REPUBLIC OF THE PHILIPPINES

PROVINCE OF SURIGAO DEL SUR


CITY OF BISLIG

CITY ENGINEERING OFFICE

A-1 PERSPECTIVE VIEW, S -10 DETAIL ELEVATION OF CANTILEVER TRUSS


TABLE OF CONTENTS (CT-1) MAIN ENTRANCE,
A - 2 GROUND FLOOR PLAN, DETAIL PLAN AND CONN. OF CT-1 TO R.C. COL.,
DETAIL A, B, AND C
SCHEDULE OF FLOOR FINISHES
S -11 DETAIL ELEVATION OF CANTILEVER TRUSS (CT-2),
A-3 SECOND FLOOR PLAN, DETAIL PLAN AND CONN.
SCHEDULE OF FLOOR FINISHES OF CT-2 TO SC-3, COL., DETAIL AND ELEVATION
OF "A-A" / "B-B"
A-4 FRONT ELEVATION, REAR ELEVATION S -12 DETAIL CONNECTION OF STEEL PIPE TO R.C. CITY ENGINEER
A-5 RIGHT SIDE ELEVATION, SLAB (F-1a) - PLAN AND
LEFT SIDE ELEVATION, ELEVATION, DETAIL CONNECTION OF STEEL PIPE
LONGITUDINAL SECTIONS CONCRETE PEDESTAL
(F-1a) - PLAN AND ELEVATION BUILDING OFFICIAL
A - 6 CROSS SECTIONS 1 & 2, DETAIL
DETAIL SECTION OF CEILING PLAN
@ DISTRICT P-1 GROUND FLOOR PLAN (SEWERDRAINAGE
AND LAYOUT),
ENGINEER OFFICE, DETAIL SECTION
P-2 SECOND FLOOR PLAN (SEWER
DRAINAGE
AND LAYOUT)
OF CEILING @ CONFERENCE ROOM
AND CENTER HALL WAY @ SECOND P-3 ROOF PLAN (SEWER DRAINAGE
AND LAYOUT)
FLOOR
P-4 ISOMETRIC DIAGRAM - 1 (SEWER LAYOUT)
A - 7 ROOF PLAN
A - 8 GROUND FLOOR REFLECTED CEILING P-5 ISOMETRIC DIAGRAM - 2 (SEWER LAYOUT)
SCHEDULE OF CEILING FINISHES P-6 ISOMETRIC DIAGRAM (DRAINAGE LAYOUT)
DATE
A-9 SECOND FLOOR REFLECTED CEILING P - 7 GROUND FLOOR PLAN (WATER LINE LAYOUT)
PLAN, SCHEDULE OF CEILING FINISHES P - 8 SECOND FLOOR PLAN (WATER LINELAYOUT)
A - 10 DETAIL PLAN OF MAIN ENTRANCE, P - 9 ISOMETRIC DIAGRAM (WATER LINE LAYOUT)
DETAIL ELEVATION OF MAIN ENTRANCE
P - 10 DETAIL OF CATCH BASIN (CB-1 & CB-2)
DETAIL SECTION OF MAIN ENTRANCE, PLUMBING NOTES, PLUMBING LEGEND
SPOT DETAILS
A - 11 DETAIL SECTIONS OF RAMP, TYPICAL P - 11 DETAIL OF SEPTIC VAULT, SCHEDULE OF SLAB
DETAIL OF RAMP RAILINGS REINFORCEMENT DATE
SPOT DETAIL OF RAMP FLOORING,
TYPICAL DETAIL OF ACCU PLATFORM
E - 1 GROUND FLOOR LIGHTING LAYOUT
A - 12 DETAIL BAY ELEVATION, DETAIL BAY

TO
GENERAL NOTES

BU
SECTIONS, DETAIL OF R.C. PARAPET/

TU
AN
E - 2 SECOND FLOOR LIGHTING LAYOUT
GUTTER, SPOT DETAIL, KEY PLAN ELECTRICAL SYMBOLS
A - 13 DETAIL BAY ELEVATION, DEATIL BAY
E - 3 GROUND FLOOR POWER LAYOUT
SECTIONS, KEY PLAN DATE
A - 14 DETAIL BAY ELEVATION, DETAIL BAY E-4 SECOND FLOOR POWER LAYOUT

RO
GO SECTIONS, KEY PLAN, E - 5 GROUND FLOOR AIRCONDITIONING &
NCA
MA
BL
ISS DETAIL OF R.C. PARAPET/GUTTER, VENTILATION LAYOUT
TYPICAL DETAIL SECTION OF MEDIA AGUA E - 6 SECOND FLOOR AIRCONDITIONING &
A - 15 DETAIL OF MAIN STAIR, DETAIL SECTION
VENTILATION LAYOUT
N
OF STAIR, DETAIL SECTION OF STEP,
SO
ICK
ER
A - 16 DETAIL OF SERVICE STAIR E - 7 SCHEDULE OF LOADS & COMPUTATIONS
DATE
A - 18 SCHEDULE OF WINDOWS, DETAIL OF E - 8 SCHEDULE OF LOADS & COMPUTATIONS
ELECTRICAL RISER DIAGRAM
FIRE ESCAPE, DETAIL SECTION OF FIRE
ESCAPE, SPOT DETAIL E - 9 SCHEDULE OF LIGHTING FIXTURES & LAMPS
SCHEDULE OF LIGHTING FIXTURES & LAMPS
THIS SITE A - 19 DETAIL PLAN OF TOILET @ GROUND NETWORK CABLING RISER DIAGRAM
FLOOR, DETAIL PLAN OF TOILET @ GROUND FLOOR VOLTS & DATA LAYOUT
SECOND FLOOR E - 11 SECOND FLOOR VOLTS & DATA LAYOUT
A - 20 DETAIL SECTION OF TOILET
(SHOWING MALE & FEMALE TOILETS) DATE
A - 21 DETAIL PLAN OF TOILET @ SECOND FLOOR

NA
TINA
LH
IGH
WA
Y
S-1 CONSTRUCTION NOTES
S-2 DESIGN CRITERIA, FOUNDATION PLAN,
DETAIL OF WALL FOOTINGS
S-3 SECOND FLOOR FRAMING PLAN,
TYPICAL DETAIL OF SUSPENDED SLABS, DATE
SCHEDULE OF SLABS
AS TO
S-4 REFEERENCE COLUMN-FOOTING ,
W
MA MAN DET. OF STIFFINER COLUMNS,
CU GA
GO
Y
Y.
SCHEDULE OF COLUMN
G
BR
S-5 SCHEDULE OF BEAMS AND GIRDERS,
SCHEDULE OF FOOTING TIE BEAMS,
SCHEDULE OF FOOTING, TTYPICAL
BEAM ELEVATION DATE
LLS
Y-AN FA
TO TINU S-6 ROOF FRAMING PLAN
S-7 DETAIL OF TRUSS-1 (T-1), DETAIL CONNECTIONS,
SCHEDULE OF WELD
S-8 DETAIL SECTIONS OF PARAPET/GUTTER
S-9 DETAIL OF STAIR (MAIN & SERVICE STAIR),
DETAIL OF R.C. RAMP & R.C.
1 SITE DEVELOPMENT PLAN 2 VICINITY MAP ON - FILL
SCALE NTS SCALE NTS
A-1 A-1 DATE

TRACED BY : (COPIED FROM ORIGINAL PLAN)


PROJECT & LOCATION: SHEET CONTENTS: CHECKED & VERIFIED BY : SUBMITTED BY: RECOMMENDING APPROVED BY: APPROVED BY: SET NO. SHEET NO.

JOVEN MARK D. ORIEL


PROPOSED TWO (2) - STOREY DPWH Engineering Assistant
DISTRICT ENGINEERING OFFICE CHECKED BY :
BUILDING, MANCAROGO, BISLIG CITY,
RICARDO N. ORIEL FERDINAND C. ACMA CANDELARIO P. PORTILLO NOEL R. OCLARIT
BISLIG CITY SURIGAO DEL SUR 2ND LD Chief ,Planning & Design Section OIC - Assistant District Engineer District Engineer
Asst. Chief, Planning & Design Section
JEFFREY M. CORDERO
Architect II