GAS Flow: Section Z1-Z1
GAS Flow: Section Z1-Z1
TOLERANCES UNLESS
OTHERWISE STATED
MACHINING ±0.5mm
ANGULAR ±1°
Z1 2 Ø +0.8mm / - 0.0mm
REFER TO BALTEC STANDARD
4 TOLERANCES DOC xxxx-90-0201_05
FOR ADDITIONAL TOLERANCES
60 60 4
4
2
54 54 Z1 6 60
VERTICAL LINE
9 4 4
ONLY
150
150
4 1
C
10 TYP. C
1559 60
17 7 53 3
SECTION Z1-Z1
7 7
55
1554 4 60
GAS 32 7 1
51 47 2
FLOW
GAS PATH
7 7
3050
q
TYP.
150
16 55
B B
7
7 7
17 SECTION Z2-Z2
10 Z2 15 Z2
50 1550
11 11 11 11
A SECTION Z-Z A
THIS DRAWING AND ALL INFORMATION HEREIN IS THE BALTEC INLET & EXHAUST SYSTEMS Pty Ltd DRAWN
PROPERTY OF BALTEC INLET & EXHAUST SYSTEMS
PTY LTD AND MUST NOT BE MADE PUBLIC
Suite 1.01, 10 Ferntree Place, Notting Hill A.S. 28/06/2018 FRAME CLADDING WALL
OR COPIED OR USED IN ANY WAY DETRIMENTAL TO OUR VIC 3186, Melbourne, Australia CHECKED
INTEREST. PH+61-3-9763 6711 FAX+61-3-9763 6799
UNLESS FURNISHED UNDER CONTRACT PROVISIONS, web: www.baltecies.com.au K.C. 21/08/2018 32m SGT-800 Bypass, Arroyo Seco Argentina, Vogt Power
THIS DRAWING IS LOANED SUBJECT TO RETURN UPON APPROVED
DEMAND.
NO COPIES ARE TO BE MADE WITHOUT THE WRITTEN F.E. 21/08/2018 SECTION & DETAIL
PERMISSION OF BALTEC INLET & EXHAUST SYSTEMS PROJECT NO. DWG NO. REV
PTY LTD.
9009 A3 9009-13-1500 SHT 3 OF 32 4