Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING

Date of execution: May 06, 2019

ADMAS PROJECT AT BKC

PT SLAB STRENGTHENING

1
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

101 LIST OF CONTENTS


(Organized according to the numerical ID of each report)

110 STRUCTURAL COMPONENTS


110.01.02 PLAN GEOMETRY
110.14.02 TENDON PLAN
110.60 TENDON ELONGATION, INDIVIDUAL TENDONS
117 MATERIALS
117.20 CONCRETE MATERIAL PROPERTIES
117.40 REINFORCEMENT (NONPRESTRESSED) MATERIAL PROPERTIES
117.60 PRESTRESSING MATERIAL PROPERTIES
120 LOAD CASES PLAN
120.10 APPLIED LOADS
120.20 DEAD LOAD PLAN
120.30 LIVE LOAD PLAN
142 CODES AND ASSUMPTIONS
142.10 DESIGN CODE SPECIFIED
142.20 MATERIAL AND STRENGTH REDUCTION FACTORS
142.30 COVER TO REINFORCEMENT
142.40 MINIMUM BAR LENGTH
143 DESIGN CRITERIA
143.10 ONE-WAY SLABS
143.20 TWO-WAY SLABS
143.30 BEAMS
158 DESIGN SECTION CAPACITY
158.20 DESIGN SECTION CAPACITIES BASED ON REINFORCEMENT
REPORTED IN THE PROGRAM
158.40 DESIGN SECTION CAPACITIES FOR MANUALLY GENERATED
SECTIONS
160.20/40 LOWER/UPPER COLUMN REACTIONS
180 STRESS CHECK PLAN
180.22 STRESS CHECK IN X-DIRECTION
199.00 REBAR LEGEND
210 DESIGN SECTION LEGEND
210.00 REBAR TOTALS
220 DESIGN SECTION CODE CHECK
300.00 PT TOTALS

1500 GRAPHICAL REPOTS


1500.1 COLUMN REACTIONS

2
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

160.20/40 LOWER/UPPER COLUMNS

Service(Total Load)
# Label Location Axial Fr Fs Mrr Mss Mzz
kN kN kN kN-m kN-m kN-m
1 Column 1 top -1365.400 -0.000 -0.000 1076.400 -411.990 12.071
bottom 1391.900 0.000 -0.000 -1076.400 411.990 -12.071
2 Column 2 top -878.520 -0.000 -0.000 635.800 50.231 2.217
bottom 905.000 -0.000 0.000 -635.800 -50.231 -2.217
3 Column 3 top -779.260 -0.000 -0.000 535.960 -169.070 5.011
bottom 805.740 0.000 -0.000 -535.960 169.070 -5.011
4 Column 4 top -990.420 -0.000 -0.000 440.460 561.000 149.450
bottom 1016.900 -0.000 0.000 -440.460 -561.000 -149.450
5 Column 5 top -1427.700 0.000 0.000 -1058.900 -456.410 -13.362
bottom 1454.100 -0.000 0.000 1058.900 456.410 13.362
6 Column 6 top -872.850 0.000 -0.000 -631.620 53.720 -4.197
bottom 899.330 -0.000 0.000 631.620 -53.720 4.197
7 Column 7 top -788.930 -0.000 -0.000 -531.990 -161.130 -7.373
bottom 815.410 0.000 -0.000 531.990 161.130 7.373
8 Column 8 top -1067.900 -0.000 0.000 -430.090 614.540 -161.840
bottom 1094.400 0.000 -0.000 430.090 -614.540 161.840
9 Column 9 top -248.480 0.000 0.000 33.770 13.516 -0.272
bottom 257.490 -0.000 0.000 -33.770 -13.516 0.272
10 Column 10 top -124.690 -0.000 -0.000 17.096 -18.276 0.229
bottom 133.700 -0.000 -0.000 -17.096 18.276 -0.229
11 Column 11 top -40.164 -0.000 0.000 2.232 -13.476 -0.128
bottom 47.612 0.000 -0.000 -2.232 13.476 0.128
12 Column 12 top -153.530 -0.000 -0.000 2.237 -2.705 -0.030
bottom 156.590 0.000 0.000 -2.237 2.705 0.030
13 Column 13 top 78.237 -0.000 -0.000 1.605 -1.393 0.034
bottom -75.181 0.000 -0.000 -1.605 1.393 -0.034
14 Column 14 top -489.800 -0.000 -0.000 0.902 4.535 0.085
bottom 491.750 -0.000 0.000 -0.902 -4.535 -0.085
15 Column 15 top -615.250 -0.000 -0.000 0.046 5.433 0.057
bottom 617.190 0.000 -0.000 -0.046 -5.433 -0.057

Service(Sustained Load)
# Label Location Axial Fr Fs Mrr Mss Mzz
kN kN kN kN-m kN-m kN-m
1 Column 1 top -1180.300 -0.000 -0.000 900.430 -403.810 12.270

3
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

bottom 1206.700 0.000 -0.000 -900.430 403.810 -12.270


2 Column 2 top -696.110 -0.000 -0.000 456.050 46.234 1.744
bottom 722.590 -0.000 0.000 -456.050 -46.234 -1.744
3 Column 3 top -634.470 -0.000 -0.000 383.810 -125.130 2.686
bottom 660.950 0.000 -0.000 -383.810 125.130 -2.686
4 Column 4 top -880.790 -0.000 -0.000 381.490 509.340 130.170
bottom 907.270 -0.000 0.000 -381.490 -509.340 -130.170
5 Column 5 top -1241.700 0.000 0.000 -882.720 -447.860 -14.041
bottom 1268.200 -0.000 0.000 882.720 447.860 14.041
6 Column 6 top -690.910 0.000 -0.000 -452.480 49.789 -4.185
bottom 717.390 -0.000 0.000 452.480 -49.789 4.185
7 Column 7 top -642.510 -0.000 -0.000 -380.840 -118.540 -5.515
bottom 668.990 0.000 -0.000 380.840 118.540 5.515
8 Column 8 top -963.310 -0.000 0.000 -370.310 558.710 -142.040
bottom 989.790 0.000 -0.000 370.310 -558.710 142.040
9 Column 9 top -193.900 0.000 0.000 24.694 11.475 -0.424
bottom 202.910 -0.000 0.000 -24.694 -11.475 0.424
10 Column 10 top -101.680 -0.000 -0.000 13.464 -14.847 0.150
bottom 110.700 -0.000 -0.000 -13.464 14.847 -0.150
11 Column 11 top -29.052 -0.000 -0.000 1.853 -11.865 -0.091
bottom 36.500 0.000 -0.000 -1.853 11.865 0.091
12 Column 12 top -122.060 -0.000 -0.000 1.813 -2.289 -0.025
bottom 125.110 0.000 0.000 -1.813 2.289 0.025
13 Column 13 top 74.062 -0.000 0.000 1.384 -1.153 0.029
bottom -71.006 0.000 -0.000 -1.384 1.153 -0.029
14 Column 14 top -426.070 -0.000 -0.000 0.786 3.963 0.072
bottom 428.020 -0.000 0.000 -0.786 -3.963 -0.072
15 Column 15 top -525.310 -0.000 0.000 0.143 4.761 0.047
bottom 527.250 0.000 -0.000 -0.143 -4.761 -0.047

Strength
# Label Location Axial Fr Fs Mrr Mss Mzz
kN kN kN kN-m kN-m kN-m
1 Column 1 top -2043.800 -0.000 -0.000 1741.200 -611.930 17.789
bottom 2083.500 0.000 0.000 -1741.200 611.930 -17.789
2 Column 2 top -1318.700 0.000 -0.000 1088.000 74.240 3.727
bottom 1358.400 0.000 0.000 -1088.000 -74.240 -3.727
3 Column 3 top -1153.500 0.000 -0.000 918.980 -266.940 9.721
bottom 1193.300 0.000 0.000 -918.980 266.940 -9.721
4 Column 4 top -1465.000 -0.000 -0.000 737.490 850.090 245.830
bottom 1504.700 -0.000 -0.000 -737.490 -850.090 -245.830
5 Column 5 top -2136.900 0.000 -0.000 -1715.100 -678.600 -19.204
bottom 2176.600 0.000 0.000 1715.100 678.600 19.204
6 Column 6 top -1310.700 0.000 -0.000 -1082.800 79.454 -6.173
bottom 1350.400 -0.000 0.000 1082.800 -79.454 6.173
7 Column 7 top -1166.900 0.000 -0.000 -912.810 -255.860 -12.524
bottom 1206.600 0.000 -0.000 912.810 255.860 12.524
8 Column 8 top -1585.200 -0.000 0.000 -723.240 928.230 -264.910
bottom 1625.000 0.000 0.000 723.240 -928.230 264.910
9 Column 9 top -379.300 0.000 -0.000 53.369 18.634 0.009
bottom 392.810 -0.000 -0.000 -53.369 -18.634 -0.009
10 Column 10 top -185.170 0.000 -0.000 25.615 -26.635 0.351
bottom 198.680 -0.000 -0.000 -25.615 26.635 -0.351
11 Column 11 top -55.726 -0.000 0.000 3.410 -21.346 0.156

4
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

bottom 66.898 0.000 0.000 -3.410 21.346 -0.156


12 Column 12 top -229.140 -0.000 -0.000 3.303 -4.112 -0.035
bottom 233.730 0.000 -0.000 -3.303 4.112 0.035
13 Column 13 top 130.820 -0.000 0.000 2.498 -2.198 0.061
bottom -126.240 0.000 -0.000 -2.498 2.198 -0.061
14 Column 14 top -783.980 -0.000 0.000 1.419 7.273 0.143
bottom 786.910 -0.000 -0.000 -1.419 -7.273 -0.143
15 Column 15 top -976.810 -0.000 0.000 0.149 8.736 0.106
bottom 979.720 0.000 -0.000 -0.149 -8.736 -0.106

Initial
# Label Location Axial Fr Fs Mrr Mss Mzz
kN kN kN kN-m kN-m kN-m
1 Column 1 top -539.920 0.000 -0.000 199.890 -39.977 0.437
bottom 566.400 0.000 -0.000 -199.890 39.977 -0.437
2 Column 2 top -513.610 -0.000 -0.000 185.820 11.613 0.325
bottom 540.090 -0.000 0.000 -185.820 -11.613 -0.325
3 Column 3 top -470.990 -0.000 0.000 174.070 -67.418 0.776
bottom 497.470 0.000 -0.000 -174.070 67.418 -0.776
4 Column 4 top -389.820 0.000 0.000 3.020 118.750 4.488
bottom 416.300 -0.000 0.000 -3.020 -118.750 -4.488
5 Column 5 top -541.500 0.000 0.000 -199.660 -40.847 -0.413
bottom 567.980 -0.000 -0.000 199.660 40.847 0.413
6 Column 6 top -511.910 0.000 0.000 -182.720 11.387 -0.339
bottom 538.390 0.000 0.000 182.720 -11.387 0.339
7 Column 7 top -477.230 -0.000 -0.000 -172.380 -61.788 -1.220
bottom 503.710 0.000 -0.000 172.380 61.788 1.220
8 Column 8 top -374.590 0.000 0.000 -4.978 132.460 -5.087
bottom 401.070 0.000 -0.000 4.978 -132.460 5.087
9 Column 9 top -129.850 0.000 0.000 13.394 9.611 -0.580
bottom 138.860 -0.000 0.000 -13.394 -9.611 0.580
10 Column 10 top -75.951 -0.000 -0.000 9.328 -11.156 0.193
bottom 84.962 -0.000 -0.000 -9.328 11.156 -0.193
11 Column 11 top -42.609 -0.000 0.000 0.860 -3.801 -0.342
bottom 50.057 0.000 0.000 -0.860 3.801 0.342
12 Column 12 top -89.733 -0.000 -0.000 1.539 -1.470 -0.028
bottom 92.790 0.000 0.000 -1.539 1.470 0.028
13 Column 13 top -1.875 -0.000 -0.000 0.533 -0.334 0.002
bottom 4.931 -0.000 -0.000 -0.533 0.334 -0.002
14 Column 14 top -86.439 -0.000 0.000 0.202 0.703 0.013
bottom 88.389 0.000 -0.000 -0.202 -0.703 -0.013
15 Column 15 top -135.310 -0.000 -0.000 -0.276 0.754 -0.003
bottom 137.250 -0.000 -0.000 0.276 -0.754 0.003

DLLL
# Label Location Axial Fr Fs Mrr Mss Mzz
kN kN kN kN-m kN-m kN-m
1 Column 1 top -1356.800 -0.000 -0.000 1329.500 -399.880 11.427
bottom 1383.200 0.000 -0.000 -1329.500 399.880 -11.427
2 Column 2 top -880.310 -0.000 -0.000 904.450 48.018 3.010
bottom 906.790 0.000 0.000 -904.450 -48.018 -3.010
3 Column 3 top -748.570 -0.000 -0.000 766.040 -195.760 9.411
bottom 775.050 -0.000 -0.000 -766.040 195.760 -9.411
4 Column 4 top -949.060 -0.000 -0.000 594.060 578.190 192.750

5
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

bottom 975.540 -0.000 0.000 -594.060 -578.190 -192.750


5 Column 5 top -1418.400 0.000 -0.000 -1312.600 -444.370 -11.693
bottom 1444.900 -0.000 0.000 1312.600 444.370 11.693
6 Column 6 top -875.630 0.000 -0.000 -902.380 51.469 -3.961
bottom 902.110 -0.000 0.000 902.380 -51.469 3.961
7 Column 7 top -756.000 -0.000 -0.000 -761.630 -189.480 -10.311
bottom 782.480 0.000 0.000 761.630 189.480 10.311
8 Column 8 top -1034.700 -0.000 0.000 -586.300 627.380 -206.140
bottom 1061.200 0.000 -0.000 586.300 -627.380 206.140
9 Column 9 top -261.630 0.000 0.000 39.199 10.237 0.553
bottom 270.640 0.000 0.000 -39.199 -10.237 -0.553
10 Column 10 top -120.950 -0.000 -0.000 17.039 -16.719 0.234
bottom 129.960 -0.000 -0.000 -17.039 16.719 -0.234
11 Column 11 top -31.124 -0.000 0.000 2.356 -15.731 0.021
bottom 38.572 0.000 -0.000 -2.356 15.731 -0.021
12 Column 12 top -151.220 -0.000 -0.000 2.132 -2.815 -0.020
bottom 154.280 0.000 0.000 -2.132 2.815 0.020
13 Column 13 top 105.170 -0.000 -0.000 1.785 -1.609 0.043
bottom -102.120 0.000 0.000 -1.785 1.609 -0.043
14 Column 14 top -588.360 -0.000 -0.000 1.034 5.476 0.107
bottom 590.310 -0.000 0.000 -1.034 -5.476 -0.107
15 Column 15 top -723.110 -0.000 0.000 0.206 6.604 0.087
bottom 725.050 0.000 -0.000 -0.206 -6.604 -0.087

PRESTRESS
# Label Location Axial Fr Fs Mrr Mss Mzz
kN kN kN kN-m kN-m kN-m
1 Column 1 top -8.689 0.000 0.000 -253.140 -12.113 0.644
bottom 8.689 0.000 -0.000 253.140 12.113 -0.644
2 Column 2 top 1.787 -0.000 -0.000 -268.650 2.213 -0.792
bottom -1.787 -0.000 0.000 268.650 -2.213 0.792
3 Column 3 top -30.691 -0.000 0.000 -230.080 26.690 -4.400
bottom 30.691 0.000 -0.000 230.080 -26.690 4.400
4 Column 4 top -41.360 -0.000 0.000 -153.600 -17.190 -43.302
bottom 41.360 0.000 0.000 153.600 17.190 43.302
5 Column 5 top -9.257 -0.000 0.000 253.710 -12.039 -1.669
bottom 9.257 -0.000 -0.000 -253.710 12.039 1.669
6 Column 6 top 2.780 0.000 0.000 270.760 2.251 -0.236
bottom -2.780 0.000 0.000 -270.760 -2.251 0.236
7 Column 7 top -32.929 -0.000 0.000 229.640 28.353 2.938
bottom 32.929 0.000 -0.000 -229.640 -28.353 -2.938
8 Column 8 top -33.165 0.000 0.000 156.210 -12.837 44.303
bottom 33.165 0.000 -0.000 -156.210 12.837 -44.303
9 Column 9 top 13.143 -0.000 0.000 -5.429 3.280 -0.825
bottom -13.143 -0.000 0.000 5.429 -3.280 0.825
10 Column 10 top -3.747 -0.000 0.000 0.057 -1.556 -0.005
bottom 3.747 -0.000 0.000 -0.057 1.556 0.005
11 Column 11 top -9.040 0.000 -0.000 -0.124 2.255 -0.150
bottom 9.040 0.000 0.000 0.124 -2.255 0.150
12 Column 12 top -2.310 0.000 0.000 0.105 0.110 -0.010
bottom 2.310 0.000 0.000 -0.105 -0.110 0.010
13 Column 13 top -26.938 0.000 0.000 -0.180 0.216 -0.008
bottom 26.938 0.000 -0.000 0.180 -0.216 0.008
14 Column 14 top 98.566 -0.000 0.000 -0.133 -0.941 -0.022

6
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

bottom -98.566 0.000 0.000 0.133 0.941 0.022


15 Column 15 top 107.860 0.000 -0.000 -0.161 -1.171 -0.030
bottom -107.860 -0.000 -0.000 0.161 1.171 0.030

HYPER
# Label Location Axial Fr Fs Mrr Mss Mzz
kN kN kN kN-m kN-m kN-m
1 Column 1 top -8.689 -0.000 -0.000 -253.140 -12.113 0.649
bottom 8.689 0.000 0.000 253.140 12.113 -0.649
2 Column 2 top 1.787 0.000 -0.000 -268.650 2.213 -0.787
bottom -1.787 0.000 0.000 268.650 -2.213 0.787
3 Column 3 top -30.691 0.000 -0.000 -230.080 26.690 -4.395
bottom 30.691 0.000 0.000 230.080 -26.690 4.395
4 Column 4 top -41.360 -0.000 0.000 -153.600 -17.190 -43.297
bottom 41.360 -0.000 -0.000 153.600 17.190 43.297
5 Column 5 top -9.257 0.000 -0.000 253.710 -12.039 -1.664
bottom 9.257 0.000 0.000 -253.710 12.039 1.664
6 Column 6 top 2.780 0.000 -0.000 270.760 2.251 -0.231
bottom -2.780 -0.000 0.000 -270.760 -2.251 0.231
7 Column 7 top -32.929 0.000 -0.000 229.640 28.353 2.943
bottom 32.929 0.000 -0.000 -229.640 -28.353 -2.943
8 Column 8 top -33.165 -0.000 0.000 156.210 -12.837 44.308
bottom 33.165 0.000 0.000 -156.210 12.837 -44.308
9 Column 9 top 13.143 0.000 -0.000 -5.429 3.280 -0.820
bottom -13.143 -0.000 -0.000 5.429 -3.280 0.820
10 Column 10 top -3.747 0.000 -0.000 0.057 -1.556 -0.000
bottom 3.747 -0.000 -0.000 -0.057 1.556 0.000
11 Column 11 top -9.040 0.000 0.000 -0.124 2.250 0.124
bottom 9.040 -0.000 0.000 0.124 -2.250 -0.124
12 Column 12 top -2.310 0.000 0.000 0.105 0.110 -0.005
bottom 2.310 0.000 -0.000 -0.105 -0.110 0.005
13 Column 13 top -26.938 -0.000 0.000 -0.180 0.216 -0.003
bottom 26.938 0.000 -0.000 0.180 -0.216 0.003
14 Column 14 top 98.566 -0.000 0.000 -0.133 -0.941 -0.017
bottom -98.566 0.000 -0.000 0.133 0.941 0.017
15 Column 15 top 107.860 0.000 0.000 -0.161 -1.171 -0.025
bottom -107.860 -0.000 -0.000 0.161 1.171 0.025

7
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

117 MATERIALS
117.20 CONCRETE MATERIAL PROPERTIES
ID Label F'c Unit Weight Type Ec Creep Fiber Type Fiber
coefficient Dosage
MPa kg/m3 MPa
1 M40 40.00 2500.00 Normal 31622 2.00

F'c = strength at 28 days


Ec = modulus of elasticity at 28 days

117.40 REINFORCEMENT (NONPRESTRESSED) MATERIAL


PROPERTIES
ID Label fy fvy Es
MPa MPa MPa
1 FE 500 500.00 500.00 200000

fy = yield stress of longitudinal reinforcement


fvy = yield stress of one-way shear reinforcement
Es = modulus of elasticity

117.60 PRESTRESSING MATERIAL PROPERTIES


ID Label fpu fpy Eps
MPa MPa MPa
1 Prestressing 1 1860.00 1700.00 200000

fpu = ultimate stress


fpy = yield stress
Eps = modulus of elasticity

142 CODES AND ASSUMPTIONS


142.10 DESIGN CODE SPECIFIED: INDIAN
142.15 TORSIONAL STIFFNESS OF BEAMS ACCOUNTED FOR
142.16 TORSIONAL STIFFNESS OF LOWER COLUMNS ACCOUNTED FOR
142.17 TORSIONAL STIFFNESS OF UPPER COLUMNS ACCOUNTED FOR

142.20 MATERIAL AND STRENGTH REDUCTION FACTORS

Two-way Slabs
INDIAN material factors used:
For concrete = 1.50
For nonprestressed steel = 1.15
For prestressed steel = 1.15

One-way Slabs
INDIAN material factors used:
For concrete = 1.50
For nonprestressed steel = 1.15
For prestressed steel = 1.15

8
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

Beams
INDIAN material factors used:
For concrete = 1.50
For nonprestressed steel = 1.15
For prestressed steel = 1.15

142.30 COVER TO REINFORCEMENT

Two-way Slabs
Prestressing Tendons (CGS)
At top = 25 mm
At bottom = 25 mm
Nonprestressing reinforcement (cover)
At top = 15 mm
At bottom = 15 mm

One-way Slabs
Prestressing Tendons (CGS)
At top = 25 mm
At bottom = 25 mm
Nonprestressing reinforcement (cover)
At top = 15 mm
At bottom = 15 mm

Beams
Prestressing Tendons (CGS)
At top = 25 mm
At bottom = 25 mm
Nonprestressing reinforcement (cover)
At top = 40 mm
At bottom = 40 mm

142.40 MINIMUM BAR LENGTH

Two-way systems
Cut off length of minimum steel over support (length/span) = 0.17
Cut off length of minimum steel in span (length/span) = 0.33
Extension of rebar beyond where required for strength:
Top bars = 300 mm
Bottom bars = 300 mm

One-way slabs
Cut off length of minimum steel over support (length/span) = 0.17
Cut off length of minimum steel in span (length/span) = 0.33
Extension of rebar beyond where required for strength:
Top bars = 300 mm
Bottom bars = 300 mm

Beams
Cut off length of minimum steel over support (length/span) = 0.17
Cut off length of minimum steel in span (length/span) = 0.33
Extension of rebar beyond where required for strength:
Top bars = 300 mm
Bottom bars = 300 mm

9
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

143 DESIGN CRITERIA

143.10 ONE-WAY SLABS

Sustain load stresses


Tension stress (N/mm^2)
At top fibers = 3.00
At bottom fibers = 3.00
Compression stress (N/mm^2)
Extreme fiber = 15.60

Initial load stresses


Tension stress (N/mm^2)
At top fibers = 1.39
At bottom fibers = 1.39
Compression stress (N/mm^2)
Extreme fiber = 16.20

Total load stresses


Tension stress (N/mm^2)
At top fibers = 3.00
At bottom fibers = 3.00
Compression stress (N/mm^2)
Extreme fiber = 12.67

143.20 TWO-WAY SLABS

Sustain load stresses


Tension stress (N/mm^2)
At top fibers = 3.00
At bottom fibers = 3.00
Compression stress (N/mm^2)
Extreme fiber = 15.60

Initial load stresses


Tension stress (N/mm^2)
At top fibers = 1.39
At bottom fibers = 1.39
Compression stress (N/mm^2)
Extreme fiber = 16.20

Total load stresses


Tension stress (N/mm^2)
At top fibers = 3.00
At bottom fibers = 3.00
Compression stress (N/mm^2)
Extreme fiber = 12.67

143.30 BEAMS

Sustain load stresses


Tension stress (N/mm^2)
At top fibers = 3.00
At bottom fibers = 3.00

10
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

Compression stress (N/mm^2)


Extreme fiber = 15.60

Initial load stresses


Tension stress (N/mm^2)
At top fibers = 1.39
At bottom fibers = 1.39
Compression stress (N/mm^2)
Extreme fiber = 16.20

Total load stresses


Tension stress (N/mm^2)
At top fibers = 3.00
At bottom fibers = 3.00
Compression stress (N/mm^2)
Extreme fiber = 12.67

11
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

DESIGN LEGEND
This legend is provided as an aid for the interpretation of the results that follow.

12
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

SUPPORT LINE 1
Stress Diagrams Stress Diagrams
Pro ject: G en eral name / Lo ad Case: Serv ice(Sustain ed Lo ad ) Pro ject: G en eral n ame / Load Case: Serv ice(Su stain ed Load)
1 .0 0 x Selfw eig h t + 1 .00 x D ead load + 0 .30 x Liv e lo ad + 1 .0 0 x Prestressin g 1 .0 0 x Selfw eig h t + 1 .0 0 x D ead lo ad + 0 .3 0 x Liv e lo ad + 1.00 x Prestressin g
Tensile Stress Po sitive Tensile Stress Po sitiv e

Allowable Stress es w ith R einforcement Allow able Stres ses Allowable Stress es with Reinforc ement Allowable Stress es

Top Bottom
10
10

5
5
Stress [N /mm²]

Stress [N /mm²]
0
0

-5
-5

-10 -10

-15 -15

Span 1 Span 2 Span 3 Span 1 Span 2 Span 3

(a) Max tension 3.7 N/mm2, Allowable 3.0 N/mm2          (b) Max tension 12.5 N/mm2, Allowable 3.0 N/mm2
Max compression ­7.8 N/mm2, Allowable 15.6 N/mm2     Max compression ­10.3 N/mm2, Allowable 15.6 N/mm2
DESIGN STRIP SERVICE COMBINATION STRESSES
(Tension stress positive)

Moment Diagrams
Pro ject: General n ame / Lo ad Case: Stren gth
1 .5 0 x Selfw eig ht + 1 .50 x D ead load + 1.50 x Liv e lo ad + 1 .0 0 x Hy p erstatic
Moment Draw n o n Ten sion Side

-1000

-500

0
Moment [k Nm]

500

1000

1500

2000

2500

3000
Span 1 Span 2 Span 3

DESIGN STRIP "DESIGN MOMENT (Mu)"
(Moment is drawn on the tension side)

Rebar Diagrams
Pro ject: General n ame / Lo ad Case: En velo pe

R ebar R equired Top R ebar R equired Bottom

R ebar Provided Top R ebar Provided Bottom


8000

6000

4000

2000
R ebar [mm²]

-2000

-4000

-6000

-8000

-10000

-12000

Span 2

DESIGN STRIP REINFORCEMENT
REQUIRED AND PROVIDED

13
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

SUMMARY

14
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

SUPPORT LINE 2
Stress Diagrams Stress Diagrams
Pro ject: G en eral name / Lo ad Case: Serv ice(Sustain ed Lo ad ) Pro ject: G en eral n ame / Load Case: Serv ice(Su stain ed Load)
1 .0 0 x Selfw eig h t + 1 .00 x D ead load + 0 .30 x Liv e lo ad + 1 .0 0 x Prestressin g 1 .0 0 x Selfw eig h t + 1 .0 0 x D ead lo ad + 0 .3 0 x Liv e lo ad + 1.00 x Prestressin g
Tensile Stress Po sitive Tensile Stress Po sitiv e

Allowable Stress es w ith R einforcement Allow able Stres ses Allowable Stress es with Reinforc ement Allowable Stress es

Top Bottom
10 10

5 5
Stress [N /mm²]

Stress [N /mm²]
0 0

-5 -5

-10 -10

-15 -15

Span 1 Span 2 Span 3 Span 1 Span 2 Span 3

(a) Max tension 1.2 N/mm2, Allowable 3.0 N/mm2          (b) Max tension 8.3 N/mm2, Allowable 3.0 N/mm2
Max compression ­7.1 N/mm2, Allowable 15.6 N/mm2     Max compression ­5.3 N/mm2, Allowable 15.6 N/mm2
DESIGN STRIP SERVICE COMBINATION STRESSES
(Tension stress positive)

Moment Diagrams
Pro ject: General n ame / Lo ad Case: Stren gth
1 .5 0 x Selfw eig ht + 1 .50 x D ead load + 1.50 x Liv e lo ad + 1 .0 0 x Hy p erstatic
Moment Draw n o n Ten sion Side
-400

-200

200

400
Moment [k Nm]

600

800

1000

1200

1400

1600

1800

Span 1 Span 2 Span 3

DESIGN STRIP "DESIGN MOMENT (Mu)"
(Moment is drawn on the tension side)

Rebar Diagrams
Pro ject: General n ame / Lo ad Case: En velo pe

R ebar Required Top R ebar Required Bottom

R ebar Prov ided Top R ebar Provided Bottom


0

-1000

-2000

-3000
R ebar [mm²]

-4000

-5000

-6000

-7000

-8000

Span 2

DESIGN STRIP REINFORCEMENT
REQUIRED AND PROVIDED

15
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

SUMMARY

16
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

SUPPORT LINE 3
Stress Diagrams Stress Diagrams
Pro ject: G en eral name / Lo ad Case: Serv ice(Sustain ed Lo ad ) Pro ject: G en eral n ame / Load Case: Serv ice(Su stain ed Load)
1 .0 0 x Selfw eig h t + 1 .00 x D ead load + 0 .30 x Liv e lo ad + 1 .0 0 x Prestressin g 1 .0 0 x Selfw eig h t + 1 .0 0 x D ead lo ad + 0 .3 0 x Liv e lo ad + 1.00 x Prestressin g
Tensile Stress Po sitive Tensile Stress Po sitiv e

Allowable Stress es w ith R einforcement Allow able Stres ses Allowable Stress es with Reinforc ement Allowable Stress es

Top Bottom
10 10

5 5
Stress [N /mm²]

Stress [N /mm²]
0 0

-5 -5

-10 -10

-15 -15

Span 1 Span 2 Span 3 Span 1 Span 2 Span 3

(a) Max tension 1.7 N/mm2, Allowable 3.0 N/mm2          (b) Max tension 6.4 N/mm2, Allowable 3.0 N/mm2
Max compression ­4.8 N/mm2, Allowable 15.6 N/mm2     Max compression ­6.2 N/mm2, Allowable 15.6 N/mm2
DESIGN STRIP SERVICE COMBINATION STRESSES
(Tension stress positive)

Moment Diagrams
Pro ject: General n ame / Lo ad Case: Stren gth
1 .5 0 x Selfw eig ht + 1 .50 x D ead load + 1.50 x Liv e lo ad + 1 .0 0 x Hy p erstatic
Moment Draw n o n Ten sion Side

-500

0
Moment [k Nm]

500

1000

1500

2000

Span 1 Span 2 Span 3

DESIGN STRIP "DESIGN MOMENT (Mu)"
(Moment is drawn on the tension side)

Rebar Diagrams
Pro ject: General n ame / Lo ad Case: En velo pe

R ebar Required Top R ebar Required Bottom

R ebar Prov ided Top R ebar Provided Bottom


3000
2000
1000
0
-1000
R ebar [mm²]

-2000
-3000
-4000
-5000
-6000
-7000
-8000
-9000
Span 2

DESIGN STRIP REINFORCEMENT
REQUIRED AND PROVIDED

17
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

SUMMARY

18
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

SUPPORT LINE 4
Stress Diagrams Stress Diagrams
Pro ject: G en eral name / Lo ad Case: Serv ice(Sustain ed Lo ad ) Pro ject: G en eral n ame / Load Case: Serv ice(Su stain ed Load)
1 .0 0 x Selfw eig h t + 1 .00 x D ead load + 0 .30 x Liv e lo ad + 1 .0 0 x Prestressin g 1 .0 0 x Selfw eig h t + 1 .0 0 x D ead lo ad + 0 .3 0 x Liv e lo ad + 1.00 x Prestressin g
Tensile Stress Po sitive Tensile Stress Po sitiv e

Allowable Stress es w ith R einforcement Allow able Stres ses Allowable Stress es with Reinforc ement Allowable Stress es

Top Bottom
10 10

5 5
Stress [N /mm²]

Stress [N /mm²]
0 0

-5 -5

-10 -10

-15 -15

Span 1 Span 2 Span 3 Span 1 Span 2 Span 3

(a) Max tension 1.6 N/mm2, Allowable 3.0 N/mm2          (b) Max tension 4.3 N/mm2, Allowable 3.0 N/mm2
Max compression ­3.8 N/mm2, Allowable 15.6 N/mm2     Max compression ­6.0 N/mm2, Allowable 15.6 N/mm2
DESIGN STRIP SERVICE COMBINATION STRESSES
(Tension stress positive)

Moment Diagrams
Pro ject: General n ame / Lo ad Case: Stren gth
1 .5 0 x Selfw eig ht + 1 .50 x D ead load + 1.50 x Liv e lo ad + 1 .0 0 x Hy p erstatic
Moment Draw n o n Ten sion Side
-800

-600

-400

-200

0
Moment [k Nm]

200

400

600

800

1000

1200

1400

1600
Span 1 Span 2 Span 3

DESIGN STRIP "DESIGN MOMENT (Mu)"
(Moment is drawn on the tension side)

Rebar Diagrams
Pro ject: General n ame / Lo ad Case: En velo pe

R ebar Required Top R ebar Required Bottom

R ebar Prov ided Top R ebar Provided Bottom

2000

1000

0
R ebar [mm²]

-1000

-2000

-3000

-4000

Span 2

DESIGN STRIP REINFORCEMENT
REQUIRED AND PROVIDED

19
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

SUMMARY

20
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

SUPPORT LINE 5
Stress Diagrams Stress Diagrams
Pro ject: G en eral name / Lo ad Case: Serv ice(Sustain ed Lo ad ) Pro ject: G en eral n ame / Load Case: Serv ice(Su stain ed Load)
1 .0 0 x Selfw eig h t + 1 .00 x D ead load + 0 .30 x Liv e lo ad + 1 .0 0 x Prestressin g 1 .0 0 x Selfw eig h t + 1 .0 0 x D ead lo ad + 0 .3 0 x Liv e lo ad + 1.00 x Prestressin g
Tensile Stress Po sitive Tensile Stress Po sitiv e

Allowable Stress es w ith R einforcement Allow able Stres ses Allowable Stress es with Reinforc ement Allowable Stress es

Top Bottom
10 10

5 5
Stress [N /mm²]

Stress [N /mm²]
0 0

-5 -5

-10 -10

-15 -15

Span 1 Span 2 Span 3 Span 4 Span 5 Span 1 Span 2 Span 3 Span 4 Span 5

(a) Max tension 0.0 N/mm2, Allowable 3.0 N/mm2          (b) Max tension 0.0 N/mm2, Allowable 3.0 N/mm2
Max compression 0.0 N/mm2, Allowable 15.6 N/mm2     Max compression 0.0 N/mm2, Allowable 15.6 N/mm2
DESIGN STRIP SERVICE COMBINATION STRESSES
(Tension stress positive)

Moment Diagrams
Pro ject: General n ame / Lo ad Case: Stren gth
1 .5 0 x Selfw eig ht + 1 .50 x D ead load + 1.50 x Liv e lo ad + 1 .0 0 x Hy p erstatic
Moment Draw n o n Ten sion Side
-300

-200

-100

0
Moment [k Nm]

100

200

300

400

500

Span 1 Span 2 Span 3 Span 4 Span 5

DESIGN STRIP "DESIGN MOMENT (Mu)"
(Moment is drawn on the tension side)

Rebar Diagrams
Pro ject: General n ame / Lo ad Case: En velo pe

R ebar Required Top R ebar Required Bottom

R ebar Prov ided Top R ebar Provided Bottom

1500

1000

500

0
R ebar [mm²]

-500

-1000

-1500

-2000

-2500

-3000

-3500
Span 2 Span 3 Span 4 Span 5

DESIGN STRIP REINFORCEMENT
REQUIRED AND PROVIDED

21
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

SUMMARY

22
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

SUPPORT LINE 6
Stress Diagrams Stress Diagrams
Pro ject: G en eral name / Lo ad Case: Serv ice(Sustain ed Lo ad ) Pro ject: G en eral n ame / Load Case: Serv ice(Su stain ed Load)
1 .0 0 x Selfw eig h t + 1 .00 x D ead load + 0 .30 x Liv e lo ad + 1 .0 0 x Prestressin g 1 .0 0 x Selfw eig h t + 1 .0 0 x D ead lo ad + 0 .3 0 x Liv e lo ad + 1.00 x Prestressin g
Tensile Stress Po sitive Tensile Stress Po sitiv e

Allowable Stress es w ith R einforcement Allow able Stres ses Allowable Stress es with Reinforc ement Allowable Stress es

Top Bottom
10 10

5 5
Stress [N /mm²]

Stress [N /mm²]
0 0

-5 -5

-10 -10

-15 -15

Span 1 Span 2 Span 3 Span 4 Span 5 Span 1 Span 2 Span 3 Span 4 Span 5

(a) Max tension 0.0 N/mm2, Allowable 3.0 N/mm2          (b) Max tension 0.0 N/mm2, Allowable 3.0 N/mm2
Max compression 0.0 N/mm2, Allowable 15.6 N/mm2     Max compression 0.0 N/mm2, Allowable 15.6 N/mm2
DESIGN STRIP SERVICE COMBINATION STRESSES
(Tension stress positive)

Moment Diagrams
Pro ject: General n ame / Lo ad Case: Stren gth
1 .5 0 x Selfw eig ht + 1 .50 x D ead load + 1.50 x Liv e lo ad + 1 .0 0 x Hy p erstatic
Moment Draw n o n Ten sion Side

-300

-200

-100

0
Moment [k Nm]

100

200

300

400

500

600
Span 1 Span 2 Span 3 Span 4 Span 5

DESIGN STRIP "DESIGN MOMENT (Mu)"
(Moment is drawn on the tension side)

Rebar Diagrams
Pro ject: General n ame / Lo ad Case: En velo pe

R ebar Required Top R ebar Required Bottom

R ebar Prov ided Top R ebar Provided Bottom

1500
1000

500
0
-500
R ebar [mm²]

-1000
-1500

-2000
-2500
-3000

-3500
-4000
Span 2 Span 3 Span 4 Span 5

DESIGN STRIP REINFORCEMENT
REQUIRED AND PROVIDED

23
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

SUMMARY

24
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

SUPPORT LINE 7
Stress Diagrams Stress Diagrams
Pro ject: G en eral name / Lo ad Case: Serv ice(Sustain ed Lo ad ) Pro ject: G en eral n ame / Load Case: Serv ice(Su stain ed Load)
1 .0 0 x Selfw eig h t + 1 .00 x D ead load + 0 .30 x Liv e lo ad + 1 .0 0 x Prestressin g 1 .0 0 x Selfw eig h t + 1 .0 0 x D ead lo ad + 0 .3 0 x Liv e lo ad + 1.00 x Prestressin g
Tensile Stress Po sitive Tensile Stress Po sitiv e

Allowable Stress es w ith R einforcement Allow able Stres ses Allowable Stress es with Reinforc ement Allowable Stress es

Top Bottom
10 10

5 5
Stress [N /mm²]

Stress [N /mm²]
0 0

-5 -5

-10 -10

-15 -15

Span 1 Span 2 Span 3 Span 4 Span 1 Span 2 Span 3 Span 4

(a) Max tension 0.0 N/mm2, Allowable 3.0 N/mm2          (b) Max tension 0.0 N/mm2, Allowable 3.0 N/mm2
Max compression ­2.5 N/mm2, Allowable 15.6 N/mm2     Max compression ­3.7 N/mm2, Allowable 15.6 N/mm2
DESIGN STRIP SERVICE COMBINATION STRESSES
(Tension stress positive)

Moment Diagrams
Pro ject: General n ame / Lo ad Case: Stren gth
1 .5 0 x Selfw eig ht + 1 .50 x D ead load + 1.50 x Liv e lo ad + 1 .0 0 x Hy p erstatic
Moment Draw n o n Ten sion Side
-500

-400

-300

-200
Moment [k Nm]

-100

100

200

300

400

Span 1 Span 2 Span 3 Span 4

DESIGN STRIP "DESIGN MOMENT (Mu)"
(Moment is drawn on the tension side)

Rebar Diagrams
Pro ject: General n ame / Lo ad Case: En velo pe

R ebar Required Top R ebar Required Bottom

R ebar Prov ided Top R ebar Prov ided Bottom


1.0

0.8

0.6

0.4
R ebar [mm²]

0.2

-0.2

-0.4

-0.6

-0.8

-1.0

Span 2 Span 3 Span 4

DESIGN STRIP REINFORCEMENT
REQUIRED AND PROVIDED

25
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

SUMMARY

26
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

SUPPORT LINE 8
Stress Diagrams Stress Diagrams
Pro ject: G en eral name / Lo ad Case: Serv ice(Sustain ed Lo ad ) Pro ject: G en eral n ame / Load Case: Serv ice(Su stain ed Load)
1 .0 0 x Selfw eig h t + 1 .00 x D ead load + 0 .30 x Liv e lo ad + 1 .0 0 x Prestressin g 1 .0 0 x Selfw eig h t + 1 .0 0 x D ead lo ad + 0 .3 0 x Liv e lo ad + 1.00 x Prestressin g
Tensile Stress Po sitive Tensile Stress Po sitiv e

Allowable Stress es w ith R einforcement Allow able Stres ses Allowable Stress es with Reinforc ement Allowable Stress es

Top Bottom
10 10

5 5
Stress [N /mm²]

Stress [N /mm²]
0 0

-5 -5

-10 -10

-15 -15

Span 1 Span 1

(a) Max tension 0.0 N/mm2, Allowable 3.0 N/mm2          (b) Max tension 5.0 N/mm2, Allowable 3.0 N/mm2
Max compression ­9.0 N/mm2, Allowable 15.6 N/mm2     Max compression ­2.9 N/mm2, Allowable 15.6 N/mm2
DESIGN STRIP SERVICE COMBINATION STRESSES
(Tension stress positive)

Moment Diagrams
Pro ject: General n ame / Lo ad Case: Stren gth
1 .5 0 x Selfw eig ht + 1 .50 x D ead load + 1.50 x Liv e lo ad + 1 .0 0 x Hy p erstatic
Moment Draw n o n Ten sion Side
-400

-200

200
Moment [k Nm]

400

600

800

1000

1200

Span 1

DESIGN STRIP "DESIGN MOMENT (Mu)"
(Moment is drawn on the tension side)

Rebar Diagrams
Pro ject: General n ame / Lo ad Case: En velo pe

R ebar Required Top R ebar Required Bottom

R ebar Prov ided Top R ebar Provided Bottom


0

-1000

-2000

-3000
R ebar [mm²]

-4000

-5000

-6000

-7000

Span 1

DESIGN STRIP REINFORCEMENT
REQUIRED AND PROVIDED

27
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

SUMMARY

28
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

158 DESIGN SECTION CAPACITY


158.20 DESIGN SECTION CAPACITIES BASED ON REINFORCEMENT REPORTED IN THE
PROGRAM

Design Strip: Support Line 1


Design section Moment Moment
positive negative
KN-M KN-M
102000 622.300 -1331.000
102001 759.100 -316.800
102002 1447.000 -195.500
102003 2462.000 -103.500
102004 2744.000 -55.730
102005 2893.000 -42.450
102006 2771.000 -56.290
102007 2455.000 -104.400
102008 1468.000 -197.000
102009 759.100 -316.800
102010 622.200 -1363.000

Design Strip: Support Line 2


Design section Moment Moment
positive negative
KN-M KN-M
202000 604.800 -467.600
202001 740.700 -316.600
202002 1364.000 -195.300
202003 1913.000 -102.800
202004 2123.000 -56.290
202005 2215.000 -43.020
202006 2231.000 -56.360
202007 2014.000 -103.500
202008 1360.000 -196.100
202009 740.700 -316.600
202010 604.800 -467.600

Design Strip: Support Line 3


Design section Moment Moment
positive negative
KN-M KN-M
302000 622.600 -794.500
302001 759.100 -316.800
302002 1025.000 -187.000
302003 1730.000 -102.500
302004 2258.000 -55.660
302005 2390.000 -41.880
302006 2241.000 -56.010
302007 1690.000 -102.500
302008 1014.000 -186.300
302009 759.100 -316.800
302010 622.600 -792.000

Design Strip: Support Line 4

29
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

Design section Moment Moment


positive negative
KN-M KN-M
402000 616.800 -740.700
402001 754.100 -316.800
402002 879.200 -181.800
402003 1211.000 -100.400
402004 1573.000 -56.030
402005 1672.000 -43.110
402006 1568.000 -55.640
402007 1219.000 -100.300
402008 879.200 -181.800
402009 754.100 -316.700
402010 616.800 -738.500

Design Strip: Support Line 5


Design section Moment Moment
positive negative
KN-M KN-M
502000 379.800 -6.896
502001 517.700 -7.114
502002 688.100 -7.010
502003 748.200 -7.040
502004 705.700 -7.131
502005 570.000 -6.980
502006 329.000 -6.868
502007 64.840 -15.490
502008 21.210 -306.300
503000 20.750 -289.300
503001 11.990 -142.900
503002 5.591 -64.340
503003 145.000 -63.450
503004 192.900 -6.528
503005 179.500 -6.500
503006 106.000 -5.906
503007 64.820 -14.690
503008 10.140 -120.200
504000 13.030 -157.000
504001 64.810 -17.480
504002 128.900 -6.201
504003 236.600 -6.689
504004 278.800 -6.759
504005 254.500 -6.678
504006 167.300 -6.487
504007 64.770 -5.185
504008 8.604 -101.800
505000 9.763 -115.200
505001 5.591 -64.340
505002 64.020 -7.883
505003 64.080 -5.177
505004 64.080 -5.177
505005 64.080 -5.177
505006 64.080 -5.177
505007 64.080 -5.177

30
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

505008 8.596 -64.400

Design Strip: Support Line 6


Design section Moment Moment
positive negative
KN-M KN-M
602000 378.500 -6.949
602001 551.300 -7.067
602002 740.000 -7.216
602003 816.000 -7.198
602004 781.400 -7.217
602005 635.500 -7.194
602006 369.500 -6.899
602007 64.770 -5.185
602008 21.420 -335.700
603000 21.210 -306.300
603001 13.030 -157.000
603002 5.591 -64.340
603003 132.500 -63.500
603004 186.600 -6.558
603005 175.800 -6.345
603006 101.700 -5.969
603007 64.830 -13.900
603008 65.760 -112.900
604000 12.680 -153.500
604001 64.820 -16.600
604002 128.400 -6.079
604003 235.700 -6.628
604004 276.600 -6.652
604005 252.800 -6.580
604006 163.500 -6.431
604007 64.770 -5.185
604008 8.913 -104.700
605000 10.420 -123.900
605001 6.117 -70.560
605002 65.530 -64.160
605003 64.080 -5.177
605004 64.080 -5.177
605005 64.080 -5.177
605006 64.080 -5.177
605007 64.080 -5.177
605008 64.080 -5.177

Design Strip: Support Line 7


Design section Moment Moment
positive negative
KN-M KN-M
702000 359.600 -699.300
702001 575.800 -483.600
702002 730.600 -325.400
702003 824.400 -218.700
702004 858.900 -181.700
702005 827.100 -216.000
702006 735.100 -320.700

31
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

702007 581.100 -479.700


702008 365.200 -692.100
703000 355.400 -702.000
703001 574.600 -485.300
703002 730.000 -326.500
703003 824.200 -219.100
703004 858.900 -181.700
703005 827.100 -216.000
703006 733.400 -321.200
703007 580.200 -480.600
703008 363.400 -694.800
704000 498.200 -556.800
704001 679.900 -377.500
704002 796.200 -249.300
704003 850.200 -191.100
704004 851.900 -189.700
704005 817.000 -226.900
704006 747.000 -301.100
704007 649.500 -403.700
704008 545.800 -509.400

Design Strip: Support Line 8


Design section Moment Moment
positive negative
KN-M KN-M
801000 717.200 -340.600
801001 775.300 -274.700
801002 984.800 -253.200
801003 1137.000 -245.300
801004 1168.000 -259.200
801005 1034.000 -307.800
801006 758.600 -404.400
801007 524.600 -535.500
801008 336.000 -720.500

NA = not applicable, wall-supported design section.

32
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

300.00 PT TOTALS
# Label Reference Tendon/Duct Strand Area Number Strand Tendon Stressing
Plane Length Of Length Diameter ends
Strands
m mm2 m mm
1 Tendon 2 Current plane 31.394 98 5 156.970 20 2
2 Tendon 3 Current plane 31.394 98 5 156.970 20 2
3 Tendon 4 Current plane 31.394 98 5 156.970 20 2
4 Tendon 5 Current plane 31.394 98 5 156.970 20 2
5 Tendon 6 Current plane 31.394 98 5 156.970 20 2
6 Tendon 7 Current plane 31.394 98 5 156.970 20 2
7 Tendon 8 Current plane 31.394 98 5 156.970 20 2
8 Tendon 9 Current plane 31.394 98 5 156.970 20 2
9 Tendon 10 Current plane 31.601 98 5 158.006 20 2
10 Tendon 11 Current plane 13.225 98 20 264.509 20 2
11 Tendon 12 Current plane 13.225 98 20 264.509 20 2
12 Tendon 13 Current plane 13.225 98 20 264.509 20 2
13 Tendon 14 Current plane 13.225 98 20 264.509 20 2

Summary by Type
Type # Tendon Strand Area Strand Length Tendon/Duct Weight # Stressing # Dead
Diameter Length Ends Ends
mm mm2 m m kg
1 20 98 2471.805 335.655 1889.45 26 0
Total - - 2471.805 335.655 1889.45 26 0

Summary
Reference Plane Floor Area Floor Volume Weight Rate Rate Cost
m2 m3 kg kg/m2 kg/m3 Euro
Current plane 672.44 178.93 1889.45 2.81 10.56 94472.39
Total 672.44 178.93 1889.45 2.81 10.56 94472.39

Unit weight of prestressing steel = 7800.00 kg/m3

33
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

199.00 REBAR LEGEND


Legend Note
A 12mmx4950mm(B)

34
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

210.00 REBAR TOTALS


Bar Reinforcement (calculated and user defined base reinforcement)
Type Quantity Size Length/ Length Weight Unit cost Total cost
bar
bars m m kg INR/kg INR
1 66 12mm 4.95 326.70 288.06 50.00 14402.77
Total 326.70 288.06 14402.77

Note:
Type = Identification assigned to a group of bars with the same diameter and length.

35
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

Plan Geometry

36
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

Tendon Plan

37
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

Dead Load Plan

38
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

Live Load Plan

39
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

Stress Check in X-direction

40
Project Name: ADMAS PROJECT AT BKC Specific Data: PT SLAB STRENGTHENING
Date of execution: May 06, 2019

Column Reactions

41