ENGINEERING DESIGN
1.1. Population Projection
Projected Population
Year Decades AP II GP State Ave.
2015 1.4 21769 22218 22665 25527
2030 2.9 25251 26761 28142 36004
2045 4.4 28734 31906 34944 50780
x x x x
Water Demand
1. Arithmetical Progression
r1 = 2188 /13876
= 0.1577
r2 = 2455 /16064
= 0.1528
Assuming that the future growth follows the geometric mean for the period 1981 to 2001,
N
Projected population, PN = P0 x ( 1 + rg )
Where,
P0 = Population in 2001
N = (PN - P0) / 10
Year Population
1981 13876
1991 16064
2001 18519
Manning's Formula
2/3 1/2
V = (1/n) (R x S )
Where,
V = cross-sectional average veolcity in m/sec
n = Gauckler-Manning coefficient
R = hydraulic radius in m
S = slope of the water surface
2
Total X - Sectional Area, A = 578.32 m
Total Wetted Perimater, P = 250.21 m
Hydraulic Radius, R = A/P
= 2.31 m
Bed Slope of River, S = 0.0019
Rational Formula
Qp = 1/36 (K x pc x A)
Where,
Qp = Discharge
K = runoff coefficient
pc = critical rainfall intensity in cm/hr
A = catchment area in hectares
K (assumed) = 0.7
Mean Intensity Factor, F = 0.8
Critical intensity of rainfall in cm/hr, pc = po (2/(1 + Tc))
Max hourly rainfall in cm/hr, po = 7
Tc = time of concentration, in hours
Kirpich Formula
3 0.385
Tc = (0.885 L0 /H)
Where,
Tc = overland flow in hours
L0 = distance from the critical point in kilometres
H = total fall in level from the critical point in metres
3
Maximum discharge = 2,857.26 m /sec
3
Adopted Design Discharge = 3,000.00 m /sec
1 Design Data
Hydraulic Overloading @ 20 %
Flow rate with hydraulic overloading = 449 m3/hr
River Data
River Bed Level (Lowest) = 93.38 m
Minimum Flow Level = 94.27 m
Maximum Flow Level = 97.61 m
Normal Water Level = 94.81 m
Sand Depth (as per site condition) = 2 m
3
Discharge during Maximum Flow = 3000 m /sec
For Kharkai River, d for medium sand (as per IS:3955-1967) = 0.5 mm
Hence, Lacey's Silt Factor = 1.76 x √0.5
= 1.24
2 Inlet Well
Design as per Water Supply Engineering (Vol. 1), S. K. Garg, Pg. 244
No. of Openings per level, Σo = 3 Nos.
No. of Levels = 2 Nos.
3
Required discharge per opening, Qo = Q / Σo m /hr
= 448.8/3 m3/hr
= 149.60 m3/hr
= 0.04 m3/sec
2
C/s of opening required, Ao = Qo/vc m
= 0.04/0.2 m2
= 0.21 m2
Provide R.C.C Hume Pipes of Dia 500mm, 115m length at slope 1:500
4 Jack Well
Crown level of R.C.C. Hume Pipe at inlet well, 2m from Inlet Floor = 88.81 m
Crown level of R.C.C. Hume Pipe at jack well = 88.58 m
1 Design Parameters
Design Flow:
Hydraulic Overloading @ 20 %
3
Flow rate with hydraulic overloading = 552.63 m /hr
All Inter connecting Channels has been designed for a hydraulic
overloading of 20% over the design flow. All the process
parameters has been adopted as per the guidelines of CPHEEO
manual and as per our assumptions based on standard
engineering practices.
2 Treatment Units
The main Treatment units for the water treatment plant are as
detailed below:
i Cascade Aerator
ii Raw Water Channel with Parshall Flume
iii Flash Mixer
iv Clariflocculator
v Gravity Sand Filters (Variable Declining Rate)
vi Chemical House & Filter Annex Building
vii Central Sludge Sump
viii Chlorine Building
ix Clear Water reservoir
x Pure Water Pump House
Design Parameters
3
Design Flow = 460.53 m /hr
Surface Loading Rate = 600 lpm/sqm
3 2
= 36 m /hr/m
No of cascades = 4 nos.
Rise of cascade = 0.3 m
Design Parameters
3
Design Flow, with 20% hydraulic overloading 552.63 m /hr
Number 1 no.
Hydraulic Overloading 20 %
Type of Flow meter: Float operated Open channel transmitter
Type of Flume: Parshall Flume
Free Board 300 mm
Material of Construction: R.C.C. - M25
Design Parameters
3
Design Flow 460.53 m /hr
Number 1 no.
Material of Construction: R.C.C. - M25
Free Board 300 mm
Detention Time 60 sec
-1
Velocity Gradient (300-600) 300 sec
Number of Agitators 1 no.
Ratio of Tank Height to Dia. 1.43
Ratio of Impeller Dia to Tank dia. 0.3
3.4 Clariflocculator
The Conventional type clariflocculator with an arrangement of
central feed and flocculation and clarification, has been
adopted. Clariflocculator is of a circular reinforced cement
concrete structure having a central area for coagulation and
flocculation and outer area for settling. The flocculation zone
and the sedimentation zone will be separated by a circular
isolation wall.
Design Parameters
3
Design flow 460.53 m /hr
No. of units 1
Velocity of Water in central shaft 0.65 m/sec
Clarifier Side water Depth 3 m
Free Board 500 mm
Velocity gradient (20 – 75) 40 per sec
Detention period in flocculator 30 min
Detention period in Clariflocculator 2.5 hr
Surface over flow rate (20-40) 30 cum/sqm/day
Weir Loading <300, 300 cum/m/hr
Velocity of water below the partition wall 0.3 m/min
Bottom Slope provided 1 in 12
a) Chemical House
The chemical house along with necessary storage space for 90
days requirement of chemicals and weighing arrangements etc
will be provided, with a calculated floor area as per
requirement.
Ground Floor:
Chemical store
Toilet block
Stair case
First Floor:
Alum Solution tanks (1 no. for preparation, 1 no. for Dosing and
1 no. Standby) 3 Nos.
Lime Solution tanks (1 no. for preparation, 1 no. for Dosing and
1 no. Standby) 3 Nos.
Laboratory – For measuring Dose of alum as per raw water
turbidity condition Stair case
Alum 30 mg/l
Lime 10 mg/l
Post Chlorination 5 ppm
c) Chlorine Building
Chlorine Building Consisting of:
Chlorine Tonner Yard to accommodate 2 Chlorine Tonners with
Neutralization Pit
Chlorinator Room, Emergency Bleaching powder tanks with
Storage Room
Design Parameters
3
Rate of flow 460.53 m /hr
Hydraulic Overloading 20 %
No of Twin Bed Filter Beds 6 nos.
3 2
Filtration Rate 4.8 m /m /hr
Height of water over the filter bed 1.8 m
Free board 0.5 m
2
Rate of back wash 600 l/m /min
No of filters washed at a time 1 nos.
Duration of wash 12 min
Velocity of flow across channels 1 m/sec
Velocity at Filter inlet Gate 0.6 m/s
Velocity at Filter outlet 0.8 m/s
Velocity in wash water inlet Pipe 1.8 m/s
Velocity in wash water outlet Gate 0.75 m/s
3 2
Air scouring rate 36 m /m /hr
All valves for filter beds are operated by actuator operation and
will be operated from Operating platform of filter house.
Backwash Reservoir
The backwash reservoir is a RCC Structure located on top of the
filter gallery at a staging height of 12m or fixed according to the
requirement of the backwash pressure whichever is higher. The
capacity of the reservoir so calculated will be sufficient to
provide for quantity of water required for back-washing of one
full filter bed , water Required for Chemical preparation and
10% additional Margin for, service/drinking water
requirements.
It will have a minimum free board of 30 cm.
Design Parameters
A clear gap of 1500 mm will be maintained between Clear
Water Sump wall and Pure Water pump house. All pumps will
be housed in one pump house and drive way to be attached to
pump house for entry of truck loaded with pumps.
5 Clariflocculator - 1 No.
23 m dia x 3 m SWD + 0.5 m FB
NOTE:
The Sizes calculated for various Units of WTP are subject to get
optimized with respect to the associated electro-mechanical
equipment.
DESIGN BASIS
1 Cascade Aerator
Design Criteria
Design Flow = 460.53 cum/hr
Surface Loading Rate = 600 lpm/sqm
= 36 cum/hr/sqm
No of cascades = 4 nos.
Rise of cascade = 0.30 m
Sizing Calculation
Surface area required = design flow / surface loading rate = 460.53 / 36 sqm
= 12.79 sqm
No of cascades = 4 nos.
Dia. of lowest cascade = 2 x √(12.95/π) m
= 4.06 m
Say, 4.10 m
Freeboard = 0.30 m
Free fall from last step to channel = 0.20 m
Depth of Channel wall = 0.11 + 0.3 + 0.2 m
= 0.61 m
Design Criteria
Design flow = 460.53 cum/hr
Hydraulic Overloading = 20 %
= 552.63 cum/hr
Sizing Calculation
a Approach Channel to Parshall Flume
Velocity across channel, V = 0.60 m/sec
Cross-sectional area of the channel = 552.63/3600/0.6 sqm
= 0.26 sqm
b Flume Structure
Flume Dimensions as per Fig-1 (IS 14371:1996)
Throat
Width, b = 0.30 m
Length, l = 0.60 m
Height of Flume Crest, hp1 = 0.23 m
Entrance Section
Width, b1 = 0.84 m
Length, l1 = 1.35 m
Slant wall length, le = 1.377 m
Exit Section
Width, b2 = 0.60 m
Length, l2 = 0.92 m
hp2 = 0.072 m
Measurement of Head
For free flow condition, the discharge through Parshall Flume is
determined by measuring the head, ha in the entrance
3 Flash mixer
Design Criteria
Design flow = 460.53 cum/hr
No .of mixers = 1 No.
Detention time = 60 Sec
Free board = 0.30 m
Side water depth = 2.00 m
Sizing Calculation
Volume of tank = 460.53 x 60 / 3600 cum
= 7.68 cum
Volume of tank provided = 7.7 cum
6 Clariflocculator
Design Criteria
Design flow = 460.53 cum/hr
No. of units = 1 no.
Velocity of Water in central shaft = 0.65 m/sec
Side water Depth = 3 m
Free Board = 500 mm
-1
Velocity gradient, 40 to 60 = 40 sec
Detention period in flocculator, given = 30 min
Detention period in Clariflocculator, given = 2.5 hr
Surface over flow rate, given = 30 cum/sqm/day
Weir loading, given = 300 cum/m/day
Velocity of water below the partition wall = 0.3 m/min
Bottom Slope provided 1 in 12 as per CPHEEO Manual
a) Flocculator
Rate of flow/unit = 460.53 cum/hr
Central Shaft
Dia. of shaft = 0.5 m
Assume thickness of wall = 0.2 m
Therefore, outside dia of central shaft = 0.5 + 2 x 0.2 m
= 0.9 m
b) Clarifier - Circular
Design flow = 460.53 cum/hr
No. of units = 1 no.
Rate of flow/unit = 460.53 cum/hr
Volume of Tank = Design Flow x Detention Time = 460.53 x 2.5 cum
= 1151.32 cum
Side water depth = 3 m
2
Surface Area of Clarifier = Volume of Tank / Side Water Depth = 1151.32 / 3 m
2
= 383.77 m
Diameter of Clarifier, Dcf = √(4 x 383.77 / π) m
= 22.11 m
Say, 23 m
Hence, OK
3/2 1/2
Slope of Channel, V = 1/n x R xS = 0.03
= 1 / 31
Design Criteria
Alum dosage, assumed = 30 mg/lt
No. of days for Alum Storage, given = 90 days
Strength of Solution = 10 %
No. of Alum Solution Tanks = 3 nos.
Maximum dosing hours for each tank = 8 hr
8 Post Chlorination
a) Chlorinators
Post chlorination
Rate of Dosing = 5 ppm
Rate of flow = 460.53 cum/hr
Dosing capacity of chlorinators = 2.30 kg/hr
Say, 0-5 kg/hr
Provide 2 Nos. Vacuum Type Chlorinators (1Working + 1
Standby) of each capacity 0-5 Kg/Hr
Design Criteria
Rate of flow = 460.53 cum/hr
No. of Twin Bed Filter Beds, given = 6 nos.
Filtration Rate, given = 4.8 cum/sq m/hr
Height of water over the filter bed = 1.8 m
Free board = 0.5 m
Sizing Calculation
Rate of flow = 460.53 cum/hr
No of Twin Bed units = 6 nos.
Rate of flow/unit = 76.75 cum/hr
c) Filter Media
Sand Bed
3 2
Q = Rate of Filtration Maximum = 6 m /m /h
d = Size of sand = 0.7 mm
H = Terminal Loss of Head, assumed = 4 m
-4 -3
B = Breakthrough Index, assumed (4x10 - 6x10 ) = 0.0004
l = Depth of Sand bed = 0.70 m
~ 0.7 m
Depth of filter sand provided 0.7 m
0.6 to 0.75m
Supporting Gravel
Gravel depth, provided = 0.45 m
Size of gravel at top - 2.5 to 6 mm
Size of gravel at bottom layers = 50 mm
e) Wash Water Pump Calculations (Pump Location: Pure Water Pump House)
Duration of filling time of wash water tank = 1 hr
No. of Pumps provided, = 2 Nos.
Standby = 50 %
Total no. of Pumps (2 W + 1 S) = 3 Nos.
Head Requirement
Height of Back wash tank bottom = 12 m
Back wash water tank Height = 2.5 m
Suction head = 0.3 m
Total Head required, with 10% transmission losses = 16.28 m
Efficiency of Pumping = 75 %
Safety on Motor = 15 %
Input power of pump = 7.28 HP
~ 10.00 HP
However the actual motor rating shall be as recommended by
pump manufacturer.
h) Design of Gullet
Wash water rate/unit = 9594.30 l/min
Width of Gullet = 0.9 m
Minimum Depth of Gullet Required = 0.26 m
Depth Required for Gullet = 0.7 m
However the Gullet will be provided up to filter bottom with
Free fall condition
Length of Lateral travel of water in Central Gullet = 0.92 m
< 1.4
Hence, OK.
Design Criteria
Capacity = 500 cum
No. of Clear Water Sumps = 1 No.
Side water depth = 4 m
Free Board = 0.45 m
Shape of sump: Rectangular
Sizing Calculation
Total Volume of sump = 500 cum
Area of sump = 125.00 sqm
Length of sump = 14 m
Width of sump = 8.93 m
~ 9.00 m
12 Bypass arrangements
Bypass pipe line from Flash Mixer inlet to clariflocculator outlet
a channel
Bypass pipe line from filter inlet channel to clear water sump
b inlet
Formulae used
Hazen Williams Formula .
10.67
Head Loss in Straight circular pipes (in m), Hf = . .
Where, L = length of the pipe (in m)
3
Q = discharge volume (in m /s)
C = Pipe roughness coefficient
D = internal diameter of pipe (in m)
Manning's Formula
1
Velocity in pipe (in m/sec), V = × ×
R = hydraulic radius of conduit, (in m)
S = slope of hydralic gradient = Hf/L
n = Manning's coefficient of roughness
S = Hf/L
Hf = headloss in conduit
L - length of conduit
(As per CPHEEO Manual, 6.2.1, Pg. 104)
Basic Formula
2
Head Loss in Specials and Appurtenances, h = KLV /2g
Where, KL = constant for different fittings
V = velocity in pipe
g = accelaration due to gravity
(As per CPHEEO Manual, 6.2.9, Pg. 115 and Water Supply
Engineering, S. K. Garg, Pg. 276)
2 .
Discharge through a rectangular notch, Q = 2
3
Where, be = effective width
H = effective head
2
g = acceleration due to gravity (in m /s)
Ce = varies from 0.58 to 0.7
(As per CPHEEO Manual, 4.2.1.1, Pg. 39)
2.5
Discharge through 90 ° V-Notch, Q = 2.362 Ce H
Ce ranges from 0.603 to 0.686
h, measured head in m
Clarifier Diameter = 23 m
Collecting trough slope = 0.0020 m/m
Head loss = 23 / 2 x 0.0020 m
= 0.0231 m
3
Flow per notch = 0.001051 m /sec
Pipe Losses
Pipe Length, L = 25 m
Velocity in pipe, V = 0.90 m/sec
Diameter of Pipe, D = 0.5 m
Roughness coefficient = 120
Head loss, using Hazen Williams formula = 0.0347 m
Losses in Bends
For 45° Bends
KL = 0.6
V = 0.90 m/sec
Minor Loss = 0.6 x (0.9²/2 x 9.806) m/sec
= 0.0248 m
No. of Bends = 2
Total loss for 45° Bends = 0.0496 m
Valve Losses
KL = 0.7
V = 0.9 m/sec
Minor Loss = 0.7 x (0.9²/2 x 9.806) m/sec
= 0.0289 m
7 Cascade Aerator
OHT 1 OHT 2
Pipe Matrix
Dia 100 m 150 m 200 m 250 m 300 m 350 m
Pipes
Length 0m 0m 1700 m 900 m 8000 m 0m 10600 m
INPUT DATA
OHT 1 OHT 2
TABLE 2: KILOWATTS, COST OF PUMP SETS REQUIRED FOR DIFFERENT PIPE SIZES AND PIPE COST
1st Stage Flow 4.746 mld 2nd Stage Flow 5.980 mld.
Initial
Grand Total of
investment for
Annual Energy Capitalised Capitalised Annual Energy Capitalised Capitalised cost
S. No. Cost of pump Cost of pump pump and Pipe Dia. (mm) Pipe Material
Cost in THS Energy cost in Total Cost in Cost in THS Energy cost in for 30 yrs. In
sets in THS (Rs.) sets in THS (Rs.) Annual Energy
(Rs.) THS (Rs.) THS (Rs.) (Rs.) THS (Rs.) THS (Rs.)
Cost in THS
(Rs.)
1. 133692.03 168573.08 1246399.81 1380091.84 257408.40 324581.77 2399900.68 594302.97 1980940.96 100 DI:CML
2. 19744.32 24895.73 184074.65 203818.96 37226.33 46940.92 347072.95 85947.93 299482.99 150 DI:CML
3. 5901.78 7441.59 55021.82 60923.60 10478.29 13212.70 97692.40 24192.20 97759.60 200 DI:CML
4. 2903.35 3660.85 27067.72 29971.07 4684.40 5906.84 43674.15 10815.31 57767.65 250 DI:CML
5. 2005.15 2528.30 18693.82 20698.97 2948.79 3718.31 27492.52 6808.15 48652.02 300 DI:CML
6. 1673.53 2110.16 15602.18 17275.71 2308.00 2910.30 21518.24 5328.70 49037.33 350 DI:CML
7. 1531.78 1931.43 14280.65 15812.43 2034.10 2564.91 18964.53 4696.31 53847.21 400 DI:CML
8. 1464.24 1846.27 13650.96 15115.20 1903.59 2400.35 17747.74 4394.99 58527.96 450 DI:CML
9. 1429.24 1802.14 13324.71 14753.95 1835.96 2315.08 17117.28 4238.86 63673.39 500 DI:CML
10. 1398.53 1763.41 13038.35 14436.88 1776.61 2240.24 16563.93 4101.83 77640.36 600 DI:CML
11. 1387.19 1749.11 12932.63 14319.81 1754.70 2212.61 16359.63 4051.24 97193.13 700 DI:CML
12. 1384.29 1745.46 12905.65 14289.95 1749.11 2205.56 16307.50 4038.33 105444.38 750 DI:CML
13. 1382.34 1743.00 12887.43 14269.77 1745.33 2200.80 16272.30 4029.61 119331.51 800 DI:CML
14. 1380.03 1740.09 12865.90 14245.93 1740.87 2195.17 16230.69 4019.31 137335.09 900 DI:CML
15. 1378.83 1738.58 12854.74 14233.58 1738.56 2192.25 16209.13 4013.97 155849.37 1000 DI:CML
1) Selected economic diameter for Clear Water pipeline is : 300 mm DI K9 with internal Cement Mortar Lining
Keeping in view the multiple advantages offered by DI pipes over CI pipes the material of Construction of pipeline is selected as DI K9
Allowable head
Velocity, Velocity, C, C, Hmax, Hmax, Max. total head
Thickness of E value for pipe for pipe
S. No. Pipe Size (mm) Type of Pipe 1st Stage 2nd Stage st
1 Stage nd
2 Stage st
1 Stage nd
2 Stage with line Remarks
pipe wall (mm) (kg/m2) (including
(m/sec) (m/sec) (m/sec) (m/sec) (m) (m) pressure (m)
surge) (m)
1. 100 DI:CML 6.00 7.50E+09 10.49 13.22 1170.16 1170.16 1251.70 1577.17 770 12225.94 Failed
2. 150 DI:CML 6.00 7.50E+09 4.66 5.88 1085.13 1085.13 516.15 650.36 770 2190.38 Failed
3. 200 DI:CML 6.30 7.50E+09 2.62 3.31 1028.41 1028.41 275.16 346.70 740 780.18 Failed
4. 250 DI:CML 6.80 1.70E+10 1.68 2.12 1175.30 1175.30 201.25 253.58 650 447.37 Safe
5. 300 DI:CML 7.20 1.70E+10 1.17 1.47 1151.02 1151.02 136.87 172.46 590 294.45 Safe
6. 350 DI:CML 7.70 1.70E+10 0.86 1.08 1133.26 1133.26 99.01 124.75 540 220.23 Safe
7. 400 DI:CML 8.10 1.70E+10 0.66 0.83 1115.68 1115.68 74.63 94.03 510 178.18 Safe
8. 450 DI:CML 8.60 1.70E+10 0.52 0.65 1103.03 1103.03 58.30 73.45 480 152.20 Safe
9. 500 DI:CML 9.00 1.70E+10 0.42 0.53 1089.63 1089.63 46.65 58.78 460 134.73 Safe
10. 600 DI:CML 9.90 1.70E+10 0.29 0.37 1069.63 1069.63 31.80 40.07 430 113.56 Safe
11. 700 DI:CML 10.80 1.70E+10 0.21 0.27 1053.77 1053.77 23.02 29.00 410 101.59 Safe
12. 750 DI:CML 11.30 1.70E+10 0.19 0.24 1048.08 1048.08 19.94 25.13 390 97.49 Safe
13. 800 DI:CML 11.70 1.70E+10 0.16 0.21 1040.89 1040.89 17.41 21.93 380 94.14 Safe
14. 900 DI:CML 12.60 1.70E+10 0.13 0.16 1030.22 1030.22 13.61 17.15 370 89.17 Safe
15. 1000 DI:CML 13.50 1.70E+10 0.10 0.13 1021.23 1021.23 10.93 13.77 360 85.69 Safe
Bundu Water Supply Scheme: Engineering Design Page 65
WATER HAMMER CALCULATIONS
C = 1425 / √ (1 + kd/EC1)
Where,
2
k = bulk modulus of water = 2.07E+08 kg/m
d = diameter of pipe in m
E = modulus of elasticity of pipe material in kg/m2 = 1.7E+10 kg/m
2
(For DI)
C1 = wall thickness of pipe in m
1) Selected economic diameter for Rising Water pipeline is : 300 mm DI-K9 is Safe
INPUT DATA
OHT 1 OHT 2
TABLE 2: KILOWATTS, COST OF PUMP SETS REQUIRED FOR DIFFERENT PIPE SIZES AND PIPE COST
1st Stage Flow 4.508 mld 2nd Stage Flow 5.681 mld.
Initial
Grand Total of
investment for
Annual Energy Capitalised Capitalised Annual Energy Capitalised Capitalised cost
S. No. Cost of pump Cost of pump pump and Pipe Dia. (mm) Pipe Material
Cost in THS Energy cost in Total Cost in Cost in THS Energy cost in for 30 yrs. In
sets in THS (Rs.) sets in THS (Rs.) Annual Energy
(Rs.) THS (Rs.) THS (Rs.) (Rs.) THS (Rs.) THS (Rs.)
Cost in THS
(Rs.)
1. 7633.09 9624.61 71162.68 78795.77 14741.57 18588.53 137440.33 34035.24 113267.42 100 DI:CML
2. 1069.72 1348.82 9972.95 11042.68 2059.12 2596.47 19197.85 4754.09 16444.51 150 DI:CML
3. 272.40 343.47 2539.54 2811.93 518.44 653.73 4833.58 1196.97 4851.82 200 DI:CML
4. 99.69 125.70 929.39 1029.07 184.71 232.92 1722.14 426.46 2587.62 250 DI:CML
5. 47.95 60.46 447.05 495.00 84.74 106.86 790.08 195.65 2100.32 300 DI:CML
6. 28.85 36.38 268.97 297.82 47.83 60.32 445.96 110.44 2170.46 350 DI:CML
7. 20.69 26.08 192.85 213.54 32.06 40.42 298.87 74.01 2510.11 400 DI:CML
8. 16.80 21.18 156.58 173.38 24.54 30.94 228.78 56.66 2831.22 450 DI:CML
9. 14.78 18.64 137.79 152.57 20.64 26.03 192.47 47.66 3178.94 500 DI:CML
10. 13.01 16.41 121.30 134.31 17.23 21.72 160.60 39.77 4114.19 600 DI:CML
11. 12.36 15.58 115.21 127.56 15.96 20.13 148.83 36.86 5419.22 700 DI:CML
12. 12.19 15.37 113.65 125.84 15.64 19.72 145.83 36.11 5969.70 750 DI:CML
13. 12.08 15.23 112.60 124.68 15.42 19.45 143.80 35.61 6895.77 800 DI:CML
14. 11.95 15.06 111.36 123.31 15.17 19.12 141.40 35.02 8096.32 900 DI:CML
15. 11.88 14.97 110.72 122.60 15.03 18.96 140.16 34.71 9330.76 1000 DI:CML
1) Selected economic diameter for Clear Water pipeline is : 300 mm DI K9 with internal Cement Mortar Lining
Keeping in view the multiple advantages offered by DI pipes over CI pipes the material of Construction of pipeline is selected as DI K9
Allowable head
Velocity, Velocity, C, C, Hmax, Hmax, Max. total head
Thickness of E value for pipe for pipe
S. No. Pipe Size (mm) Type of Pipe 1st Stage 2nd Stage st
1 Stage nd
2 Stage st
1 Stage nd
2 Stage with line Remarks
pipe wall (mm) (kg/m2) (including
(m/sec) (m/sec) (m/sec) (m/sec) (m) (m) pressure (m)
surge) (m)
1. 100 DI:CML 6.00 7.50E+09 9.97 12.56 1170.16 1170.16 1189.12 1498.31 770 2140.25 Failed
2. 150 DI:CML 6.00 7.50E+09 4.43 5.58 1085.13 1085.13 490.34 617.84 770 707.51 Safe
3. 200 DI:CML 6.30 7.50E+09 2.49 3.14 1028.41 1028.41 261.40 329.37 740 351.94 Safe
4. 250 DI:CML 6.80 1.70E+10 1.60 2.01 1175.30 1175.30 191.19 240.91 650 248.95 Safe
5. 300 DI:CML 7.20 1.70E+10 1.11 1.40 1151.02 1151.02 130.03 163.84 590 167.53 Safe
6. 350 DI:CML 7.70 1.70E+10 0.81 1.03 1133.26 1133.26 94.06 118.51 540 120.60 Safe
7. 400 DI:CML 8.10 1.70E+10 0.62 0.79 1115.68 1115.68 70.90 89.33 510 90.73 Safe
8. 450 DI:CML 8.60 1.70E+10 0.49 0.62 1103.03 1103.03 55.38 69.78 480 70.85 Safe
9. 500 DI:CML 9.00 1.70E+10 0.40 0.50 1089.63 1089.63 44.31 55.84 460 56.74 Safe
10. 600 DI:CML 9.90 1.70E+10 0.28 0.35 1069.63 1069.63 30.21 38.06 430 38.81 Safe
11. 700 DI:CML 10.80 1.70E+10 0.20 0.26 1053.77 1053.77 21.87 27.55 410 28.25 Safe
12. 750 DI:CML 11.30 1.70E+10 0.18 0.22 1048.08 1048.08 18.94 23.87 390 24.55 Safe
13. 800 DI:CML 11.70 1.70E+10 0.16 0.20 1040.89 1040.89 16.54 20.84 380 21.51 Safe
14. 900 DI:CML 12.60 1.70E+10 0.12 0.16 1030.22 1030.22 12.93 16.29 370 16.95 Safe
15. 1000 DI:CML 13.50 1.70E+10 0.10 0.13 1021.23 1021.23 10.38 13.08 360 13.74 Safe
Bundu Water Supply Scheme: Engineering Design Page 70
WATER HAMMER CALCULATIONS
C = 1425 / √ (1 + kd/EC1)
Where,
2
k = bulk modulus of water = 2.07E+08 kg/m
d = diameter of pipe in m
E = modulus of elasticity of pipe material in kg/m2 = 1.7E+10 kg/m
2
(For DI)
C1 = wall thickness of pipe in m
1) Selected economic diameter for Rising Water pipeline is : 300 mm DI-K9 is Safe
INPUT DATA
OHT 1 OHT 2
TABLE 2: KILOWATTS, COST OF PUMP SETS REQUIRED FOR DIFFERENT PIPE SIZES AND PIPE COST
1st Stage Flow 1.960 mld 2nd Stage Flow 2.469 mld.
Initial
Grand Total of
investment for
Annual Energy Capitalised Capitalised Annual Energy Capitalised Capitalised cost
S. No. Cost of pump Cost of pump pump and Pipe Dia. (mm) Pipe Material
Cost in THS Energy cost in Total Cost in Cost in THS Energy cost in for 30 yrs. In
sets in THS (Rs.) sets in THS (Rs.) Annual Energy
(Rs.) THS (Rs.) THS (Rs.) (Rs.) THS (Rs.) THS (Rs.)
Cost in THS
(Rs.)
1. 2219.54 2798.50 20691.61 22911.16 4130.20 5208.34 38509.55 9536.31 33669.42 100 DI:CML
2. 509.30 642.15 4747.95 5257.25 826.81 1042.64 7709.08 1909.04 8979.96 150 DI:CML
3. 301.54 380.19 2811.09 3112.63 425.51 536.58 3967.40 982.47 6455.27 200 DI:CML
4. 256.54 323.45 2391.55 2648.08 338.58 426.97 3156.91 781.76 6599.68 250 DI:CML
5. 243.06 306.45 2265.87 2508.93 312.54 394.13 2914.12 721.64 7177.61 300 DI:CML
6. 238.08 300.18 2219.47 2457.55 302.93 382.01 2824.49 699.44 8091.14 350 DI:CML
7. 235.95 297.50 2199.64 2435.59 298.82 376.82 2786.17 689.95 9348.72 400 DI:CML
8. 234.94 296.22 2190.19 2425.12 296.86 374.35 2767.91 685.43 10393.87 450 DI:CML
9. 234.41 295.56 2185.29 2419.70 295.85 373.08 2758.45 683.09 11443.16 500 DI:CML
10. 233.95 294.97 2180.99 2414.94 294.96 371.95 2750.15 681.03 14128.28 600 DI:CML
11. 233.78 294.76 2179.40 2413.18 294.63 371.54 2747.09 680.27 17806.91 700 DI:CML
12. 233.74 294.71 2179.00 2412.74 294.54 371.43 2746.30 680.08 19354.49 750 DI:CML
13. 233.71 294.67 2178.73 2412.43 294.49 371.36 2745.78 679.95 21951.71 800 DI:CML
14. 233.67 294.62 2178.40 2412.08 294.42 371.28 2745.15 679.80 25318.24 900 DI:CML
15. 233.65 294.60 2178.24 2411.89 294.39 371.23 2744.83 679.72 28777.28 1000 DI:CML
1) Selected economic diameter for Clear Water pipeline is : 200 mm DI K9 with internal Cement Mortar Lining
Keeping in view the multiple advantages offered by DI pipes over CI pipes the material of Construction of pipeline is selected as DI K9
Allowable head
Velocity, Velocity, C, C, Hmax, Hmax, Max. total head
Thickness of E value for pipe for pipe
S. No. Pipe Size (mm) Type of Pipe 1st Stage 2nd Stage st
1 Stage nd
2 Stage st
1 Stage nd
2 Stage with line Remarks
pipe wall (mm) (kg/m2) (including
(m/sec) (m/sec) (m/sec) (m/sec) (m) (m) pressure (m)
surge) (m)
1. 100 DI:CML 6.00 7.50E+09 4.33 5.46 1170.16 1170.16 516.88 651.19 770 1065.02 Failed
2. 150 DI:CML 6.00 7.50E+09 1.93 2.43 1085.13 1085.13 213.14 268.52 770 351.37 Safe
3. 200 DI:CML 6.30 7.50E+09 1.08 1.37 1028.41 1028.41 113.62 143.15 740 185.78 Safe
4. 250 DI:CML 6.80 1.70E+10 0.69 0.87 1175.30 1175.30 83.11 104.70 650 138.63 Safe
5. 300 DI:CML 7.20 1.70E+10 0.48 0.61 1151.02 1151.02 56.52 71.21 590 102.52 Safe
6. 350 DI:CML 7.70 1.70E+10 0.35 0.45 1133.26 1133.26 40.88 51.51 540 81.86 Safe
7. 400 DI:CML 8.10 1.70E+10 0.27 0.34 1115.68 1115.68 30.82 38.82 510 68.76 Safe
8. 450 DI:CML 8.60 1.70E+10 0.21 0.27 1103.03 1103.03 24.07 30.33 480 60.07 Safe
9. 500 DI:CML 9.00 1.70E+10 0.17 0.22 1089.63 1089.63 19.26 24.27 460 53.91 Safe
10. 600 DI:CML 9.90 1.70E+10 0.12 0.15 1069.63 1069.63 13.13 16.54 430 46.10 Safe
11. 700 DI:CML 10.80 1.70E+10 0.09 0.11 1053.77 1053.77 9.50 11.97 410 41.49 Safe
12. 750 DI:CML 11.30 1.70E+10 0.08 0.10 1048.08 1048.08 8.23 10.37 390 39.89 Safe
13. 800 DI:CML 11.70 1.70E+10 0.07 0.09 1040.89 1040.89 7.19 9.06 380 38.56 Safe
14. 900 DI:CML 12.60 1.70E+10 0.05 0.07 1030.22 1030.22 5.62 7.08 370 36.58 Safe
15. 1000 DI:CML 13.50 1.70E+10 0.04 0.05 1021.23 1021.23 4.51 5.69 360 35.18 Safe
Bundu Water Supply Scheme: Engineering Design Page 75
WATER HAMMER CALCULATIONS
C = 1425 / √ (1 + kd/EC1)
Where,
2
k = bulk modulus of water = 2.07E+08 kg/m
d = diameter of pipe in m
E = modulus of elasticity of pipe material in kg/m2 = 1.7E+10 kg/m
2
(For DI)
C1 = wall thickness of pipe in m
1) Selected economic diameter for Rising Water pipeline is : 200 mm DI-K9 is Safe
INPUT DATA
OHT 1 OHT 2
TABLE 2: KILOWATTS, COST OF PUMP SETS REQUIRED FOR DIFFERENT PIPE SIZES AND PIPE COST
1st Stage Flow 2.549 mld 2nd Stage Flow 3.212 mld.
Initial
Grand Total of
investment for
Annual Energy Capitalised Capitalised Annual Energy Capitalised Capitalised cost
S. No. Cost of pump Cost of pump pump and Pipe Dia. (mm) Pipe Material
Cost in THS Energy cost in Total Cost in Cost in THS Energy cost in for 30 yrs. In
sets in THS (Rs.) sets in THS (Rs.) Annual Energy
(Rs.) THS (Rs.) THS (Rs.) (Rs.) THS (Rs.) THS (Rs.)
Cost in THS
(Rs.)
1. 2718.35 3427.72 25343.95 28062.30 5241.91 6609.53 48869.67 12101.97 40949.81 100 DI:CML
2. 393.23 495.84 3666.19 4059.42 747.67 942.74 6970.42 1726.14 6951.49 150 DI:CML
3. 110.77 139.68 1032.74 1143.51 201.70 254.33 1880.44 465.67 3126.44 200 DI:CML
4. 49.59 62.53 462.31 511.90 83.44 105.21 777.90 192.64 2742.29 250 DI:CML
5. 31.26 39.42 291.44 322.69 48.01 60.54 447.62 110.85 2970.93 300 DI:CML
6. 24.49 30.88 228.35 252.84 34.93 44.05 325.69 80.65 3505.44 350 DI:CML
7. 21.60 27.24 201.38 222.98 29.34 37.00 273.56 67.74 4291.34 400 DI:CML
8. 20.22 25.50 188.53 208.75 26.68 33.64 248.73 61.59 4952.48 450 DI:CML
9. 19.51 24.60 181.87 201.38 25.30 31.90 235.86 58.41 5621.46 500 DI:CML
10. 18.88 23.81 176.03 194.91 24.09 30.37 224.57 55.61 7342.72 600 DI:CML
11. 18.65 23.52 173.87 192.52 23.64 29.81 220.40 54.58 9705.75 700 DI:CML
12. 18.59 23.44 173.32 191.91 23.53 29.66 219.33 54.31 10700.16 750 DI:CML
13. 18.55 23.39 172.95 191.50 23.45 29.57 218.61 54.14 12369.49 800 DI:CML
14. 18.50 23.33 172.51 191.01 23.36 29.45 217.76 53.93 14533.32 900 DI:CML
15. 18.48 23.30 172.28 190.76 23.31 29.39 217.32 53.82 16756.80 1000 DI:CML
1) Selected economic diameter for Clear Water pipeline is : 250 mm DI K9 with internal Cement Mortar Lining
Keeping in view the multiple advantages offered by DI pipes over CI pipes the material of Construction of pipeline is selected as DI K9
Allowable head
Velocity, Velocity, C, C, Hmax, Hmax, Max. total head
Thickness of E value for pipe for pipe
S. No. Pipe Size (mm) Type of Pipe 1st Stage 2nd Stage st
1 Stage nd
2 Stage st
1 Stage nd
2 Stage with line Remarks
pipe wall (mm) (kg/m2) (including
(m/sec) (m/sec) (m/sec) (m/sec) (m) (m) pressure (m)
surge) (m)
1. 100 DI:CML 6.00 7.50E+09 5.63 7.10 1170.16 1170.16 672.24 847.12 770 1250.86 Failed
2. 150 DI:CML 6.00 7.50E+09 2.51 3.16 1085.13 1085.13 277.20 349.32 770 406.91 Safe
3. 200 DI:CML 6.30 7.50E+09 1.41 1.78 1028.41 1028.41 147.78 186.22 740 201.76 Safe
4. 250 DI:CML 6.80 1.70E+10 0.90 1.14 1175.30 1175.30 108.09 136.20 650 142.63 Safe
5. 300 DI:CML 7.20 1.70E+10 0.63 0.79 1151.02 1151.02 73.51 92.63 590 96.33 Safe
6. 350 DI:CML 7.70 1.70E+10 0.46 0.58 1133.26 1133.26 53.17 67.01 540 69.70 Safe
7. 400 DI:CML 8.10 1.70E+10 0.35 0.44 1115.68 1115.68 40.08 50.51 510 52.77 Safe
8. 450 DI:CML 8.60 1.70E+10 0.28 0.35 1103.03 1103.03 31.31 39.45 480 41.51 Safe
9. 500 DI:CML 9.00 1.70E+10 0.23 0.28 1089.63 1089.63 25.05 31.57 460 33.52 Safe
10. 600 DI:CML 9.90 1.70E+10 0.16 0.20 1069.63 1069.63 17.08 21.52 430 23.38 Safe
11. 700 DI:CML 10.80 1.70E+10 0.12 0.14 1053.77 1053.77 12.36 15.58 410 17.40 Safe
12. 750 DI:CML 11.30 1.70E+10 0.10 0.13 1048.08 1048.08 10.71 13.50 390 15.31 Safe
13. 800 DI:CML 11.70 1.70E+10 0.09 0.11 1040.89 1040.89 9.35 11.78 380 13.59 Safe
14. 900 DI:CML 12.60 1.70E+10 0.07 0.09 1030.22 1030.22 7.31 9.21 370 11.01 Safe
15. 1000 DI:CML 13.50 1.70E+10 0.06 0.07 1021.23 1021.23 5.87 7.40 360 9.19 Safe
Bundu Water Supply Scheme: Engineering Design Page 80
WATER HAMMER CALCULATIONS
C = 1425 / √ (1 + kd/EC1)
Where,
2
k = bulk modulus of water = 2.07E+08 kg/m
d = diameter of pipe in m
E = modulus of elasticity of pipe material in kg/m2 = 1.7E+10 kg/m
2
(For DI)
C1 = wall thickness of pipe in m
1) Selected economic diameter for Rising Water pipeline is : 250 mm DI-K9 is Safe
INPUT DATA
OHT 1 OHT 2
TABLE 2: KILOWATTS, COST OF PUMP SETS REQUIRED FOR DIFFERENT PIPE SIZES AND PIPE COST
1st Stage Flow 1.274 mld 2nd Stage Flow 1.606 mld.
Initial
Grand Total of
investment for
Annual Energy Capitalised Capitalised Annual Energy Capitalised Capitalised cost
S. No. Cost of pump Cost of pump pump and Pipe Dia. (mm) Pipe Material
Cost in THS Energy cost in Total Cost in Cost in THS Energy cost in for 30 yrs. In
sets in THS (Rs.) sets in THS (Rs.) Annual Energy
(Rs.) THS (Rs.) THS (Rs.) (Rs.) THS (Rs.) THS (Rs.)
Cost in THS
(Rs.)
1. 172.01 216.90 1603.70 1775.71 258.75 326.25 2412.26 597.37 2504.00 100 DI:CML
2. 118.26 149.12 1102.59 1220.86 154.86 195.26 1443.72 357.52 1772.70 150 DI:CML
3. 111.73 140.89 1041.72 1153.45 142.24 179.35 1326.06 328.38 1734.71 200 DI:CML
4. 110.32 139.11 1028.53 1138.85 139.50 175.90 1300.57 322.07 1800.55 250 DI:CML
5. 109.90 138.57 1024.58 1134.48 138.68 174.87 1292.94 320.18 1877.55 300 DI:CML
6. 109.74 138.38 1023.12 1132.86 138.38 174.49 1290.12 319.48 1981.00 350 DI:CML
7. 109.67 138.29 1022.50 1132.17 138.25 174.32 1288.91 319.18 2118.12 400 DI:CML
8. 109.64 138.25 1022.20 1131.84 138.19 174.25 1288.34 319.04 2231.24 450 DI:CML
9. 109.62 138.23 1022.05 1131.67 138.16 174.21 1288.04 318.97 2344.25 500 DI:CML
10. 109.61 138.21 1021.91 1131.52 138.13 174.17 1287.78 318.90 2632.46 600 DI:CML
11. 109.60 138.21 1021.86 1131.47 138.12 174.16 1287.68 318.88 3026.79 700 DI:CML
12. 109.60 138.20 1021.85 1131.45 138.12 174.15 1287.66 318.87 3192.65 750 DI:CML
13. 109.60 138.20 1021.84 1131.44 138.12 174.15 1287.64 318.87 3470.96 800 DI:CML
14. 109.60 138.20 1021.83 1131.43 138.11 174.15 1287.62 318.86 3831.69 900 DI:CML
15. 109.60 138.20 1021.83 1131.43 138.11 174.15 1287.61 318.86 4202.33 1000 DI:CML
1) Selected economic diameter for Clear Water pipeline is : 200 mm DI K9 with internal Cement Mortar Lining
Keeping in view the multiple advantages offered by DI pipes over CI pipes the material of Construction of pipeline is selected as DI K9
Allowable head
Velocity, Velocity, C, C, Hmax, Hmax, Max. total head
Thickness of E value for pipe for pipe
S. No. Pipe Size (mm) Type of Pipe 1st Stage 2nd Stage st
1 Stage nd
2 Stage st
1 Stage nd
2 Stage with line Remarks
pipe wall (mm) (kg/m2) (including
(m/sec) (m/sec) (m/sec) (m/sec) (m) (m) pressure (m)
surge) (m)
1. 100 DI:CML 6.00 7.50E+09 2.82 3.55 1170.16 1170.16 336.12 423.56 770 463.42 Safe
2. 150 DI:CML 6.00 7.50E+09 1.25 1.58 1085.13 1085.13 138.60 174.66 770 198.51 Safe
3. 200 DI:CML 6.30 7.50E+09 0.70 0.89 1028.41 1028.41 73.89 93.11 740 115.02 Safe
4. 250 DI:CML 6.80 1.70E+10 0.45 0.57 1175.30 1175.30 54.04 68.10 650 89.59 Safe
5. 300 DI:CML 7.20 1.70E+10 0.31 0.39 1151.02 1151.02 36.75 46.32 590 67.68 Safe
6. 350 DI:CML 7.70 1.70E+10 0.23 0.29 1133.26 1133.26 26.59 33.50 540 54.82 Safe
7. 400 DI:CML 8.10 1.70E+10 0.18 0.22 1115.68 1115.68 20.04 25.25 510 46.55 Safe
8. 450 DI:CML 8.60 1.70E+10 0.14 0.18 1103.03 1103.03 15.65 19.73 480 41.01 Safe
9. 500 DI:CML 9.00 1.70E+10 0.11 0.14 1089.63 1089.63 12.53 15.78 460 37.07 Safe
10. 600 DI:CML 9.90 1.70E+10 0.08 0.10 1069.63 1069.63 8.54 10.76 430 32.04 Safe
11. 700 DI:CML 10.80 1.70E+10 0.06 0.07 1053.77 1053.77 6.18 7.79 410 29.06 Safe
12. 750 DI:CML 11.30 1.70E+10 0.05 0.06 1048.08 1048.08 5.35 6.75 390 28.02 Safe
13. 800 DI:CML 11.70 1.70E+10 0.04 0.06 1040.89 1040.89 4.67 5.89 380 27.17 Safe
14. 900 DI:CML 12.60 1.70E+10 0.03 0.04 1030.22 1030.22 3.66 4.61 370 25.88 Safe
15. 1000 DI:CML 13.50 1.70E+10 0.03 0.04 1021.23 1021.23 2.93 3.70 360 24.97 Safe
Bundu Water Supply Scheme: Engineering Design Page 85
WATER HAMMER CALCULATIONS
C = 1425 / √ (1 + kd/EC1)
Where,
2
k = bulk modulus of water = 2.07E+08 kg/m
d = diameter of pipe in m
E = modulus of elasticity of pipe material in kg/m2 = 1.7E+10 kg/m
2
(For DI)
C1 = wall thickness of pipe in m
1) Selected economic diameter for Rising Water pipeline is : 200 mm DI-K9 is Safe
INPUT DATA
OHT 1 OHT 2
TABLE 2: KILOWATTS, COST OF PUMP SETS REQUIRED FOR DIFFERENT PIPE SIZES AND PIPE COST
1st Stage Flow 1.274 mld 2nd Stage Flow 1.606 mld.
Initial
Grand Total of
investment for
Annual Energy Capitalised Capitalised Annual Energy Capitalised Capitalised cost
S. No. Cost of pump Cost of pump pump and Pipe Dia. (mm) Pipe Material
Cost in THS Energy cost in Total Cost in Cost in THS Energy cost in for 30 yrs. In
sets in THS (Rs.) sets in THS (Rs.) Annual Energy
(Rs.) THS (Rs.) THS (Rs.) (Rs.) THS (Rs.) THS (Rs.)
Cost in THS
(Rs.)
1. 172.01 216.90 1603.70 1775.71 258.75 326.25 2412.26 597.37 2504.00 100 DI:CML
2. 118.26 149.12 1102.59 1220.86 154.86 195.26 1443.72 357.52 1772.70 150 DI:CML
3. 111.73 140.89 1041.72 1153.45 142.24 179.35 1326.06 328.38 1734.71 200 DI:CML
4. 110.32 139.11 1028.53 1138.85 139.50 175.90 1300.57 322.07 1800.55 250 DI:CML
5. 109.90 138.57 1024.58 1134.48 138.68 174.87 1292.94 320.18 1877.55 300 DI:CML
6. 109.74 138.38 1023.12 1132.86 138.38 174.49 1290.12 319.48 1981.00 350 DI:CML
7. 109.67 138.29 1022.50 1132.17 138.25 174.32 1288.91 319.18 2118.12 400 DI:CML
8. 109.64 138.25 1022.20 1131.84 138.19 174.25 1288.34 319.04 2231.24 450 DI:CML
9. 109.62 138.23 1022.05 1131.67 138.16 174.21 1288.04 318.97 2344.25 500 DI:CML
10. 109.61 138.21 1021.91 1131.52 138.13 174.17 1287.78 318.90 2632.46 600 DI:CML
11. 109.60 138.21 1021.86 1131.47 138.12 174.16 1287.68 318.88 3026.79 700 DI:CML
12. 109.60 138.20 1021.85 1131.45 138.12 174.15 1287.66 318.87 3192.65 750 DI:CML
13. 109.60 138.20 1021.84 1131.44 138.12 174.15 1287.64 318.87 3470.96 800 DI:CML
14. 109.60 138.20 1021.83 1131.43 138.11 174.15 1287.62 318.86 3831.69 900 DI:CML
15. 109.60 138.20 1021.83 1131.43 138.11 174.15 1287.61 318.86 4202.33 1000 DI:CML
1) Selected economic diameter for Clear Water pipeline is : 200 mm DI K9 with internal Cement Mortar Lining
Keeping in view the multiple advantages offered by DI pipes over CI pipes the material of Construction of pipeline is selected as DI K9
Allowable head
Velocity, Velocity, C, C, Hmax, Hmax, Max. total head
Thickness of E value for pipe for pipe
S. No. Pipe Size (mm) Type of Pipe 1st Stage 2nd Stage st
1 Stage nd
2 Stage st
1 Stage nd
2 Stage with line Remarks
pipe wall (mm) (kg/m2) (including
(m/sec) (m/sec) (m/sec) (m/sec) (m) (m) pressure (m)
surge) (m)
1. 100 DI:CML 6.00 7.50E+09 2.82 3.55 1170.16 1170.16 336.12 423.56 770 463.42 Safe
2. 150 DI:CML 6.00 7.50E+09 1.25 1.58 1085.13 1085.13 138.60 174.66 770 198.51 Safe
3. 200 DI:CML 6.30 7.50E+09 0.70 0.89 1028.41 1028.41 73.89 93.11 740 115.02 Safe
4. 250 DI:CML 6.80 1.70E+10 0.45 0.57 1175.30 1175.30 54.04 68.10 650 89.59 Safe
5. 300 DI:CML 7.20 1.70E+10 0.31 0.39 1151.02 1151.02 36.75 46.32 590 67.68 Safe
6. 350 DI:CML 7.70 1.70E+10 0.23 0.29 1133.26 1133.26 26.59 33.50 540 54.82 Safe
7. 400 DI:CML 8.10 1.70E+10 0.18 0.22 1115.68 1115.68 20.04 25.25 510 46.55 Safe
8. 450 DI:CML 8.60 1.70E+10 0.14 0.18 1103.03 1103.03 15.65 19.73 480 41.01 Safe
9. 500 DI:CML 9.00 1.70E+10 0.11 0.14 1089.63 1089.63 12.53 15.78 460 37.07 Safe
10. 600 DI:CML 9.90 1.70E+10 0.08 0.10 1069.63 1069.63 8.54 10.76 430 32.04 Safe
11. 700 DI:CML 10.80 1.70E+10 0.06 0.07 1053.77 1053.77 6.18 7.79 410 29.06 Safe
12. 750 DI:CML 11.30 1.70E+10 0.05 0.06 1048.08 1048.08 5.35 6.75 390 28.02 Safe
13. 800 DI:CML 11.70 1.70E+10 0.04 0.06 1040.89 1040.89 4.67 5.89 380 27.17 Safe
14. 900 DI:CML 12.60 1.70E+10 0.03 0.04 1030.22 1030.22 3.66 4.61 370 25.88 Safe
15. 1000 DI:CML 13.50 1.70E+10 0.03 0.04 1021.23 1021.23 2.93 3.70 360 24.97 Safe
Bundu Water Supply Scheme: Engineering Design Page 90
WATER HAMMER CALCULATIONS
C = 1425 / √ (1 + kd/EC1)
Where,
2
k = bulk modulus of water = 2.07E+08 kg/m
d = diameter of pipe in m
E = modulus of elasticity of pipe material in kg/m2 = 1.7E+10 kg/m
2
(For DI)
C1 = wall thickness of pipe in m
1) Selected economic diameter for Rising Water pipeline is : 200 mm DI-K9 is Safe
INPUT DATA
Frictional head loss Velocity 1st Stage Flow 2nd Stage Flow
Pipe size Residual Check for Residual Check for
S. No. 1st Stage 2nd Stage 1st Stage 2nd Stage Frictional Other Frictional Other
(mm) Pressure at req. residual Pressure at req. residual
Flow Flow Flow Flow Loss losses* Loss losses*
end head end head
1 100 836.006 1282.059 10.490 13.218 6270.046 627.005 -6695.271 Fail 9615.446 961.545 -10518.771 Fail
2 150 116.050 177.969 4.662 5.875 870.375 87.037 -755.632 Fail 1334.766 133.477 -1410.022 Fail
3 200 28.589 43.842 2.623 3.305 214.415 21.441 -34.076 Fail 328.816 32.882 -303.478 Fail
4 250 9.644 14.789 1.678 2.115 72.327 7.233 122.220 Ok 110.918 11.092 -63.790 Fail
5 300 3.969 6.086 1.166 1.469 29.764 2.976 169.040 Ok 45.645 4.564 8.011 Ok
6 350 1.873 2.873 0.856 1.079 14.049 1.405 186.326 Ok 21.546 2.155 34.520 Ok
7 400 0.978 1.499 0.656 0.826 7.332 0.733 193.715 Ok 11.244 1.124 45.851 Ok
8 450 0.551 0.845 0.518 0.653 4.132 0.413 197.235 Ok 6.336 0.634 51.250 Ok
9 500 0.330 0.506 0.420 0.529 2.473 0.247 199.059 Ok 3.793 0.379 54.048 Ok
10 600 0.136 0.208 0.291 0.367 1.018 0.102 200.660 Ok 1.561 0.156 56.503 Ok
11 700 0.064 0.098 0.214 0.270 0.480 0.048 201.252 Ok 0.737 0.074 57.410 Ok
12 750 0.046 0.070 0.186 0.235 0.343 0.034 201.402 Ok 0.527 0.053 57.641 Ok
13 800 0.033 0.051 0.164 0.207 0.251 0.025 201.504 Ok 0.385 0.038 57.797 Ok
14 900 0.019 0.029 0.130 0.163 0.141 0.014 201.625 Ok 0.217 0.022 57.982 Ok
15 1000 0.011 0.017 0.105 0.132 0.085 0.008 201.687 Ok 0.130 0.013 58.077 Ok
>>>>> * Other losses = 10% of frictional loss.
Bundu Water Supply Scheme: Engineering Design Page 93
DESIGN OF CLEAR WATER RISING MAIN FROM WTP TO NODE 1
INPUT DATA
Frictional head loss Velocity 1st Stage Flow 2nd Stage Flow
Pipe size Residual Check for Residual Check for
S. No. 1st Stage 2nd Stage 1st Stage 2nd Stage Frictional Other Frictional Other
(mm) Pressure at req. residual Pressure at req. residual
Flow Flow Flow Flow Loss losses* Loss losses*
end head end head
1 100 760.323 1165.995 9.966 12.557 380.162 38.016 -362.532 Fail 582.998 58.300 -586.943 Fail
2 150 105.544 161.857 4.429 5.581 52.772 5.277 -2.403 Fail 80.929 8.093 -34.668 Fail
3 200 26.001 39.873 2.491 3.139 13.000 1.300 41.346 Ok 19.937 1.994 32.424 Ok
4 250 8.771 13.450 1.595 2.009 4.385 0.439 50.822 Ok 6.725 0.673 46.956 Ok
5 300 3.609 5.535 1.107 1.395 1.805 0.180 53.661 Ok 2.767 0.277 51.310 Ok
6 350 1.704 2.613 0.814 1.025 0.852 0.085 54.709 Ok 1.306 0.131 52.917 Ok
7 400 0.889 1.364 0.623 0.785 0.445 0.044 55.157 Ok 0.682 0.068 53.604 Ok
8 450 0.501 0.768 0.492 0.620 0.251 0.025 55.370 Ok 0.384 0.038 53.931 Ok
9 500 0.300 0.460 0.399 0.502 0.150 0.015 55.481 Ok 0.230 0.023 54.101 Ok
10 600 0.123 0.189 0.277 0.349 0.062 0.006 55.578 Ok 0.095 0.009 54.250 Ok
11 700 0.058 0.089 0.203 0.256 0.029 0.003 55.614 Ok 0.045 0.004 54.305 Ok
12 750 0.042 0.064 0.177 0.223 0.021 0.002 55.623 Ok 0.032 0.003 54.319 Ok
13 800 0.030 0.047 0.156 0.196 0.015 0.002 55.629 Ok 0.023 0.002 54.328 Ok
14 900 0.017 0.026 0.123 0.155 0.009 0.001 55.637 Ok 0.013 0.001 54.340 Ok
15 1000 0.010 0.016 0.100 0.126 0.005 0.001 55.640 Ok 0.008 0.001 54.345 Ok
>>>>> * Other losses = 10% of frictional loss.
Bundu Water Supply Scheme: Engineering Design Page 94
DESIGN OF CLEAR WATER RISING MAIN FROM NODE 1 TO SUMP FOR OHT IN ZONE 3
INPUT DATA
Frictional head loss Velocity 1st Stage Flow 2nd Stage Flow
Pipe size Residual Check for Residual Check for
S. No. 1st Stage 2nd Stage 1st Stage 2nd Stage Frictional Other Frictional Other
(mm) Pressure at req. residual Pressure at req. residual
Flow Flow Flow Flow Loss losses* Loss losses*
end head end head
1 100 162.782 249.569 4.332 5.458 227.894 22.789 -174.883 Fail 349.397 34.940 -357.518 Fail
2 150 22.596 34.644 1.925 2.426 31.635 3.164 41.002 Ok 48.501 4.850 -26.533 Fail
3 200 5.567 8.534 1.083 1.364 7.793 0.779 67.228 Ok 11.948 1.195 13.676 Ok
4 250 1.878 2.879 0.693 0.873 2.629 0.263 72.909 Ok 4.030 0.403 22.385 Ok
5 300 0.773 1.185 0.481 0.606 1.082 0.108 74.611 Ok 1.659 0.166 24.994 Ok
6 350 0.365 0.559 0.354 0.446 0.511 0.051 75.239 Ok 0.783 0.078 25.958 Ok
7 400 0.190 0.292 0.271 0.341 0.267 0.027 75.508 Ok 0.409 0.041 26.369 Ok
8 450 0.107 0.164 0.214 0.270 0.150 0.015 75.636 Ok 0.230 0.023 26.565 Ok
9 500 0.064 0.098 0.173 0.218 0.090 0.009 75.702 Ok 0.138 0.014 26.667 Ok
10 600 0.026 0.041 0.120 0.152 0.037 0.004 75.760 Ok 0.057 0.006 26.756 Ok
11 700 0.012 0.019 0.088 0.111 0.017 0.002 75.782 Ok 0.027 0.003 26.789 Ok
12 750 0.009 0.014 0.077 0.097 0.012 0.001 75.787 Ok 0.019 0.002 26.798 Ok
13 800 0.007 0.010 0.068 0.085 0.009 0.001 75.791 Ok 0.014 0.001 26.803 Ok
14 900 0.004 0.006 0.053 0.067 0.005 0.001 75.795 Ok 0.008 0.001 26.810 Ok
15 1000 0.002 0.003 0.043 0.055 0.003 0.000 75.797 Ok 0.005 0.000 26.814 Ok
>>>>> * Other losses = 10% of frictional loss.
Bundu Water Supply Scheme: Engineering Design Page 95
DESIGN OF CLEAR WATER RISING MAIN FROM NODE 1 TO NODE 2
INPUT DATA
Frictional head loss Velocity 1st Stage Flow 2nd Stage Flow
Pipe size Residual Check for Residual Check for
S. No. 1st Stage 2nd Stage 1st Stage 2nd Stage Frictional Other Frictional Other
(mm) Pressure at req. residual Pressure at req. residual
Flow Flow Flow Flow Loss losses* Loss losses*
end head end head
1 100 264.696 406.007 5.634 7.100 238.227 23.823 -208.950 Fail 365.406 36.541 -352.427 Fail
2 150 36.744 56.360 2.504 3.155 33.069 3.307 16.723 Ok 50.724 5.072 -6.276 Fail
3 200 9.052 13.884 1.408 1.775 8.147 0.815 44.139 Ok 12.496 1.250 35.775 Ok
4 250 3.053 4.683 0.901 1.136 2.748 0.275 50.077 Ok 4.215 0.422 44.883 Ok
5 300 1.257 1.927 0.626 0.789 1.131 0.113 51.856 Ok 1.735 0.173 47.612 Ok
6 350 0.593 0.910 0.460 0.580 0.534 0.053 52.513 Ok 0.819 0.082 48.619 Ok
7 400 0.310 0.475 0.352 0.444 0.279 0.028 52.793 Ok 0.427 0.043 49.050 Ok
8 450 0.174 0.268 0.278 0.351 0.157 0.016 52.927 Ok 0.241 0.024 49.255 Ok
9 500 0.104 0.160 0.225 0.284 0.094 0.009 52.996 Ok 0.144 0.014 49.361 Ok
10 600 0.043 0.066 0.156 0.197 0.039 0.004 53.057 Ok 0.059 0.006 49.455 Ok
11 700 0.020 0.031 0.115 0.145 0.018 0.002 53.080 Ok 0.028 0.003 49.489 Ok
12 750 0.014 0.022 0.100 0.126 0.013 0.001 53.085 Ok 0.020 0.002 49.498 Ok
13 800 0.011 0.016 0.088 0.111 0.010 0.001 53.089 Ok 0.015 0.001 49.504 Ok
14 900 0.006 0.009 0.070 0.088 0.005 0.001 53.094 Ok 0.008 0.001 49.511 Ok
15 1000 0.004 0.005 0.056 0.071 0.003 0.000 53.096 Ok 0.005 0.000 49.514 Ok
>>>>> * Other losses = 10% of frictional loss.
Bundu Water Supply Scheme: Engineering Design Page 96
DESIGN OF CLEAR WATER RISING MAIN FROM NODE 2 TO OHT IN ZONE 2
INPUT DATA
Frictional head loss Velocity 1st Stage Flow 2nd Stage Flow
Pipe size Residual Check for Residual Check for
S. No. 1st Stage 2nd Stage 1st Stage 2nd Stage Frictional Other Frictional Other
(mm) Pressure at req. residual Pressure at req. residual
Flow Flow Flow Flow Loss losses* Loss losses*
end head end head
1 100 73.425 112.623 2.817 3.550 11.014 1.101 49.043 Ok 16.893 1.689 10.025 Ok
2 150 10.192 15.634 1.252 1.578 1.529 0.153 59.476 Ok 2.345 0.235 26.029 Ok
3 200 2.511 3.851 0.704 0.887 0.377 0.038 60.744 Ok 0.578 0.058 27.973 Ok
4 250 0.847 1.299 0.451 0.568 0.127 0.013 61.018 Ok 0.195 0.019 28.394 Ok
5 300 0.349 0.535 0.313 0.394 0.052 0.005 61.101 Ok 0.080 0.008 28.520 Ok
6 350 0.165 0.252 0.230 0.290 0.025 0.002 61.131 Ok 0.038 0.004 28.567 Ok
7 400 0.086 0.132 0.176 0.222 0.013 0.001 61.144 Ok 0.020 0.002 28.586 Ok
8 450 0.048 0.074 0.139 0.175 0.007 0.001 61.150 Ok 0.011 0.001 28.596 Ok
9 500 0.029 0.044 0.113 0.142 0.004 0.000 61.153 Ok 0.007 0.001 28.601 Ok
10 600 0.012 0.018 0.078 0.099 0.002 0.000 61.156 Ok 0.003 0.000 28.605 Ok
11 700 0.006 0.009 0.057 0.072 0.001 0.000 61.157 Ok 0.001 0.000 28.607 Ok
12 750 0.004 0.006 0.050 0.063 0.001 0.000 61.157 Ok 0.001 0.000 28.607 Ok
13 800 0.003 0.005 0.044 0.055 0.000 0.000 61.158 Ok 0.001 0.000 28.607 Ok
14 900 0.002 0.003 0.035 0.044 0.000 0.000 61.158 Ok 0.000 0.000 28.608 Ok
15 1000 0.001 0.002 0.028 0.035 0.000 0.000 61.158 Ok 0.000 0.000 28.608 Ok
>>>>> * Other losses = 10% of frictional loss.
Bundu Water Supply Scheme: Engineering Design Page 97
DESIGN OF CLEAR WATER RISING MAIN FROM NODE 2 TO OHT IN ZONE 1
INPUT DATA
Frictional head loss Velocity 1st Stage Flow 2nd Stage Flow
Pipe size Residual Check for Residual Check for
S. No. 1st Stage 2nd Stage 1st Stage 2nd Stage Frictional Other Frictional Other
(mm) Pressure at req. residual Pressure at req. residual
Flow Flow Flow Flow Loss losses* Loss losses*
end head end head
1 100 73.425 112.623 2.817 3.550 11.014 1.101 49.043 Ok 16.893 1.689 10.025 Ok
2 150 10.192 15.634 1.252 1.578 1.529 0.153 59.476 Ok 2.345 0.235 26.029 Ok
3 200 2.511 3.851 0.704 0.887 0.377 0.038 60.744 Ok 0.578 0.058 27.973 Ok
4 250 0.847 1.299 0.451 0.568 0.127 0.013 61.018 Ok 0.195 0.019 28.394 Ok
5 300 0.349 0.535 0.313 0.394 0.052 0.005 61.101 Ok 0.080 0.008 28.520 Ok
6 350 0.165 0.252 0.230 0.290 0.025 0.002 61.131 Ok 0.038 0.004 28.567 Ok
7 400 0.086 0.132 0.176 0.222 0.013 0.001 61.144 Ok 0.020 0.002 28.586 Ok
8 450 0.048 0.074 0.139 0.175 0.007 0.001 61.150 Ok 0.011 0.001 28.596 Ok
9 500 0.029 0.044 0.113 0.142 0.004 0.000 61.153 Ok 0.007 0.001 28.601 Ok
10 600 0.012 0.018 0.078 0.099 0.002 0.000 61.156 Ok 0.003 0.000 28.605 Ok
11 700 0.006 0.009 0.057 0.072 0.001 0.000 61.157 Ok 0.001 0.000 28.607 Ok
12 750 0.004 0.006 0.050 0.063 0.001 0.000 61.157 Ok 0.001 0.000 28.607 Ok
13 800 0.003 0.005 0.044 0.055 0.000 0.000 61.158 Ok 0.001 0.000 28.607 Ok
14 900 0.002 0.003 0.035 0.044 0.000 0.000 61.158 Ok 0.000 0.000 28.608 Ok
15 1000 0.001 0.002 0.028 0.035 0.000 0.000 61.158 Ok 0.000 0.000 28.608 Ok
>>>>> * Other losses = 10% of frictional loss.
Bundu Water Supply Scheme: Engineering Design Page 98
1.8. BRANCH Output
Version 3.0
BRANCH: Branched Water Distribution Design Program - (C) The World Bank
Pipe Data
------------
===========================================================
Pipe From To Length Diameter Hazen's Status
No. Node Node m mm Const (E/P)
-----------------------------------------------------------
1 1 2 7500.00 300.0 140.00000
===========================================================
Node Data
-----------
============================================================
Node Peak Flow Elevation Res. Press Meet Res.
No. Factor lps m m Pres (Y/N)?
------------------------------------------------------------
1 1.50 0.000 98.61 5.00
2 1.50 -68.148 153.39 17.00 Y
============================================================
===================
Node Grade Line
No. m
-------------------
1 228.61
===================
BRANCH: Branched Water Distribution Design Program - (C) The World Bank
====================================
Pipe Dia. Hazen's Unit Cost
Int. (mm) Const Rs /m length
------------------------------------
100.0 140.00000 872.82
150.0 140.00000 1295.48
200.0 140.00000 1685.84
250.0 140.00000 2264.17
300.0 140.00000 2819.32
350.0 140.00000 3524.39
400.0 140.00000 4445.13
450.0 140.00000 5205.37
500.0 140.00000 5957.41
600.0 140.00000 7880.22
====================================
Pipe Details
--------------
============================================================================
Pipe From To Peak Flow Diam Hazen's HL HL/1000 Length Status
No. Node Node (lps) (mm) Const (m ) (m ) (m ) (E/P)
----------------------------------------------------------------------------
1 1 2 102.222 300.0 140.00000 44.25 5.90 7500.00
============================================================================
Node Details
--------------
=============================================================================
Node Peak Flow Elevation H G L Cal Pres Spc Pres Meet Res
No. (lps) (m ) (m ) (m ) (m ) Pres. (Y)
-----------------------------------------------------------------------------
1 S 102.222 98.61 228.61 130.00 5.00
2 T -102.222 153.39 184.36 30.97 17.00 Y
=============================================================================
BRANCH: Branched Water Distribution Design Program - (C) The World Bank
Cost Summary
--------------
=================================================
Diameter Length Cost Cum. Cost
(mm) (m ) (1000 Rs ) (1000 Rs )
-------------------------------------------------
300.0 7500.00 21144.90 21144.90
=================================================
==========================================================
Pipe Diameter Length Cost Cum. Cost
No (mm) (m ) (1000 Rs ) (1000 Rs )
----------------------------------------------------------
1 300.0 7500.00 21144.90 21144.90
BRANCH: Branched Water Distribution Design Program - (C) The World Bank
Version 3.0
BRANCH: Branched Water Distribution Design Program - (C) The World Bank
Pipe Data
------------
===========================================================
Pipe From To Length Diameter Hazen's Status
No. Node Node m mm Const (E/P)
-----------------------------------------------------------
1 1 2 500.00 300.0 140.00000
2 2 3 1400.00
3 2 4 900.00
4 4 5 150.00
5 4 6 150.00
===========================================================
Node Data
-----------
============================================================
Node Peak Flow Elevation Res. Press Meet Res.
No. Factor lps m m Pres (Y/N)?
------------------------------------------------------------
1 1.50 0.000 144.39 5.00
2 1.50 0.000 151.04 5.00
3 1.50 -28.576 157.53 23.00 Y
4 1.50 0.000 152.83 5.00
5 1.50 -18.079 154.10 20.00 Y
6 1.50 -18.079 154.10 20.00 Y
============================================================
BRANCH: Branched Water Distribution Design Program - (C) The World Bank
===================
Node Grade Line
No. m
-------------------
1 208.39
===================
====================================
Pipe Dia. Hazen's Unit Cost
Int. (mm) Const Rs /m length
------------------------------------
100.0 140.00000 872.82
150.0 140.00000 1295.48
200.0 140.00000 1685.84
250.0 140.00000 2264.17
300.0 140.00000 2819.32
350.0 140.00000 3524.39
400.0 140.00000 4445.13
450.0 140.00000 5202.37
500.0 140.00000 5957.41
600.0 140.00000 7880.22
====================================
Pipe Details
--------------
============================================================================
Pipe From To Peak Flow Diam Hazen's HL HL/1000 Length Status
No. Node Node (lps) (mm) Const (m ) (m ) (m ) (E/P)
----------------------------------------------------------------------------
1 1 2 97.101 300.0 140.00000 2.68 5.36 500.00
2 2 3 42.864 200.0 140.00000 11.92 8.51 1400.00
3 2 4 54.237 250.0 140.00000 3.99 4.43 900.00
4 4 5 27.118 200.0 140.00000 0.55 3.67 150.00
5 4 6 27.118 200.0 140.00000 0.55 3.67 150.00
============================================================================
BRANCH: Branched Water Distribution Design Program - (C) The World Bank
Node Details
--------------
=============================================================================
Node Peak Flow Elevation H G L Cal Pres Spc Pres Meet Res
No. (lps) (m ) (m ) (m ) (m ) Pres. (Y)
-----------------------------------------------------------------------------
1 S 97.101 144.39 208.39 64.00 5.00
2 0.000 151.04 205.71 54.67 5.00
3 T -42.864 157.53 193.79 36.26 23.00 Y
4 0.000 152.83 201.71 48.88 5.00
5 T -27.118 154.10 201.17 47.07 20.00 Y
6 T -27.118 154.10 201.17 47.07 20.00 Y
=============================================================================
Cost Summary
--------------
=================================================
Diameter Length Cost Cum. Cost
(mm) (m ) (1000 Rs ) (1000 Rs )
-------------------------------------------------
200.0 1700.00 2865.93 2865.93
250.0 900.00 2037.75 4903.68
300.0 500.00 1409.66 6313.34
=================================================
==========================================================
Pipe Diameter Length Cost Cum. Cost
No (mm) (m ) (1000 Rs ) (1000 Rs )
----------------------------------------------------------
1 300.0 500.00 1409.66 1409.66
2 200.0 1400.00 2360.18 3769.84
3 250.0 900.00 2037.75 5807.59
4 200.0 150.00 252.88 6060.46
5 200.0 150.00 252.88 6313.34
BRANCH: Branched Water Distribution Design Program - (C) The World Bank
Maximum
Maximum Capacity of Capacty of Reservoir
Pumping Hours Cumulative
Cumulative Deficit Reservoir (ML)
Surplus
(1) (2) (3) (4) = (2) + (3) (5) = (4) x 0.08
16 1.80 a 7.60 a 9.40 a 0.779
Maximum
Maximum Capacity of Capacty of Reservoir
Pumping Hours Cumulative
Cumulative Deficit Reservoir (ML)
Surplus
(1) (2) (3) (4) = (2) + (3) (5) = (4) x 0.10
16 1.80 a 7.60 a 9.40 a 0.986
Version 4.0
LOOP: Looped Water Distribution Design Program - (C) The World Bank
Pipe Data
------------
===================================================================
Pipe From To Length Diameter Hazen's Pipe Status
No. Node Node m mm Const Material (E/P)
-------------------------------------------------------------------
74 32 33 970.00 0.0 140.00000 DI
75 95 34 180.00 0.0 140.00000 DI
76 34 35 135.00 100.0 100.00000 CI E
77 34 36 945.00 0.0 140.00000 DI
78 33 70 135.00 0.0 140.00000 DI
79 68 70 300.00 100.0 100.00000 CI E
80 69 70 235.00 0.0 140.00000 DI
81 64 69 270.00 100.0 100.00000 CI E
82 68 69 160.00 0.0 140.00000 DI
83 67 68 150.00 0.0 140.00000 DI
84 65 67 105.00 0.0 140.00000 DI
85 65 66 45.00 0.0 140.00000 DI
86 64 65 70.00 0.0 140.00000 DI
87 38 64 235.00 0.0 140.00000 DI
92 38 62 135.00 0.0 140.00000 DI
93 62 63 130.00 0.0 140.00000 DI
94 63 64 85.00 0.0 140.00000 DI
95 63 71 60.00 0.0 140.00000 DI
96 67 71 115.00 0.0 140.00000 DI
97 67 78 60.00 100.0 100.00000 CI E
98 78 79 60.00 0.0 140.00000 DI
99 78 80 135.00 100.0 100.00000 CI E
LOOP: Looped Water Distribution Design Program - (C) The World Bank
===================================================================
Pipe From To Length Diameter Hazen's Pipe Status
No. Node Node m mm Const Material (E/P)
-------------------------------------------------------------------
100 71 80 215.00 0.0 140.00000 DI
101 80 81 65.00 0.0 140.00000 DI
102 72 80 225.00 0.0 140.00000 DI
103 63 72 115.00 0.0 140.00000 DI
104 72 73 40.00 0.0 140.00000 DI
105 72 74 160.00 0.0 140.00000 DI
106 61 62 145.00 0.0 140.00000 DI
107 61 74 160.00 0.0 140.00000 DI
108 74 75 225.00 0.0 140.00000 DI
109 75 77 60.00 0.0 140.00000 DI
110 75 76 25.00 0.0 140.00000 DI
111 81 88 630.00 0.0 140.00000 DI
112 81 87 145.00 0.0 140.00000 DI
113 87 88 220.00 0.0 140.00000 DI
114 87 96 1060.00 0.0 140.00000 DI
115 89 91 120.00 0.0 140.00000 DI
116 89 90 45.00 0.0 140.00000 DI
117 89 92 745.00 0.0 140.00000 DI
118 88 92 480.00 0.0 140.00000 DI
119 92 33 1175.00 0.0 100.00000 DI
120 93 94 520.00 100.0 100.00000 CI E
121 93 94 360.00 0.0 140.00000 DI
122 95 94 655.00 0.0 140.00000 DI
123 67 82 490.00 0.0 140.00000 DI
124 82 83 85.00 0.0 140.00000 DI
125 82 84 520.00 0.0 140.00000 DI
126 84 85 70.00 0.0 140.00000 DI
127 84 86 45.00 0.0 140.00000 DI
128 101 96 250.00 0.0 140.00000 DI
129 95 33 20.00 0.0 140.00000 DI
130 89 96 470.00 0.0 140.00000 DI
===================================================================
Node Data
-----------
=============================================================
Node Peak Flow Elevation Min Press Max Press
No. lps m m m
-------------------------------------------------------------
101 3.00 0.000 157.53 1.00 40.00
32 3.00 -0.988 136.27 1.00 40.00
33 3.00 -2.341 152.67 1.00 40.00
34 3.00 -1.283 150.22 1.00 40.00
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=============================================================
Node Peak Flow Elevation Min Press Max Press
No. lps m m m
-------------------------------------------------------------
35 3.00 -0.138 150.23 1.00 40.00
36 3.00 -0.961 136.79 1.00 40.00
38 3.00 -0.379 148.14 1.00 40.00
61 3.00 -0.310 144.00 1.00 40.00
62 3.00 -0.419 147.39 1.00 40.00
63 3.00 -0.399 149.17 1.00 40.00
64 3.00 -0.672 148.38 1.00 40.00
65 3.00 -0.222 148.85 1.00 40.00
66 3.00 -0.045 149.53 1.00 40.00
67 3.00 -0.939 151.09 1.00 40.00
68 3.00 -0.621 151.73 1.00 40.00
69 3.00 -0.678 149.08 1.00 40.00
70 3.00 -0.684 151.78 1.00 40.00
71 3.00 -0.399 151.83 1.00 40.00
72 3.00 -0.550 150.77 1.00 40.00
73 3.00 -0.041 150.77 1.00 40.00
74 3.00 -0.554 144.80 1.00 40.00
75 3.00 -0.313 146.43 1.00 40.00
76 3.00 -0.024 145.81 1.00 40.00
77 3.00 -0.061 147.08 1.00 40.00
78 3.00 -0.261 150.04 1.00 40.00
79 3.00 -0.061 149.61 1.00 40.00
80 3.00 -0.651 147.41 1.00 40.00
81 3.00 -0.855 147.15 1.00 40.00
82 3.00 -1.116 151.11 1.00 40.00
83 3.00 -0.086 149.24 1.00 40.00
84 3.00 -0.647 154.37 1.00 40.00
85 3.00 -0.071 155.20 1.00 40.00
86 3.00 -0.045 155.93 1.00 40.00
87 3.00 -1.450 150.05 1.00 40.00
88 3.00 -1.354 155.20 1.00 40.00
89 3.00 -1.403 162.97 1.00 40.00
90 3.00 -0.045 162.90 1.00 40.00
91 3.00 -0.122 161.44 1.00 40.00
92 3.00 -2.443 163.38 1.00 40.00
93 3.00 -0.896 162.44 1.00 40.00
94 3.00 -1.564 157.03 1.00 40.00
95 3.00 -0.871 152.67 1.00 40.00
96 3.00 -2.066 156.61 1.00 40.00
=============================================================
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=============================
Source Head Ref Res?
Node m (R)
-----------------------------
101 178.53 R
=============================
=========================================================
Pipe Dia. Hazen's Unit Cost Allow Press Pipe
Int. (mm) Const Rs /m length m Material
---------------------------------------------------------
100.0 140.00000 757.51 770.00 DI
150.0 140.00000 1113.18 770.00 DI
200.0 140.00000 1423.38 740.00 DI
250.0 140.00000 1875.41 650.00 DI
300.0 140.00000 2355.89 590.00 DI
350.0 140.00000 2952.23 540.00 DI
400.0 140.00000 3751.08 510.00 DI
450.0 140.00000 4329.31 480.00 DI
500.0 140.00000 5045.92 460.00 DI
600.0 140.00000 6682.10 430.00 DI
700.0 140.00000 9477.31 410.00 DI
750.0 140.00000 10711.67 390.00 DI
800.0 140.00000 12768.11 380.00 DI
900.0 140.00000 15028.18 370.00 DI
1000.0 140.00000 17343.17 360.00 DI
75.0 100.00000 750.00 125.00 CI
100.0 100.00000 1000.00 125.00 CI
=========================================================
--------------------------------------
BandWidth = 4
Number of Loops = 11
Newton Raphson Iterations = 2
--------------------------------------
LOOP: Looped Water Distribution Design Program - (C) The World Bank
Pipe Details
---------------
=========================================================================
Pipe From To Flow Dia HL HL/1000m Length Velocity
No. Node Node (lps) (mm) (m ) (m ) (m ) (m/s )
-------------------------------------------------------------------------
74 32 33 -2.964 100.0 -1.70 -1.75 970.00 -0.38
75 95 34 7.146 150.0 0.22 1.24 180.00 0.40
76 34 35 0.414 100.0 0.01 0.09 135.00 0.05
77 34 36 2.883 100.0 1.57 1.66 945.00 0.37
78 33 70 -3.714 100.0 -0.36 -2.66 135.00 -0.47
79 68 70 2.591 100.0 0.76 2.54 300.00 0.33
80 69 70 3.175 100.0 0.47 1.99 235.00 0.40
81 64 69 2.156 100.0 0.49 1.81 270.00 0.27
82 68 69 3.053 100.0 0.30 1.85 160.00 0.39
83 67 68 7.507 150.0 0.20 1.36 150.00 0.42
84 65 67 -0.653 100.0 -0.01 -0.11 105.00 -0.08
85 65 66 0.135 100.0 0.00 0.01 45.00 0.02
86 64 65 0.148 100.0 0.00 0.01 70.00 0.02
87 38 64 0.283 100.0 0.01 0.02 235.00 0.04
92 38 62 -1.420 100.0 -0.06 -0.45 135.00 -0.18
93 62 63 -2.749 100.0 -0.20 -1.52 130.00 -0.35
94 63 64 4.037 100.0 0.26 3.10 85.00 0.51
95 63 71 -4.615 100.0 -0.24 -3.97 60.00 -0.59
96 67 71 -13.942 150.0 -0.49 -4.27 115.00 -0.79
97 67 78 -2.930 100.0 -0.19 -3.19 60.00 -0.37
98 78 79 0.183 100.0 0.00 0.01 60.00 0.02
99 78 80 -3.896 100.0 -0.73 -5.41 135.00 -0.50
100 71 80 -19.754 200.0 -0.43 -2.01 215.00 -0.63
101 80 81 -34.458 250.0 -0.12 -1.90 65.00 -0.70
102 72 80 -8.855 150.0 -0.41 -1.84 225.00 -0.50
103 63 72 -3.368 100.0 -0.25 -2.22 115.00 -0.43
104 72 73 0.123 100.0 0.00 0.00 40.00 0.02
105 72 74 3.713 100.0 0.42 2.66 160.00 0.47
106 61 62 -0.073 100.0 -0.00 -0.00 145.00 -0.01
107 61 74 -0.857 100.0 -0.03 -0.18 160.00 -0.11
108 74 75 1.194 100.0 0.07 0.32 225.00 0.15
109 75 77 0.183 100.0 0.00 0.01 60.00 0.02
110 75 76 0.072 100.0 0.00 0.00 25.00 0.01
111 81 88 -0.818 100.0 -0.10 -0.16 630.00 -0.10
112 81 87 -36.205 250.0 -0.30 -2.08 145.00 -0.74
113 87 88 2.080 100.0 0.20 0.91 220.00 0.26
114 87 96 -42.635 250.0 -2.98 -2.81 1060.00 -0.87
115 89 91 0.366 100.0 0.00 0.04 120.00 0.05
116 89 90 0.135 100.0 0.00 0.01 45.00 0.02
117 89 92 33.541 250.0 1.34 1.80 745.00 0.68
118 88 92 -2.800 100.0 -0.76 -1.57 480.00 -0.36
119 92 33 23.412 200.0 3.23 2.75 1175.00 0.75
120 93 94 -0.993 100.0 -0.22 -0.43 520.00 -0.13
121 93 94 -1.695 100.0 -0.22 -0.62 360.00 -0.22
122 95 94 7.380 150.0 0.86 1.31 655.00 0.42
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=========================================================================
Pipe From To Flow Dia HL HL/1000m Length Velocity
No. Node Node (lps) (mm) (m ) (m ) (m ) (m/s )
-------------------------------------------------------------------------
123 67 82 5.895 100.0 3.06 6.25 490.00 0.75
124 82 83 0.258 100.0 0.00 0.02 85.00 0.03
125 82 84 2.289 100.0 0.56 1.08 520.00 0.29
126 84 85 0.213 100.0 0.00 0.01 70.00 0.03
127 84 86 0.135 100.0 0.00 0.01 45.00 0.02
128 101 96 87.084 350.0 0.51 2.05 250.00 0.90
129 95 33 -17.139 200.0 -0.03 -1.54 20.00 -0.55
130 89 96 -38.251 250.0 -1.08 -2.30 470.00 -0.78
Note: Negative value indicates the flow in reverse direction in that Pipe
=========================================================================
==========================================================================
Pipe From To Dia Hazen's Pipe Max Press Allow Press Status
No. Node Node (mm) Const Material (m ) (m ) (E/P)
--------------------------------------------------------------------------
74 32 33 100.0 140.00000 DI 34.40 770.00
75 95 34 150.0 140.00000 DI 21.89 770.00
76 34 35 100.0 100.00000 CI 21.89 125.00 E
77 34 36 100.0 140.00000 DI 33.75 770.00
78 33 70 100.0 140.00000 DI 20.95 770.00
79 68 70 100.0 100.00000 CI 21.76 125.00 E
80 69 70 100.0 140.00000 DI 24.11 770.00
81 64 69 100.0 100.00000 CI 25.30 125.00 E
82 68 69 100.0 140.00000 DI 24.11 770.00
83 67 68 150.0 140.00000 DI 22.60 770.00
84 65 67 100.0 140.00000 DI 24.83 770.00
85 65 66 100.0 140.00000 DI 24.83 770.00
86 64 65 100.0 140.00000 DI 25.30 770.00
87 38 64 100.0 140.00000 DI 25.55 770.00
92 38 62 100.0 140.00000 DI 26.36 770.00
93 62 63 100.0 140.00000 DI 26.36 770.00
94 63 64 100.0 140.00000 DI 25.30 770.00
95 63 71 100.0 140.00000 DI 24.77 770.00
96 67 71 150.0 140.00000 DI 22.60 770.00
97 67 78 100.0 100.00000 CI 23.84 125.00 E
98 78 79 100.0 140.00000 DI 24.27 770.00
99 78 80 100.0 100.00000 CI 27.20 125.00 E
100 71 80 200.0 140.00000 DI 27.20 740.00
101 80 81 250.0 140.00000 DI 27.59 650.00
102 72 80 150.0 140.00000 DI 27.20 770.00
LOOP: Looped Water Distribution Design Program - (C) The World Bank
==========================================================================
Pipe From To Dia Hazen's Pipe Max Press Allow Press Status
No. Node Node (mm) Const Material (m ) (m ) (E/P)
--------------------------------------------------------------------------
103 63 72 100.0 140.00000 DI 24.77 770.00
104 72 73 100.0 140.00000 DI 23.43 770.00
105 72 74 100.0 140.00000 DI 28.97 770.00
106 61 62 100.0 140.00000 DI 29.75 770.00
107 61 74 100.0 140.00000 DI 29.75 770.00
108 74 75 100.0 140.00000 DI 28.97 770.00
109 75 77 100.0 140.00000 DI 27.27 770.00
110 75 76 100.0 140.00000 DI 27.89 770.00
111 81 88 100.0 140.00000 DI 27.59 770.00
112 81 87 250.0 140.00000 DI 27.59 650.00
113 87 88 100.0 140.00000 DI 24.99 770.00
114 87 96 250.0 140.00000 DI 24.99 650.00
115 89 91 100.0 140.00000 DI 15.49 770.00
116 89 90 100.0 140.00000 DI 14.04 770.00
117 89 92 250.0 140.00000 DI 13.97 650.00
118 88 92 100.0 140.00000 DI 19.64 770.00
119 92 33 200.0 140.00000 DI 19.70 740.00
120 93 94 100.0 100.00000 CI 14.44 125.00 E
121 93 94 100.0 140.00000 DI 14.44 770.00
122 95 94 150.0 140.00000 DI 19.67 770.00
123 67 82 100.0 140.00000 DI 22.60 770.00
124 82 83 100.0 140.00000 DI 21.39 770.00
125 82 84 100.0 140.00000 DI 19.52 770.00
126 84 85 100.0 140.00000 DI 15.70 770.00
127 84 86 100.0 140.00000 DI 15.70 770.00
128 101 96 350.0 140.00000 DI 21.41 540.00
129 95 33 200.0 140.00000 DI 19.70 740.00
130 89 96 250.0 140.00000 DI 21.41 650.00
==========================================================================
Node Details
--------------
=======================================================
Node Flow Elev. H G L Pressure
No. (lps) (m ) (m ) (m )
-------------------------------------------------------
101 S 87.084 157.53 178.53 21.00
32 -2.964 136.27 170.67 34.40
33 -7.023 152.67 172.37 19.70
34 -3.849 150.22 172.11 21.89
35 -0.414 150.23 172.10 21.87
36 -2.883 136.79 170.54 33.75
38 -1.137 148.14 173.69 25.55
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=======================================================
Node Flow Elev. H G L Pressure
No. (lps) (m ) (m ) (m )
-------------------------------------------------------
61 -0.930 144.00 173.75 29.75
62 -1.257 147.39 173.75 26.36
63 -1.197 149.17 173.94 24.77
64 -2.016 148.38 173.68 25.30
65 -0.666 148.85 173.68 24.83
66 -0.135 149.53 173.68 24.15
67 -2.817 151.09 173.69 22.60
68 -1.863 151.73 173.49 21.76
69 -2.034 149.08 173.19 24.11
70 -2.052 151.78 172.73 20.95
71 -1.197 151.83 174.18 22.35
72 -1.650 150.77 174.20 23.43
73 -0.123 150.77 174.20 23.43
74 -1.662 144.80 173.77 28.97
75 -0.939 146.43 173.70 27.27
76 -0.072 145.81 173.70 27.89
77 -0.183 147.08 173.70 26.62
78 -0.783 150.04 173.88 23.84
79 -0.183 149.61 173.88 24.27
80 -1.953 147.41 174.61 27.20
81 -2.565 147.15 174.74 27.59
82 -3.348 151.11 170.63 19.52
83 -0.258 149.24 170.63 21.39
84 -1.941 154.37 170.07 15.70
85 -0.213 155.20 170.07 14.87
86 -0.135 155.93 170.07 14.14
87 -4.350 150.05 175.04 24.99
88 -4.062 155.20 174.84 19.64
89 -4.209 162.97 176.94 13.97
90 -0.135 162.90 176.94 14.04
91 -0.366 161.44 176.93 15.49
92 -7.329 163.38 175.59 12.21
93 -2.688 162.44 171.25 8.81
94 -4.692 157.03 171.47 14.44
95 -2.613 152.67 172.34 19.67
96 -6.198 156.61 178.02 21.41
=======================================================
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=========================================================
Diameter Pipe Length Cost Cum. Cost
(mm) Material (m ) (1000 Rs ) (1000 Rs )
---------------------------------------------------------
100.0 DI 7365.00 5579.06 5579.06
150.0 DI 1325.00 1474.96 7054.02
200.0 DI 1410.00 2006.97 9060.99
250.0 DI 2485.00 4660.39 13721.38
350.0 DI 250.00 738.06 14459.44
=========================================================
===============================================================
Pipe Diameter Pipe Length Cost Cum. Cost
No (mm) Material (m ) (1000 Rs ) (1000 Rs )
---------------------------------------------------------------
74 100.0 DI 970.00 734.78 734.78
75 150.0 DI 180.00 200.37 935.16
77 100.0 DI 945.00 715.85 1651.00
78 100.0 DI 135.00 102.26 1753.27
80 100.0 DI 235.00 178.01 1931.28
82 100.0 DI 160.00 121.20 2052.48
83 150.0 DI 150.00 166.98 2219.46
84 100.0 DI 105.00 79.54 2299.00
85 100.0 DI 45.00 34.09 2333.09
86 100.0 DI 70.00 53.03 2386.11
87 100.0 DI 235.00 178.01 2564.13
92 100.0 DI 135.00 102.26 2666.39
93 100.0 DI 130.00 98.48 2764.87
94 100.0 DI 85.00 64.39 2829.26
95 100.0 DI 60.00 45.45 2874.71
96 150.0 DI 115.00 128.02 3002.72
98 100.0 DI 60.00 45.45 3048.17
100 200.0 DI 215.00 306.03 3354.20
101 250.0 DI 65.00 121.90 3476.10
102 150.0 DI 225.00 250.47 3726.57
103 100.0 DI 115.00 87.11 3813.68
104 100.0 DI 40.00 30.30 3843.98
105 100.0 DI 160.00 121.20 3965.18
106 100.0 DI 145.00 109.84 4075.02
107 100.0 DI 160.00 121.20 4196.22
108 100.0 DI 225.00 170.44 4366.66
109 100.0 DI 60.00 45.45 4412.11
110 100.0 DI 25.00 18.94 4431.05
111 100.0 DI 630.00 477.23 4908.28
112 250.0 DI 145.00 271.93 5180.22
LOOP: Looped Water Distribution Design Program - (C) The World Bank
===============================================================
Pipe Diameter Pipe Length Cost Cum. Cost
No (mm) Material (m ) (1000 Rs ) (1000 Rs )
---------------------------------------------------------------
113 100.0 DI 220.00 166.65 5346.87
114 250.0 DI 1060.00 1987.93 7334.80
115 100.0 DI 120.00 90.90 7425.71
116 100.0 DI 45.00 34.09 7459.79
117 250.0 DI 745.00 1397.18 8856.97
118 100.0 DI 480.00 363.60 9220.58
119 200.0 DI 1175.00 1672.47 10893.05
121 100.0 DI 360.00 272.70 11165.75
122 150.0 DI 655.00 729.13 11894.89
123 100.0 DI 490.00 371.18 12266.07
124 100.0 DI 85.00 64.39 12330.46
125 100.0 DI 520.00 393.91 12724.36
126 100.0 DI 70.00 53.03 12777.39
127 100.0 DI 45.00 34.09 12811.47
128 350.0 DI 250.00 738.06 13549.53
129 200.0 DI 20.00 28.47 13578.00
130 250.0 DI 470.00 881.44 14459.44
===============================================================
LOOP: Looped Water Distribution Design Program - (C) The World Bank
Version 4.0
LOOP: Looped Water Distribution Design Program - (C) The World Bank
Pipe Data
------------
===================================================================
Pipe From To Length Diameter Hazen's Pipe Status
No. Node Node m mm Const Material (E/P)
-------------------------------------------------------------------
74 32 33 970.00 100.0 140.00000 DI
75 95 34 180.00 150.0 140.00000 DI
76 34 35 135.00 100.0 100.00000 CI E
77 34 36 945.00 100.0 140.00000 DI
78 33 70 135.00 150.0 140.00000 DI
79 68 70 300.00 150.0 140.00000 DI
80 69 70 235.00 100.0 140.00000 DI
81 64 69 270.00 100.0 100.00000 CI E
82 68 69 160.00 100.0 140.00000 DI
83 67 68 150.00 150.0 140.00000 DI
84 65 67 105.00 100.0 140.00000 DI
85 65 66 45.00 100.0 140.00000 DI
86 64 65 70.00 100.0 140.00000 DI
87 38 64 235.00 100.0 140.00000 DI
92 38 62 135.00 100.0 140.00000 DI
93 62 63 130.00 100.0 140.00000 DI
94 63 64 85.00 100.0 140.00000 DI
95 63 71 60.00 100.0 140.00000 DI
96 67 71 115.00 150.0 140.00000 DI
97 67 78 60.00 100.0 100.00000 CI E
98 78 79 60.00 100.0 140.00000 DI
99 78 80 135.00 100.0 100.00000 CI E
LOOP: Looped Water Distribution Design Program - (C) The World Bank
===================================================================
Pipe From To Length Diameter Hazen's Pipe Status
No. Node Node m mm Const Material (E/P)
-------------------------------------------------------------------
100 71 80 215.00 200.0 140.00000 DI
101 80 81 65.00 250.0 140.00000 DI
102 72 80 225.00 150.0 140.00000 DI
103 63 72 115.00 100.0 140.00000 DI
104 72 73 40.00 100.0 140.00000 DI
105 72 74 160.00 100.0 140.00000 DI
106 61 62 145.00 100.0 140.00000 DI
107 61 74 160.00 100.0 140.00000 DI
108 74 75 225.00 100.0 140.00000 DI
109 75 77 60.00 100.0 140.00000 DI
110 75 76 25.00 100.0 140.00000 DI
111 81 88 630.00 100.0 140.00000 DI
112 81 87 145.00 300.0 140.00000 DI
113 87 88 220.00 100.0 140.00000 DI
114 87 96 1060.00 300.0 140.00000 DI
115 89 91 120.00 100.0 140.00000 DI
116 89 90 45.00 100.0 140.00000 DI
117 89 92 745.00 250.0 140.00000 DI
118 88 92 480.00 100.0 140.00000 DI
119 92 33 1175.00 200.0 100.00000 DI
120 93 94 520.00 100.0 100.00000 CI E
121 93 94 360.00 100.0 140.00000 DI
122 95 94 655.00 150.0 140.00000 DI
123 67 82 490.00 100.0 140.00000 DI
124 82 83 85.00 100.0 140.00000 DI
125 82 84 520.00 100.0 140.00000 DI
126 84 85 70.00 100.0 140.00000 DI
127 84 86 45.00 100.0 140.00000 DI
128 101 96 250.00 350.0 140.00000 DI
129 95 33 20.00 200.0 140.00000 DI
130 89 96 470.00 250.0 140.00000 DI
===================================================================
Node Data
-----------
=============================================================
Node Peak Flow Elevation Min Press Max Press
No. lps m m m
-------------------------------------------------------------
101 3.00 0.000 157.53 12.00 40.00
32 3.00 -0.988 136.27 12.00 40.00
33 3.00 -2.341 152.67 12.00 40.00
34 3.00 -1.283 150.22 12.00 40.00
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=============================================================
Node Peak Flow Elevation Min Press Max Press
No. lps m m m
-------------------------------------------------------------
35 3.00 -0.138 150.23 12.00 40.00
36 3.00 -0.961 136.79 12.00 40.00
38 3.00 -0.379 148.14 12.00 40.00
61 3.00 -0.310 144.00 12.00 40.00
62 3.00 -0.419 147.39 12.00 40.00
63 3.00 -0.399 149.17 12.00 40.00
64 3.00 -0.672 148.38 12.00 40.00
65 3.00 -0.222 148.85 12.00 40.00
66 3.00 -0.045 149.53 12.00 40.00
67 3.00 -0.939 151.09 12.00 40.00
68 3.00 -0.621 151.73 12.00 40.00
69 3.00 -0.678 149.08 12.00 40.00
70 3.00 -0.684 151.78 12.00 40.00
71 3.00 -0.399 151.83 12.00 40.00
72 3.00 -0.550 150.77 12.00 40.00
73 3.00 -0.041 150.77 12.00 40.00
74 3.00 -0.554 144.80 12.00 40.00
75 3.00 -0.313 146.43 12.00 40.00
76 3.00 -0.024 145.81 12.00 40.00
77 3.00 -0.061 147.08 12.00 40.00
78 3.00 -0.261 150.04 12.00 40.00
79 3.00 -0.061 149.61 12.00 40.00
80 3.00 -0.651 147.41 12.00 40.00
81 3.00 -0.855 147.15 12.00 40.00
82 3.00 -1.116 151.11 12.00 40.00
83 3.00 -0.086 149.24 12.00 40.00
84 3.00 -0.647 154.37 12.00 40.00
85 3.00 -0.071 155.20 12.00 40.00
86 3.00 -0.045 155.93 12.00 40.00
87 3.00 -1.450 150.05 12.00 40.00
88 3.00 -1.354 155.20 12.00 40.00
89 3.00 -1.403 162.97 12.00 40.00
90 3.00 -0.045 162.90 12.00 40.00
91 3.00 -0.122 161.44 12.00 40.00
92 3.00 -2.443 163.38 12.00 40.00
93 3.00 -0.896 162.44 12.00 40.00
94 3.00 -1.564 157.03 12.00 40.00
95 3.00 -0.871 152.67 12.00 40.00
96 3.00 -2.066 156.61 12.00 40.00
=============================================================
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=============================
Source Head Ref Res?
Node m (R)
-----------------------------
101 178.53 R
=============================
=========================================================
Pipe Dia. Hazen's Unit Cost Allow Press Pipe
Int. (mm) Const Rs /m length m Material
---------------------------------------------------------
100.0 140.00000 757.51 770.00 DI
150.0 140.00000 1113.18 770.00 DI
200.0 140.00000 1423.38 740.00 DI
250.0 140.00000 1875.41 650.00 DI
300.0 140.00000 2355.89 590.00 DI
350.0 140.00000 2952.23 540.00 DI
400.0 140.00000 3751.08 510.00 DI
450.0 140.00000 4329.31 480.00 DI
500.0 140.00000 5045.92 460.00 DI
600.0 140.00000 6682.10 430.00 DI
700.0 140.00000 9477.31 410.00 DI
750.0 140.00000 10711.67 390.00 DI
800.0 140.00000 12768.11 380.00 DI
900.0 140.00000 15028.18 370.00 DI
1000.0 140.00000 17343.17 360.00 DI
75.0 100.00000 750.00 125.00 CI
100.0 100.00000 1000.00 125.00 CI
=========================================================
--------------------------------------
BandWidth = 4
Number of Loops = 11
Newton Raphson Iterations = 8
--------------------------------------
LOOP: Looped Water Distribution Design Program - (C) The World Bank
Pipe Details
---------------
=========================================================================
Pipe From To Flow Dia HL HL/1000m Length Velocity
No. Node Node (lps) (mm) (m ) (m ) (m ) (m/s )
-------------------------------------------------------------------------
74 32 33 -2.964 100.0 -1.70 -1.75 970.00 -0.38
75 95 34 7.146 150.0 0.22 1.24 180.00 0.40
76 34 35 0.414 100.0 0.01 0.09 135.00 0.05
77 34 36 2.883 100.0 1.57 1.66 945.00 0.37
78 33 70 -10.148 150.0 -0.32 -2.37 135.00 -0.57
79 68 70 9.185 150.0 0.59 1.97 300.00 0.52
80 69 70 3.014 100.0 0.42 1.80 235.00 0.38
81 64 69 2.802 100.0 0.79 2.94 270.00 0.36
82 68 69 2.246 100.0 0.17 1.05 160.00 0.29
83 67 68 13.295 150.0 0.59 3.91 150.00 0.75
84 65 67 0.595 100.0 0.01 0.09 105.00 0.08
85 65 66 0.135 100.0 0.00 0.01 45.00 0.02
86 64 65 1.396 100.0 0.03 0.43 70.00 0.18
87 38 64 1.024 100.0 0.06 0.24 235.00 0.13
92 38 62 -2.161 100.0 -0.13 -0.97 135.00 -0.28
93 62 63 -2.988 100.0 -0.23 -1.78 130.00 -0.38
94 63 64 5.191 100.0 0.42 4.94 85.00 0.66
95 63 71 -5.198 100.0 -0.30 -4.95 60.00 -0.66
96 67 71 -17.605 150.0 -0.76 -6.58 115.00 -1.00
97 67 78 -3.806 100.0 -0.31 -5.18 60.00 -0.48
98 78 79 0.183 100.0 0.00 0.01 60.00 0.02
99 78 80 -4.772 100.0 -1.06 -7.88 135.00 -0.61
100 71 80 -24.000 200.0 -0.62 -2.88 215.00 -0.76
101 80 81 -40.892 250.0 -0.17 -2.60 65.00 -0.83
102 72 80 -10.167 150.0 -0.54 -2.38 225.00 -0.58
103 63 72 -4.178 100.0 -0.38 -3.30 115.00 -0.53
104 72 73 0.123 100.0 0.00 0.00 40.00 0.02
105 72 74 4.216 100.0 0.54 3.36 160.00 0.54
106 61 62 0.430 100.0 0.01 0.05 145.00 0.05
107 61 74 -1.360 100.0 -0.07 -0.41 160.00 -0.17
108 74 75 1.194 100.0 0.07 0.32 225.00 0.15
109 75 77 0.183 100.0 0.00 0.01 60.00 0.02
110 75 76 0.072 100.0 0.00 0.00 25.00 0.01
111 81 88 0.324 100.0 0.02 0.03 630.00 0.04
112 81 87 -43.781 300.0 -0.18 -1.22 145.00 -0.62
113 87 88 2.051 100.0 0.19 0.88 220.00 0.26
114 87 96 -50.182 300.0 -1.66 -1.56 1060.00 -0.71
115 89 91 0.366 100.0 0.00 0.04 120.00 0.05
116 89 90 0.135 100.0 0.00 0.01 45.00 0.02
117 89 92 25.994 250.0 0.84 1.12 745.00 0.53
118 88 92 -1.687 100.0 -0.30 -0.62 480.00 -0.21
119 92 33 16.978 200.0 3.32 2.82 1175.00 0.54
120 93 94 -0.993 100.0 -0.22 -0.43 520.00 -0.13
121 93 94 -1.695 100.0 -0.22 -0.62 360.00 -0.22
122 95 94 7.380 150.0 0.86 1.31 655.00 0.42
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=========================================================================
Pipe From To Flow Dia HL HL/1000m Length Velocity
No. Node Node (lps) (mm) (m ) (m ) (m ) (m/s )
-------------------------------------------------------------------------
123 67 82 5.895 100.0 3.06 6.25 490.00 0.75
124 82 83 0.258 100.0 0.00 0.02 85.00 0.03
125 82 84 2.289 100.0 0.56 1.08 520.00 0.29
126 84 85 0.213 100.0 0.00 0.01 70.00 0.03
127 84 86 0.135 100.0 0.00 0.01 45.00 0.02
128 101 96 87.084 350.0 0.51 2.05 250.00 0.90
129 95 33 -17.139 200.0 -0.03 -1.54 20.00 -0.55
130 89 96 -30.704 250.0 -0.72 -1.53 470.00 -0.63
Note: Negative value indicates the flow in reverse direction in that Pipe
=========================================================================
==========================================================================
Pipe From To Dia Hazen's Pipe Max Press Allow Press Status
No. Node Node (mm) Const Material (m ) (m ) (E/P)
--------------------------------------------------------------------------
74 32 33 100.0 140.00000 DI 35.17 770.00
75 95 34 150.0 140.00000 DI 22.67 770.00
76 34 35 100.0 100.00000 CI 22.67 125.00 E
77 34 36 100.0 140.00000 DI 34.53 770.00
78 33 70 150.0 140.00000 DI 21.68 770.00
79 68 70 150.0 140.00000 DI 22.32 770.00
80 69 70 100.0 140.00000 DI 24.81 770.00
81 64 69 100.0 100.00000 CI 26.30 125.00 E
82 68 69 100.0 140.00000 DI 24.81 770.00
83 67 68 150.0 140.00000 DI 23.55 770.00
84 65 67 100.0 140.00000 DI 25.80 770.00
85 65 66 100.0 140.00000 DI 25.80 770.00
86 64 65 100.0 140.00000 DI 26.30 770.00
87 38 64 100.0 140.00000 DI 26.60 770.00
92 38 62 100.0 140.00000 DI 27.48 770.00
93 62 63 100.0 140.00000 DI 27.48 770.00
94 63 64 100.0 140.00000 DI 26.30 770.00
95 63 71 100.0 140.00000 DI 25.93 770.00
96 67 71 150.0 140.00000 DI 23.57 770.00
97 67 78 100.0 100.00000 CI 24.91 125.00 E
98 78 79 100.0 140.00000 DI 25.34 770.00
99 78 80 100.0 100.00000 CI 28.60 125.00 E
100 71 80 200.0 140.00000 DI 28.60 740.00
101 80 81 250.0 140.00000 DI 29.03 650.00
102 72 80 150.0 140.00000 DI 28.60 770.00
LOOP: Looped Water Distribution Design Program - (C) The World Bank
==========================================================================
Pipe From To Dia Hazen's Pipe Max Press Allow Press Status
No. Node Node (mm) Const Material (m ) (m ) (E/P)
--------------------------------------------------------------------------
103 63 72 100.0 140.00000 DI 25.93 770.00
104 72 73 100.0 140.00000 DI 24.71 770.00
105 72 74 100.0 140.00000 DI 30.14 770.00
106 61 62 100.0 140.00000 DI 30.88 770.00
107 61 74 100.0 140.00000 DI 30.88 770.00
108 74 75 100.0 140.00000 DI 30.14 770.00
109 75 77 100.0 140.00000 DI 28.44 770.00
110 75 76 100.0 140.00000 DI 29.06 770.00
111 81 88 100.0 140.00000 DI 29.03 770.00
112 81 87 300.0 140.00000 DI 29.03 590.00
113 87 88 100.0 140.00000 DI 26.31 770.00
114 87 96 300.0 140.00000 DI 26.31 590.00
115 89 91 100.0 140.00000 DI 15.85 770.00
116 89 90 100.0 140.00000 DI 14.40 770.00
117 89 92 250.0 140.00000 DI 14.33 650.00
118 88 92 100.0 140.00000 DI 20.96 770.00
119 92 33 200.0 100.00000 DI 20.47 740.00
120 93 94 100.0 100.00000 CI 15.22 125.00 E
121 93 94 100.0 140.00000 DI 15.22 770.00
122 95 94 150.0 140.00000 DI 20.44 770.00
123 67 82 100.0 140.00000 DI 23.55 770.00
124 82 83 100.0 140.00000 DI 22.34 770.00
125 82 84 100.0 140.00000 DI 20.47 770.00
126 84 85 100.0 140.00000 DI 16.64 770.00
127 84 86 100.0 140.00000 DI 16.64 770.00
128 101 96 350.0 140.00000 DI 21.41 540.00
129 95 33 200.0 140.00000 DI 20.47 740.00
130 89 96 250.0 140.00000 DI 21.41 650.00
==========================================================================
Node Details
--------------
=======================================================
Node Flow Elev. H G L Pressure
No. (lps) (m ) (m ) (m )
-------------------------------------------------------
101 S 87.084 157.53 178.53 21.00
32 -2.964 136.27 171.44 35.17
33 -7.023 152.67 173.14 20.47
34 -3.849 150.22 172.89 22.67
35 -0.414 150.23 172.88 22.65
36 -2.883 136.79 171.32 34.53
38 -1.137 148.14 174.74 26.60
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=======================================================
Node Flow Elev. H G L Pressure
No. (lps) (m ) (m ) (m )
-------------------------------------------------------
61 -0.930 144.00 174.88 30.88
62 -1.257 147.39 174.87 27.48
63 -1.197 149.17 175.10 25.93
64 -2.016 148.38 174.68 26.30
65 -0.666 148.85 174.65 25.80
66 -0.135 149.53 174.65 25.12
67 -2.817 151.09 174.64 23.55
68 -1.863 151.73 174.05 22.32
69 -2.034 149.08 173.89 24.81
70 -2.052 151.78 173.46 21.68
71 -1.197 151.83 175.40 23.57
72 -1.650 150.77 175.48 24.71
73 -0.123 150.77 175.48 24.71
74 -1.662 144.80 174.94 30.14
75 -0.939 146.43 174.87 28.44
76 -0.072 145.81 174.87 29.06
77 -0.183 147.08 174.87 27.79
78 -0.783 150.04 174.95 24.91
79 -0.183 149.61 174.95 25.34
80 -1.953 147.41 176.01 28.60
81 -2.565 147.15 176.18 29.03
82 -3.348 151.11 171.58 20.47
83 -0.258 149.24 171.58 22.34
84 -1.941 154.37 171.01 16.64
85 -0.213 155.20 171.01 15.81
86 -0.135 155.93 171.01 15.08
87 -4.350 150.05 176.36 26.31
88 -4.062 155.20 176.16 20.96
89 -4.209 162.97 177.30 14.33
90 -0.135 162.90 177.30 14.40
91 -0.366 161.44 177.29 15.85
92 -7.329 163.38 176.46 13.08
93 -2.688 162.44 172.03 9.59 LO
94 -4.692 157.03 172.25 15.22
95 -2.613 152.67 173.11 20.44
96 -6.198 156.61 178.02 21.41
=======================================================
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=========================================================
Diameter Pipe Length Cost Cum. Cost
(mm) Material (m ) (1000 Rs ) (1000 Rs )
---------------------------------------------------------
100.0 DI 7230.00 5476.80 5476.80
150.0 DI 1760.00 1959.20 7435.99
200.0 DI 1410.00 2006.97 9442.96
250.0 DI 1280.00 2400.52 11843.49
300.0 DI 1205.00 2838.85 14682.33
350.0 DI 250.00 738.06 15420.39
=========================================================
===============================================================
Pipe Diameter Pipe Length Cost Cum. Cost
No (mm) Material (m ) (1000 Rs ) (1000 Rs )
---------------------------------------------------------------
74 100.0 DI 970.00 734.78 734.78
75 150.0 DI 180.00 200.37 935.16
77 100.0 DI 945.00 715.85 1651.00
78 150.0 DI 135.00 150.28 1801.28
79 150.0 DI 300.00 333.95 2135.24
80 100.0 DI 235.00 178.01 2313.25
82 100.0 DI 160.00 121.20 2434.45
83 150.0 DI 150.00 166.98 2601.43
84 100.0 DI 105.00 79.54 2680.97
85 100.0 DI 45.00 34.09 2715.06
86 100.0 DI 70.00 53.03 2768.08
87 100.0 DI 235.00 178.01 2946.10
92 100.0 DI 135.00 102.26 3048.36
93 100.0 DI 130.00 98.48 3146.84
94 100.0 DI 85.00 64.39 3211.23
95 100.0 DI 60.00 45.45 3256.68
96 150.0 DI 115.00 128.02 3384.69
98 100.0 DI 60.00 45.45 3430.14
100 200.0 DI 215.00 306.03 3736.17
101 250.0 DI 65.00 121.90 3858.07
102 150.0 DI 225.00 250.47 4108.54
103 100.0 DI 115.00 87.11 4195.65
104 100.0 DI 40.00 30.30 4225.95
105 100.0 DI 160.00 121.20 4347.15
106 100.0 DI 145.00 109.84 4456.99
107 100.0 DI 160.00 121.20 4578.19
108 100.0 DI 225.00 170.44 4748.63
109 100.0 DI 60.00 45.45 4794.08
110 100.0 DI 25.00 18.94 4813.02
LOOP: Looped Water Distribution Design Program - (C) The World Bank
===============================================================
Pipe Diameter Pipe Length Cost Cum. Cost
No (mm) Material (m ) (1000 Rs ) (1000 Rs )
---------------------------------------------------------------
111 100.0 DI 630.00 477.23 5290.25
112 300.0 DI 145.00 341.60 5631.86
113 100.0 DI 220.00 166.65 5798.51
114 300.0 DI 1060.00 2497.24 8295.75
115 100.0 DI 120.00 90.90 8386.65
116 100.0 DI 45.00 34.09 8420.74
117 250.0 DI 745.00 1397.18 9817.92
118 100.0 DI 480.00 363.60 10181.53
119 200.0 DI 1175.00 1672.47 11854.00
121 100.0 DI 360.00 272.70 12126.70
122 150.0 DI 655.00 729.13 12855.83
123 100.0 DI 490.00 371.18 13227.01
124 100.0 DI 85.00 64.39 13291.40
125 100.0 DI 520.00 393.91 13685.31
126 100.0 DI 70.00 53.03 13738.33
127 100.0 DI 45.00 34.09 13772.42
128 350.0 DI 250.00 738.06 14510.48
129 200.0 DI 20.00 28.47 14538.95
130 250.0 DI 470.00 881.44 15420.39
===============================================================
LOOP: Looped Water Distribution Design Program - (C) The World Bank
Version 4.0
LOOP: Looped Water Distribution Design Program - (C) The World Bank
Pipe Data
------------
===================================================================
Pipe From To Length Diameter Hazen's Pipe Status
No. Node Node m mm Const Material (E/P)
-------------------------------------------------------------------
1 1 2 90.00 0.0 140.00000 DI
2 2 3 80.00 0.0 140.00000 DI
3 3 4 175.00 0.0 140.00000 DI
4 3 5 460.00 0.0 140.00000 DI
5 5 6 70.00 0.0 140.00000 DI
6 6 7 225.00 0.0 140.00000 DI
7 6 8 250.00 0.0 140.00000 DI
8 5 9 610.00 0.0 140.00000 DI
9 8 9 175.00 0.0 140.00000 DI
10 9 10 325.00 0.0 140.00000 DI
11 8 16 945.00 0.0 140.00000 DI
12 10 13 385.00 100.0 140.00000 CI
13 10 15 430.00 100.0 140.00000 CI
14 12 15 430.00 100.0 140.00000 CI
15 11 12 90.00 100.0 140.00000 CI
16 12 13 40.00 100.0 140.00000 CI
17 13 14 105.00 100.0 140.00000 CI
18 15 16 125.00 0.0 140.00000 DI
19 15 46 225.00 0.0 140.00000 DI
20 16 17 25.00 0.0 140.00000 DI
21 17 18 50.00 0.0 140.00000 DI
22 18 19 45.00 0.0 140.00000 DI
LOOP: Looped Water Distribution Design Program - (C) The World Bank
===================================================================
Pipe From To Length Diameter Hazen's Pipe Status
No. Node Node m mm Const Material (E/P)
-------------------------------------------------------------------
23 19 45 90.00 0.0 140.00000 DI
24 19 46 160.00 0.0 140.00000 DI
25 46 47 150.00 0.0 140.00000 DI
26 44 57 45.00 100.0 140.00000 CI
27 47 57 255.00 0.0 140.00000 DI
28 47 48 45.00 0.0 140.00000 DI
29 47 49 45.00 0.0 140.00000 DI
30 49 50 310.00 0.0 140.00000 DI
31 50 51 180.00 0.0 140.00000 DI
32 50 52 670.00 0.0 140.00000 DI
33 52 53 495.00 0.0 140.00000 DI
34 52 54 1240.00 0.0 140.00000 DI
35 54 56 90.00 0.0 140.00000 DI
36 54 55 215.00 0.0 140.00000 DI
37 49 58 270.00 0.0 140.00000 DI
38 58 59 45.00 0.0 140.00000 DI
39 57 58 75.00 100.0 140.00000 CI E
40 58 60 90.00 0.0 140.00000 DI
41 43 60 100.00 100.0 140.00000 CI E
42 43 44 55.00 100.0 140.00000 CI E
43 42 43 45.00 100.0 140.00000 CI E
44 42 61 210.00 100.0 140.00000 CI E
45 60 61 185.00 0.0 140.00000 DI
46 40 42 130.00 100.0 140.00000 CI E
47 41 44 135.00 100.0 140.00000 CI E
48 40 41 90.00 0.0 140.00000 DI
49 18 41 100.00 0.0 140.00000 DI
50 44 45 90.00 0.0 140.00000 DI
51 45 46 105.00 0.0 140.00000 DI
52 18 20 100.00 75.0 140.00000 CI E
53 17 21 150.00 100.0 140.00000 CI E
54 20 22 170.00 75.0 140.00000 CI E
55 20 23 165.00 0.0 140.00000 DI
56 21 22 135.00 75.0 140.00000 CI E
58 23 24 170.00 0.0 140.00000 DI
59 23 37 205.00 0.0 140.00000 DI
60 24 25 60.00 0.0 140.00000 DI
61 22 25 75.00 0.0 140.00000 DI
62 25 26 190.00 0.0 140.00000 DI
63 24 27 220.00 0.0 140.00000 DI
64 21 26 260.00 100.0 140.00000 CI E
65 25 29 270.00 0.0 140.00000 DI
66 26 30 540.00 0.0 140.00000 DI
67 28 29 315.00 0.0 140.00000 DI
68 27 28 205.00 0.0 140.00000 DI
LOOP: Looped Water Distribution Design Program - (C) The World Bank
===================================================================
Pipe From To Length Diameter Hazen's Pipe Status
No. Node Node m mm Const Material (E/P)
-------------------------------------------------------------------
69 28 32 90.00 0.0 140.00000 DI
70 31 32 345.00 0.0 140.00000 DI
71 29 31 265.00 0.0 140.00000 DI
72 31 30 160.00 0.0 140.00000 DI
73 2 30 1350.00 0.0 140.00000 DI
88 38 39 85.00 0.0 140.00000 DI
89 37 38 250.00 0.0 140.00000 DI
90 37 39 180.00 0.0 140.00000 DI
91 39 40 120.00 0.0 140.00000 DI
92 201 18 50.00 0.0 140.00000 DI
93 202 18 50.00 0.0 140.00000 DI
===================================================================
Node Data
-----------
=============================================================
Node Peak Flow Elevation Min Press Max Press
No. lps m m m
-------------------------------------------------------------
201 3.00 0.000 154.03 12.00 40.00
202 3.00 0.000 154.03 12.00 40.00
1 3.00 -0.096 128.63 12.00 40.00
2 3.00 -1.619 128.80 12.00 40.00
3 3.00 -0.762 129.65 12.00 40.00
4 3.00 -0.187 132.59 12.00 40.00
5 3.00 -1.214 132.12 12.00 40.00
6 3.00 -0.581 132.43 12.00 40.00
7 3.00 -0.238 133.01 12.00 40.00
8 3.00 -1.457 134.26 12.00 40.00
9 3.00 -1.180 134.75 12.00 40.00
10 3.00 -1.212 139.44 12.00 40.00
11 3.00 -0.096 142.60 12.00 40.00
12 3.00 -0.596 141.03 12.00 40.00
13 3.00 -0.562 139.97 12.00 40.00
14 3.00 -0.111 139.34 12.00 40.00
15 3.00 -1.286 147.42 12.00 40.00
16 3.00 -1.163 149.31 12.00 40.00
17 3.00 -0.238 151.23 12.00 40.00
18 3.00 -0.475 153.93 12.00 40.00
19 3.00 -0.313 153.90 12.00 40.00
20 3.00 -0.464 147.55 12.00 40.00
21 3.00 -0.579 148.20 12.00 40.00
22 3.00 -0.405 145.90 12.00 40.00
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=============================================================
Node Peak Flow Elevation Min Press Max Press
No. lps m m m
-------------------------------------------------------------
23 3.00 -0.575 145.19 12.00 40.00
24 3.00 -0.479 143.13 12.00 40.00
25 3.00 -0.635 142.50 12.00 40.00
26 3.00 -1.054 139.97 12.00 40.00
27 3.00 -0.451 139.34 12.00 40.00
28 3.00 -0.650 137.52 12.00 40.00
29 3.00 -0.903 139.66 12.00 40.00
30 3.00 -2.183 129.34 12.00 40.00
31 3.00 -0.818 136.57 12.00 40.00
32 3.00 -0.464 136.27 12.00 40.00
37 3.00 -0.675 145.54 12.00 40.00
38 3.00 -0.356 148.14 12.00 40.00
39 3.00 -0.409 149.28 12.00 40.00
40 3.00 -0.362 151.01 12.00 40.00
41 3.00 -0.347 153.70 12.00 40.00
42 3.00 -0.409 147.63 12.00 40.00
43 3.00 -0.213 147.66 12.00 40.00
44 3.00 -0.347 148.06 12.00 40.00
45 3.00 -0.302 152.30 12.00 40.00
46 3.00 -0.682 149.17 12.00 40.00
47 3.00 -0.524 145.37 12.00 40.00
48 3.00 -0.047 148.17 12.00 40.00
49 3.00 -0.664 144.67 12.00 40.00
50 3.00 -1.235 138.27 12.00 40.00
51 3.00 -0.192 137.27 12.00 40.00
52 3.00 -2.560 142.01 12.00 40.00
53 3.00 -0.528 147.76 12.00 40.00
54 3.00 -1.644 137.68 12.00 40.00
55 3.00 -0.230 137.73 12.00 40.00
56 3.00 -0.096 137.13 12.00 40.00
57 3.00 -0.400 146.77 12.00 40.00
58 3.00 -0.513 145.36 12.00 40.00
59 3.00 -0.047 144.03 12.00 40.00
60 3.00 -0.400 144.18 12.00 40.00
61 3.00 -0.422 144.00 12.00 40.00
=============================================================
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=============================
Source Head Ref Res?
Node m (R)
-----------------------------
201 169.03 R
202 169.03
=============================
=========================================================
Pipe Dia. Hazen's Unit Cost Allow Press Pipe
Int. (mm) Const Rs /m length m Material
---------------------------------------------------------
100.0 140.00000 757.51 770.00 DI
150.0 140.00000 1113.18 770.00 DI
200.0 140.00000 1423.38 740.00 DI
250.0 140.00000 1875.41 650.00 DI
300.0 140.00000 2355.89 590.00 DI
350.0 140.00000 2952.23 540.00 DI
400.0 140.00000 3751.08 510.00 DI
450.0 140.00000 4329.31 480.00 DI
500.0 140.00000 5045.92 460.00 DI
600.0 140.00000 6682.10 430.00 DI
700.0 140.00000 9477.31 410.00 DI
750.0 140.00000 10711.67 390.00 DI
800.0 140.00000 12768.11 380.00 DI
900.0 140.00000 15028.18 370.00 DI
1000.0 140.00000 17343.17 360.00 DI
75.0 100.00000 750.00 125.00 CI
100.0 100.00000 1000.00 125.00 CI
=========================================================
--------------------------------------
BandWidth = 6
Number of Loops = 21
Newton Raphson Iterations = 4
--------------------------------------
LOOP: Looped Water Distribution Design Program - (C) The World Bank
Pipe Details
---------------
=========================================================================
Pipe From To Flow Dia HL HL/1000m Length Velocity
No. Node Node (lps) (mm) (m ) (m ) (m ) (m/s )
-------------------------------------------------------------------------
1 1 2 -0.288 100.0 -0.00 -0.02 90.00 -0.04
2 2 3 -3.944 100.0 -0.24 -2.97 80.00 -0.50
3 3 4 0.561 100.0 0.01 0.08 175.00 0.07
4 3 5 -6.791 100.0 -3.74 -8.12 460.00 -0.86
5 5 6 -7.606 100.0 -0.70 -10.02 70.00 -0.97
6 6 7 0.714 100.0 0.03 0.13 225.00 0.09
7 6 8 -10.063 150.0 -0.58 -2.33 250.00 -0.57
8 5 9 -2.827 100.0 -0.98 -1.60 610.00 -0.36
9 8 9 8.633 150.0 0.31 1.76 175.00 0.49
10 9 10 2.266 100.0 0.35 1.06 325.00 0.29
11 8 16 -23.067 200.0 -2.53 -2.67 945.00 -0.73
12 10 13 0.392 75.0 0.12 0.31 385.00 0.09
13 10 15 -1.762 75.0 -2.17 -5.05 430.00 -0.40
14 12 15 -3.703 100.0 -2.12 -4.93 430.00 -0.47
15 11 12 -0.288 75.0 -0.02 -0.18 90.00 -0.07
16 12 13 1.627 75.0 0.17 4.36 40.00 0.37
17 13 14 0.333 75.0 0.02 0.23 105.00 0.08
18 15 16 -6.761 100.0 -1.01 -8.05 125.00 -0.86
19 15 46 -2.561 100.0 -0.30 -1.33 225.00 -0.33
20 16 17 -33.318 200.0 -0.13 -5.28 25.00 -1.06
21 17 18 -42.486 250.0 -0.14 -2.79 50.00 -0.87
22 18 19 31.557 200.0 0.21 4.77 45.00 1.00
23 19 45 15.817 150.0 0.49 5.39 90.00 0.89
24 19 46 14.801 150.0 0.76 4.77 160.00 0.84
25 46 47 20.960 200.0 0.34 2.24 150.00 0.67
26 44 57 3.968 100.0 0.25 5.60 45.00 0.51
27 47 57 -1.080 100.0 -0.07 -0.27 255.00 -0.14
28 47 48 0.141 100.0 0.00 0.01 45.00 0.02
29 47 49 20.328 200.0 0.10 2.11 45.00 0.65
30 49 50 19.455 200.0 0.60 1.95 310.00 0.62
31 50 51 0.576 100.0 0.02 0.08 180.00 0.07
32 50 52 15.174 150.0 3.35 4.99 670.00 0.86
33 52 53 1.584 100.0 0.27 0.55 495.00 0.20
34 52 54 5.910 100.0 7.78 6.28 1240.00 0.75
35 54 56 0.288 100.0 0.00 0.02 90.00 0.04
36 54 55 0.690 100.0 0.03 0.12 215.00 0.09
37 49 58 -1.119 100.0 -0.08 -0.29 270.00 -0.14
38 58 59 0.141 100.0 0.00 0.01 45.00 0.02
39 57 58 1.687 100.0 0.09 1.15 75.00 0.21
40 58 60 -1.112 100.0 -0.03 -0.28 90.00 -0.14
41 43 60 2.143 100.0 0.18 1.79 100.00 0.27
42 43 44 -2.528 100.0 -0.13 -2.43 55.00 -0.32
43 42 43 0.254 100.0 0.00 0.03 45.00 0.03
44 42 61 1.435 100.0 0.18 0.85 210.00 0.18
45 60 61 -0.169 100.0 -0.00 -0.01 185.00 -0.02
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=========================================================================
Pipe From To Flow Dia HL HL/1000m Length Velocity
No. Node Node (lps) (mm) (m ) (m ) (m ) (m/s )
-------------------------------------------------------------------------
46 40 42 2.917 100.0 0.41 3.17 130.00 0.37
47 41 44 3.392 100.0 0.57 4.19 135.00 0.43
48 40 41 -25.314 200.0 -0.29 -3.17 90.00 -0.81
49 18 41 29.747 200.0 0.43 4.28 100.00 0.95
50 44 45 -4.144 100.0 -0.29 -3.25 90.00 -0.53
51 45 46 10.766 150.0 0.28 2.65 105.00 0.61
52 18 20 4.736 75.0 3.15 31.53 100.00 1.07
53 17 21 8.454 100.0 3.41 22.71 150.00 1.08
54 20 22 2.398 75.0 1.52 8.94 170.00 0.54
55 20 23 0.946 100.0 0.03 0.21 165.00 0.12
56 21 22 2.310 75.0 1.13 8.35 135.00 0.52
58 23 24 16.212 150.0 0.96 5.65 170.00 0.92
59 23 37 -16.991 150.0 -1.26 -6.16 205.00 -0.96
60 24 25 8.283 100.0 0.70 11.73 60.00 1.05
61 22 25 3.493 100.0 0.18 2.37 75.00 0.44
62 25 26 3.545 100.0 0.46 2.44 190.00 0.45
63 24 27 6.492 100.0 1.64 7.47 220.00 0.83
64 21 26 4.407 100.0 1.77 6.80 260.00 0.56
65 25 29 6.327 100.0 1.92 7.12 270.00 0.81
66 26 30 4.790 100.0 2.30 4.25 540.00 0.61
67 28 29 -0.342 100.0 -0.01 -0.03 315.00 -0.04
68 27 28 5.139 100.0 0.99 4.85 205.00 0.65
69 28 32 3.531 100.0 0.22 2.42 90.00 0.45
70 31 32 -2.139 100.0 -0.33 -0.96 345.00 -0.27
71 29 31 3.275 100.0 0.56 2.10 265.00 0.42
72 31 30 2.960 100.0 0.28 1.75 160.00 0.38
73 2 30 -1.201 100.0 -0.44 -0.33 1350.00 -0.15
88 38 39 -4.587 100.0 -0.33 -3.93 85.00 -0.58
89 37 38 -3.519 100.0 -0.60 -2.40 250.00 -0.45
90 37 39 -15.497 150.0 -0.93 -5.19 180.00 -0.88
91 39 40 -21.311 200.0 -0.28 -2.31 120.00 -0.68
92 201 18 54.975 250.0 0.23 4.50 50.00 1.12
93 202 18 54.975 250.0 0.23 4.50 50.00 1.12
Note: Negative value indicates the flow in reverse direction in that Pipe
=========================================================================
LOOP: Looped Water Distribution Design Program - (C) The World Bank
==========================================================================
Pipe From To Dia Hazen's Pipe Max Press Allow Press Status
No. Node Node (mm) Const Material (m ) (m ) (E/P)
--------------------------------------------------------------------------
1 1 2 100.0 140.00000 DI 32.12 770.00
2 2 3 100.0 140.00000 DI 31.95 770.00
3 3 4 100.0 140.00000 DI 31.34 770.00
4 3 5 100.0 140.00000 DI 32.60 770.00
5 5 6 100.0 140.00000 DI 32.99 770.00
6 6 7 100.0 140.00000 DI 32.99 770.00
7 6 8 150.0 140.00000 DI 32.99 770.00
8 5 9 100.0 140.00000 DI 32.60 770.00
9 8 9 150.0 140.00000 DI 31.75 770.00
10 9 10 100.0 140.00000 DI 30.95 770.00
11 8 16 200.0 140.00000 DI 31.75 740.00
12 10 13 75.0 100.00000 CI 25.91 125.00
13 10 15 75.0 100.00000 CI 25.91 125.00
14 12 15 100.0 100.00000 CI 24.38 125.00
15 11 12 75.0 100.00000 CI 24.38 125.00
16 12 13 75.0 100.00000 CI 25.26 125.00
17 13 14 75.0 100.00000 CI 25.87 125.00
18 15 16 100.0 140.00000 DI 20.11 770.00
19 15 46 100.0 140.00000 DI 20.11 770.00
20 16 17 200.0 140.00000 DI 19.22 740.00
21 17 18 250.0 140.00000 DI 17.44 650.00
22 18 19 200.0 140.00000 DI 14.87 740.00
23 19 45 150.0 140.00000 DI 15.80 770.00
24 19 46 150.0 140.00000 DI 18.66 770.00
25 46 47 200.0 140.00000 DI 22.12 740.00
26 44 57 100.0 100.00000 CI 20.79 125.00
27 47 57 100.0 140.00000 DI 22.12 770.00
28 47 48 100.0 140.00000 DI 22.12 770.00
29 47 49 200.0 140.00000 DI 22.73 740.00
30 49 50 200.0 140.00000 DI 28.52 740.00
31 50 51 100.0 140.00000 DI 29.51 770.00
32 50 52 150.0 140.00000 DI 28.52 770.00
33 52 53 100.0 140.00000 DI 21.44 770.00
34 52 54 100.0 140.00000 DI 21.44 770.00
35 54 56 100.0 140.00000 DI 18.53 770.00
36 54 55 100.0 140.00000 DI 17.98 770.00
37 49 58 100.0 140.00000 DI 22.73 770.00
38 58 59 100.0 140.00000 DI 23.44 770.00
39 57 58 100.0 100.00000 CI 22.11 125.00 E
40 58 60 100.0 140.00000 DI 23.32 770.00
41 43 60 100.0 100.00000 CI 23.32 125.00 E
42 43 44 100.0 100.00000 CI 20.02 125.00 E
43 42 43 100.0 100.00000 CI 20.05 125.00 E
44 42 61 100.0 100.00000 CI 23.50 125.00 E
45 60 61 100.0 140.00000 DI 23.50 770.00
LOOP: Looped Water Distribution Design Program - (C) The World Bank
==========================================================================
Pipe From To Dia Hazen's Pipe Max Press Allow Press Status
No. Node Node (mm) Const Material (m ) (m ) (E/P)
--------------------------------------------------------------------------
46 40 42 100.0 100.00000 CI 20.05 125.00 E
47 41 44 100.0 100.00000 CI 19.75 125.00 E
48 40 41 200.0 140.00000 DI 17.08 740.00
49 18 41 200.0 140.00000 DI 14.87 740.00
50 44 45 100.0 140.00000 DI 19.75 770.00
51 45 46 150.0 140.00000 DI 18.66 770.00
52 18 20 75.0 100.00000 CI 18.10 125.00 E
53 17 21 100.0 100.00000 CI 17.44 125.00 E
54 20 22 75.0 100.00000 CI 18.23 125.00 E
55 20 23 100.0 140.00000 DI 20.43 770.00
56 21 22 75.0 100.00000 CI 18.23 125.00 E
58 23 24 150.0 140.00000 DI 21.53 770.00
59 23 37 150.0 140.00000 DI 21.34 770.00
60 24 25 100.0 140.00000 DI 21.53 770.00
61 22 25 100.0 140.00000 DI 21.45 770.00
62 25 26 100.0 140.00000 DI 23.52 770.00
63 24 27 100.0 140.00000 DI 23.67 770.00
64 21 26 100.0 100.00000 CI 23.52 125.00 E
65 25 29 100.0 140.00000 DI 22.37 770.00
66 26 30 100.0 140.00000 DI 31.85 770.00
67 28 29 100.0 140.00000 DI 24.50 770.00
68 27 28 100.0 140.00000 DI 24.50 770.00
69 28 32 100.0 140.00000 DI 25.53 770.00
70 31 32 100.0 140.00000 DI 25.53 770.00
71 29 31 100.0 140.00000 DI 24.90 770.00
72 31 30 100.0 140.00000 DI 31.85 770.00
73 2 30 100.0 140.00000 DI 31.95 770.00
88 38 39 100.0 140.00000 DI 19.34 770.00
89 37 38 100.0 140.00000 DI 21.34 770.00
90 37 39 150.0 140.00000 DI 21.34 770.00
91 39 40 200.0 140.00000 DI 18.53 740.00
92 201 18 250.0 140.00000 DI 15.00 650.00
93 202 18 250.0 140.00000 DI 15.00 650.00
==========================================================================
Node Details
--------------
=======================================================
Node Flow Elev. H G L Pressure
No. (lps) (m ) (m ) (m )
-------------------------------------------------------
201 S 54.975 154.03 169.03 15.00
202 S 54.975 154.03 169.03 15.00
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=======================================================
Node Flow Elev. H G L Pressure
No. (lps) (m ) (m ) (m )
-------------------------------------------------------
1 -0.288 128.63 160.75 32.12
2 -4.857 128.80 160.75 31.95
3 -2.286 129.65 160.99 31.34
4 -0.561 132.59 160.97 28.38
5 -3.642 132.12 164.72 32.60
6 -1.743 132.43 165.42 32.99
7 -0.714 133.01 165.40 32.39
8 -4.371 134.26 166.01 31.75
9 -3.540 134.75 165.70 30.95
10 -3.636 139.44 165.35 25.91
11 -0.288 142.60 165.39 22.79
12 -1.788 141.03 165.41 24.38
13 -1.686 139.97 165.23 25.26
14 -0.333 139.34 165.21 25.87
15 -3.858 147.42 167.53 20.11
16 -3.489 149.31 168.53 19.22
17 -0.714 151.23 168.67 17.44
18 -1.425 153.93 168.80 14.87
19 -0.939 153.90 168.59 14.69
20 -1.392 147.55 165.65 18.10
21 -1.737 148.20 165.26 17.06
22 -1.215 145.90 164.13 18.23
23 -1.725 145.19 165.62 20.43
24 -1.437 143.13 164.66 21.53
25 -1.905 142.50 163.95 21.45
26 -3.162 139.97 163.49 23.52
27 -1.353 139.34 163.01 23.67
28 -1.950 137.52 162.02 24.50
29 -2.709 139.66 162.03 22.37
30 -6.549 129.34 161.19 31.85
31 -2.454 136.57 161.47 24.90
32 -1.392 136.27 161.80 25.53
37 -2.025 145.54 166.88 21.34
38 -1.068 148.14 167.48 19.34
39 -1.227 149.28 167.81 18.53
40 -1.086 151.01 168.09 17.08
41 -1.041 153.70 168.38 14.68
42 -1.227 147.63 167.68 20.05
43 -0.639 147.66 167.68 20.02
44 -1.041 148.06 167.81 19.75
45 -0.906 152.30 168.10 15.80
46 -2.046 149.17 167.83 18.66
47 -1.572 145.37 167.49 22.12
48 -0.141 148.17 167.49 19.32
49 -1.992 144.67 167.40 22.73
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=======================================================
Node Flow Elev. H G L Pressure
No. (lps) (m ) (m ) (m )
-------------------------------------------------------
50 -3.705 138.27 166.79 28.52
51 -0.576 137.27 166.78 29.51
52 -7.680 142.01 163.45 21.44
53 -1.584 147.76 163.17 15.41
54 -4.932 137.68 155.66 17.98
55 -0.690 137.73 155.64 17.91
56 -0.288 137.13 155.66 18.53
57 -1.200 146.77 167.56 20.79
58 -1.539 145.36 167.47 22.11
59 -0.141 144.03 167.47 23.44
60 -1.200 144.18 167.50 23.32
61 -1.266 144.00 167.50 23.50
=======================================================
=========================================================
Diameter Pipe Length Cost Cum. Cost
(mm) Material (m ) (1000 Rs ) (1000 Rs )
---------------------------------------------------------
100.0 DI 10170.00 7703.88 7703.88
150.0 DI 2005.00 2231.93 9935.80
200.0 DI 1830.00 2604.79 12540.59
250.0 DI 150.00 281.31 12821.90
75.0 CI 1050.00 787.50 13609.40
100.0 CI 475.00 475.00 14084.40
=========================================================
===============================================================
Pipe Diameter Pipe Length Cost Cum. Cost
No (mm) Material (m ) (1000 Rs ) (1000 Rs )
---------------------------------------------------------------
1 100.0 DI 90.00 68.18 68.18
2 100.0 DI 80.00 60.60 128.78
3 100.0 DI 175.00 132.56 261.34
4 100.0 DI 460.00 348.45 609.80
5 100.0 DI 70.00 53.03 662.82
6 100.0 DI 225.00 170.44 833.26
7 150.0 DI 250.00 278.30 1111.56
LOOP: Looped Water Distribution Design Program - (C) The World Bank
===============================================================
Pipe Diameter Pipe Length Cost Cum. Cost
No (mm) Material (m ) (1000 Rs ) (1000 Rs )
---------------------------------------------------------------
8 100.0 DI 610.00 462.08 1573.64
9 150.0 DI 175.00 194.81 1768.44
10 100.0 DI 325.00 246.19 2014.63
11 200.0 DI 945.00 1345.09 3359.73
12 75.0 CI 385.00 288.75 3648.48
13 75.0 CI 430.00 322.50 3970.98
14 100.0 CI 430.00 430.00 4400.98
15 75.0 CI 90.00 67.50 4468.48
16 75.0 CI 40.00 30.00 4498.48
17 75.0 CI 105.00 78.75 4577.23
18 100.0 DI 125.00 94.69 4671.92
19 100.0 DI 225.00 170.44 4842.36
20 200.0 DI 25.00 35.58 4877.94
21 250.0 DI 50.00 93.77 4971.71
22 200.0 DI 45.00 64.05 5035.76
23 150.0 DI 90.00 100.19 5135.95
24 150.0 DI 160.00 178.11 5314.06
25 200.0 DI 150.00 213.51 5527.57
26 100.0 CI 45.00 45.00 5572.57
27 100.0 DI 255.00 193.17 5765.73
28 100.0 DI 45.00 34.09 5799.82
29 200.0 DI 45.00 64.05 5863.87
30 200.0 DI 310.00 441.25 6305.12
31 100.0 DI 180.00 136.35 6441.47
32 150.0 DI 670.00 745.83 7187.30
33 100.0 DI 495.00 374.97 7562.27
34 100.0 DI 1240.00 939.31 8501.58
35 100.0 DI 90.00 68.18 8569.76
36 100.0 DI 215.00 162.86 8732.62
37 100.0 DI 270.00 204.53 8937.15
38 100.0 DI 45.00 34.09 8971.24
40 100.0 DI 90.00 68.18 9039.41
45 100.0 DI 185.00 140.14 9179.55
48 200.0 DI 90.00 128.10 9307.66
49 200.0 DI 100.00 142.34 9450.00
50 100.0 DI 90.00 68.18 9518.17
51 150.0 DI 105.00 116.88 9635.05
55 100.0 DI 165.00 124.99 9760.04
58 150.0 DI 170.00 189.24 9949.29
59 150.0 DI 205.00 228.20 10177.49
60 100.0 DI 60.00 45.45 10222.94
61 100.0 DI 75.00 56.81 10279.75
62 100.0 DI 190.00 143.93 10423.68
63 100.0 DI 220.00 166.65 10590.33
65 100.0 DI 270.00 204.53 10794.86
LOOP: Looped Water Distribution Design Program - (C) The World Bank
===============================================================
Pipe Diameter Pipe Length Cost Cum. Cost
No (mm) Material (m ) (1000 Rs ) (1000 Rs )
---------------------------------------------------------------
66 100.0 DI 540.00 409.06 11203.91
67 100.0 DI 315.00 238.62 11442.53
68 100.0 DI 205.00 155.29 11597.82
69 100.0 DI 90.00 68.18 11666.00
70 100.0 DI 345.00 261.34 11927.34
71 100.0 DI 265.00 200.74 12128.08
72 100.0 DI 160.00 121.20 12249.28
73 100.0 DI 1350.00 1022.64 13271.92
88 100.0 DI 85.00 64.39 13336.30
89 100.0 DI 250.00 189.38 13525.68
90 150.0 DI 180.00 200.37 13726.05
91 200.0 DI 120.00 170.81 13896.86
92 250.0 DI 50.00 93.77 13990.63
93 250.0 DI 50.00 93.77 14084.40
===============================================================
LOOP: Looped Water Distribution Design Program - (C) The World Bank
Version 4.0
LOOP: Looped Water Distribution Design Program - (C) The World Bank
Pipe Data
------------
===================================================================
Pipe From To Length Diameter Hazen's Pipe Status
No. Node Node m mm Const Material (E/P)
-------------------------------------------------------------------
1 1 2 90.00 100.0 140.00000 DI
2 2 3 80.00 150.0 140.00000 DI
3 3 4 175.00 100.0 140.00000 DI
4 3 5 460.00 150.0 140.00000 DI
5 5 6 70.00 150.0 140.00000 DI
6 6 7 225.00 100.0 140.00000 DI
7 6 8 250.00 150.0 140.00000 DI
8 5 9 610.00 100.0 140.00000 DI
9 8 9 175.00 150.0 140.00000 DI
10 9 10 325.00 100.0 140.00000 DI
11 8 16 945.00 200.0 140.00000 DI
12 10 13 385.00 75.0 140.00000 CI
13 10 15 430.00 75.0 140.00000 CI
14 12 15 430.00 100.0 140.00000 CI
15 11 12 90.00 75.0 140.00000 CI
16 12 13 40.00 75.0 140.00000 CI
17 13 14 105.00 75.0 140.00000 CI
18 15 16 125.00 150.0 140.00000 DI
19 15 46 225.00 100.0 140.00000 DI
20 16 17 25.00 200.0 140.00000 DI
21 17 18 50.00 250.0 140.00000 DI
22 18 19 45.00 200.0 140.00000 DI
LOOP: Looped Water Distribution Design Program - (C) The World Bank
===================================================================
Pipe From To Length Diameter Hazen's Pipe Status
No. Node Node m mm Const Material (E/P)
-------------------------------------------------------------------
23 19 45 90.00 150.0 140.00000 DI
24 19 46 160.00 150.0 140.00000 DI
25 46 47 150.00 200.0 140.00000 DI
26 44 57 45.00 100.0 140.00000 CI
27 47 57 255.00 100.0 140.00000 DI
28 47 48 45.00 100.0 140.00000 DI
29 47 49 45.00 200.0 140.00000 DI
30 49 50 310.00 200.0 140.00000 DI
31 50 51 180.00 100.0 140.00000 DI
32 50 52 670.00 150.0 140.00000 DI
33 52 53 495.00 100.0 140.00000 DI
34 52 54 1240.00 100.0 140.00000 DI
35 54 56 90.00 100.0 140.00000 DI
36 54 55 215.00 100.0 140.00000 DI
37 49 58 270.00 100.0 140.00000 DI
38 58 59 45.00 100.0 140.00000 DI
39 57 58 75.00 100.0 140.00000 CI E
40 58 60 90.00 100.0 140.00000 DI
41 43 60 100.00 100.0 140.00000 CI E
42 43 44 55.00 100.0 140.00000 CI E
43 42 43 45.00 100.0 140.00000 CI E
44 42 61 210.00 100.0 140.00000 CI E
45 60 61 185.00 100.0 140.00000 DI
46 40 42 130.00 100.0 140.00000 CI E
47 41 44 135.00 100.0 140.00000 CI E
48 40 41 90.00 200.0 140.00000 DI
49 18 41 100.00 200.0 140.00000 DI
50 44 45 90.00 100.0 140.00000 DI
51 45 46 105.00 150.0 140.00000 DI
52 18 20 100.00 150.0 140.00000 DI
53 17 21 150.00 150.0 140.00000 DI
54 20 22 170.00 75.0 140.00000 CI E
55 20 23 165.00 100.0 140.00000 DI
56 21 22 135.00 75.0 140.00000 CI E
58 23 24 170.00 150.0 140.00000 DI
59 23 37 205.00 150.0 140.00000 DI
60 24 25 60.00 100.0 140.00000 DI
61 22 25 75.00 100.0 140.00000 DI
62 25 26 190.00 100.0 140.00000 DI
63 24 27 220.00 100.0 140.00000 DI
64 21 26 260.00 100.0 140.00000 CI E
65 25 29 270.00 100.0 140.00000 DI
66 26 30 540.00 100.0 140.00000 DI
67 28 29 315.00 100.0 140.00000 DI
68 27 28 205.00 100.0 140.00000 DI
LOOP: Looped Water Distribution Design Program - (C) The World Bank
===================================================================
Pipe From To Length Diameter Hazen's Pipe Status
No. Node Node m mm Const Material (E/P)
-------------------------------------------------------------------
69 28 32 90.00 100.0 140.00000 DI
70 31 32 345.00 100.0 140.00000 DI
71 29 31 265.00 100.0 140.00000 DI
72 31 30 160.00 100.0 140.00000 DI
73 2 30 1350.00 100.0 140.00000 DI
88 38 39 85.00 100.0 140.00000 DI
89 37 38 250.00 100.0 140.00000 DI
90 37 39 180.00 150.0 140.00000 DI
91 39 40 120.00 200.0 140.00000 DI
92 201 18 50.00 250.0 140.00000 DI
93 202 18 50.00 250.0 140.00000 DI
===================================================================
Node Data
-----------
=============================================================
Node Peak Flow Elevation Min Press Max Press
No. lps m m m
-------------------------------------------------------------
201 3.00 0.000 154.03 12.00 40.00
202 3.00 0.000 154.03 12.00 40.00
1 3.00 -0.096 128.63 12.00 40.00
2 3.00 -1.619 128.80 12.00 40.00
3 3.00 -0.762 129.65 12.00 40.00
4 3.00 -0.187 132.59 12.00 40.00
5 3.00 -1.214 132.12 12.00 40.00
6 3.00 -0.581 132.43 12.00 40.00
7 3.00 -0.238 133.01 12.00 40.00
8 3.00 -1.457 134.26 12.00 40.00
9 3.00 -1.180 134.75 12.00 40.00
10 3.00 -1.212 139.44 12.00 40.00
11 3.00 -0.096 142.60 12.00 40.00
12 3.00 -0.596 141.03 12.00 40.00
13 3.00 -0.562 139.97 12.00 40.00
14 3.00 -0.111 139.34 12.00 40.00
15 3.00 -1.286 147.42 12.00 40.00
16 3.00 -1.163 149.31 12.00 40.00
17 3.00 -0.238 151.23 12.00 40.00
18 3.00 -0.475 153.93 12.00 40.00
19 3.00 -0.313 153.90 12.00 40.00
20 3.00 -0.464 147.55 12.00 40.00
21 3.00 -0.579 148.20 12.00 40.00
22 3.00 -0.405 145.90 12.00 40.00
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=============================================================
Node Peak Flow Elevation Min Press Max Press
No. lps m m m
-------------------------------------------------------------
23 3.00 -0.575 145.19 12.00 40.00
24 3.00 -0.479 143.13 12.00 40.00
25 3.00 -0.635 142.50 12.00 40.00
26 3.00 -1.054 139.97 12.00 40.00
27 3.00 -0.451 139.34 12.00 40.00
28 3.00 -0.650 137.52 12.00 40.00
29 3.00 -0.903 139.66 12.00 40.00
30 3.00 -2.183 129.34 12.00 40.00
31 3.00 -0.818 136.57 12.00 40.00
32 3.00 -0.464 136.27 12.00 40.00
37 3.00 -0.675 145.54 12.00 40.00
38 3.00 -0.356 148.14 12.00 40.00
39 3.00 -0.409 149.28 12.00 40.00
40 3.00 -0.362 151.01 12.00 40.00
41 3.00 -0.347 153.70 12.00 40.00
42 3.00 -0.409 147.63 12.00 40.00
43 3.00 -0.213 147.66 12.00 40.00
44 3.00 -0.347 148.06 12.00 40.00
45 3.00 -0.302 152.30 12.00 40.00
46 3.00 -0.682 149.17 12.00 40.00
47 3.00 -0.524 145.37 12.00 40.00
48 3.00 -0.047 148.17 12.00 40.00
49 3.00 -0.664 144.67 12.00 40.00
50 3.00 -1.235 138.27 12.00 40.00
51 3.00 -0.192 137.27 12.00 40.00
52 3.00 -2.560 142.01 12.00 40.00
53 3.00 -0.528 147.76 12.00 40.00
54 3.00 -1.644 137.68 12.00 40.00
55 3.00 -0.230 137.73 12.00 40.00
56 3.00 -0.096 137.13 12.00 40.00
57 3.00 -0.400 146.77 12.00 40.00
58 3.00 -0.513 145.36 12.00 40.00
59 3.00 -0.047 144.03 12.00 40.00
60 3.00 -0.400 144.18 12.00 40.00
61 3.00 -0.422 144.00 12.00 40.00
=============================================================
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=============================
Source Head Ref Res?
Node m (R)
-----------------------------
201 169.03 R
202 169.03
=============================
=========================================================
Pipe Dia. Hazen's Unit Cost Allow Press Pipe
Int. (mm) Const Rs /m length m Material
---------------------------------------------------------
100.0 140.00000 757.51 770.00 DI
150.0 140.00000 1113.18 770.00 DI
200.0 140.00000 1423.38 740.00 DI
250.0 140.00000 1875.41 650.00 DI
300.0 140.00000 2355.89 590.00 DI
350.0 140.00000 2952.23 540.00 DI
400.0 140.00000 3751.08 510.00 DI
450.0 140.00000 4329.31 480.00 DI
500.0 140.00000 5045.92 460.00 DI
600.0 140.00000 6682.10 430.00 DI
700.0 140.00000 9477.31 410.00 DI
750.0 140.00000 10711.67 390.00 DI
800.0 140.00000 12768.11 380.00 DI
900.0 140.00000 15028.18 370.00 DI
1000.0 140.00000 17343.17 360.00 DI
75.0 100.00000 750.00 125.00 CI
100.0 100.00000 1000.00 125.00 CI
=========================================================
--------------------------------------
BandWidth = 6
Number of Loops = 21
Newton Raphson Iterations = 9
--------------------------------------
LOOP: Looped Water Distribution Design Program - (C) The World Bank
Pipe Details
---------------
=========================================================================
Pipe From To Flow Dia HL HL/1000m Length Velocity
No. Node Node (lps) (mm) (m ) (m ) (m ) (m/s )
-------------------------------------------------------------------------
1 1 2 -0.288 100.0 -0.00 -0.02 90.00 -0.04
2 2 3 -5.001 150.0 -0.05 -0.64 80.00 -0.28
3 3 4 0.561 100.0 0.01 0.08 175.00 0.07
4 3 5 -7.848 150.0 -0.68 -1.47 460.00 -0.44
5 5 6 -9.105 150.0 -0.14 -1.94 70.00 -0.52
6 6 7 0.714 100.0 0.03 0.13 225.00 0.09
7 6 8 -11.562 150.0 -0.75 -3.02 250.00 -0.65
8 5 9 -2.385 100.0 -0.71 -1.17 610.00 -0.30
9 8 9 6.414 150.0 0.18 1.01 175.00 0.36
10 9 10 0.489 100.0 0.02 0.06 325.00 0.06
11 8 16 -22.347 200.0 -2.38 -2.52 945.00 -0.71
12 10 13 -0.659 75.0 -0.17 -0.44 385.00 -0.15
13 10 15 -2.488 75.0 -2.21 -5.13 430.00 -0.56
14 12 15 -4.754 100.0 -1.80 -4.19 430.00 -0.61
15 11 12 -0.288 75.0 -0.01 -0.09 90.00 -0.07
16 12 13 2.678 75.0 0.24 5.88 40.00 0.61
17 13 14 0.333 75.0 0.01 0.12 105.00 0.08
18 15 16 -11.453 150.0 -0.37 -2.97 125.00 -0.65
19 15 46 0.353 100.0 0.01 0.03 225.00 0.04
20 16 17 -37.289 200.0 -0.16 -6.50 25.00 -1.19
21 17 18 -48.672 250.0 -0.18 -3.59 50.00 -0.99
22 18 19 26.892 200.0 0.16 3.55 45.00 0.86
23 19 45 13.419 150.0 0.36 3.98 90.00 0.76
24 19 46 12.534 150.0 0.56 3.51 160.00 0.71
25 46 47 19.926 200.0 0.31 2.04 150.00 0.63
26 44 57 4.515 100.0 0.17 3.81 45.00 0.57
27 47 57 -1.529 100.0 -0.13 -0.51 255.00 -0.19
28 47 48 0.141 100.0 0.00 0.01 45.00 0.02
29 47 49 19.742 200.0 0.09 2.00 45.00 0.63
30 49 50 19.455 200.0 0.60 1.95 310.00 0.62
31 50 51 0.576 100.0 0.02 0.08 180.00 0.07
32 50 52 15.174 150.0 3.35 4.99 670.00 0.86
33 52 53 1.584 100.0 0.27 0.55 495.00 0.20
34 52 54 5.910 100.0 7.78 6.28 1240.00 0.75
35 54 56 0.288 100.0 0.00 0.02 90.00 0.04
36 54 55 0.690 100.0 0.03 0.12 215.00 0.09
37 49 58 -1.705 100.0 -0.17 -0.63 270.00 -0.22
38 58 59 0.141 100.0 0.00 0.01 45.00 0.02
39 57 58 1.786 100.0 0.05 0.68 75.00 0.23
40 58 60 -1.599 100.0 -0.05 -0.56 90.00 -0.20
41 43 60 2.425 100.0 0.12 1.21 100.00 0.31
42 43 44 -2.130 100.0 -0.05 -0.95 55.00 -0.27
43 42 43 0.933 100.0 0.01 0.21 45.00 0.12
44 42 61 1.640 100.0 0.12 0.58 210.00 0.21
45 60 61 -0.374 100.0 -0.01 -0.04 185.00 -0.05
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=========================================================================
Pipe From To Flow Dia HL HL/1000m Length Velocity
No. Node Node (lps) (mm) (m ) (m ) (m ) (m/s )
-------------------------------------------------------------------------
46 40 42 3.801 100.0 0.36 2.77 130.00 0.48
47 41 44 4.259 100.0 0.46 3.42 135.00 0.54
48 40 41 -17.521 200.0 -0.14 -1.61 90.00 -0.56
49 18 41 22.820 200.0 0.26 2.62 100.00 0.73
50 44 45 -3.428 100.0 -0.21 -2.29 90.00 -0.44
51 45 46 9.085 150.0 0.20 1.93 105.00 0.51
52 18 20 10.140 150.0 0.24 2.37 100.00 0.57
53 17 21 10.669 150.0 0.39 2.60 150.00 0.60
54 20 22 3.199 75.0 1.39 8.18 170.00 0.72
55 20 23 5.549 100.0 0.92 5.59 165.00 0.71
56 21 22 3.125 75.0 1.06 7.83 135.00 0.71
58 23 24 12.138 150.0 0.56 3.30 170.00 0.69
59 23 37 -8.314 150.0 -0.34 -1.64 205.00 -0.47
60 24 25 4.907 100.0 0.27 4.45 60.00 0.62
61 22 25 5.110 100.0 0.36 4.80 75.00 0.65
62 25 26 2.016 100.0 0.16 0.86 190.00 0.26
63 24 27 5.795 100.0 1.33 6.05 220.00 0.74
64 21 26 5.807 100.0 1.58 6.08 260.00 0.74
65 25 29 6.095 100.0 1.79 6.65 270.00 0.78
66 26 30 4.661 100.0 2.18 4.05 540.00 0.59
67 28 29 -0.599 100.0 -0.03 -0.09 315.00 -0.08
68 27 28 4.442 100.0 0.76 3.70 205.00 0.57
69 28 32 3.090 100.0 0.17 1.89 90.00 0.39
70 31 32 -1.698 100.0 -0.22 -0.62 345.00 -0.22
71 29 31 2.787 100.0 0.41 1.56 265.00 0.35
72 31 30 2.032 100.0 0.14 0.87 160.00 0.26
73 2 30 -0.144 100.0 -0.01 -0.01 1350.00 -0.02
88 38 39 -2.858 100.0 -0.14 -1.63 85.00 -0.36
89 37 38 -1.790 100.0 -0.17 -0.69 250.00 -0.23
90 37 39 -8.550 150.0 -0.31 -1.73 180.00 -0.48
91 39 40 -12.634 200.0 -0.11 -0.88 120.00 -0.40
92 201 18 54.975 250.0 0.23 4.50 50.00 1.12
93 202 18 54.975 250.0 0.23 4.50 50.00 1.12
Note: Negative value indicates the flow in reverse direction in that Pipe
=========================================================================
LOOP: Looped Water Distribution Design Program - (C) The World Bank
==========================================================================
Pipe From To Dia Hazen's Pipe Max Press Allow Press Status
No. Node Node (mm) Const Material (m ) (m ) (E/P)
--------------------------------------------------------------------------
1 1 2 100.0 140.00000 DI 35.83 770.00
2 2 3 150.0 140.00000 DI 35.66 770.00
3 3 4 100.0 140.00000 DI 34.86 770.00
4 3 5 150.0 140.00000 DI 34.86 770.00
5 5 6 150.0 140.00000 DI 33.07 770.00
6 6 7 100.0 140.00000 DI 32.90 770.00
7 6 8 150.0 140.00000 DI 32.90 770.00
8 5 9 100.0 140.00000 DI 33.07 770.00
9 8 9 150.0 140.00000 DI 31.82 770.00
10 9 10 100.0 140.00000 DI 31.15 770.00
11 8 16 200.0 140.00000 DI 31.82 740.00
12 10 13 75.0 140.00000 CI 26.44 125.00
13 10 15 75.0 140.00000 CI 26.44 125.00
14 12 15 100.0 140.00000 CI 25.26 125.00
15 11 12 75.0 140.00000 CI 25.26 125.00
16 12 13 75.0 140.00000 CI 26.08 125.00
17 13 14 75.0 140.00000 CI 26.70 125.00
18 15 16 150.0 140.00000 DI 20.67 770.00
19 15 46 100.0 140.00000 DI 20.67 770.00
20 16 17 200.0 140.00000 DI 19.15 740.00
21 17 18 250.0 140.00000 DI 17.40 650.00
22 18 19 200.0 140.00000 DI 14.87 740.00
23 19 45 150.0 140.00000 DI 15.99 770.00
24 19 46 150.0 140.00000 DI 18.91 770.00
25 46 47 200.0 140.00000 DI 22.41 740.00
26 44 57 100.0 140.00000 CI 21.14 125.00
27 47 57 100.0 140.00000 DI 22.41 770.00
28 47 48 100.0 140.00000 DI 22.41 770.00
29 47 49 200.0 140.00000 DI 23.02 740.00
30 49 50 200.0 140.00000 DI 28.81 740.00
31 50 51 100.0 140.00000 DI 29.80 770.00
32 50 52 150.0 140.00000 DI 28.81 770.00
33 52 53 100.0 140.00000 DI 21.73 770.00
34 52 54 100.0 140.00000 DI 21.73 770.00
35 54 56 100.0 140.00000 DI 18.82 770.00
36 54 55 100.0 140.00000 DI 18.27 770.00
37 49 58 100.0 140.00000 DI 23.02 770.00
38 58 59 100.0 140.00000 DI 23.83 770.00
39 57 58 100.0 140.00000 CI 22.50 125.00 E
40 58 60 100.0 140.00000 DI 23.73 770.00
41 43 60 100.0 140.00000 CI 23.73 125.00 E
42 43 44 100.0 140.00000 CI 20.37 125.00 E
43 42 43 100.0 140.00000 CI 20.41 125.00 E
44 42 61 100.0 140.00000 CI 23.92 125.00 E
45 60 61 100.0 140.00000 DI 23.92 770.00
LOOP: Looped Water Distribution Design Program - (C) The World Bank
==========================================================================
Pipe From To Dia Hazen's Pipe Max Press Allow Press Status
No. Node Node (mm) Const Material (m ) (m ) (E/P)
--------------------------------------------------------------------------
46 40 42 100.0 140.00000 CI 20.41 125.00 E
47 41 44 100.0 140.00000 CI 20.02 125.00 E
48 40 41 200.0 140.00000 DI 17.39 740.00
49 18 41 200.0 140.00000 DI 14.87 740.00
50 44 45 100.0 140.00000 DI 20.02 770.00
51 45 46 150.0 140.00000 DI 18.91 770.00
52 18 20 150.0 140.00000 DI 21.02 770.00
53 17 21 150.0 140.00000 DI 20.04 770.00
54 20 22 75.0 140.00000 CI 21.28 125.00 E
55 20 23 100.0 140.00000 DI 22.46 770.00
56 21 22 75.0 140.00000 CI 21.28 125.00 E
58 23 24 150.0 140.00000 DI 23.95 770.00
59 23 37 150.0 140.00000 DI 22.46 770.00
60 24 25 100.0 140.00000 DI 24.32 770.00
61 22 25 100.0 140.00000 DI 24.32 770.00
62 25 26 100.0 140.00000 DI 26.69 770.00
63 24 27 100.0 140.00000 DI 26.41 770.00
64 21 26 100.0 140.00000 CI 26.69 125.00 E
65 25 29 100.0 140.00000 DI 25.36 770.00
66 26 30 100.0 140.00000 DI 35.13 770.00
67 28 29 100.0 140.00000 DI 27.47 770.00
68 27 28 100.0 140.00000 DI 27.47 770.00
69 28 32 100.0 140.00000 DI 28.55 770.00
70 31 32 100.0 140.00000 DI 28.55 770.00
71 29 31 100.0 140.00000 DI 28.04 770.00
72 31 30 100.0 140.00000 DI 35.13 770.00
73 2 30 100.0 140.00000 DI 35.66 770.00
88 38 39 100.0 140.00000 DI 20.01 770.00
89 37 38 100.0 140.00000 DI 22.44 770.00
90 37 39 150.0 140.00000 DI 22.44 770.00
91 39 40 200.0 140.00000 DI 19.01 740.00
92 201 18 250.0 140.00000 DI 15.00 650.00
93 202 18 250.0 140.00000 DI 15.00 650.00
==========================================================================
Node Details
--------------
=======================================================
Node Flow Elev. H G L Pressure
No. (lps) (m ) (m ) (m )
-------------------------------------------------------
201 S 54.975 154.03 169.03 15.00
202 S 54.975 154.03 169.03 15.00
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=======================================================
Node Flow Elev. H G L Pressure
No. (lps) (m ) (m ) (m )
-------------------------------------------------------
1 -0.288 128.63 164.46 35.83
2 -4.857 128.80 164.46 35.66
3 -2.286 129.65 164.51 34.86
4 -0.561 132.59 164.50 31.91
5 -3.642 132.12 165.19 33.07
6 -1.743 132.43 165.33 32.90
7 -0.714 133.01 165.30 32.29
8 -4.371 134.26 166.08 31.82
9 -3.540 134.75 165.90 31.15
10 -3.636 139.44 165.88 26.44
11 -0.288 142.60 166.28 23.68
12 -1.788 141.03 166.29 25.26
13 -1.686 139.97 166.05 26.08
14 -0.333 139.34 166.04 26.70
15 -3.858 147.42 168.09 20.67
16 -3.489 149.31 168.46 19.15
17 -0.714 151.23 168.63 17.40
18 -1.425 153.93 168.80 14.87
19 -0.939 153.90 168.65 14.75
20 -1.392 147.55 168.57 21.02
21 -1.737 148.20 168.24 20.04
22 -1.215 145.90 167.18 21.28
23 -1.725 145.19 167.65 22.46
24 -1.437 143.13 167.08 23.95
25 -1.905 142.50 166.82 24.32
26 -3.162 139.97 166.66 26.69
27 -1.353 139.34 165.75 26.41
28 -1.950 137.52 164.99 27.47
29 -2.709 139.66 165.02 25.36
30 -6.549 129.34 164.47 35.13
31 -2.454 136.57 164.61 28.04
32 -1.392 136.27 164.82 28.55
37 -2.025 145.54 167.98 22.44
38 -1.068 148.14 168.15 20.01
39 -1.227 149.28 168.29 19.01
40 -1.086 151.01 168.40 17.39
41 -1.041 153.70 168.54 14.84
42 -1.227 147.63 168.04 20.41
43 -0.639 147.66 168.03 20.37
44 -1.041 148.06 168.08 20.02
45 -0.906 152.30 168.29 15.99
46 -2.046 149.17 168.08 18.91
47 -1.572 145.37 167.78 22.41
48 -0.141 148.17 167.78 19.61
49 -1.992 144.67 167.69 23.02
LOOP: Looped Water Distribution Design Program - (C) The World Bank
=======================================================
Node Flow Elev. H G L Pressure
No. (lps) (m ) (m ) (m )
-------------------------------------------------------
50 -3.705 138.27 167.08 28.81
51 -0.576 137.27 167.07 29.80
52 -7.680 142.01 163.74 21.73
53 -1.584 147.76 163.47 15.71
54 -4.932 137.68 155.95 18.27
55 -0.690 137.73 155.93 18.20
56 -0.288 137.13 155.95 18.82
57 -1.200 146.77 167.91 21.14
58 -1.539 145.36 167.86 22.50
59 -0.141 144.03 167.86 23.83
60 -1.200 144.18 167.91 23.73
61 -1.266 144.00 167.92 23.92
=======================================================
=========================================================
Diameter Pipe Length Cost Cum. Cost
(mm) Material (m ) (1000 Rs ) (1000 Rs )
---------------------------------------------------------
100.0 DI 9435.00 7147.11 7147.11
150.0 DI 2990.00 3328.41 10475.51
200.0 DI 1830.00 2604.79 13080.30
250.0 DI 150.00 281.31 13361.61
75.0 CI 1050.00 787.50 14149.11
100.0 CI 475.00 475.00 14624.11
=========================================================
===============================================================
Pipe Diameter Pipe Length Cost Cum. Cost
No (mm) Material (m ) (1000 Rs ) (1000 Rs )
---------------------------------------------------------------
1 100.0 DI 90.00 68.18 68.18
2 150.0 DI 80.00 89.05 157.23
3 100.0 DI 175.00 132.56 289.79
4 150.0 DI 460.00 512.06 801.86
5 150.0 DI 70.00 77.92 879.78
6 100.0 DI 225.00 170.44 1050.22
7 150.0 DI 250.00 278.30 1328.51
LOOP: Looped Water Distribution Design Program - (C) The World Bank
===============================================================
Pipe Diameter Pipe Length Cost Cum. Cost
No (mm) Material (m ) (1000 Rs ) (1000 Rs )
---------------------------------------------------------------
8 100.0 DI 610.00 462.08 1790.60
9 150.0 DI 175.00 194.81 1985.40
10 100.0 DI 325.00 246.19 2231.59
11 200.0 DI 945.00 1345.09 3576.69
12 75.0 CI 385.00 288.75 3865.44
13 75.0 CI 430.00 322.50 4187.94
14 100.0 CI 430.00 430.00 4617.94
15 75.0 CI 90.00 67.50 4685.44
16 75.0 CI 40.00 30.00 4715.44
17 75.0 CI 105.00 78.75 4794.19
18 150.0 DI 125.00 139.15 4933.33
19 100.0 DI 225.00 170.44 5103.77
20 200.0 DI 25.00 35.58 5139.36
21 250.0 DI 50.00 93.77 5233.13
22 200.0 DI 45.00 64.05 5297.18
23 150.0 DI 90.00 100.19 5397.37
24 150.0 DI 160.00 178.11 5575.48
25 200.0 DI 150.00 213.51 5788.98
26 100.0 CI 45.00 45.00 5833.98
27 100.0 DI 255.00 193.17 6027.15
28 100.0 DI 45.00 34.09 6061.24
29 200.0 DI 45.00 64.05 6125.29
30 200.0 DI 310.00 441.25 6566.54
31 100.0 DI 180.00 136.35 6702.89
32 150.0 DI 670.00 745.83 7448.72
33 100.0 DI 495.00 374.97 7823.69
34 100.0 DI 1240.00 939.31 8763.00
35 100.0 DI 90.00 68.18 8831.17
36 100.0 DI 215.00 162.86 8994.04
37 100.0 DI 270.00 204.53 9198.57
38 100.0 DI 45.00 34.09 9232.66
40 100.0 DI 90.00 68.18 9300.83
45 100.0 DI 185.00 140.14 9440.97
48 200.0 DI 90.00 128.10 9569.07
49 200.0 DI 100.00 142.34 9711.41
50 100.0 DI 90.00 68.18 9779.59
51 150.0 DI 105.00 116.88 9896.47
52 150.0 DI 100.00 111.32 10007.79
53 150.0 DI 150.00 166.98 10174.77
55 100.0 DI 165.00 124.99 10299.76
58 150.0 DI 170.00 189.24 10489.00
59 150.0 DI 205.00 228.20 10717.20
60 100.0 DI 60.00 45.45 10762.65
61 100.0 DI 75.00 56.81 10819.46
62 100.0 DI 190.00 143.93 10963.39
LOOP: Looped Water Distribution Design Program - (C) The World Bank
===============================================================
Pipe Diameter Pipe Length Cost Cum. Cost
No (mm) Material (m ) (1000 Rs ) (1000 Rs )
---------------------------------------------------------------
63 100.0 DI 220.00 166.65 11130.04
65 100.0 DI 270.00 204.53 11334.57
66 100.0 DI 540.00 409.06 11743.63
67 100.0 DI 315.00 238.62 11982.24
68 100.0 DI 205.00 155.29 12137.53
69 100.0 DI 90.00 68.18 12205.71
70 100.0 DI 345.00 261.34 12467.05
71 100.0 DI 265.00 200.74 12667.79
72 100.0 DI 160.00 121.20 12788.99
73 100.0 DI 1350.00 1022.64 13811.63
88 100.0 DI 85.00 64.39 13876.02
89 100.0 DI 250.00 189.38 14065.39
90 150.0 DI 180.00 200.37 14265.77
91 200.0 DI 120.00 170.81 14436.57
92 250.0 DI 50.00 93.77 14530.34
93 250.0 DI 50.00 93.77 14624.11
===============================================================
LOOP: Looped Water Distribution Design Program - (C) The World Bank
Other Loads = 10 kW
Total Load = 157.10 kW
Considering overloading = 10 %
Transformer rating = 218.19 x 1.1
= 240.01 kVA
Hence, the recommended rating of the transformer = 250 kVA
Other Loads = 20 kW
Total Load = 93.55 kW
Considering overloading = 10 %
Transformer rating = 129.93 x 1.1
= 142.92 kVA
Hence, the recommended rating of the transformer = 150 kVA
1 Chlorination system
3
Normal output from plant = 7000 m /day
Hours of operation = 16 hrs
3
Normal hourly flow from plant = 7000 / 16 m /hr
3
= 437.50 m /hr
Considering Chlorine dose for design flow for post chlorination = 5 mg/l
So, the dose required = 437.5 x 5 / 1000 kg/hr
= 2.19 kg/hr
= 35.00 kg/day
Quantity required in a year = 12775.00 kg
Assuming size of cylinder = 100 kg
Annual Chlorine requirement = 127.75 cylinders
~ 128 cylinders