Trips should not be self resetting unless adequate justification has been
made. Protective interlocks prevent those control actions which might
Rizwan M
initiate a hazard from being undertaken by an operator or process
Fieldbu
control system, and are by nature self-resetting.
Mihir Ra
Qadir M
Quick O
Michael
Intervie
mouyed
Sequen
FOLLOW
Like
CATEGO
This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept
Read More
Select C
https://instrumentationtools.com/process-interlocks-trips/ 2/28
3/28/2019 Process Interlocks and Trips | PLC | DCS | RTU | InstrumentationTools
Select C
RECENT
Independence Loop Co
Qadir M
Protective systems should be sufficiently independent of the control
Quick O
system or other protective systems (electrical/electronic or
Michael
programmable). Where there is an interface between systems (e.g. for
Intervie
indication, monitoring or shared components) or shared utilities (e.g.
mouyed
power), environment (e.g. accommodation,
or wiring routes)
Sequen
FOLLOW
management systems (maintenance procedures, personnel), then the
method of achieving independence should be defined, and common
cause failures adequately considered.
CATEGO
Independence will also be required for protection against systematic
This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept
and common mode faults. Measures may include use of diverse
Read More
Select C
https://instrumentationtools.com/process-interlocks-trips/ 3/28
3/28/2019 Process Interlocks and Trips | PLC | DCS | RTU | InstrumentationTools
Select C
technology for different protective systems. Where more than one
E/E/PES protective system is used to provide the required risk reduction
for a safety function, then adequate independence should be achieved
RECENT
by diverse technology, construction, manufacturer or software as
necessary to achieve the requires safety integrity level. Rizwan M
Fieldbu
Dependence on utilities
Mihir Ra
Loop Co
The action required from the protective system depend upon the nature
of the process. The actions may be passive in nature, such as simple
Qadir M
Quick O
isolation of plant or removal of power, or they may be active in that
continued or positive action is required to maintain or restore a safe
Michael
Intervie
state, for example by injection of inhibitor into the process, or provision
of emergency cooling.
mouyed
Sequen
FOLLOW
Active protective measures have a high dependence upon utilities, and
may be particularly vulnerable to common mode failures. The scope of
the protective system therefore includes all utilities upon which it
depends, and they should have an integrity consistent and contributory
to that of the remainder of the system.
Like
Measures taken to defend against common mode failure of utilities will
be commensurate with the level of safety integrity required, but may
include standby or uninterruptable/reservoir supplies for electricity, air, CATEGO
This website uses cookies to improve your cooling water,
experience. or other
We'll assume you'reutilities essential
ok with this, foropt-out
but you can performance
if you wish.of the safety
Accept
function. Such measures
Read More should themselves be of sufficient integrity.
Select C
https://instrumentationtools.com/process-interlocks-trips/ 4/28
3/28/2019 Process Interlocks and Trips | PLC | DCS | RTU | InstrumentationTools
Select C
Survivability and external in uences
The protective system should be adequately protected against
RECENT
environmental influences, the effects of the hazard against which it is
protecting, and other hazards which may be present.
Rizwan M
Fieldbu
Environmental influences include power system failure or
characteristics, lightning, electromagnetic radiation (EMR) (IEC 61000),
Mihir Ra
Loop Co
flammable atmospheres, corrosive or humid atmospheres, ingress of
water or dust, temperature, rodent attack, chemical attack, vibration
Qadir M
Quick O
physical impact, and other plant hazards.
Michael
Degradation of protection against environmental influences during
Intervie
maintenance and testing should have been considered and appropriate
measures taken. e.g. Use of radios by maintenance personnel may be mouyed
Sequen
FOLLOW
prohibited during testing of a protective system with the cabinet door
open where the cabinet provides protection against EMR.
CATEGO
Proof testing procedures should clearly set out how sensors are
This website uses cookies to improve your reinstated andassume
experience. We'll how such
you're reinstatement is can
ok with this, but you verified
opt-outafter
if you proof
wish. testing.
Accept
Read More
Select C
https://instrumentationtools.com/process-interlocks-trips/ 7/28
3/28/2019 Process Interlocks and Trips | PLC | DCS | RTU | InstrumentationTools
Select C
Maintenance procedures should define how sensors/transmitters are
calibrated with traceability back to national reference standards by use
of calibrated test equipment. RECENT
RECENT
Dangerous failures can be minimised by a number of measures
such as:
Rizwan M
Fieldbu
Use of ‘fail-safe’ principles so that the actuator takes up the tripped
state on loss of signal or power (electricity, air etc.). e.g. held open,
Mihir Ra
spring return actuator; Loop Co
CATEGO
This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept
Read More
Select C
https://instrumentationtools.com/process-interlocks-trips/ 10/28
3/28/2019 Process Interlocks and Trips | PLC | DCS | RTU | InstrumentationTools
Select C
RECENT
Rizwan M
Fieldbu
Valves should be properly selected for their duty, and it should not
Mihir Ra
Loop Co
be assumed that a control valve can satisfactorily perform isolation
functions; Qadir M
Actuators may also include programmable control elements Quick O
(e.g.
SMART instruments) particularly within positioners and variable
Michael
speed drives and motor control centres. Modern motor control
Intervie
Logic systems
CATEGO
Commonly, the logic systems for protective systems are electronic, but
This website uses cookies to improve your programmable and
experience. We'll assume you'reother technology
ok with this, systems
but you can opt-out (magnetic
if you wish. Accept or
Read More
Select C
https://instrumentationtools.com/process-interlocks-trips/ 11/28
3/28/2019 Process Interlocks and Trips | PLC | DCS | RTU | InstrumentationTools
Select C
fluidic/pneumatic) have been used.
signal lines for detection of wiring (open circuit, short circuit) and
Michael
sensors/actuators (stuck-at, out of range). Such monitoring may initiate
Intervie
Utilities CATEGO
This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept
Read More
Select C
https://instrumentationtools.com/process-interlocks-trips/ 13/28
3/28/2019 Process Interlocks and Trips | PLC | DCS | RTU | InstrumentationTools
Select C
Utilities which are required for the protective system to perform its
safety function may include power supplies such as electricity, air,
inhibitor materials and their propellants, inert gas such as nitrogen, RECENT
cooling water, steam, pilot flames and their gases all of which should be
adequately reliable. Rizwan M
Fieldbu
Measures such as redundancy, and uninterruptable/reservoir supplies,
Mihir Ra
and availability monitoring (e.g. loss of air alarm) may be required.
Loop Co
Confirmation that the designed capacity of reserves is adequate should
be demonstrated by test. Qadir M
Quick O
Proof testing
CATEGO
The probability of failure on demand, or the failure rate of a protective
This website uses cookies to improve your system is We'll
experience. critically
assumedependent
you're ok withupon
this, butthe
youfrequency
can opt-out if of
youproof
wish. testing
Accept and
Read More
Select C
https://instrumentationtools.com/process-interlocks-trips/ 14/28
3/28/2019 Process Interlocks and Trips | PLC | DCS | RTU | InstrumentationTools
Select C
its ability to detect previously unrevealed failures of the system. The
proof test interval should therefore be established accordingly, and as a
rule of thumb for low demand systems, should be an order of RECENT
magnitude less than the mean time between failure of the system and
the demand rate. Rizwan M
Fieldbu
Proof test procedures should be available which specify the
Mihir Ra
success/failure criteria and detail how the test will be performed safely,
Loop Co
including any management arrangements, operating restrictions and
competence of personnel. Qadir M
Quick O
The tests should be arranged to reveal all dangerous failures which have
Michael
been unrevealed in normal operation including the following measures:Intervie
Operation
CATEGO
Procedures should be available which detail the operation of the
This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept
protective system including:
Read More
Select C
https://instrumentationtools.com/process-interlocks-trips/ 15/28
3/28/2019 Process Interlocks and Trips | PLC | DCS | RTU | InstrumentationTools
Select C
Override management (authorisation, security, recording,
monitoring and review of overrides, reset requirements);
Operating instruction for trips; RECENT
Instructions for response to equipment faults including fault alarms.
(There should be procedural arrangements in place to ensure timely
Rizwan M
Fieldbu
repair so that mean time to repair criteria can be met).
Maintenance
Mihir Ra
Loop Co
Maintenance instructions;
Michael
Control of spares (segregation of faulty or non-conforming parts,
Intervie
identification to prevent interchange of similar parts etc.);
mouyed
Competence of maintenance personnel; Sequen
FOLLOW
Operating restriction during maintenance;
Control of software back-ups and memory media (E/EPROMS, floppy
disks, files on hard disks on portable PCs etc.);
Post maintenance reinstatement and proof testing.
For systems where a high diagnostic coverage is claimed, for example Like
Qadir M
Whilst beyond the scope of HS(G)87 ‘Safety in the remote diagnosis of
Quick O
manufacturing plant and equipment’, the publication provides a useful
background to the subject. Michael
Intervie