Professional Documents
Culture Documents
Parallel Processing: Synchronised Processes, No Time Wasted..
Parallel Processing: Synchronised Processes, No Time Wasted..
Parallel Processing: Synchronised Processes, No Time Wasted..
c o m
Parallel Processing
Synchronised processes, no time wasted...
a t c h e s
14 B
w w w. m atc o n i b c . c o m
s h i f t !
per
Parallel Processing...
...the smarter, more efficient way to manufacture.
Reduce the cost per kilogram manufactured.
Key Benefits
Increasingly sophisticated consumer tastes In contrast, the Matcon system uses IBCs to
result in a broadening of product portfolios & transport material between the manufacturing
Increase productivity by up to 300%
processes, decoupling them to allow Filling,
a need to continually improve product quality. Blending, Packing & Cleaning to take place
This requires greater manufacturing flexibility simultaneously - Parallel Processing. One recipe
to respond quickly to customer demand and can be packed, at the same time as one is mixed Production flexibility for rush orders
to handle a wide range of ingredients within and another is formulated; whilst used IBCs are
stringent regulations. cleaned off-line.
tches Optimum utilisation, OEE around 80%
Only 7 Ba ft!
per shi
IBC Blending is central to the success of the
Matcon system. Because the IBC becomes the
Conventional manufacturing plants with linked
mixing vessel there is no need for cleaning ‘Make to order’ not Campaign
processes (shown left) are perfect for long
between recipes, thereby speeding up the whole
campaign runs as they are highly automated. cycle time and adding flexibility to the system
However, if the requirement is for many recipe and eliminating ‘dead’ time. Reduce process inventory to a fifth
changes, then they lack flexibility. The system is
limited by the need to conduct time-consuming
cleaning due to the risk of cross-contamination. Give us a call Assured product quality
As a result, large quantities of inventory are often We have a global team of technical sales
produced to cope with demand. consultants who offer their services free of charge
for an initial site survey. They will identify what
financial gains you could make by implementing a
Customer satisfaction
Matcon IBC System.
w w w. m a t c o n i b c . c o m
Pro
j ec
tM
ce n
ana
tena
BUIL
ATE / IMPROVE
gem
ial Use / Cleaning / Main
ent
D/
The
/ Manufacture / Qualit
FACTORY TES
Continuous
Improvement
Cycle
OPER
merc
C om
/ Do y
T
cu m
enta
ti o
n
Sh g
ip in
pin ain
g/I
nstall i ng / Tr
ati on / Commis si o n
IMP
LEMENT / SITE TEST
MATCON, Bramley Drive, Vale Park West, Evesham, Worcestershire, WR11 1JH, UK
Tel: +44 (0) 1386 769 000 Fax: +44 (0) 870 1911116 Email: matcon_marketing@idexcorp.com