Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8

Drilling Drilling
Ball Blasting
N8 B A N8
Ball Blasting
A-A (1:1) B-B (1:1) C-C (1:1)
N10
C N10
A A
35 54 29

8
Drilling

13

19
N9
11 R12
5
0 .1 3
+ 0.0 +0.08
- 8 -0.02

-0 .1
.5

3
Ball Blasting

.0
+0
Ø9 Ø3 Ball Blasting
38

16
B 14 2± N10 B
0.2

Ø
5 N10
102

33
22
38

C .04 C
13

+0 .03
-0

Ø1
5

12.5

26
Ø2

12
Drilling

2.5
R1

+0 .2
2

-0
N9

.4
Drilling 14 41 24 19
N8 140
B A
20 C 32 Ball Blasting
D N10 D

38
32

19

12

Drilling
E E
N9

Dept. Technical reference Created by Approved by

Jennyca Dwika Permata 17/11/2016


Document type Document status

Title DWG No.

F TUGAS 6 FIXED F

Rev. Date of issue Sheet

1/1
1 2 3 4 5 6 7 8

You might also like