DPR FB-Amd 01.10.2018

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

TO:

BASIN MANAGER, BARODA, HOI-IRS; HEAD E&D, DEHRADUN; BLOCK MNGR-II,BARODA;


SSM, AHMEDABAD; HEAD LOGGING SERVICES, AHMEDABAD; I/C SPL POOL, BARODA
__________________________________________________________________________________________
FILE REFERENCE: AMD/FB/DPR/2018-19

DATE:01.10.2018
DAILY GEOLOGICAL REPORT: 30.09.2018
TD/ SPUD
WELL NO OPERATIONS CARRIED OUT / MW
RIG DD HERM
(NAME) OBJECTIVE PRODUCTION TESTING VIS
(M) R/REL
E-1400- WD#72 Primary: 1792 25.09.18 D/DN UPTO 1036M. M/C. C/O W/TRIP. M/C. D/DN UPTO 1192M. 1.25
M1 (WDBA) K-IV, 1192 FDIP. 46
(R-II) Secondary: S/D – 1170.69 M, INC – 17° & AZM – 198.50°
N EXT : NGJV K-V, K-IX,
K-VI+VII
IPS-M700- LM#8_A LIMBODARA 1021 22.09.18 WOC. IWH & TESTED AT 250 KSC, OK. N/UP BOP. F/TEST, OK. R/I 1.23
1 (LMAH_A) PAY 1021 29.09.18 SCR + 2 7/8” TBG, EUE, N-80Q(MSL) IS IN PROGRESS. 46
(OP)
( CW-I)

IPS-M700- RIG UNDER CAPITAL REPAIR SINCE 1800 HRS OF 22.08.2018.


2 N EXT : HRAG
(CW-II)
IPS-M700- BS_A K-IX+X 1582 26.09.18 D/DOWN TO 637 M. LEAKAGE FROM W/PIPE. P/O UP TO C/S. 1.13
3 (NG#23_A) (OP) 700 CHANGED WASH PIPE & TESTED, OK. RIH. M/C. D/DOWN TO 700 42
(CW- III) M. FDIP.

IPS-M700- WS#18 K-XII (OP) 1633 20.09.18 POOH FOR RECOVERY OF FISH. FISH NOT RECOVERED. R/I WITH 1.28
8 (WSEA) 1633 FISHING TOOL. POOH. RECOVERED 2.5 M WIRE. RIH OF 8 ½” BIT 46
(CW-VIII) IS IN PROGRESS.
JOHN-19 LM#262 CHHATRAL-1 1248 21.09.18 LOWERED & CEMENTED 5 ½” CASING, L-80, 20PPF, C/S – 1216.33 1.40
(LMJJ) (OP) 1248 30.09.18 M, F/C – 1189.58 M. PLUG HIT AT 1700PSI. C/OUT HERMETICAL 45
TEST OF CASING AT 3000PSI FROM 13:15 TO 13:30 HRS, OK. WOC
SINCE 13:30 HRS.
JOHN -28 WS#19 K-XII (OP) 1661 28.09.18 LOWERED & CEMENTED 9 5/8” CASING, J-55, 40PPF, C/S – 300 M, 1.09
(WSDV) 303 F/C – 287 M. WOC. FITTED BOWL. IBOP. F/TEST & PR. TEST, OK. 38
FABRICATION OF RISER NIPPLE IS IN PROGRESS.

DR-12 KL#754 K-XI (OP) 1716 11.09.18 OBJ I (1653 – 1651 M), K – XII
(KLVU) 1716 26.09.18
WUO. NO FLOW. APPLIED N2 UP TO 140 KSC. 0 – 140 KSC: WATER,
N2 NEAR CUT AT 140 KSC. DURING RELEASING THRU 4 MM BEAN,
FLOW OF GAS & OIL INTERMITTENTLY. CLEANED WELL THRU 6
MM BEAN. WELL FLOWING TO ACTIVATION TANK THRU 6 MM
BEAN FOR FLOW STABILIZATION, MAINLY FLOW OF GAS WITH
LITTLE THICK OIL INTERMITTENTLY. CHP – 74 KSC, THP – 59 KSC.

*N EXT LOCATIONS ARE AS PER LATEST R IG D EPLOYMENT P LAN .

PLAN DEVIATION DATA :

WELL NO. KOP (M) HD (M) ZONE TVD (M) DIRECTION(°) PROFILE MAX. ANGLE AT DEPTH (M)
WDBA 800 145 1342 197.16 L 18 989.89
KLVU 500 349.522 1521 234.63 L 22 807.93
WSEA 950 165.6 1522 139.78 L 20 1170.94
WSDW 400 429.2 1505 208.68 L 24 677.78
LMAH_A 330 59.3 746 84.4 S 15 463.16
LMJJ 110 458.45 972 355.9 L 34 463.88
BS_A 380 446.853 1363 194.97 L 29 726.14

FOR GM - HEAD FORWARD BASE


AHMEDABAD