This document outlines the procedure for inspection of steel structure preparation work done by painting subcontractors at Damen Shipyards Galati. It states that defects removal and edge rounding is the responsibility of the shipyard or construction firms. Inspection is done in two stages - initially before entering halls, and then on completed vessels. The paint applicator representative checks entire sections. Production cannot be stopped if the representative is unavailable. Sections and third parties will invite the representative in writing. After remarks are addressed, a final check is done. The representative only checks their initial remarks. Both parties sign an acceptance document and keep a copy.
This document outlines the procedure for inspection of steel structure preparation work done by painting subcontractors at Damen Shipyards Galati. It states that defects removal and edge rounding is the responsibility of the shipyard or construction firms. Inspection is done in two stages - initially before entering halls, and then on completed vessels. The paint applicator representative checks entire sections. Production cannot be stopped if the representative is unavailable. Sections and third parties will invite the representative in writing. After remarks are addressed, a final check is done. The representative only checks their initial remarks. Both parties sign an acceptance document and keep a copy.
This document outlines the procedure for inspection of steel structure preparation work done by painting subcontractors at Damen Shipyards Galati. It states that defects removal and edge rounding is the responsibility of the shipyard or construction firms. Inspection is done in two stages - initially before entering halls, and then on completed vessels. The paint applicator representative checks entire sections. Production cannot be stopped if the representative is unavailable. Sections and third parties will invite the representative in writing. After remarks are addressed, a final check is done. The representative only checks their initial remarks. Both parties sign an acceptance document and keep a copy.
Modificat Verificat DOCUMENT + INDICE : IL 2504 Aprobat DISTRIBUIT LA: DISTRIBUIT LA: Compartiment Numele Semnătura Data Compartiment Numele Semnătura Data Secţia I Secţia IA DRA Lǎcǎtuşerie Navalǎ Damen Services Tubulaturǎ Den Breejen România SRL Metacom Sandblasting SRL Metacom Steel Building SRL Painter SRL Pronavserv SRL Armax SRL Carsinav SRL Eekels SRL Firogal SRL Galmirad SRL Galsena SRL Heinen & Hopman Mar SRL Hidromecanica SRL Nardacom SRL Navmaro SRL Shipbuilding SRL Navelectric Team SRL Trimetalica SRL Spiroduct SRL Verblast SRL
VALIDITY : GENERAL
Drawn up C. MACOVEI
Checked S. POPESCU
1/3 Approved L. SILION I.L. 2504
Procedura de inspecţie a lucrǎrilor de pregǎtire DAMEN SHIPYARDS GALATI a structurilor de oţel de cǎtre subcontractorii JOB PREPARATION de vopsitorie / DEPARTMENT Procedure for inspection done by painting applicators, for preparation of steel structures IL 2504 Pag. 2/4
04.07.2006
Procedura de inspecţie a lucrǎrilor de Procedure for inspection done by
pregǎtire a structurilor de oţel de painting applicators, for cǎtre subcontractorii de vopsitorie. preparation of steel structures
Inaintea activitǎţilor specifice de vopsitorie Before specific painting activities to start
– pregǎtirea suprafeţelor şi aplicarea – surface preparation and application of straturilor specificate de vopsea – este paint layers – is necessary to remove necesar sǎ fie îndepǎrtate defectele de surface defects and defects of welding suprafaţǎ şi defectele cordoanelor de seams. Some particular sharp edges sudurǎ. Anumite muchii ascuţite se have to be rounded, as per Shipyard rotunjesc, în conformitate cu Standardul de Quality Standard. Calitate.
In conformitate cu prevederile Contractelor According provisions of Frame Contracts
Cadru dintre Şantierul Naval Damen Galaţi between Damen Shipyards Galati and şi subcontractorii pentru activitaţi de subcontractors for painting activities, vopsitorie, îndepǎrtarea defectelor şi removing of steel defects and rounding rotunjirea muchiilor ascuţite sunt în sarcina of sharp edges are in shipyard’s charge, şantierului, respectiv a terţelor firme care respectively of third Companies executǎ lucrǎri de construcţie. performing construction works. Nivelul acestei pregǎtiri este limitat la The level of this preparation is limited to defectele vizibile înaintea operaţiilor de visible defects before surface pregǎtire a suprafeţelor pentru vopsire şi preparation operations for painting and de prevederile Standardului de Calitate al provisions of Shipyard Quality Standard SNDG. of DSGa. Defectele descoperite dupǎ pregǎtirea The defects found after surface suprafeţei sunt în sarcina subcontractorului preparation are in paint applicator’s de vopsitorie. charge.
In scopul delimitǎrii responsabilitǎţilor, For separation of responsibilities,
secţiile de construcţii I şi I A, respectiv construction departments I and I A, terţele firme care executǎ lucrǎri de profil, respectively third Companies executing prezintǎ aceste lucrǎri subcontractorilor de dedicated works, are presenting these vopsitorie. works to paint applicators.
Prezentarea se face în doua etape: The presentation is done in two stages:
- In faza de secţie, înainte ca secţia - In section stage, before the sǎ fie introdusǎ în halele de section/hull unit to be introduced in sablare/vopsire (sau, în cazul în care blasting/painting hall (or, in case the nu se specificǎ vopsirea secţiei, section is not to be painted, before înainte de a fi montatǎ la navǎ). Se va erection to ship). It will be checked by verifica de cǎtre reprezentantul firmei applicator’s representative the entire de vopsitorie întreaga secţie, inclusiv section, including areas not to be suprafeţele care nu se vopsesc. painted. IL 2504 Pag. 3/4 - Pe nava încheiatǎ, dar numai pentru - On completed vessel, but only for inspecţia cuplǎrii de montaj. inspection of coupling seams.
Procedura de inspecţie Inspection Procedure
Verificarea lucrǎrilor de pregǎtire a Checking of steel structure preparation
structurilor de oţel respectǎ urmǎtoarele observes the rules bellow: reguli: - Reprezentantul firmei de vopsitorie - The representative of painting verificǎ întreaga secţie, indiferent dacǎ applicator is checking entire section, aceasta se vopseşte complet, parţial, regardless it have to be painted sau nu se vopseşte de loc. Acceptarea completely, only partly or not to be lucrǎrilor este interpretatǎ în acest painted at all. Acceptance of works is sens. interpreted accordingly. - Procesul de producţie nu poate fi - Production process cannot be oprit ca urmare a indisponibilitaţii stopped because the paint applicator’s reprezentantului firmei de vopsitorie la representative is not available at the ora stabilitǎ pentru inspecţie. Modul de time established by invitation. The inspectie are regim de “witness point” inspection mode has character of aşa cum este înţeleasǎ aceastǎ “witness point” as this is understood in sintagma în Planul de Inspecţie. Inspection Plan. - In vederea verificǎrii, secţiile de - For inspection purpose, construction construcţii corp şi terţele firme departments and third Companies and constructoare precum şi Damen Damen Services as well will invite in Services vor invita în scris (prin e-mail writing (by e-mail of fax) the sau fax) reprezentantul firmei de representative of painting Company. vopsitorie. Dupǎ executarea After execution of remarks found and observaţiilor indicate şi marcate, dacǎ marked, if any, the representative of este cazul, reprezentantul firmei de paint applicator will be invited for final vopsitorie va fi invitat pentru verificarea check. During this second inspection, finalǎ. La acestǎ a doua inspecţie, the representative will check only reprezentantul firmei de vopsitorie va his/her remarks of the first inspection. verifica numai observaţiile sale de la inspecţia iniţialǎ.
Inregistrǎri Registration
Dupǎ acceptarea de cǎtre reprezentantul After acceptance of works by paint
firmei de vopsitorie a lucrǎrilor, acesta va applicator’s representative, he/she will semna în documentul de predare standard. sign the standard acceptance document. (Request for inspection – S.N.D.G. – FCTC (Request for inspection – S.N.D.G. – – 10) FCTC – 10) Fiecare din cele doua pǎrţi va pǎstra o Both parties will keep a copy. copie. IL 2504 Pag. 4/4