A 2. Elevation measurements in meters (Note: Reference here should be the same as for the survey drawings)
5.10 3. Measurements in meters.
1 1 4. Qibla direction: 175º South (indicated beside North sign).
5. In IFD document general urbanization elevations are shown in relative coordinates.
2.40
03 FM200 room
2.60
12.20 m2 02 Electrical room 6. Final building height shall be verified with the definitive structural system, headroom requirements for
64.26 m2
cables room, switchgear height and HVAC system dimensions in IFC document.
1 3 7. This document is not for construction.
6.13
5.55
8. Indicated useful surfaces are preliminary because of definitive surface depend on the thickness of the
enclosures, definitive distribution and structure.
9. Urban facilities (rain-water, sewage system, fire-protection system, etc) will be defined in the documents
3.41 1.69 11.51 which describe each of these networks at a general level for the entire power block.
2.60
01 Entrance 852.60 10. Fire-fighting equipment and elements (hydrants, fire-extinguisher, detector, etc) will be defined on
A A'
8.88 m2 fire-protection drawings of electrical building and general fire-fighting facility for the entire power block.
B Instructions:
1. Structure:
1.1. Building will be built using reinforced concrete structure frames.
C'
1.2. Foundation will be define according to upper-structure and geo-technical requirements.
1.3. Minimum thickness of base or grade slab will be in accordance with trays support requirements.
2. Enclosure requirements:
Ground floor B'
2 2.1. Cable cellar
Scale 1:100 - Enclosure: underground concrete perimetral walls.
2.2. Switchgear level (in accordance with 4011-SPE-ABE-050-370-0001_Buildings. Architectural works)
- Exterior wall: Enclosure Type E1*
6.13 17.73 Umin: 0,25 W/m² K; FRmin: 180min
- Interior wall: formed by concrete block, plastered for both sides; total thickness will be in
5.55 5.35 5.85 5.85 accordance with fire-protection requirements.
A B 01 02 03 04 - Roof: Roof Type R1* (without cantilever, and parapet 50cm tall)
+860.32 +860.32 Umin: 0,25 W/m² K; FRmin: 180min
2.3. Transformer area
1 1
- Exterior wall: firewalls of reinforced concrete designed for FRmin: 180min
01 02 03 04 - Roof: hot-rolled structural steel and metal sheet
+858.82 +858.82 2.4. Operation of exterior doors:
17.73
- T1. Equipment and pedestrian access during plant operation and emergency evacuation door
- T2. Equipment installation during works.
A
TOC +857.32 TOC +857.32
2.5. HVAC requirements (in accordance with 4011-SPE-ABE-050-370-0003Buildings. HVAC System)
1
Note: Roof finish floor level Area [ESP] Internal conditions [ESP]
according to drainage and 1.31 1.60 0.95 1.60 0.67
architectural plans [type of room] Summer Winter
6.52
6.52
Electronic room 26±2ºC / 50±5% r.h. 22±2ºC / 40% r.h.
TOC + 857.32
6.13
Battery room * 25ºC max. & 20ºC min.
HVAC equipment HVAC equipment Switchgear room * 35ºC max. & 20ºC min.
3. Total number and dimensions of exit or exit access doorways shall be in accordance with the local codes
(SBC-201 & SBC-801) and international codes (NFPA-101); taking into account the maximum travel
1 1 1 FFL +852.60 Sidewalk Sidewalk
distance with the updated lay-out of the building and the type of occupation.
+852.30 +852.28 +852.30 +852.28
B 4. Extinction method and equipment will be in accordance with the local code (SBC-801) and international
codes (NFPA-101 & NFPA-850).
5. Transformer retention basin will be in accordance with NFPA-850 [Paragraph 5.5 Containment and
5.35 5.85 5.85
Drainage].
6. Fire resistance of structure and enclosure will be in accordance with :
Roof plan view Elevation 1 Elevation 2 Occupancy: Group F-1 [IBC/SBC-801] Special Purpose Industrial [NFPA 850/101]
Scale 1:100 Scale 1:100 Type of construction: Type II (222) [NFPA 5000/220] Type IB [IBC Chapter 6 / SBC-801]
Scale 1:100
See the document: 4011-DRA-ABE-054-340-0004_ 7. Acoustic insulation will be in accordance with GEMSS-G-02 Rev 02 Plant Design Criteria; in function of
_Main administration building Auxiliary enclosure structure the distance between the building and the equipment.
6.13
17.73 8. Electrical equipments shall be identified in the electrical layout.
2.42
1.56 3.43 0.86 - 4011-SPE-ABE-050-370-0003_Buildings. HVAC System
11.50
2.73
1.45
5.25
6.52
6.52
Technical floor 0.48
1
5.35
4.77
Technical floor
3.32
16.85
B Sidewalk Sidewalk
+852.30 +852.28 +852.28 +852.30 01 2019/03/14 Second edition IFD ADSC ALNM RPR VTM
00 2018/12/12 First issue IFD AFF ALNM RPR VTM
Technical floor plan view Rev. Edition Description: Issue Signature Signature Signature Signature
Scale 1:100 No.: Date: for: Drawn: Checked: Reviewed: Approved:
See the document: 4011-DRA-ABE-054-340-0003_ Location:
Elevation 3 Elevation 4 _Main Administration building Auxiliary elect trays structure
Scale 1:100 Scale 1:100
A B A B
01 02 TOC +860.32 03 04 TOC +860.32 TOC +860.32
1 1 1
01
05
04
02
08
07
06
03
0.40
1.35
Pressure
1 1 1 1 1
1.47
1.47
01 Entrance
3.00
room
1 EPC Contractor: EPC Subcontractor:
FFL +852.60 Sidewalk Sidewalk FFL +852.60 TOC +852.60 Sidewalk Consultant:
FFL +852.58
+852.28 +852.28 +852.28 ABENER
1.30
1.30