RISK ASSESSMENT FORM

Company Group 1 Conducted By (Date) 12/07/2006

Task Grit Blasting in C.S (Ballast Tank /Cargo Tank) with


Scaffold

Approved By (Date) 12/07/2006 Next Review Date 11/07/2009

1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference


No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/III Risk Control Follow-up Date) Reference
Health & Measure
Persons-at-
risk
1 Entry into C.S -Oxygen -Fatality -Entry Permit (PTW) 5 1 M - Supervisor -
deficiency -Asphyxiation -Continuous atmospheric
-Oxygen -Bodily injury monitoring
enrichment -Adequate lighting
-Overcome by -Adequate ventilation
toxic gas
-Corrosive
substance
-Trip and Slip
2 Mobilization of -Falling -Minor H/F -Trained vehicle/forklift 2 2 L - Supervisor
equipment hazard injury operator
-Vehicle -Collision -Qualified signal/rigger 5 1 M -
incident -Fatality -Provide appropriate PPE

3 Setting up and -Struck by -Bodily injury -Equipment checklist 4 2 M - Supervisor


testing of compressed -Adequate safety features
equipment air/hose/ -Provide PPE
faulty A.R -Checking validity of AR
(Air Receiver)

Association of Singapore Marine Industries


1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/ Ill Risk Control (Follow-up Date) Reference
Health & Measure
Persons-at-
risk
4 Top up blasting -Falling -Bodily injury -Barricade top area 4 2 M - Supervisor
grit hazard -Qualified signal/rigger

5 Inspection of -Falling of -Fatal -Scaffold certificate validity 5 1 M - Supervisor


scaffold persons/ -Bodily injury
object

6 Commencement -Strike by -Bodily injury -PTW 4 2 M -Maintenance Supervisor


of grit blasting compressed -Provide appropriate PPE require to
air/ grit/ hose -Equipment checklist verify
-Trip and fall -Provide adequate lighting/ equipment
-Dust -Lung disease no obstruction 4 2 M safety after job
inhalation -PPE completion
-Overcome -Fatal -Co modification @ supply 5 1 M
by Co when compressed air (Visual or
using diesel audible alarm)
operated air - Checking of air filter
compressor
for breathing
air supply
7 Grit removal -Ergonomic -Back pain -Provide appropriate PPE 3 2 M - Supervisor
and emptying -Dust -H/F injury
the grit inhalation -Lung disease

Association of Singapore Marine Industries


RISK ASSESSMENT FORM
Company Group 2 Conducted By (Date)

Task Grit Blasting at shipside with Cherry Picker (Dry


Dock)

Approved By (Date) Next Review Date

1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference


No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/III Risk Control Follow-up Date) Reference
Health & Measure
Persons-at-risk

1 Transporting of -Moving Collision of -Qualified operator 5 1 M -Supervision -Immediate


blasting vehicle forklift/ lorry truck -Working condition of -Brief to Supervisor
equipment / vehicle workers
material by -Ensure the load is within
forklift / lorry the safe working load and
truck from store the C.G of vehicle
to worksite -Observe yard’s speed limit
-Ensure clear passageway
before operating vehicle
-Maintain a clear vision of
the operator
Falling Strike by falling -Secure load 2 2 L -Supervision -Immediate
object object -Ensure clear passageway -Brief to Supervisor
from surrounding area workers
-Lifting equipment is valid
and in safe working
condition
-Safe working load of lifting
equipment

Association of Singapore Marine Industries


1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/ Ill Risk Control (Follow-up Date) Reference
Health & Measure
Persons-at-risk

2 Setting up of -Falling of -Same as above -Same as above 2 2 L -Supervision -Immediate


grit-blasting object -Brief to Supervisor
equipment workers
-Hands and -Pinch point -Hand gloves 2 2 L -Supervision -Immediate
fingers areas -Maintain two-way -Brief to Supervisor
injury communication workers
-Bodily -Using trained personnel
injury -Safe manual handling
practice
Slip, trip -Slip and fall on -Maintain clean and dry 2 2 L -Supervision -Immediate
and fall slippery work work place at all times -Brief to Supervisor
surface or trip -Do not place blasting workers
and fall over hoses at passageway
hoses placed at -Hang up of blasting hoses
passageway using cable hanger
3 Blasting -High -Bodily injuries -Physical check on hose 3 3 M -Supervision -Immediate
Operation pressure -Noise Induced condition -Brief to Supervisor
-Noise Deafness (NID) -Secure if hoses workers
-Relief valve in safe
working condition (PE ?)
-Trained personnel
-Functional test (Gradually
turn on)
-Protective clothing
-Exposure -Inhalation -Blasting hood (Air-fed) 2 3 M -Electrical -Immediate
to dust (respiratory -CO monitoring device generated Supervisor
problems) installed compressed air
-Overcome by
CO

Association of Singapore Marine Industries


1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/ Ill Risk Control (Follow-up Date) Reference
Health & Measure
Persons-at-risk

Continue -Bodily -Poor -Proper marking of hoses 2 2 L Dead Man -Immediate


from 3.
injuries communication and valves Switch Supervisor
(during between pot man recommended
blasting) and blaster result
in wrong
pressurized hose
-Surrounding -Railings covered with Blaster to look -Immediate
people bit by canvas out prior to Supervisor
spent grit -Highlight in VSCC blasting
meeting
-Display warning
signboard
3.1 Operating of Moving Collision/ -Cherry Picker in safe 5 1 M -Supervisor -Immediate
Cherry Picker Cherry Toppling working condition -Brief to worker Supervisor
Picker -Trained operator
-Certification of Cherry
Picker to be valid
-Traveling path to be
cleaned of obstruction and
on even ground
Falling of Fell from basket -Anchor of safety belt 5 1 M -Supervisor -Immediate
person -Max. 2 persons operating -Brief to worker Supervisor
Electrocution Contact with -Ensure no contact 5 1 M -Supervisor -Immediate
electrical cables between Cherry Picker -Brief to worker Supervisor
and electrical cable.
4 Demob High -Residual -Off main valve 3 3 M -Supervisor -Immediate
Pressure pressure in -Release existing pressure -Brief to worker Supervisor
hoses result in in the hose
body injuries
(Strike by)
Refer to No.2

Association of Singapore Marine Industries


RISK ASSESSMENT FORM
Company Group 3 Conducted By (Date)

Task Grit blasting at main deck onboard ship

Approved By (Date) 12/07/2006 Samsudin Next Review Date 11/07/2009

1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference


No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/III Risk Control Follow-up Date) Reference
Health & Measure
Persons-at-risk
1 Accessing are -Trip, slip -Trip due to -Safety Shoes 1 2 L Nil Immediate
to be grit and fall uneven surface -Use cable harness to Supervisor
blasted -Slip due to oily hang up hoses
surface -Keep surface clear and
-Minor injury dry

2 Equipment -Hit by -Collision / -Trained forklift operator 5 1 M Nil Immediate


mobilization moving Forklift topple assign Supervisor
using fork lift & vehicle (Fatality) -Check condition / capacity
lorry crane -Keep persons clear from
operation
-Falling -Strike by falling -Secure load using proper 2 2 L Nil Immediate
object equipment pallet Supervisor
(Minor) -Keep persons clear from
operation

3 Setting up of -Trip, Slip -Trip due to -Safety shoes 1 2 L Nil Immediate


equipment and fall uneven surface -Use cable harness to Supervisor
slip due to oily hang up hoses
surface (Minor) -Keep surface clean & dry
-Falling -Strike by falling -Do not lift heavy load 2 2 L
object equipment manually
(Minor) -Use forklift or crane to lift
equipment

Association of Singapore Marine Industries


1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/ Ill Risk Control (Follow-up Date) Reference
Health & Measure
Persons-at-risk

4 Grit Blasting High -Hit by flying grits -Check and use correct 3 3 M Nil Immediate
pressure -Hose burst rating and gravel condition Supervisor
injection -Slip/Trip and fall hose 3 3 M
injury -Blasting pot -Use dead men switch
burst -Visual inspect blasting 5 1 M
pots for defects
-Ensure blasting pot is
testes and valid
-Use of safety relief valve
Asphyxiation CO poisoning -Use electrical driven 5 1 M Nil Immediate
compressor Supervisor

5 Demob of High -Hit by flying grits -Release pressure before 3 3 M Nil Immediate
blasting pressure -Remaining disconnecting hose Supervisor
equipment injection pressure in the
injury hose

Association of Singapore Marine Industries


RISK ASSESSMENT FORM
Company Group 4 Conducted By (Date) Yard Supervisor

Task Hydro jetting with rotor gun in a confined


space/tank

Approved By (Date) 12/07/2006 Next Review Date 12/07/2009

1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference


No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/III Risk Control Follow-up Date) Reference
Health & Measure
Persons-at-risk

1 Transporting of -Moving -Collision / -Assigned appointed and 5 1 M Nil Immediate


hydro jetting vehicle / Forklift topple trained forklift operator Supervisor
equipment by crane crane: fatality -Check forklift condition
forklift from before operating it
store to -Falling object -Strike by a -Ensure that load is within 2 1 L
worksite falling spray and e.g. load
gun/hose from -Keep the people clear
forklift: minor from forklift
injury

2 Setting up of -Pinch point -Finger injury -Wear safety gloves 1 2 L Nil Immediate
hydrojetting Supervisor
equipment at
worksite and -High -Leg injury -Supervisor authorized 3 2 M
checklist for all pressure -Possible falling the test of hydorjetting
the equipment down equipment

-Falling object -Falling ? from -Housekeeping 2 1 L


-Finger injury height

Association of Singapore Marine Industries


1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/ Ill Risk Control (Follow-up Date) Reference
Health & Measure
Persons-at-
risk
3 Entry the -Asphyxiation -Fatality -Entry permit 5 1 M Nil Immediate
confined space hazard -Lost plank & -OK Tag for staging Supervisor
-Lack of air small material -Ventilation, lighting, body 2 1 L
-Falling object fall down harness and gas checklist
-Person -Fatality -Tank watchman 5 1 M
falling? -Permit display on a tank
entry

4 Hydrojetting -High pressure -Leg injury -Safety boots 3 3 M Nil Immediate


with rotor gun -People falling -Fatality -Body harness 5 1 M Supervisor

5 Demobilize -Pinch point -Hand injury -Released the pressure 1 2 L Nil Immediate
hydrojetting before disconnect/ make Supervisor
equipment after -High pressure -Leg injury and sure 3 2 M
hydrojetting possible to fall -Supervisor authorized
down the demobilized the 2 1 L
-Falling object -Falling from ? settons
-House keeping

6 Transporting of -Moving -Collision -Trained forklift operator 5 1 M Nil Immediate


hydrojetting vehicle crane forklift/crane -Check forklift condition Supervisor
equipment by -Falling object -Struck by -Keep the people clear 2 1 L
forklift back to falling object from forklift
the store hose, gun from -Ensure that load is within
forklift and the e.g. load
crane

Association of Singapore Marine Industries


RISK ASSESSMENT FORM
Company Group 5 Conducted By (Date) Yard Supervisor/ Foreman

Task Hydro-jetting on main deck rotor gun

Approved By (Date) Section Head (12/07/2006) Next Review Date 12/07/2009

1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference


No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/III Risk Control Follow-up Date) Reference
Health & Measure
Persons-at-risk

1 Preparation on -Moving of -Collision -Certified Operator 5 1 M -Premark -Supervisor and -Safe Work
Mobilization of vehicle and -Damage -Qualified signal men location and foreman Procedure
Equipment shifting and equipment check list Equipment
lifting -Hand injury Catalog
: Fatality

2 Hydrojetting in -Over -Leg and hand -PPE, boots guard and 2 3 M -Built in -Supervisor and
progress pressure injury face shield Interlock Foreman
-No -Body injury -Barricade in this area and
secured ? -Hearing illness signboard highlighted
-Flaying VSCC
object

3 Demob -Pressure -Eyes and body -Release pressure and 1 1 L -Premark -Supervisor
mobilization of injury PPE location
equipment

Association of Singapore Marine Industries


RISK ASSESSMENT FORM
Company Group 6 Conducted By (Date) Group 6 (12/07/2006)

Task Hydro-Jetting With Rotor Gun At Shipside Using


Cherry Picker

Approved By (Date) Next Review Date 12/07/2009

1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference


No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer Document for

Severity

Likelihood

Risk Level
Accident/III Control Follow-up Date) Reference
Health & Measure
Persons-at-
risk
1 Transporting of Moving -Collision / -Assigned trained forklift 5 1 M -Ensure clear Immediate
hydro jetting vehicle Forklift topple operator location Supervisor
M/C from store fatality -Check forklift condition before -Ensure audio
to worksite operating it. visual alarms
using forklift -Ensure that load is within the operative during
forklift capacity and the C.G. forklift operation
is within the forks -Ensure clear
-Keep persons clear from passageway
operating forklift and location
Falling -Strike by a -Secure load to transport them 4 1 M -Ensure clear Immediate
object falling hydro -Keep persons clear from location Supervisor
jetting pump/ operating forklift -Ensure audio
gun/ hose visual alarms
from forklift operative during
forklift operation
1A Transportation Moving -Collision/ -Assigned trained Cherry 5 1 M -Ensure audio Immediate
of Cherry Picker vehicle topple Picker operator visual alarms Supervisor
-Fatality -Check Cherry Picker before operative during
operating it operation
-Ensure rest position of boom -Maintenance &
-Clear passageway inspection
checks as need

Association of Singapore Marine Industries


1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer Document for

Severity

Likelihood

Risk Level
Accident/ Ill Control (Follow-up Date) Reference
Health & Measure
Persons-at-
risk
2 Setting of hydro Slip, trip, -Hands & -Keep work place clean and 2 2 L Nil Immediate
jetting fall at finger capture neat Operator and
equipment at worksite while setting -Do not place hoses at Foreman
worksite -Minor injury passageway
-Use hose arrestor with
correct capacity
-Assigned trained operator
-Using adequate PPE
-Use proper and correct
capacity hoses, fittings and
rotor guns
-Using proper warning signs/
barrication
3 Hydro jetting High -High -Assigned trained operator/ 4 2 M -Ensure proper Immediate
with rotor gun pressure pressure blaster trained / Supervisor and
using Cherry injection water injected -Use of hose/ parts/ fittings of authorized Foreman
Picker injury on fingers/ correct rating (SWP) without person at
parts of body damage kinks worksite
Due to; -Release trigger of the gun, -Checklist for
-Improper release pressure in M/C and maintenance
handing of stop the M/C before adjusting inspections of
hydro-jetting nozzle equipments/
gun/hoses -Keep hands away from accessories
-Use of sub- nozzle during operation
standard -Secure all hoses, fittings
hose, fittings, adequately
parts
-Noise -Deafness -Ensure no leaking 3 1 L -Refresher Immediate
-Falling -Falling from -(PPE) Ear plug to be used 5 1 M training and Supervisor and
hazard height, fatality -Assigned trained operator/ documentation Foreman
blaster
-Adequate use of PPE

Association of Singapore Marine Industries


1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer Document for

Severity

Likelihood

Risk Level
Accident/ Ill Control (Follow-up Date) Reference
Health & Measure
Persons-at-
risk
4 De-setting of Slip, trip -Hands and -Keep work place clean and 2 2 L Nil Immediate
hydro jetting Fall at fingers injury neat Supervisor and
equipment at worksite -Do not place hoses at Foreman
worksite -Minor Injury passageway, roll them
properly and pack
-Disconnect fittings carefully
and store in M/C’s
-Disconnect guns and store
properly
-Finally pack all accessories/
secure it/ lock the M/C
-Clear passageway
5 De-mobilize Moving -Collision / -Assigned trained forklift 5 1 M Immediate
hydro jetting vehicle forklift topple operator Foreman
equipment -Fatality -Check forklift condition before
operating it
-Ensure that load is within the
forklift capacity and the CG is
within the forks
-Ensure clear location
-Ensure audio visual alarms
operative during forklift
operation
Falling -Strike by a -Keep persons clear from 4 1 M Immediate
object falling hydro operating forklift location Foreman
jetting pump/ -Secure load to transport them
gun hose -Keep persons clear from
forklift operating forklift
-Ensure clear location
-Ensure audio visual alarms
operative during forklift
operation

Association of Singapore Marine Industries


1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer Document for

Severity

Likelihood

Risk Level
Accident/ Ill Control (Follow-up Date) Reference
Health & Measure
Persons-at-
risk
5A Transportation Moving -Collision/ -Assigned trained Cherry 5 1 6 Immediate
of Cherry vehicle topple Picker operator Foreman
Picker -Fatality -Check Cherry Picker before
operating it
-Ensure that the boon
should be in rest position
-Ensure audio visual alarms
operative during operation
-Maintenance and inspection
checks as need

Association of Singapore Marine Industries


RISK ASSESSMENT FORM
Company Black and White International Marine Pte Ltd Conducted By (Date) Group 7 (12/07/2006)

Task Spray Painting With Airless Spray Gun In A


Confined Space

Approved By (Date) 12/07/2006 Next Review Date 11/07/2009

1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference


No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/III Risk Control Follow-up Date) Reference
Health & Measure
Persons-at-
risk
1 Transporting Moving -Collision -Assigned trained forklift 5 1 M - Immediate
painting vehicle -Topple operator Supervisor
equipment by -Fatality -Check and ensure green
forklift to tag, proper maintenance,
worksite check list, follow speed
limit
-Do not overload
-Ensure adequate lighting
Falling object -Strike by falling -Secure equipments 2 2 M - Immediate
spray pump, properly Supervisor
hoses and paint
drum
2 Lifting up Falling object -Strike by falling -Assigned trained signaler 2 2 M - Immediate
equipment on object and rigger Supervisor
board vessel by -Struck by -Assigned trained crane
crane moving object operator
-Check and inspect all
lifting devices before use
-Materials secured
properly
-No obstruction

Association of Singapore Marine Industries


1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/ Ill Risk Control (Follow-up Date) Reference
Health & Measure
Persons-at-
risk
3 Setting and Slip, trip and -Oily surface -Proper housekeeping 1 2 L Nil Immediate
connection all fall -Poor -All hoses and cable must Supervisor
equipments housekeeping be lay out properly
-Obstruction on
passageway
Sharp edges -Contact with -Use proper hand gloves 1 2 L
sharp edges
4 Testing of -High noise -NID -Use proper PPE 1 3 M Nil Immediate
equipment level Supervisor
-Leakage and -Eye injury
splash
5 Mixing paints -Fire hazard -Fire hazard -Check and ensure no hot 5 1 M Nil Immediate
-Explosion due to hot work work at the vicinity Supervisor
-Splashing -Smoking -Ban smoking
-Barricade and display
signboard

6 Spray painting -Fire hazard -Fire and -Check and ensure no in- 5 1 M Nil Immediate
in confined -Explosion explosion due compatible hot work Supervisor
spaces with -Falling from to hot work -Coordinate painting work
airless gun height -Smoking in VSCC meeting
-Inhalation -Inhalation of -Must use proper PPE
-Skin irritation harmful vapor -Proper lighting (explosion
-Electrocution -Defect ladder proof light)
-Asphyxiation -Entry permit
-High -Keep finger or body away
pressure from spray gun tip
injury

Association of Singapore Marine Industries


1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/ Ill Risk Control (Follow-up Date) Reference
Health & Measure
Persons-at-
risk
7 Demobilize -High -Paint injects -Released pressure from 3 2 M - Immediate
pressure into hand and equipments and hoses Supervisor
injuries; paint body -Use proper PPE
inject -Clear all empty paint
drums and do
housekeeping upon
completion of work

Association of Singapore Marine Industries


RISK ASSESSMENT FORM
Company Group 8 Conducted By (Date) 12/07/2006

Task Spray Painting Using Airless Spray Gun At


Shipside With Cherry Picker

Approved By (Date) Group 8 Next Review Date 11/07/2006

1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference


No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/III Risk Control Follow-up Date) Reference
Health & Measure
Persons-at-risk

1 Identify the Slip, trip -Slip, trip and -Keep working area clean 2 2 L More attention Supervisor Nil
working area and fall fall due to wet and dry at all times to monitor by
and slippery -Housekeeping to be done Supervisor
ground before commencement of
-Passageway any work
obstructed -VSCC
(Minor injury) -PTW
2 Mobilization of Moving -Collision -Assigned trained/ qualified 3 2 M Nil Foreman Nil
equipments and vehicle -Struck by forklift operator
materials moving vehicle
-Forklift topple
Moving -Cherry Picker -Ensure qualified SPP 3 2 M Nil Supervisor Nil
vehicle / topple due to operator only operate
equipment outrigger not -Ensure ground are nor
extended or / obstructed by any foreign
and uneven materials
ground
(Major injuries)
-Person falling -Ensure safety belt/ harness 3 2 M Nil Supervisor Nil
from height is being used.
(PPE)

Association of Singapore Marine Industries


1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/ Ill Risk Control (Follow-up Date) Reference
Health & Measure
Persons-at-risk

Continue Falling -Struck by -Ensure equipments and 2 2 L Nil Supervisor Nil


from
No.2 object falling painting materials are properly secured
equipments and and no overloading
paint drums
-Minor injuries
3 Setting up of Falling -Struck by -Ensure that manual lifting 2 2 L Nil Supervisor Nil
spray painting objects falling within the capability (not more
equipments equipments than 25 kg per person)
(Minor injuries)
Slip, trip -Slip, trip and -Ensure good housekeeping at 3 2 M Nil Foreman/ Nil
and fall fall due to bad all times Supervisor
housekeeping
(Major injuries)
4 Mixing of paint Fire and -Fire and -Ensure no hotwork and/or 3 2 M Nil Foreman/ Nil
explosion explosion due to other heat sources within the Supervisor
hotwork and/ or vicinity
other heat
sources
-Eye and -Paint splash to -Ensure trained/ qualified 3 2 M Nil Foreman/ Nil
body injury eyes and/or painter are being deployed Supervisor
-Skin other body parts -Use proper paint equipments/
irritation due to improper hoses
handling -Use proper PPE
-Equipment/
hose break
5 Spray painting Fire and -Fire and -Ensure no hotwork and/or 5 2 H -Proper co- Foreman/ Nil
using airless explosion explosion due to other heat sources in the ordination in Supervisor
spray gun with hotwork and/or vicinity VSCC meeting
Cherry Picker other heat -Coordinate in VSCC meeting
sources
-Fatality

Association of Singapore Marine Industries


1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/ Ill Risk Control (Follow-up Date) Reference
Health & Measure
Persons-at-risk

Continue High -Pressurized -Ensure trained painter are 3 2 M Nil Foreman/ Nil
from
No. 5 pressure paint injected assigned Supervisor
injection due to -SSIC
injury improper -Ensure equipment are
handling being check prior to use
-Equipment fail -Proper PPE
-Major injuries
Expose to -Chronic -Ensure proper PPE are 3 1 L Nil Foreman/ Nil
toxic health illness being used Supervisor
vapor due to
inhalation
6 Demobilization Falling -Hit/Struck by -Manual lifting to be within 3 1 L Nil Foreman/ Nil
of pointing object falling object the person’s capacity (not Supervisor
equipments due to more than 25kg)
improper
handling
Slip and -Slip and trip, -Ensure proper 3 2 M Nil Foreman/ Nil
trip/fall fall due to bad housekeeping at the end of Supervisor
housekeeping any work

Association of Singapore Marine Industries


RISK ASSESSMENT FORM
Company Group 9 Conducted By (Date) 12/07/2006

Task Spray Painting With Airless Spray Gun At Main


Deck

Approved By (Date) Next Review Date 12/07/2009

1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference


No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/III Risk Control Follow-up Date) Reference
Health & Measure
Persons-at-risk

1 Preparation of Pinch point Hand caught in -Keep hand away from 2 2 L - Immediate
equipment such between pinch point during Supervisor or
as Spray Pump, equipment preparation Foreman
Spray Gun, Moving -Collision -Assign trained forklift 5 1 M - Immediate Refer to SOPM
Paints vehicle -Forklift topple driver Supervisor or Chapter 25 on
Compressor, -Fatality -Check forklift condition Foreman Forklift Driving
Canvas, -Ensure forklift capacity
Gaskets and -Follow in-house rules
transport it by -Keep forklift clear from
using forklift to pedestrian and others
wharf side during operation
Falling -Strike by a -Do not lift load more than 2 2 L - Immediate
object falling spray you can carry Supervisor or
pump, hose, gun, -Ask for assistance if Foreman
paint drums possible
-Minor injury
2 Blanking-up all Hand injury Hand cut by wire Use hand glove 1 2 L - Immediate
pipelines by Supervisor
rubber gaskets,
wooden plugs
Covering
Slip, fall, -Due to improper -Maintain good 2 3 M - Immediate
protection on
trips housekeeping housekeeping and keep Supervisor
electrical
-Slippery surface tidy at all times
equipment and
-Hang up all cables
etc.
Association of Singapore Marine Industries
1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/ Ill Risk Control (Follow-up Date) Reference
Health & Measure
Persons-at-risk

3 Barricade the Slip, fall As above As above 2 3 M - Immediate


site that are and trip Supervisor
under operation
4 Arragement of Falling -Strike by a Keep others clear away 2 2 L - Immediate
equipment such object falling paint from the operation area Supervisor
as compressor, drums, hose
spray pumps, (Wharf
spray guns, arranging)
paint ?, paints, Slip and Due to poor -Maintain good 2 3 M - Immediate
rubbish bins Fall housekeeping housekeeping Supervisor
and equipment -Maintain at all times
5 Paint mixing -Fire -Due to smoking, -Close all paint containers 3 1 L - Immediate
-Pollution sparks, heat from when not in use Supervisor
hot work -Display signboard
-Major injury -Highlight at VSCC
meeting
-No smoking
Eye injury Paint splashes to Wear eye protector 2 2 L - Immediate
eyes Supervisor
6 Start spray Fire Flash fire due to -Apply permit 4 1 M - Immediate
painting with smoking, hot -Blank off all openings Supervisor
airless spray works -No hot works within the
gun area
-Co-ordinate at VSCC
meeting
-Display signboard
“Painting in Progress”
High Due to finger and -Trained spray painter or 3 2 M - Immediate
pressure body injury qualified personnel. Supervisor
injection -Buddy system applied to
injury look during operation
-Keep hand away from
nozzle tip

Association of Singapore Marine Industries


1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/ Ill Risk Control (Follow-up Date) Reference
Health & Measure
Persons-at-risk

7 Demobilizing Refer to As above Refer to SOPM


and hazard on Chapter 18
housekeeping setting-up on good
housekeeping

Association of Singapore Marine Industries


RISK ASSESSMENT FORM
Company Group 10 Conducted By (Date) 12/07/2006

Task Power Tooling At Open Space/Decks

Approved By (Date) 12/07/2005 Next Review Date 11/07/2009

1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference


No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/III Risk Control Follow-up Date) Reference
Health & Measure
Persons-at-risk

1 Transporting of Moving Collision / Forklift -Assigned appointed and 5 1 M Nil Immediate


power tooling vehicle topple – trained forklift and crane Supervisor and
equipments by (forklift) Fatality operator Lifting Supervisor
forklift and -Check forklift/crane
crane Falling condition before operating
hazards it
(Equipment) -Ensure that load is within
the CG, is within the
forks/lifting follow 3 steps
of lifting procedure
-Assigned appointed
riggers
2 Setting up of Falling -Hit by falling air -Secure load and use 3 2 M Nil Immediate
power tooling object manifolds and air proper lifting equipment Supervisor
equipments to hoses like skip
work site -Minor injury -Keep persons clear from
operating area
-Before connect the hose
make sure shut

Association of Singapore Marine Industries


1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/ Ill Risk Control (Follow-up Date) Reference
Health & Measure
Persons-at-risk

3 Power tooling in -Fire -Sparks flying -Check and ensure no 3 1 L Nil Immediate
progress around during flammable liquids Supervisor
power tooling surrounding areas
-Co-ordinate in VSCC
meeting
-Assign experienced
workers
-Close all air hoses when
not in use
-Eye and -Particles and -Use proper eyewear 3 2 M Nil Immediate
body injury hoses may ? -To use whip arrestor for Supervisor
eyes and body connections
4 Demobilize -Falling -Hit by falling air -Assigned appointed rigger 3 2 M Nil Immediate
power tooling object manifolds and -Secured load and use Supervisor
equipments -Slip, trip hoses proper lifting equipment
after power and fall -Minor injury like skip 2 2 L
tooling -Slip, trip and fall -Keep persons clear from
over hoses operating area
placed at -Do not place air gases at
passageway passageway
5 Transporting of Moving -Collision / forklift -Assigned appointed and 5 1 M Nil Immediate
power tooling vehicle topple trained forklift operator Supervisor
equipment by -Fatality -Check forklift condition
forklift back to before operating it
workshop -Ensure that load is within
the forklift capacity
-Keep persons clear from
operating forklift

Association of Singapore Marine Industries


RISK ASSESSMENT FORM
Company Group 11 Conducted By (Date)

Task Power Tooling Pneumatic Confine Space

Approved By (Date) 12/07/2006 Next Review Date 12/07/2009

1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference


No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/III Risk Control Follow-up Date) Reference
Health & Measure
Persons-at-
risk
1 Apply entry Nil Nil Highlight in the VSCC Yard Foreman
permit meeting
2 Check location -Slip and fall -Slippery work -Clear and dry all times 5 1 M Supervisor
-In sufficient place -Arrange more lights
light -Poor visibility -More ventilation
-Lack oxygen -Fatality -Gas meter
CO2
3 Arrange -Unskilled -Prone to injury -Proper tool handling 3 2 M Supervisor
manpower worker -Mis- -Buddy system
distribution -Language Communication -Proper PPE issue, inspect
barrier -? Injury
-Improper
PPE

4 Equipment -Pinch point --Hand, finger -Use proper PPE 4 2 M Supervisor


distribution -Falling object injury -Proper rigging
-Faulty -Strike by -Secure loose item
equipment falling object -Keep clear lifting area
-Poor -Bodily injury -Check before issue
housekeeping -Slip and fall -Keep clear/ and clean
5 Starting work -Dust -Respiratory -Use proper respirator 4 2 M Supervisor
-Hit by falling disease -Proper PPE
object -Bodily injury

Association of Singapore Marine Industries


1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Existing Risk Control Additional Action Officer Document for

Severity

Likelihood

Risk Level
Accident/ Ill Risk Control (Follow-up Date) Reference
Health & Measure
Persons-at-risk

6 General -Dust -Respiratory -Use proper respirator 1 1 L Supervisor


cleaning disease
(vacuum)
7 Demobilizing -Pinch -Hand and finger -Use proper PPE 4 2 M Supervisor
point injury --Proper rigger
-Falling -Strike by falling -Keep clear/ clean
object object
-Faulty -Bodily injury
equipment -Slip and fall
–Poor
house
keeping

Association of Singapore Marine Industries