Dynamic Compaction

Joachim KERN – Productmanger Heavy Duty Crawler Cranes


Agenda

1 The Process
2 The Performance
3 The Place
4 The Project

2 NEW TECHNIQUES AND TECHNOLOGIES FOR GROUND IMPROVEMENT 20-Nov-18


The Process

The Process

- Lifting a defined weight on a defined height


- Weight droped on the ground by activating the
free fall
- Weight hit and compact the ground
- After this proces lift up the weight and start the
process again

3
The Process

4 NEW TECHNIQUES AND TECHNOLOGIES FOR GROUND IMPROVEMENT 20-Nov-18


Agenda

1 The Process
2 The Performance
3 The Place
4 The Project

5 NEW TECHNIQUES AND TECHNOLOGIES FOR GROUND IMPROVEMENT 20-Nov-18


The Performance

Nr. 1 The Phases (Stages)

Stage 1 Machine Nr. 1


Stage 2 Machine Nr. 3
Stage 3 Machine Nr. 2
Nr. 2 Stage 4 Machine Nr. 4

Nr. 3  cycle Time <30s  70-90 drops/hour


Nr. 4 The Parameters

Winch capacity
Winch speed
Intelligent braking system to avoid slak rope
Intelligent hydraulic to avoid overheating
Optimized engine size
Planning

6 NEW TECHNIQUES AND TECHNOLOGIES FOR GROUND IMPROVEMENT 20-Nov-18


Agenda

1 The Process
2 The Performance
3 The Place
4 The Project

7 NEW TECHNIQUES AND TECHNOLOGIES FOR GROUND IMPROVEMENT 20-Nov-18


The Place

Hayward Baker USA Windfarm Menard, Kuwait Sabah Al Ahmad Sea City TDE, Germany, Coal Mining

8 NEW TECHNIQUES AND TECHNOLOGIES FOR GROUND IMPROVEMENT 20-Nov-18


Agenda

1 The Process
2 The Performance
3 The Place
4 The Project

9 NEW TECHNIQUES AND TECHNOLOGIES FOR GROUND IMPROVEMENT 20-Nov-18


The Project
Jätkäsaari-Hafen in Finland

Jätkäsaari-Harbour
Country Finland
City Helsinki
Building Site Jätkäsaari
Area 100ha

10 NEW TECHNIQUES AND TECHNOLOGIES FOR GROUND IMPROVEMENT 20-Nov-18


The Project

HS 8130 HD
Main Boom 14m-35m (14m-53m)
Main Winch 2x35t – free-fall
Engine 505kW – Liebherr V8
Operating weight 116t
Transport weight 51t
Max. Drop weight Up to 25t

Jätkäsaari-Hafen in Finland

11 NEW TECHNIQUES AND TECHNOLOGIES FOR GROUND IMPROVEMENT 20-Nov-18


The Project

Jätkäsaari-Hafen

Main boom 26m

Drop height 10m

Drop weight 14t

Winch speed 88m/min

Drops per hour app. 110

Total Drops 50.000

Ground improvement Down to 7m

Area 25.000m²

Fuel Consumption 34l/h

12 NEW TECHNIQUES AND TECHNOLOGIES FOR GROUND IMPROVEMENT 20-Nov-18


The Project

Jätkäsaari-Hafen

Main boom 26m

Drop height 10m

Drop weight 14t

Winch speed 88m/min

Drops per hour app. 110

Total Drops 50.000

Ground improvement Down to 7m

Area 25.000m²

Fuel Consumption 38l/h