L [JOB SAFETY ANALYSIS (JSA) RECORD SHEET 1
[Project Tite West Pler Roof Replacement for BLOG # 16,16, AND 6
asi ‘esarment ‘ae CSEROTT
RT Marine West Pier | marine Department ee
oO
| vcs:
‘hision TURE BRE
DESCRIPTION OF ACTH;
Remoung esting Root mate
ra
ee ewes] foe
nse amas | aaah
a
‘SAUDI ARANICO CONSTRUCTION SAFETY MANUAL AND GENERAL INSTRUCTION (3)
| Perzonal Protectv
ment Requred: Hard hat, Safety glass, Gloves Resplator, Cover All, Full body harness
fied under REGUIRED WAZARD CONTROLS:
Horizontal ie ne
ay221. Falling ying of meal during lading
duos! Transportation
TOWORKSITE
2 Overspeed diving
Supervisor
3. Hand and boy inres
st
Supervisor
eeping though out the work and
seqepate the materials
2/2DHAFER M, AL ZLAIQ & PARTNERS GEN, CONT. CO.
Slip Tp
Dono block the iss alk way
omngscey Ell
Uneven Ground
> Check the conion of the ground / surfice before
op ground or suices
‘oul make acide ice.
sie
Supenisoe
Colson with ther Vehicles during
‘ransporaton
Siicly Telow We Soudl Arabian Trae eles and
> Divers should panicipute and won th DIPY DBP Road
Test and should have Approved Driver Cand while
ving inside Saul Aramco premises,
> Divers should keep the comset numbers of is
Use signal man if neces
site
‘Superinor