CHECK LIST FOR DRINKING WATER SUPPLY SCHEMES

(DISTRICT / STATE SECTOR)

S. DESCRIPTION OF THE INFORMATION / DATA REQUIRED TO BE SUBMITTED WITH EACH

NO. SCHEMES FOR AUTHORITY’ APPROVAL.

1. 6 Copies of Detailed Project Report (DPR)

(Attached / Not Attached)

2. 3 Signed Copies of the Maps of Proposed Service Area (Habitation) in which

Water Supply is to be made available.

(Attached / Not Attached)

3. Scheme Category

(District Sector/State Sector/NRDWP/NABARD)

4. Location of the Scheme

(Rural / Urban)

5. Type of Scheme

(Lift / Gravity)

6. Type of Source

(Surface/Spring/Tube Well / Dug Well/Any Other)

7. Whether Source is

(Perennial / Seasonal)

8. Whether Source is free from any dispute

(Yes / No)

9. Quantity of water available at source during the lean period of the year.

(In Litres / Kilo-Litres per day )

10. Quantity of water required for the designed population of the scheme.

(In Litres / Kilo-Litres per day )

11. Proposed Service Level of Water to be provided.

(In Litres per Capta per Day )


Contd……

R.W.S. DIVISION GANDERBAL


12. Whether scheme is consistent with the state water policy as per its objectives.

(Yes / No)

13. Whether the land required for construction / raising infrastructure of the

scheme in the ownership / possession of the department.

(Yes / No)

14. Whether a certificate to the effect by the Chief Engineer in case of a NRDWP or

a State Sector Scheme /NABARD/Superintending Engineer in case of a District

Sector Scheme, that source of water proposed to be tapped has adequate /

sustainable discharge at least up to the designed life of the project.

(Attached / Non Attached)

15. Certificate to the effect by the Chief Engineer, in case of NRDWP or a State

Sector Scheme / NABARD / Superintending Engineer in case of a District Sector

Scheme, that the proposed scheme is economical and there is no other viable

alternative. (Attached / Non Attached)

16. Certificate to the effect by the Chief Engineer, in case of a NRDWP or a state

sector scheme / Superintending Engineer in case of a District Sector Scheme,

that the proposed Scheme is not detrimental to any existing ongoing or proposed

water supply, Irrigation, Flood Control or any other Scheme in the area.

(Attached / Non Attached)

17. Whether safety measures for protecting Public have been envisaged and providing

for in the detailed project report (Refer Regulations on Safety measures issued

by the Authority vide notification No.07/JKSWRRA/2013 Dated:22.04.2013.

(Yes / No)

18. Whether the prescribed fees and Service Charges have been paid by the user

(proof by way of a Bank Draft / Pay Order to be attached).

(Attached / Non Attached)

Contd……

R.W.S. DIVISION GANDERBAL


19. Whether a note on the likely environmental impact on the scheme by the Chief

Engineer in case of a State Sector or a NRDWP Scheme / NABARD Scheme /

Superintending Engineer in case of a District Sector Scheme, has been attached.

(Attached / Non Attached)

20. Whether a copy of the No Object Certificate from the concerned Department /

Agency of the Central Government based in the State, in case of the area

proposed to be covered under the scheme includes the whole or any building or

place in the occupation of the Central Government for Defense purposes, has been

attached.

(Attached / Non Attached)

Executive Engineer Superintending Engineer Chief Engineer

This information may be given only after a formal State Water Policy is notified by

Public Health Engineering, Irrigation & Flood Control Department.

R.W.S. DIVISION GANDERBAL


SALIENT FEATURES OF
WATER SUPPLY SCHEME BANJAR BASTI BELA WOUSEN
(UNDER NABARD)
1. Name of Scheme : Water Supply Scheme Banjar Basti Bela

Wousen.

2. Name of District : Ganderbal.

3. Name of Tehsil : Kangan.

4. Name of Constituency : Kangan.

5. Type of Scheme : Lift.

6. Source of Scheme : Sindh Power Canal.

7. Existing Water Service Level : 10 – 20LPCD.

8. Proposed Service Level : 70LPCD.

9. Scope of Scheme : 02No. Habitations.

S. Name of Village Census Present Population Designed Population for


No. Code 2017 30years @ 3.65%
i) Forest Compartments L.E 675 1414

ii) Banjar Basti Bela Wousen L.E 340 712

iii) Floating Population L.E 200 200

Total 1215 Souls 2326 Souls

10. Total Cost of the Scheme : Rs.160.13Lacs

11. Cost per Capita:

a) Present Population. : Rs.13,179.00

b) Designed Population : Rs.6,884.00

12. Proposed Year of Start : 2017 – 18.

13. Proposed Year of Completion : 2019 – 20.

14. EXECUTING AGENCY : KASHMIR PHE DEPARTMENT THROUGH PHE

DIVISION, GANDERBAL

Jr. Engineer Assistant Executive Engineer Executive Engineer


R.W.S. Sub Division Ganderbal R.W.S. Division Ganderbal

Superintending Engineer,
Hydraulic Circle Srinagar/Ganderbal

R.W.S. DIVISION GANDERBAL


COST OF THE SCHEME:-

The Balanced cost of the scheme as per General

Abstract of Cost enclosed works out to Rs.160.13Lacs

GESTATION PERIOD:-

The scheme is proposed to be completed within one

working seasons subject to the condition that the materials

and funds will be provided within the gestation period.

RECOMMENDATION:-

Keeping inconveniences of locals in view for want

of potable water supply the scheme in question is

recommended for implementation at an earliest.

Jr. Engineer Assistant Executive Engineer Executive Engineer


R.W.S. Sub Division Ganderbal R.W.S. Division Ganderbal

R.W.S. DIVISION GANDERBAL


FEASIBILITY CERTIFICATE

NAME OF THE WATER SUPPLY SCHEME: BANJAR BASTI BELA WOUSEN.

It is certified that DPR of this scheme has been prepared after determining

the technical feasibility. The proposals are strictly devised and designed as per

relevant codes of Bureau of Indian Standard and Sound Engineering Practices

and most suitable under site conditions.

Jr. Engineer Assistant Executive Engineer Executive Engineer


R.W.S. Sub Division Ganderbal R.W.S. Division Ganderbal

R.W.S. DIVISION GANDERBAL


NO DUPLICACY CERTIFICATE

NAME OF THE WATER SUPPLY SCHEME: BANJAR BASTI BELA WOUSEN.

This is certify that the habitations under the scope of above mentioned scheme

are not reflected in any other coverage programme of this division and the

areas are presently in deficit of water supply.

Jr. Engineer Assistant Executive Engineer Executive Engineer


R.W.S. Sub Division Ganderbal R.W.S. Division Ganderbal

R.W.S. DIVISION GANDERBAL


SOURCE CERTIFICATE

NAME OF THE WATER SUPPLY SCHEME: BANJAR BASTI BELA WOUSEN.

Certified that:

1. The source of the scheme is free from any encumbrances.

2. Discharge available is adequate and will cater the needs of the

designed population proposed to be covered under the scheme.

3. The source will not adversely affect water supply scheme in case

source has been tapped from the existing scheme.

4. The scheme has been properly investigated and proposals have

been made viable after taking into account Techno-Economical

consideration.

Jr. Engineer Assistant Executive Engineer Executive Engineer


R.W.S. Sub Division Ganderbal R.W.S. Division Ganderbal

Superintending Engineer,
Hydraulic Circle Srinagar/Ganderbal

R.W.S. DIVISION GANDERBAL


GENERAL ABSTRACT OF COST
WATER SUPPLY SCHEME BANJAR BASTI BELA WOUSEN
(UNDER NABARD)

S. Items of Work Amount


No. (Rs. In Lacs)
A) (CIVIL WORKS)

01. Cost of Pipe and pipe specials 42.00

02. Cost for Laying and fitting of pipes @ 25% of pipe cost. 10.50

03. Cost for construction of Sump cum Pump House. 11.47

04. Cost for construction of 0.04MGD Slow Sand Filtration Plant with allied 26.47

works.

05. Cost for construction of Pre – Settling Tank. 14.33

06. Cost for construction of 0.20Lac Gallons Service Reservoir. 12.26

07. Cost for construction of Chain Link Fencing around structures. 3.80

Total 120.83

Add 2.5% for W.C and Contingencies on all items except item No. 1 i.e. 1.97

on Rs.78.83Lacs

TOTAL CIVIL COST (A) 122.80

B) (MECHANICAL / ELECTRICAL WORKS)

01. Cost for Mechanical / Electrical equipments 37.33

TOTAL MECHANICAL / ELECTRICAL COST (B) 37.33

GRAND TOTAL (A + B) 160.13

Jr. Engineer Assistant Executive Engineer Executive Engineer


R.W.S. Sub Division Ganderbal R.W.S. Division Ganderbal

Superintending Engineer,
Hydraulic Circle Srinagar/Ganderbal

R.W.S. DIVISION GANDERBAL


ABSTRACT OF COST FOR PIPES & PIPE SPECIALS FOR

WATER SUPPLY SCHEME BANJAR BASTI BELA WOUSEN


S.  of Pipe (mm) Quantity Rate/m Amount
No. (G. I.) (m) (In Rs.) (Rs. In Lacs)
01. 100mm  G.I. Pipe 200.00 679.00 1.36

02. 80mm  G.I. Pipe 2150.00 512.00 11.00

03. 65mm  G.I. Pipe 1500.00 432.00 6.48

04. 50mm  G.I. Pipe 1500.00 306.00 4.59

05. 40mm  G.I. Pipe 1500.00 218.00 3.27

06. 25mm  G.I. Pipe 500.00 155.00 7.75

07. 20mm  G.I. Pipe 5000.00 111.00 5.55

Total 40.00

Add 5% for Pipe Specials 2.00

Grand Total 42.00

Jr. Engineer Assistant Executive Engineer Executive Engineer


R.W.S. Sub Division Ganderbal R.W.S. Division Ganderbal

R.W.S. DIVISION GANDERBAL


PIPE CHART REQUIREMENT CHART FOR WATER SUPPLY SCHEME

BANJAR BASTI BELA WOUSEN


S. Particulars of Line Φ of Pipes Remarks
No. 100mm 80mm 65mm of Pipes 40mm
50mm 25mm 20mm
G.I. G.I. G.I. G.I. G.I. G.I. G.I.
1. (Rising Main) - 550 - - - - -

W–X

2. X–Y 100 - - - - - -

3. Washout for S.R etc 100 - - - - - -

4. A–B - 1600 - - - - -

5. B–C - - - 800 - - -

6. A–D - - 1500 - - - -

7. D–E - - - 700 - - -

8. Distribution System - - - - 1500 500 5000

Total 200 2150 1500 1500 1500 500 5000

Jr. Engineer Assistant Executive Engineer Executive Engineer


R.W.S. Sub Division Ganderbal R.W.S. Division Ganderbal

R.W.S. DIVISION GANDERBAL


POPULATION CHART & WATER REQUIREMENT FOR

WATER SUPPLY SCHEME BANJAR BASTI BELA WOUSEN

S. Name of Village Census Present Population Designed Population for


No. Code 2017 30years @ 3.65%
1. Forest Compartments L.E 675 1414

2. Banjar Basti Bela Wousen L.E 340 712

3. Floating Population L.E 200 200

Total 1215 Souls 2326 Souls

WATER REQUIREMENT

Total designed population : 2326Souls.

Proposed rate of water supply : 70 LPCD.

Water requirement for full day (2326 x 70) : 162820Litres/day

Add 15% for system losses : 24423Litres/day

Total Water Requirement : 187243Litres/day

Or : 41242Gallons.

Say : 0.40Lac Gallons.

Capacity of Filtration Plant = 0.04MGD (SSFP)

Existing Storage = Nil

Net Requirement = 0.04MGD

Capacity of S.R Required = 0.02MGD

Existing Storage = Nil

Net Requirement = 0.02MGD

Or 0.20Lac Gallons

Jr. Engineer Assistant Executive Engineer Executive Engineer


R.W.S. Sub Division Ganderbal R.W.S. Division Ganderbal

R.W.S. DIVISION GANDERBAL


PIPE DESIGN FOR

WATER SUPPLY SCHEME BANJAR BASTI BELA WOUSEN

Line X – Y (Gravity Main Line):

Length of Line X - Y : 100.00m

Assume  of pipe : 100mm G.I

RL at X : 171.00m

RL at Y : 168.80m

Level Difference : 2.20m

Population : 2326Souls

Water Requirement : 0.04MGD

Discharge : 40000 x 4.54

1000 x 3600 x 24

= 0.00210m3/sec

1.81
Hf : 100 x 0.00210

0.74

994.62 x (0.10)4.81

= 0.16m

Other Losses 10% = 0.016m

Total = 0.176m

.. . Residual Head at Y

(RH)Y : 2.20m – 0.176m = 2.01m

OK.

R.W.S. DIVISION GANDERBAL


Line A – B (Service Mains & Sub Mains):

Length of Line A - B : 1600.00m

Assume  of pipe : 80mm G.I

RL at A : 168.00m

RL at B : 129.60m

Level Difference : 38.40m

Population : 1331Souls

Peak Factor : 3

Discharge : 1331 x 70 x 1.15 x 3

1000 x 3600 x 24

= 0.0037m3/sec

1.81
Hf : 1600 x 0.0037

0.74

994.62 x (0.08)4.81

= 20.79m

Other Losses 10% = 2.079m

Total = 22.864m

.. . Residual Head at B

(RH)B : 38.40m – 22.869m = 15.531m

OK.

R.W.S. DIVISION GANDERBAL


Line B – C:

Length of Line B - C : 800.00m

Assume  of pipe : 50mm G.I

RL at B : 129.60m

RL at C : 106.40m

Level Difference : 23.20m

Population : 644Souls

Peak Factor : 3

Discharge : 644 x 70 x 1.15 x 3

1000 x 3600 x 24

= 0.0018m3/sec

1.81
Hf : 800 x 0.0018

0.74

994.62 x (0.05)4.81

= 27.00m

Other Losses 10% = 2.70m

Total = 29.70m

.. . Residual Head at C

(RH)C : 23.20m + 15.531 - 29.70m = 9.03m

OK.

R.W.S. DIVISION GANDERBAL


Line A – D:

Length of Line A - D : 1500.00m

Assume  of pipe : 65mm G.I

RL at A : 168.00m

RL at D : 125.50m

Level Difference : 42.50m

Population : 995Souls

Peak Factor : 3

Discharge : 995 x 70 x 1.15 x 3

1000 x 3600 x 24

= 0.0027m3/sec

1.81
Hf : 1500 x 0.0027

0.74

994.62 x (0.065)4.81

= 29.90m

Other Losses 10% = 2.99m

Total = 32.89m

.. . Residual Head at D

(RH)D : 42.50m - 32.89m = 9.61m

OK.

R.W.S. DIVISION GANDERBAL


Line D – E:

Length of Line D - E : 700.00m

Assume  of pipe : 50mm G.I

RL at D : 125.50m

RL at E : 110.50m

Level Difference : 15.00m

Population : 478Souls

Peak Factor : 3

Discharge : 478 x 70 x 1.15 x 3

1000 x 3600 x 24

= 0.00133m3/sec

1.81
Hf : 700 x 0.00133

0.74

994.62 x (0.05)4.81

= 13.70m

Other Losses 10% = 1.37m

Total = 15.07m

.. . Residual Head at E

(RH)E : 15.00m + 9.61 - 15.07m = 9.54m

OK.

Jr. Engineer Assistant Executive Engineer Executive Engineer