Block Diagram 3

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

The wind tunnel and the fan was assembled as shown in figure 1.

The fan was inserted into outlet nozzle so that air was drawn through the wind tunnel
during the experiment.

A clearance was ensured approximately 1m in front of suction nozzle and behind the
fan so that the air can be drawn into the wind tunnel without any turbulence.

The smoothing screen was mounted on the inlet.

With the help of 4 screws, the Bernoulli ramp was secured underneath the Plexiglas
canopy so that the ramp the height increases in direction of flow.

The sealing strip was mounted.

The pressure guided carefully, bent section first, through the foam rubber seal of the
sealing strip and secured it to measuring trolley.

The probe was pushed down fully to the stop so that it reached a position approximately
2 cm higher than the highest point of the ramp.
The total pressure probe by means of a hose was connected to the right hose nipple of
the precision manometer.

You might also like