Outstanding Cable Work List

System Code
Related ITR KIPP-SCT-ITR-xxx-G0234

Work title Item No. Item discription


Cable pulling 11HAD50X901 PREFABRICATED CABLE
Method Statement & Risk Assessme

Action MS/RA No.

Common J1-SCT-WMS-L00-0001
Common J1-SCT-WMS-L00-0002
Common J1-SCT-WMS-L00-0003
Common J1-SCT-WMS-L00-0004

FAT ITP Submission P

Action FAT ITP No.

ETI J1-SCT-ITP-L00-0001
ETI J1-SCT-ITP-L00-0002
ETI J1-SCT-ITP-L00-0003
ETI J1-SCT-ITP-L00-0004
ETI J1-SCT-ITP-L00-0005
ETI J1-SCT-ITP-L00-0006
BBS J1-SCT-ITP-L00-0007
BBS J1-SCT-ITP-L00-0008
BBS J1-SCT-ITP-L00-0009
BBS J1-SCT-ITP-L00-0010
BBS J1-SCT-ITP-L00-0011
BBS J1-SCT-ITP-L00-0012

ITP Submission Pla


next by
FAT ITP
Action ITP No.

Common J1-SCT-ITP-L00-0013
Common J1-SCT-ITP-L00-0014
Common J1-SCT-ITP-L00-0015
Common J1-SCT-ITP-L00-0016
Method Statement & Risk Assessment Submission Plan
Submission
Title Rev No.
Plan Actual
Transmission Line Foundation Work A
Transmission Line Tower Erection Work A 20/07/19
Transmission Line Strining Work A 20/08/19
Transmission Line Final Check & Commissioning A 20/04/20

FAT ITP Submission Plan


Submission
Title Rev No.can be changed
-Title
Planof FAT
-Total amount Actual
ITP can be discussed and
ITP for Transmission Line Tower Manufacturing (Section 1) adjusted
A
ITP for Transmission Line Conductor (Section 1) A
ITP for Transmission Line Shieldwire (Section 1) A
ITP for Transmission Line OPGW Cable (Section 1) A
ITP for Transmission Line Insulator (Section 1) A
ITP for Transmission Line Fitting & Accessories (Section 1) A
ITP for Transmission Line Tower Manufacturing (Section 2) A 24/5/19
ITP for Transmission Line Conductor (Section 2) A 24/5/19
ITP for Transmission Line Shieldwire (Section 2) A 24/5/19
ITP for Transmission Line OPGW Cable (Section 2) A 24/5/19
ITP for Transmission Line Insulator (Section 2) A 24/5/19
ITP for Transmission Line Fitting & Accessories (Section 2) A 24/5/19

ITP Submission Plan


next by
FAT ITP According
Submission
to
Title Rev No.
MS/RA
Plan Actual
ITP for Transmission Line Foundation Work A 24/5/19
ITP for Transmission Line Tower Erection Work A 20/07/19
ITP for Transmission Line Strining Work A 20/08/19
ITP for Transmission Line Final Check & Commissioning A 20/04/20
mission Plan
Submission
Remark Rev No.
Plan Actual
ITP shall be prepared seperately by Rev.B B 24/5/19

anged Remark
of FAT ITP can be discussed and

ETI : AS

BBS : GS

Remark
Remark