Professional Documents
Culture Documents
Structural Micro Plan
Structural Micro Plan
L AREA
ERECTION BALANCE ITEM WELDING STATUS BALANCE WELDING
REMARKS
Under
TIE-BEAM 285 276 96.842 9 Progress 18.08.2012 270 94.7368 15 19.08.2012 05.09.2012
VERTICAL
BRACING 113 COMPLETED
DRUM
1 SLAKER HORIZENTAL
BUILDING BRACING 11 7 63.636 4 20.08.2012 25.08.2012 7 63.6364 4 26.08.2012 27.08.2012
PLATEFORM &
HANDRAILING 1 COMPLETED
Under
FLOOR BEAM 175 160 91.429 15 Progress 26.08.2012 150 85.7143 25 U/P 30.08.2012
VERTICAL
BRACING 87 0 0 87 15.08.2012 05.09.2012 0 0 87 06.09.2012 25.09.2012
HORIZENTAL
BRACING 6 0 0 6 18.08.2012 30.08.2012 0 6 30.08.2012 12.09.2012
MONRAIL
BEAM 1 0 0 1 26.08.2012 08.09.2012 0 1 08.09.2012 15.09.2012
PLATEFORM &
HANDRAILING 2 COMPLETED
Under
FLOOR BEAM 485 440 90.722 45 Progress 25.08.2012 300 61.8557 185 25.08.2012 18.10.2012
VERTICAL
BRACING 365 330 90.411 35 27.08.2012 07.09.2012 325 89.0411 40 09.09.2012 20.10.2012
HORIZENTAL
BRACING 78 66 84.615 12 22.08.2012 26.08.2012 66 84.6154 12 23.09.2012 10.10.2012
MONRAIL Under
BEAM 1 0 0 1 Progress 30.08.2012 0 0 1 05.09.2012 10.10.2012
PLATEFORM &
HANDRAILING 9 2 22.222 7 18.08.2012 07.09.2012 1 11.1111 8 20.09.2012 20.10.2012
STAIRCASE TIE-
BEAM 165 150 90.909 15 16.09.2012 28.09.2012 150 90.9091 15 29.09.2012 31.10.2012
BRACING 127 110 86.614 17 19.09.2012 22.09.2012 110 86.6142 17 22.09.2012 25.10.2012
Under
TIE-BEAM 96 85 88.542 11 Progress 26.08.2012 45 46.875 51 27.08.2012 17.09.2012
4 DE-BAGGING
CONVEYOR PURLIN 40 16 40 24 19.08.2012 30.08.2012 10 25 30 21.08.2012 10.09.2012
PLATEFORM &
HANDRAILING 1 0 0 1 26.08.2012 30.08.2012 0 0 1 06.09.2012 25.09.2012
SAG ROD in
Mtrs 66 0 0 66 02.09.2012 04.09.2012 0 0 66 11.09.2012 14.09.2012
TIE-BEAM 76 COMPLETED
VERTICAL
BRACING 9 5 55.556 4 15.08.2012 17.08.2012 5 55.5556 4 18.08.2012 19.08.2012
HORIZENTAL
BRACING 23 16 69.565 7 18.08.2012 20.08.2012 16 69.5652 7 20.08.2012 22.08.2012
WET
5 SCRUBBER
PLATEFORM ROOF TRUSS 5 COMPLETED
PURLIN 19 COMPLETED
PLATEFORM &
HANDRAILING 1 COMPLETED
SAG ROD in
Mtrs 32 0 0 32 04.09.2012 05.09.2012 0 0 32 06.09.2012 07.09.2012
AGITATER
SUPPORT 1 COMPLETED
GRIT MILL
MENTANCE PLATEFORM &
7 PLATEFORM HANDRAILING 1 0 0 1 15.08.2012 18.08.2012 0 0 1 01.09.2012 30.09.2012
STRUCTURE STATUS OF HUD HUD
ERECTION BALANCE ITEM
TIE-BEAM
ROOF TRUSS
BRACING
1 BAGGING
PURLIN
CLADDING
PLATEFORM &
HANDRAILING
LADDERS
2 WHARFF
PLATEFORM &
HANDRAILING
ROOF TRUSS
3 WHARFF
TIE-BEAM
ROOF TRUSS
BRACING
4 WHARFF
4 WHARFF
PURLIN
CLADDING
PLATEFORM &
HANDRAILING
STRUCTURE WORK
5 BAGGING
ALUMINIUM
SHEETING
TIE-BEAM
ROOF TRUSS
BRACING
6 RMH
PURLIN
CLADDING
PLATEFORM &
HANDRAILING
LADDERS
BLASTING
8 WHARFF
PAINTING
INSPECTION
OLD BELT REMOVAL
9 WHARFF
NEW BELT JOINING
INSPECTION
TIE-BEAM
ROOF TRUSS
BRACING
1 BAGGING
PURLIN
CLADDING
PLATEFORM &
HANDRAILING
9 BAGGING
NEW BELT JOINING
INSPECTION
TIE-BEAM
ROOF TRUSS
BRACING
10 COMPLEX
PURLIN
CLADDING
PLATEFORM &
HANDRAILING
SAG ROD in Mtrs
US OF HUD HUD WORKS
BALANCE ITEM WELDING STATUS BALANCE WELDING
REMARKS
6 JD 1306 Conveyor structure replacement 47 MT 31-Jul-15 work has to started.Material shifted to yard.
RMH VK Engg
7 C-tr'S TGS Damaged Platform & structure replacement 2 MT 20-Jun 30-Jun PR raised Ladder work in progress .
Complex Divya Engg
8 Wharf JD 1330 Conveyor structure Painting DV Ramana &sons Mar-15 31-Jul-15 Cherry picker needed for job for JD1330 conveyor
9 JD 1330 Conveyor belt Repalcement 200 mtrs 31-Jul-15 200 mtr belts received 1.Belt replacement will be done only after finishing JD
Wharf 1330 structural work
10 JD 1456 Conveyor structure replacement 12 MT 31-Jul-15 PR to be raised OFFERS TO BE RECEIVED
Bagging
11 JD 1456 Conveyor Belt replacement 31-Aug-15 PO NO.80386253 (19-06-15) Expected delivery date (03-08-15)
Bagging
12 JD 1315A Conveyor Damaged structure replacement 30-Jun-15 PR to be raised OFFERS TO BE RECEIVED
Complex
13 IAT , FAT, DT Tower Gratings Replacement PR to be raised Mtrl requirment to be prepaired.
SAP-1
Old conveyor structure ,Deck plates, frames & rollers removal
new structure channels , deck plates, and angles drawn from stores
cutting & fabrication shifting for sand blasting & painting
erection of channels at site and vertical angles welding & deck plates
frames fixing , rollers fixing , complete bolting & welding
dismantaling ,fabrication & renewal of head drum structure ,drive
snub base supported structure
house keeping under contractor area