clients will first
issue a Request for Proposal (RFP) to obtain bids The client will collect proposals from a number
from design firms. Some RFPs are limited to invited of firms and often invites some or all of them to
firms, while others are publicly posted for any firm interview for the job in person. The interview is a
to access and submit a response. A well-written critical link to winning work, as it pairs faces and
RFP usually includes a very specific scope of work, a personalities with the firm’s name. Many clients will
basic outline schedule, an organization chart for the hold first-round interviews, then pare down the list
client, conditions that qualified firms must meet, of candidates to a “shortlist.” Shortlisted firms are
and a formal date and time deadline for responses. then invited for second interviews. After analysis,
Many RFPs also contain a list of questions that must the winning firm is selected and the project
be answered within the responses. commences.

When Cannon Design receives an RFP, they must


decide whether or not to submit a response,
which will generally be in the form of a Proposal
for Services. Proposals require resources, time
and money to produce, and so we make careful
decisions about when and how to respond to
RFPs. The decision to propose is based upon
many factors such as client relationships, past
performance, internal expertise, potential to
succeed, and even the notoriety of the project. We
often call this decision the “go/no-go,” and we use
forms to document this decision process.

If Cannon Design makes a “go” determination,


then we must formulate a response to the RFP.
We often engage a combination of professional
staff and our marketing department to assemble a
proposal. Proposal development is usually a fast-

SPRING 2011
HOW WE DELIVER WORK
Following is a typical progression of phased clients must answer is, “Will this investment yield an
services from project inception through close appropriate return?” Well-planned and executed
out of construction. This is by no means the only building projects will yield a stream of revenue
progression of events, nor is Cannon Design always that spans years or decades. The collective
involved with each phase. annual income (returns) must be compared with
the collective annual costs of running a building
The Contract in a model known as a pro-forma. If the pro-
forma demonstrates an acceptable return on the
Before we begin any work for a client, we must initial investiment, then at least one major client
first execute a contract that defines all aspects threshold is met.
of our services. An executed contract is one
that has been drafted, reviewed in detail by all Cannon Design offers many services to clients in
parties (meaning all entities that will be bound connection with feasibility analyses. A few of these
by the contract), and signed by an authorized are listed below:
representative of each party. A strong contract
explicitly states everyone’s responsibilities, services, - Long-range planning of a given site with
schedules, deadlines, fees, and means of resolving recommendations for growth and response
disputes. It can take months to execute a contract, strategies for future user requirements
depending on how each party negotiates the - Analysis of alternative building sites (access,
terms. infrastructure, environmental impact)

Working without a contract is strongly discouraged - Participation at municipal or community hearings


by Cannon Design, and is generally not allowed
- Initial project budgeting for alternate sites and
for new clients. Without a contract, we have little
designs
to no means of establishing our right to payment
or protection in the event of disputes. Contrary
The feasibility phase generally ends with a business
to popular opinion, good contracts actually avoid
plan for the project, which the client provides to
disputes and save everyone money.
their governing board or management. These
groups then determine whether to move forward
Feasibility Analysis with a project.

Feasibility analysis is the stage in which clients


Programming
decide whether, how, and where to locate a
building project. Sometimes, this phase can mean
Upon completion of the feasibility analysis and
the end of a potential project. Feasibility may be
decision to move forward, the next step is to
repeated many times before a project continues.
determine what exactly will be built. Programming
is a process used by planning professionals to
Buildings represent major initial and long term
translate client needs and expectations into a
expenditures, and therefore the first question most

SPRING 2011
physical room listing for the project, known as a department, and radiology department. During
program. Programming is as much art as science, Conceptual Design, we determine the best
and requires a detailed knowledge of the client’s placement for these items. The output of this
business. For instance, on a healthare project, decision making is sometimes known as a “stack
the number of patient bedrooms, exam rooms, and block” diagram, which represents outlines of
operating rooms, or radiology rooms depends each department or unit on a set of floor plans or
on the expected annual volume of patient traffic, as 3-dimensional colored blocks.
the efficiency of the hospital in question, and the
projected future growth.
Schematic Design (SD)
Programmers are trained to ask the right questions
in order to arrange a responsible, right-sized Once a concept for the building is in place, we
program. Responsible programming will result in a often move right into the next phase of design,
list of functional rooms that allows for growth and known as Schematic Design or simply “SD.” Where
flexibility, but avoids excessive building. The actual sometimes we may eliminate conceptual design as
program presents an orderly list of assumptions, a formal project phase, we almost always run an SD
followed by a list of room names, quantities, and phase.
square footages. The program is delivered to the
client for approval. During SD, our team advances the building design
from a loose concept towards a more refined
and well-defined description of the project.
Conceptual Design Development of the exterior normally takes a
slight lead in order to define the exterior limits and
Once a program is approved, we sometimes assemblies that will comprise the finished building.
engage in Conceptual Design. This is usually a Interior development closely follows. The design
short phase in which the initial concept for the team is often divided into exterior (shell and core)
building is realized. The main charge during this and interior (fit out) sub-teams. These may be
phase is two-fold. First, the design team must indistinguishable to the casual observer because
determine how the building will be placed on the team must work very closely.
the site and how large the building footprint will
be. Many factors affect this determination, such Throughout this phase, the team will meet with
as existing infrastructure, site access, views, water, key decision makers from the client organization to
trees, sun patterns, wind, and a host of ecological collect their feedback and incorporate it into the
considerations. SD drawings. These sessions are often called user
group meetings, and they take place on a 2-3 week
The second major task of conceptual design is cycle, between which intense development of the
determine how individual components of the design continues.
building program (see Programming) will be
arranged within the building. For instance, in a The total duration of SD depends on the size and
hospital project, we may need to create a main complexity of the project, but may last from two to
entry, registration area, outpatient examination six months. A completed SD deliverable includes

SPRING 2011
drawings and written specifications that describe time, interior fit-out drawings become very detailed
the project. The drawings are general in nature, during this time. For most rooms, the general
such as floor plans showing the exterior walls and layout, equipment layout, ceiling design, lighting,
most of the interior rooms. Additional drawings door requirements, electrical and data needs, and
depict views of the exterior, and specify the exterior finishes are determined via user group meetings
assemblies. Engineering drawings that describe and then documented. This work is performed by
the structural, mechanical, electrical, technology/ a team of architects and interior designers.
data, and plumbing systems of the building are
usually diagrammatic at this stage. Also, the Parallel to the activity described above,
design team often produces virtual models of engineering staff develop and begin to detail
the building to determine how much energy the the structural, mechanical (HVAC), electrical,
completed project will consume. technology/data, plumbing, and other building
systems. By the end of DD, each of these
The SD phase normally ends when the client disciplines should have determined basic system
approves of the SD package and authorizes the layouts, key equipment requirements and sizes,
team to move forward. The client may withhold and routing of each system within the building.
their approval until a contractor or construction This information is critical for the architecture
manager provides an estimate or budget for the team to ensure that the building skin and interior
design based on the SD documents. If the project will interface with building systems. Similar to the
is not affordable, the team may have to revise their architects and interior designers, engineering staff
drawings to reduce the scope of work. must meet with the client to gather feedback on
their designs. Engineering systems can be major
consumers of power, water and fuels, and building
Design Development (DD) owners are very interested in controlling these costs
while implementing systems they can maintain.
Upon client approval, the design team begins
Design Development, or DD. This is generally Design Development wraps up with the production
a fast-paced phase of design, because much of a fairly robust set of drawings and specifications.
detail is added to the documents and the team Drawings graphically depict the project while
normally continues holding user group meetings. specifications provide detailed written descriptions
Also, many new players join the team during this of most products and materials that will be installed
phase. For example, interior designers become on the project. These materials are tendered to
fully engaged to design the appearance of interior the owner and usually to one or more construction
spaces, which includes initial finish and furnishing partners who will again estimate the job. As is the
selections. case in SD, if the estimates that come back are too
high, the team may be forced (contractually) to
Typical development of the exterior (shell and reduce the scope of work.
core) includes final determinations of materials,
transitions between materials (glass, metal, stone,
etc), and detail as to how the exterior skin will relate
to the building’s structural system. At the same

SPRING 2011
Conctruction Documents (CDs) Bidding and Negotiation

The last major phase of design is known as The bidding and nogotiaiton phase commences
Construction Documents, or CDs. True to its at the end of the construction documents phase,
name, this phase involves the production of the and is a phase in which the bulk of labor shifts from
drawings and specifications that will be used to the design team to the construction team. Bidding
construct the building. During the CD phase, takes several forms. If the owner has pre-selected
client interaction tends to decrease as the design a construction partner, then this constructor will
and engineering team focuses their attention on prepare a bid for the entire scope of work under
internal coordination. Therefore, meetings with the their control. The bid will consist of many portions
client are often replaced by coordination meetings that represent the cost of site work, utility work,
between various team members. structural work, and so forth to account for all
aspects of the project.
On a well-run project, the CD phase should be
focused on resolving minor conflicts and adding An alternate bidding method is competitive
detail to help the construction team build the bidding, in which multiple firms are invited to
project according to the design team’s intent. bid on a project. Almost all public work must
However, production of CD’s can be very labor be competitively bid for reasons of public
intensive as all aspects of the design need to be accountability. In this case, each bidding
coordinated internally and with other disciplines constructor will prepare and submit a sealed bid
(for example, the architectural drawings must for the scope of work defined in the construction
accurately reflect the structural system). documents. The owner will open these bids in a
public or private bid opening, which is generally
Construction Document production has changed held at a pre-determined time and location. The
considerably in recent years, as many firms migrate bid opening can be very formal for complex or
to three-dimensional software packages to produce public projects.
and detail building design projects. These
programs help to highlight conflicts in real time, Regardless of whether the bidding is by a pre-
while increasing productivity. However, no software selected constructor or by a competitive bidding
program replaces the skills of a talented project process, the design team (inclusive of architects,
architect. interior designers, engineers, etc.) must be
prepared to answer questions presented by the
At the completion of the CD phase, the team issues bidders. This process is formalized into documents
a full construction document package for bidding known as Requests for Information, or RFIs.
(called a bid package). Contractors use this Bidders issue RFIs to the architect, who retrieves
package to acquire firm bids from sub-contractors answers from the design and engineering team
that will perform the work. In some cases, the team and then issues those answers to the owner and
issues several bid packages over a span of time all bidders. It is essential that all answers are
so that portions of the project can be accelerated. communicated to all bidders so that they have
This has become increasingly common on projects parity of information.
of all sizes.

SPRING 2011
At the end of the bidding phase, the owner selects team can be complex, but all parties must fully
a preferred construction partner (in the case of understand their relationship before construction
competitive bidding), and (in all cases) negotiates commences.
the final cost of construction, which is then
formalized into a contract with the constructor. This During construction administration, the architecture
contract is an essential document that establishes and engineering team maintains a close
a legal agreement between the client and the relationship with the owner in order to ensure
constructor. that the design meets the intent of the drawings
and specifications. They will visit the jobsite on
A parallel process that often occurs during bidding a regular basis to observe works in the field, but
is document review by local, state, and even only in the role of observer. They will record their
national entities to grant required permits for observation in field reports that contain descriptive
construction. The owner is generally responsible updates and photographs, and report their findings
for securing permits. In some jurisdictions, the to the owner.
time and costs associated with permitting can
be extremely significant. In addition to standard Another primary task of the design team is to
building permits, the owner may need to obtain respond to questions in the field as they arise.
permits from environmental agencies, state health Similar to the bidding process, the RFI format is
departments, and even national security agencies used to submit questions, and the design team
before they can begin any work in the field. Failure must coordinate and issue responses to each
to comply with these requirements can result in question in a timely fashion. In addition to this task,
large fines. the design team must review various samples and
drawings that are produced by the constructor’s
sub-contractors to ensure that they conform to the
Construction Administration (CA) intended design. These tasks can represent a great
deal of time and work for the design team, and so
Construction administration is the phase in which it is important that the project manager reserve
the building is physically constructed. Clearly, a enough professional fee to cover this expense.
lot of work has occurred by the time there is any
activity in the field. Near the completion of construction, the design
team will “walk the jobsite” and assemble a punch
The architects’ and engineers’ relationship with the list, which is a detailed listing of deficiencies and
constructor is not a direct contractual one, but they incomplete work. Before the project is considered
are linked together via the owner. The owner holds complete, the punch list must be addressed to
contracts with the constructor and the architect/ the owner’s and architect’s satisfaction. Only then
engineering team, and each of these contracts will the architect issue a notification to the owner
defines responsibilities for all parties. For example, that the project is “Substantially Complete,” at
the architect can be designated as a non-binding which point the owner seeks an occupancy permit
arbiter in the event of a disagreement between the from local authorities. In all but a few cases, the
owner and constructor. The legal arrangement of owner cannot occupy a space on a temporary or
the owner, constructor, and architect/engineering permanent basis until the local building authority

SPRING 2011
clears their request. For many healthcare projects, leaves a lasting impression, and so we must never
a state entity must also clear occupancy requests. “cut and run,” from a project. Simple gestures
such as regular telephone calls, an occasional
Soon after the project is declared substantially lunch, or attendance at fundraising events can
complete, the architect’s and engineer’s formal mean the difference between future work and a
contract with the owner is considered complete. severed relationship. Therefore, no matter what
phase of design or inactivity we may be facing with
our clients, marketing is a constant task for the
Occupancy, Post-Occupancy, and Marketing employees of Cannon Design.

In most cases, the grand opening of a new


building is a cause for celebration amongst all
team members. For an effective, well-oiled design
and construction team, it can be a time of mixed
emotions since the team inevitably breaks apart
to work on new assignments. However, it can also
be a time of great activity (and stress) as the owner
attempts to occupy, furnish, and move their staff
into new or remodeled spaces. Suffice it to say, a
number of celebrations are scheduled in concert
with the many tasks an owner must undertake
before people can live or work in new buildings.

Roughly 12-18 months after occupancy, Cannon


Design often performs studies to understand
how our work is performing against our client’s
expectations. We have a standardized process
in place to conduce Post-Occupancy Evaluations
(POEs), which are detailed surveys and reports that
measure project performance. POE’s are funded by
overhead or marketing monies, but are well worth
their cost. Our staff can learn a great deal of useful
information from POEs that can be applied on
future projects.

Another critical activity that Cannon Design


performs after occupancy is ongoing marketing,
which involves nurturing our relationships with
past clients in order to be considered for future
work. The manner in which we close out projects
and continue communications with our clients