DETAIL ESTIMATE FOR CONSTRUCTION OF LABOUR SHA
NAME OF WORK - CONSTRUCTION OF LABOUR
SITUATION- WARD NO.05, NEW BUS STAND, PIPLODA,
S.O.R FOR BUILDING WORK U.A.D.D. VOL.-II IN FORCE FROM 10/05
1 2 3 4
Earth work in excavation by mechanical means(Hydraulic excavator)/
manual means over areas(exceeding 30cm in depth. 1.5m in width as
well as 10 sqm on plan) including disposal of excavated earth, lead
upto 50m and lift upto 1.5m, disposal earth to be levelled and neatly
1 2.6.1/15 dressed. All kinds of soil 6
in step base 1
Provind and laying in position specified grade of reinforced cement
concrete excluding the cost of centering shuttering, finishing and
reinforcement - All work upto plinth level: Cement concrete grade M-
20(Nominal mix) with 20mm maximum size of stone aggregate
3 5.1.1/46
in footing 6
in footing cap 6
in plinth beam 3
2
Filling by available excavted earth (excluding rock) in trenches,
plinth, sides of foundations etc. In layers not exceeding 20 cm in
4 2.25/19 depth, consolidation each deposited layer by ramming and watering, 6
lead upto 50m and lift upto 1.5 m.
Supplying and filling in plinth under floors including, watering,
5 2.27.3/19 ramming consolidating and dressing complete. Moorum/Hard copra 1
Kota stone slab 25mm thick flooring over 25mm (average) thick base
laid over and jointed with gray cement slurry mixed with pigments to
match the shade of slab including rubbing and polishing complete
7 11.26/133 with base of cement mortar 1:4 cement: coarse sand 1
in plateform 2
in plateform 1
Reinforced cement concrete work in beams, suspended floors, roofs,
having slope up to 15 degree landing, balconies, shelves, chajjas,
lintels, bands, plain window sills, staircase and spiral stair cases up to
floor two level excluding the cost of centering, shuttering, finishing
and reinforcement with cement concrete grade M-20(Nominal Mix
with 20mm maximum size of stone aggregate).
10 5.3/46
in beams 3
2
in lintels 2
2
in sun shade 2
Reinforcement for R.C.C work including straightening, cutting,
bending, placing in position and binding including cost of binding wire
11 5.20.2/49 upto floor two level including all wastage etc. Complete. TMT STEEL 1
BAR.(@1.5% of total R.C.C. Volume)
Providing ridges or hips of width 60cm over all width plain G.S. sheet
fixed with polymer coated J or L hooks, bolts and nuts 8mm dia. G.I.
limpet and bitumen washers complete.0.63 mm thick with zinc
18 12.4.2/143 coating not less than 275gm/sqm.. 1
Painting steel work with delux multi surface paint of required shade.
Two or more coat applied @0.90 ltr/10 sqm over an under coat of
25 13.48.3/162 primer applied @ 0.80 ltr/ 10 sqm of approved brand or 1
manufactured.
C. M. O.
NAGAR PARISHAD, PIPLODA
PIPLODA, Distt. RATLAM [M.P.]
OR CONSTRUCTION OF LABOUR SHADE
ONSTRUCTION OF LABOUR SHADE
05, NEW BUS STAND, PIPLODA, RATLAM
RK U.A.D.D. VOL.-II IN FORCE FROM 10/05/2012
5 6 7 8 9 10 11
1 1 1 1025 60 kg 61500
1 1 22 44.00
1 1 22.5 22.50
1 1 2 4.00
.2 3.3 1.98
4.2 .2 3 5.04
1 1 .8 1.60
2.65 .2 3 3.18
6 0.25 0.15 0.23
6 0.5 0.15 0.45
6 0.75 0.15 0.68
0.6 0.1 0.88 0.63
1.5 1.2 .2 -0.72
4.2 .2 .2 -0.34
2.65 .2 .2 -0.21
Total Qty. 10.54 3310 cum 34873
151.00 59 kg 8909
217.00 59 kg 12803
56.00 59 kg 3304
50.00 59 kg 2950
Amount= 295970
0.90*Amount= 266373
Add 12% G. S. T.= 31965
Total Amount= 298338
Say Thee lack